CN108705052A - The continuous casting producing method of bloom pinion steel strand - Google Patents
The continuous casting producing method of bloom pinion steel strand Download PDFInfo
- Publication number
- CN108705052A CN108705052A CN201810700707.1A CN201810700707A CN108705052A CN 108705052 A CN108705052 A CN 108705052A CN 201810700707 A CN201810700707 A CN 201810700707A CN 108705052 A CN108705052 A CN 108705052A
- Authority
- CN
- China
- Prior art keywords
- bloom
- steel
- continuous casting
- crystallizer
- pinion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/04—Continuous casting of metals, i.e. casting in indefinite lengths into open-ended moulds
- B22D11/0406—Moulds with special profile
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/04—Continuous casting of metals, i.e. casting in indefinite lengths into open-ended moulds
- B22D11/055—Cooling the moulds
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/10—Supplying or treating molten metal
- B22D11/11—Treating the molten metal
- B22D11/114—Treating the molten metal by using agitating or vibrating means
- B22D11/115—Treating the molten metal by using agitating or vibrating means by using magnetic fields
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/12—Accessories for subsequent treating or working cast stock in situ
- B22D11/122—Accessories for subsequent treating or working cast stock in situ using magnetic fields
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/16—Controlling or regulating processes or operations
- B22D11/18—Controlling or regulating processes or operations for pouring
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/16—Controlling or regulating processes or operations
- B22D11/22—Controlling or regulating processes or operations for cooling cast stock or mould
- B22D11/225—Controlling or regulating processes or operations for cooling cast stock or mould for secondary cooling
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Continuous Casting (AREA)
Abstract
The present invention relates to a kind of continuous casting producing methods of bloom pinion steel strand, are suitable for 360mm × 450mm section bloom pinion steel strands, belong to bloom pinion steel production technical field.The present invention is on the basis of M-EMS, electromagnetic agitation equipment is additionally arranged between two cold-zones and solidification end, and the installation site and running parameter of the two are rationally designed, in conjunction with control cast superheat of liquid steel, poring rate, cooling parameter etc., the compactness and homogenieity of bloom gear steel continuous casting billet are improved, in addition, passing through the fillet parameter designing to tube type mold, optimize the cooling of strand corner, improves the control of strand corner defect.By the improvement to cooling water channel, to ensure uniformity of conducting heat so that crystallizer exit casting blank shell thickness is uniform.Present invention can ensure that bloom gear steel continuous casting billet comprehensive quality high level controls.
Description
Technical field
The present invention relates to a kind of continuous casting producing methods of bloom pinion steel strand, and it is big to be suitable for 360mm × 450mm sections
Square billet pinion steel strand belongs to bloom pinion steel production technical field.
Background technology
Gear is important power and transmits mechanical component, and different operating modes, its stressing conditions of the gear of different parts are different, lose
Effect pattern can also have different degrees of difference, and by gear material, processing technology, lubrication circumstances, frictional force and gear
The influence of the factors such as geometry parameter and load modes.Its dominant failure mode has:Tooth caused by tooth root fracture, flank of tooth recess
Facial contour deformation, fatigue flake, abrasion are divided into adhesion wear and abrasive wear etc..It is right according to above-mentioned main failure mode
The performance requirement of pinion steel is that high conquassation drag and the good impact resistance ability of anti-spot corrosion peel-ability and bending resistance rush ability.It closes
Suitable quenching degree and case depth and the good processing performance of centre hardness and machinability and deformation and dimensionally stable
Property.Automobile gear has the function of that power transmits and change speed, is a big important representative of gear.Gear making with steel not only
There are good obdurability, wearability, can absorb impact, be bent and contact stress well, but also require to deform small.In tooth
In the manufacturing process of wheel, except requiring reasonably to design and machining is outer, also to carry out carburizing and quenching or it is quenched etc. be heat-treated, make it
Surface hardened layer is wear-resisting, matrix shock resistance.And the quality of Gear Processing blank then largely determines the effect of Gear Production
Rate and quality control.
With the continuous development of continuous casting technology, slab quality control technology level is continuously improved.Domestic automobile at present
Based on the production of gear blank is mainly produced with continuous small-billet casting, with the continuous improvement that gear quality requires, gear steel blank
Compactness, the requirement also higher of homogenieity.For small billet, bloom pinion steel strand rolling reduction bigger is high
The bloom of quality promotes advantageously the compactness and homogenieity of gear product.But the high quality of production of bloom continuous casting
There are certain technical difficulty, and strand center portion setting time first is long, and liquid core length increases, and the feeding of solidification latter stage is difficult, strand
Center segregation seriousness promoted, strand corner quality to subsequently solidify differentiation influence increase, this need to continuous cast mold,
Interference control is given in intensity of secondary cooling and casting blank solidification differentiation.Both at home and abroad have some scholars to bloom slab quality control equipment and
Technology has carried out corresponding research, mainly for bloom Properties of Heavy Rail Steel and small billet pinion steel, and for 360mm × 450mm sections
The research of bloom pinion steel slab quality control, has no substantially.
Such as:
CN107262689A discloses convex sufficient roll structure and soft reduction process, especially one kind under a kind of bloom two is cold-pressed and relates to
And convex sufficient roll structure and soft reduction process under the cold pressing of bloom two of technical field of ferrous metallurgy.Under the bloom two of the present invention is cold-pressed
Convex foot roll structure, including sufficient roller and sufficient roller under pressure area in area are depressed, it is described to depress sufficient roller sufficient roller in pressure area under area
Lower section is provided with boss in the pressure area in the middle part of sufficient roller, sufficient roller middle part is provided with boss, the pressure area under the pressure area
The boss of lower foot roller is longer than the boss of sufficient roller in pressure area.The lower area's soft reduction process of the cold pressing of bloom two of the present invention, setting are multigroup
It depresses sufficient roller in area and depresses sufficient roller under area, the drafts of sufficient roller gradually increases in throwing direction in the pressure area.The application
It can effectively solve the problems, such as bloom continuous casting base center segregation and center porosity.But it is generous for 360mm × 450mm sections
Some crucial particular contents of base pinion steel slab quality control are not directed to.
CN106735013A discloses a kind of continuous casting process improving bloom quality of primary blank, this is simple for process, changes
It is kind to open the contact for pouring molten steel with copper plate of crystallizer, increase lubrication, prevent angle seam and scrape steel phenomenon, effectively avoids opening base surface of gravying with meat or vegetables poured over rice or noodles and lack
It falls into, ensures excellent bloom quality of primary blank, while also improving the service life of copper plate of crystallizer.It is characterized in that including following
Step:(1) casting machine starts the preceding 40 ± 5min of cast, lubrication of crystallizer agent is smeared on crystallizer copper wall, and fill, especially tied
Brilliant device corner;Mode is smeared in the lubrication of crystallizer agent:It is uniformly smeared using roller, primary to smear, natural wind
Dry 5 ± 1min, then carries out secondary smearing, and other preparations opened and pour preceding routine are carried out after natural air drying;(2) casting process
In, open when pouring filled graphite at copper plate of crystallizer angle seam, control stopper open degree is 30~45% when cast, and steel stream is normally to pour
The 40~60% of casting, after the operation, other open of normal control pours work, to starting to walk, pulling rate stabilization in 0.45m/min or
0.48m/min.But for the specific interior of some keys of 360mm × 450mm section bloom pinion steel slab qualities control
Appearance is not directed to.
CN107225148A disclose it is a kind of providing a kind of milling method of 22CrMoH pinion steels, by cogging temperature
The adjusting of degree, final rolling temperature, finishing temperature, pass deformation, the cold technique of control, can effectively reduce the length/width ratio of MnS field trashes,
The austenite structure that state is organized as flattening is rolled according to the pinion steel that the method obtains, precipitate size is 20~25nm, is precipitated
It is 0.31~0.38% to measure weight fraction;After heat treatment, austenite grain size is 5~7 μm, impact of collision toughness ratio approach
In 1.It is characterized in that the milling method includes the following steps:(1) the heated stove heat of continuous casting billet, goes through high-pressure water descaling
Except iron scale;(2) continuous casting billet after dephosphorization carries out cogging and obtains bloom;(3) bloom is rolled into Continuous mill train;(4) go out
Water mist cooling is carried out after Continuous mill train;(5) enter slow cooling bed after water mist cooling and carry out slow cooling;(6) enter burial pit and carry out slow cooling;
(7) air-cooled, it can be obtained hot rolling 22CrMoH gear round steel.But for 360mm × 450mm section bloom pinion steel strands
The crucial particular content of some of quality control is not directed to.
CN106967931A discloses a kind of 20Cr2Ni4 pinion steels and its production technology, which uses
20Cr2Ni4 is made, and the mass percentage of Mo is in 20Cr2Ni4:0.15~0.30%.Its production technology include dispensing,
Electric arc furnace smelting, refining furnace are smelted, and molten steel melts in arc furnace smelting procedure, and temperature reaches 1570~1590 DEG C, and sampling carries out
Detection and analysis, make the mass percentage of Mo reach 0.15~0.30%;In refining furnace smelting process, temperature reaches 1570~
1590 DEG C, sampling is detected analysis, and the mass percentage of Mo is made to reach 0.15~0.30%.The present invention reduces to be mingled in steel
Object reduces H, O, N gas content in steel, reduces harmful element P, S, As, Sn in steel, appropriate Mo is added, and can improve steel use
In components such as large gear, axis, in quenching degree, heat resistance, crystal grain thinning, the improved combination properties such as hardness of steel are improved.Its feature
It is, the mass percentage of Mo is in 20Cr2Ni4:0.15~0.30%.But it is generous for 360mm × 450mm sections
Some crucial particular contents of base pinion steel slab quality control are not directed to.
CN106566998A discloses a kind of manufacturing method of CrMo systems gear round steel, it is characterised in that its component is by weight
Percentage is:C:0.22%~0.27%, Si:0.03%~0.12%, Mn:1.20~1.45%, S≤0.020%, P≤
0.020%, Cr:0.30%~0.60%, Mo:≤ 0.20%, Al:0.015~0.040%, Ni≤0.10%, O≤15 × 10
~6%, remainder is Fe and inevitable impurity.A classes and type impurity≤1.5 grade D, the B classes and C classes of round steel wherein obtained
Field trash≤1.0 grade, round steel hardenability:J5mm is 42~50HRC, and J9mm is 38~46HRC, and J15mm is 32~40HRC.
It change it is traditional improve the technical thought of the quenching degree of steel by adding the alloying elements such as a large amount of addition Cr, Ni, Mo, pass through
C, Mn content are properly increased, Mo contents and Cr contents is greatly lowered, replaces Ni alloys, is not dropped in the quenching degree for ensuring pinion steel
Under the premise of low, the production cost of product is considerably reduced, improves the competitiveness of product.But for 360mm ×
Some crucial particular contents of 450mm section bloom pinion steel slab qualities control are not directed to.
Invention content
The technical problem to be solved by the present invention is to:A kind of continuous casting producing method of bloom pinion steel strand is provided, is fitted
For 360mm × 450mm section blooms, bloom gear steel continuous casting billet compactness, homogenieity can be promoted, it is ensured that bloom tooth
Take turns the control of steel continuous casting billet comprehensive quality high level.
The technical solution adopted in the present invention is to solve above-mentioned technical problem:
(1) tube type mold is used, the corner fillet size of tube type mold is R20mm, can optimize strand corner in this way
It is cooling, improve the control of strand corner defect;Cooling water channel is two into two times, and there are two water inlet and two water outlets for tool, simultaneously
DN250 regulating valves are installed at water inlet position, realize accurately controlling for crystallizer intensity of cooling;The work of the cooling water of crystallizer
Skill state modulator is water flow 3150L/min~3350L/min, and hydraulic pressure 0.80MPa~0.90MPa ensures the casting of crystallizer exit
The thickness and uniformity of base green shell, shell thickness size are preferably controlled in 16mm~20mm.
(2) M-EMS is that the low level in crystallizer exit is installed, and M-EMS equips cover height
For 350mm, lower end is flushed with mouth under crystallizer;M-EMS true field gaussian intensity is measured, magnetic is stirred with practical
Field gaussian intensity is that 280 ± 15Gs is stirred electric current setting, stir current frequency 2.4Hz;
(3) electromagnetic agitation equipment is installed between two cold-zones and solidification end, electromagnetic agitation equipment installation site is
The region that linear ratio is 0.45~0.47 is solidified, specially apart from the sections crystallizer molten steel surface 10.0m~11.0m;Actual measurement stirring
Magnetic field gaussian intensity is that 200 ± 25Gs is stirred current strength setting by true field gaussian intensity, and stir current frequency is
7.0Hz;
(4) Water Rate for Secondary Cooling Water presses 0.301Lkg-1 Steel~0.323Lkg-1 SteelIt is configured;
Furthermore, it is necessary to which middle Baogang's liquid has certain degree of superheat to meet casting demand.The 1st heat cast is wrapped for middle,
Superheat of liquid steel control is poured into a mould at 25 DEG C~45 DEG C;For 2~N heats of middle packet casting, cast superheat of liquid steel control exists
15 DEG C~35 DEG C;
Casting speed control can according to target pulling rate 0.50m/min constant speed be poured into a mould in 0.45m/min~0.55m/min.
The beneficial effects of the invention are as follows:On the basis of M-EMS, increase between two cold-zones and solidification end
If electromagnetic agitation equipment, and the installation site and running parameter of the two rationally designed, pour into a mould steel in conjunction with control
The liquid degree of superheat, poring rate, cooling parameter etc. improve the compactness and homogenieity of bloom gear steel continuous casting billet, in addition, logical
The fillet parameter designing to tube type mold is crossed, the cooling of optimization strand corner improves the control of strand corner defect.By to cold
But the improvement in water route, to ensure uniformity of conducting heat so that crystallizer exit casting blank shell thickness is uniform.Present invention can ensure that big
Square billet gear steel continuous casting billet comprehensive quality high level controls.
Specific implementation mode
With reference to embodiment, the invention will be further described.
In embodiment, the electromagnetic agitation equipment installed between two cold-zones and solidification end, referred to as " between two cold and solidifications
End electromagnetic agitation " (S~F-EMS).
Embodiment 1
The embodiment is certain steel mill method production 360mm × 450mm section 20CrMnTiH series teeth using the present invention
Take turns steel continuous casting blooms.The present invention specific implementation mode be:Using tube type mold, corner fillet size is R20mm;Design
Tube type mold water route is two into two times, ensures heat transfer uniformity;It is 3150L/min~3350L/ that crystallizer, which is equipped with cooling water inflow,
Min, hydraulic pressure 0.80MPa~0.90MPa fine-tune crystallizer cooling water using DN250 regulating valves;M-EMS is
The low level in crystallizer exit is installed, and M-EMS equips cover height 350mm, and lower end is flushed with mouth under crystallizer;
M-EMS true field 280 ± 15Gs of gaussian intensity, stir current are set as 490A~510A, stir current frequency
2.4Hz.Installation " between two cold and solidification end electromagnetic agitations " position (S~F-EMS) is that solidification linear ratio is 0.45~0.47
Region, specially apart from the sections crystallizer molten steel surface 10.0m~11.0m, stirring magnetic field gaussian intensity is 200 ± 25Gs, is stirred
It is 210A~220A to mix current strength, and stir current frequency is 7.0Hz;Water Rate for Secondary Cooling Water is 0.301Lkg-1 Steel~0.323L
kg-1 Steel。
In addition, control is at 17 DEG C~32 DEG C, the first heat of middle packet, degree of superheat control for cast superheat of liquid steel (middle packet casting)
At 25~45 DEG C;By casting speed control in 0.45m/min~0.55m/min, target pull rate 0.50m/min constant speed duration of pouring ratios
It is 91%.
Casting process Mold liquid level stabilizing, covering slag thickness distribution are uniform.Low power is carried out to continuous casting blooms
Detection;Corroded using cold sour dendrite, detection strand cross section shell thickness distribution situation, the results show that the technology was produced
20CrMnTiH Series Gears steel continuous casting blooms shell thickness is circumferentially distributed uniformly along section, and whole control is in 16mm~20mm;
Strand corner quality is good, carries out in-situ metal Scanning Detction to continuous casting billet tunneling boring, strand tunneling boring homogeneity is 0.901
~0.922, center portion consistency is 0.913~0.941, and corresponding bite low power grading center segregation, center porosity are ≤0.5
Grade, non-stop layer shrinkage cavity.
Embodiment 2
The embodiment is certain steel mill method production 360mm × 450mm section 20CrMo Series Gears using the present invention
Steel continuous casting blooms.The present invention specific implementation mode be:Using tube type mold, corner fillet size is R20mm;Design pipe
Formula crystallizer water route is two into two times, ensures heat transfer uniformity;It is 3157L/mi~3340L/ that crystallizer, which is equipped with cooling water inflow,
Min, hydraulic pressure 0.82MPa~0.87MPa fine-tune crystallizer cooling water using DN250 regulating valves;M-EMS is
The low level in crystallizer exit is installed, and M-EMS equips cover height 350mm, and lower end is flushed with mouth under crystallizer;
M-EMS true field 280 ± 5Gs of gaussian intensity, stir current are set as 491A~500A, stir current frequency
2.4Hz.Installation " between two cold and solidification end electromagnetic agitations " position (S~F-EMS) is that solidification linear ratio is 0.45~0.47
Region, specially apart from the sections crystallizer molten steel surface 10.0m~11.0m, stirring magnetic field gaussian intensity is 200 ± 25Gs, is stirred
It is 214A~218A to mix current strength, and stir current frequency is 7.0Hz;Water Rate for Secondary Cooling Water is 0.311Lkg-1 Steel~0.320L
kg-1 Steel。
In addition, control is at 16 DEG C~35 DEG C, the first heat of middle packet, degree of superheat control for cast superheat of liquid steel (middle packet casting)
At 27 DEG C~43 DEG C;By casting speed control in 0.47m/min~0.53m/min, target pull rate 0.50m/min constant speed duration of pouring ratios
Example is 95%.
Casting process Mold liquid level stabilizing, covering slag thickness distribution are uniform.Low power is carried out to continuous casting blooms
Detection;Corroded using cold sour dendrite, detection strand cross section shell thickness distribution situation, the results show that the technology was produced
20CrMnTiH Series Gears steel continuous casting blooms shell thickness is circumferentially distributed uniformly along section, whole control 17mm~
18.6mm;Strand corner quality is good, and in-situ metal Scanning Detction, strand tunneling boring homogeneity are carried out to continuous casting billet tunneling boring
It is 0.904~0.931, center portion consistency is 0.910~0.936, corresponding bite low power grading center segregation, center porosity
≤ 0.5 grade, non-stop layer shrinkage cavity.
Embodiment 3
The embodiment is certain steel mill method production 360mm × 450mm section 22CrMo Series Gears using the present invention
Steel continuous casting blooms.The present invention specific implementation mode be:Using tube type mold, corner fillet size is R20mm;Design pipe
Formula crystallizer water route is two into two times, ensures heat transfer uniformity;It is 3255L/min~3350L/ that crystallizer, which is equipped with cooling water inflow,
Min, hydraulic pressure 0.85MPa~0.90MPa fine-tune crystallizer cooling water using DN250 regulating valves;M-EMS is
The low level in crystallizer exit is installed, and M-EMS equips cover height 350mm, and lower end is flushed with mouth under crystallizer;
M-EMS true field 280 ± 10Gs of gaussian intensity, stir current are set as 495A~510A, stir current frequency
2.4Hz.Installation " between two cold and solidification end electromagnetic agitations " position (S~F-EMS) is that solidification linear ratio is 0.45~0.47
Region, specially apart from the sections crystallizer molten steel surface 10.0m~11.0m, stirring magnetic field gaussian intensity is 200 ± 25Gs, is stirred
It is 215A~220A to mix current strength, and stir current frequency is 7.0Hz;Water Rate for Secondary Cooling Water is 0.312Lkg-1 Steel~0.322L
kg-1 Steel。
In addition, control is at 15 DEG C~35 DEG C, the first heat of middle packet, degree of superheat control for cast superheat of liquid steel (middle packet casting)
At 29~45 DEG C;By casting speed control in 0.46m/min~0.55m/min, target pull rate 0.50m/min constant speed duration of pouring ratios
It is 90.3%.
Casting process Mold liquid level stabilizing, covering slag thickness distribution are uniform.Low power is carried out to continuous casting blooms
Detection;Corroded using cold sour dendrite, detection strand cross section shell thickness distribution situation, the results show that the technology was produced
20CrMnTiH Series Gears steel continuous casting blooms shell thickness is circumferentially distributed uniformly along section, whole control 17.8mm~
20mm;Strand corner quality is good, carries out in-situ metal Scanning Detction to continuous casting billet tunneling boring, strand tunneling boring homogeneity is
0.900~0.931, center portion consistency is 0.921~0.933, and corresponding bite low power grading center segregation, center porosity are equal
≤ 0.5 grade, non-stop layer shrinkage cavity.
Above-described embodiment illustrates that after technical scheme of the present invention, 360mm × 450mm section pinion steels are generous
The control of base slab quality is good, and strand corner zero-fault, shell thickness is uniformly distributed circumferentially, strand tunneling boring homogenieity compared with
Good, internal rarefaction and shrinkage cavity are effectively controlled, the high-caliber control of strand center portion consistency, and center porosity, center segregation are low
Times quality classification norm controlling is more excellent, other capability and performances are all qualified.
Claims (5)
1. the continuous casting producing method of bloom pinion steel strand, it is characterised in that:Using tube type mold, the cooling water of crystallizer
Process parameter control be water flow 3150L/min~3350L/min, hydraulic pressure 0.80MPa~0.90MPa;
M-EMS is that the low level in crystallizer exit is installed, and it is 350mm that M-EMS, which equips cover height,
Lower end is flushed with mouth under crystallizer;M-EMS true field gaussian intensity is measured, it is strong with practical stirring magnetic field Gauss
Degree is that 280 ± 15Gs is stirred electric current setting, stir current frequency 2.4Hz;
Electromagnetic agitation equipment is installed between two cold-zones and solidification end, it is that solidification is linear which, which equips installation site,
Than the region for 0.45~0.47;Actual measurement stirring magnetic field gaussian intensity is that 200 ± 25Gs is stirred by true field gaussian intensity
Current strength setting is mixed, stir current frequency is 7.0Hz;Water Rate for Secondary Cooling Water presses 0.301Lkg-1 Steel~0.323Lkg-1 SteelInto
Row setting;
For the 1st heat of middle packet casting, cast superheat of liquid steel control is at 25 DEG C~45 DEG C;For 2~N of middle packet casting
Heat, cast superheat of liquid steel control is at 15 DEG C~35 DEG C;
Casting speed control is in 0.45m/min~0.55m/min.
2. the continuous casting producing method of bloom pinion steel strand as described in claim 1, it is characterised in that:Tube type mold
Corner fillet size is R20mm.
3. the continuous casting producing method of bloom pinion steel strand as described in claim 1, it is characterised in that:Tube type mold
Cooling water channel is two into two times, and there are two water inlet and two water outlets for tool.
4. the continuous casting producing method of the bloom pinion steel strand as described in any one of claims 1 to 3, feature exist
In:Shell thickness size Control is in 16mm~20mm.
5. the continuous casting producing method of the bloom pinion steel strand as described in any one of claims 1 to 3, feature exist
In:Electromagnetic agitation equipment installation site between two cold-zones and solidification end is apart from crystallizer molten steel surface 10.0m~11.0m
Section.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810700707.1A CN108705052B (en) | 2018-06-29 | 2018-06-29 | Continuous casting production method of cogged steel billets in bloom |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810700707.1A CN108705052B (en) | 2018-06-29 | 2018-06-29 | Continuous casting production method of cogged steel billets in bloom |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108705052A true CN108705052A (en) | 2018-10-26 |
CN108705052B CN108705052B (en) | 2020-02-04 |
Family
ID=63873309
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810700707.1A Active CN108705052B (en) | 2018-06-29 | 2018-06-29 | Continuous casting production method of cogged steel billets in bloom |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108705052B (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109175279A (en) * | 2018-11-26 | 2019-01-11 | 攀钢集团攀枝花钢铁研究院有限公司 | YQ450NQR1 Yi shape steel bloom continuous casting production method |
CN109317628A (en) * | 2018-11-26 | 2019-02-12 | 攀钢集团攀枝花钢铁研究院有限公司 | YQ450NQR1 Yi shape steel bloom corner crack control method |
CN109332619A (en) * | 2018-11-26 | 2019-02-15 | 攀钢集团攀枝花钢铁研究院有限公司 | YQ450NQR1 Yi shape steel bloom green shell method of quality control |
CN109382490A (en) * | 2018-11-26 | 2019-02-26 | 攀钢集团攀枝花钢铁研究院有限公司 | YQ450NQR1 Yi shape steel bloom Methods of Surface Quality Control |
CN112151129A (en) * | 2020-09-01 | 2020-12-29 | 河钢乐亭钢铁有限公司 | Technological method for accurately setting width dimension of lower opening of continuous casting slab crystallizer |
CN113953477A (en) * | 2021-10-27 | 2022-01-21 | 张家港宏昌钢板有限公司 | Core high-density continuous casting thick plate blank and production method thereof |
CN115255304A (en) * | 2022-06-14 | 2022-11-01 | 江阴兴澄特种钢铁有限公司 | Continuous casting method for controlling macroscopic inclusions in steel |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104942252A (en) * | 2015-07-23 | 2015-09-30 | 攀钢集团攀枝花钢铁研究院有限公司 | Method for improving internal quality of heavy-rail steel blooms |
CN105215309A (en) * | 2015-11-11 | 2016-01-06 | 攀钢集团攀枝花钢铁研究院有限公司 | A kind of method that big cross section Properties of Heavy Rail Steel center segregation of casting blank controls |
CN105803149A (en) * | 2016-03-23 | 2016-07-27 | 攀钢集团攀枝花钢铁研究院有限公司 | Equiaxial crystal ratio control method for 35CrMo round pipe billet with phi 280 mm |
CN107457379A (en) * | 2017-07-26 | 2017-12-12 | 山东钢铁股份有限公司 | A kind of production method of high-carbon high-alloy bearing steel large round billet |
CN107790666A (en) * | 2017-10-27 | 2018-03-13 | 攀钢集团攀枝花钢铁研究院有限公司 | Large section Properties of Heavy Rail Steel continuous casting control method |
-
2018
- 2018-06-29 CN CN201810700707.1A patent/CN108705052B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104942252A (en) * | 2015-07-23 | 2015-09-30 | 攀钢集团攀枝花钢铁研究院有限公司 | Method for improving internal quality of heavy-rail steel blooms |
CN105215309A (en) * | 2015-11-11 | 2016-01-06 | 攀钢集团攀枝花钢铁研究院有限公司 | A kind of method that big cross section Properties of Heavy Rail Steel center segregation of casting blank controls |
CN105803149A (en) * | 2016-03-23 | 2016-07-27 | 攀钢集团攀枝花钢铁研究院有限公司 | Equiaxial crystal ratio control method for 35CrMo round pipe billet with phi 280 mm |
CN107457379A (en) * | 2017-07-26 | 2017-12-12 | 山东钢铁股份有限公司 | A kind of production method of high-carbon high-alloy bearing steel large round billet |
CN107790666A (en) * | 2017-10-27 | 2018-03-13 | 攀钢集团攀枝花钢铁研究院有限公司 | Large section Properties of Heavy Rail Steel continuous casting control method |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109175279A (en) * | 2018-11-26 | 2019-01-11 | 攀钢集团攀枝花钢铁研究院有限公司 | YQ450NQR1 Yi shape steel bloom continuous casting production method |
CN109317628A (en) * | 2018-11-26 | 2019-02-12 | 攀钢集团攀枝花钢铁研究院有限公司 | YQ450NQR1 Yi shape steel bloom corner crack control method |
CN109332619A (en) * | 2018-11-26 | 2019-02-15 | 攀钢集团攀枝花钢铁研究院有限公司 | YQ450NQR1 Yi shape steel bloom green shell method of quality control |
CN109382490A (en) * | 2018-11-26 | 2019-02-26 | 攀钢集团攀枝花钢铁研究院有限公司 | YQ450NQR1 Yi shape steel bloom Methods of Surface Quality Control |
CN112151129A (en) * | 2020-09-01 | 2020-12-29 | 河钢乐亭钢铁有限公司 | Technological method for accurately setting width dimension of lower opening of continuous casting slab crystallizer |
CN112151129B (en) * | 2020-09-01 | 2022-07-12 | 河钢乐亭钢铁有限公司 | Technological method for accurately setting width dimension of lower opening of continuous casting slab crystallizer |
CN113953477A (en) * | 2021-10-27 | 2022-01-21 | 张家港宏昌钢板有限公司 | Core high-density continuous casting thick plate blank and production method thereof |
CN115255304A (en) * | 2022-06-14 | 2022-11-01 | 江阴兴澄特种钢铁有限公司 | Continuous casting method for controlling macroscopic inclusions in steel |
CN115255304B (en) * | 2022-06-14 | 2023-10-10 | 江阴兴澄特种钢铁有限公司 | Continuous casting method for controlling macroscopic inclusion in steel |
Also Published As
Publication number | Publication date |
---|---|
CN108705052B (en) | 2020-02-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108705052A (en) | The continuous casting producing method of bloom pinion steel strand | |
CN103624084B (en) | Resource-saving type high-boron high-speed steel composite roll and manufacturing method thereof | |
CN102492894B (en) | The corrosion-resistant martensitic steel of high-dimensional stability and steel structure material preparation method thereof | |
CN100566873C (en) | A kind of straightening of kinked rail cast iron roll collar and preparation method thereof | |
CN102094148B (en) | Q460D steel for low-alloy high-strength structure of below 50mm and production method thereof | |
CN1331626C (en) | Low crack type high speed steel roll and its centrifugal casting method | |
CN105750529A (en) | High-tungsten high-abrasion-resistant high-speed steel composite roller and preparation method thereof | |
CN104451417A (en) | Production process of high-cleanliness non-quenched and tempered plastic mold thick steel plate | |
CN110093474A (en) | A kind of production technology mitigating 22CrMoH toothed wheel steel band structure | |
CN105177447A (en) | Centrifugal cast Cr12MoV shape steel straightening roll and production technology thereof | |
CN109097682A (en) | A kind of high-strength fireproof reinforcing bar and preparation method thereof | |
CN107164698B (en) | The new method for producing of corrosion-resistant built-in groove | |
CN103469102B (en) | A kind of tower hoist steel HG785D and production method | |
CN101307414A (en) | Steel for high performance manganese-containing engineering machinery wheel and method for preparing same | |
CN111945053A (en) | Method for preparing high-speed steel roller by composite modification treatment | |
CN104131238B (en) | High molding high durable Ultra-thin hot rolled steel plate and CSP production technology thereof | |
CN105312541A (en) | Improved technique and device for manufacturing nickel-chromium molybdenum alloy cast iron composite roller in forged steel roller neck | |
CN103469056B (en) | High yield ratio ordinary hot rolled steel plate and manufacture method thereof | |
CN106676380B (en) | A kind of complex alloy cast-steel lining board of grinder and preparation method thereof | |
CN108772542A (en) | The method that bloom continuous casting produces 20CrMo pinion steels | |
CN108705051A (en) | 20CrMnTiH pinion steel bloom continuous casting production methods | |
CN108687315A (en) | The method that bloom continuous casting produces 22CrMo pinion steels | |
CN106521317B (en) | A kind of manufacturing method containing acicular ferrite low-carbon Thin Strip Steel | |
CN101787484B (en) | Low-silicon cold rolled precision strip steel for copper-lead bearing steel back and production method thereof | |
CN113718161B (en) | Control method for preventing 20Ni2MoA gear steel from processing cracking |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |