CN108695892A - A kind of distribution network voltage control method adjusted based on photovoltaic DC-to-AC converter - Google Patents
A kind of distribution network voltage control method adjusted based on photovoltaic DC-to-AC converter Download PDFInfo
- Publication number
- CN108695892A CN108695892A CN201810608230.4A CN201810608230A CN108695892A CN 108695892 A CN108695892 A CN 108695892A CN 201810608230 A CN201810608230 A CN 201810608230A CN 108695892 A CN108695892 A CN 108695892A
- Authority
- CN
- China
- Prior art keywords
- inverter
- voltage
- power
- photovoltaic
- access point
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 43
- 230000009467 reduction Effects 0.000 claims abstract description 23
- 238000011217 control strategy Methods 0.000 claims abstract description 22
- 238000004364 calculation method Methods 0.000 claims description 24
- 238000012937 correction Methods 0.000 claims description 15
- 230000008569 process Effects 0.000 claims description 15
- 238000012544 monitoring process Methods 0.000 claims description 9
- 239000004576 sand Substances 0.000 claims 1
- 230000000694 effects Effects 0.000 abstract description 3
- 238000012546 transfer Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 230000035699 permeability Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
Classifications
-
- H02J3/385—
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/46—Controlling of the sharing of output between the generators, converters, or transformers
- H02J3/48—Controlling the sharing of the in-phase component
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/46—Controlling of the sharing of output between the generators, converters, or transformers
- H02J3/50—Controlling the sharing of the out-of-phase component
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
- Y02E10/56—Power conversion systems, e.g. maximum power point trackers
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Control Of Electrical Variables (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
技术领域technical field
本发明涉及光伏电站并网的电压控制技术领域,具体地说是一种基于光伏逆变器调节的配电网电压控制方法。The invention relates to the technical field of voltage control for grid-connected photovoltaic power plants, in particular to a distribution network voltage control method based on photovoltaic inverter regulation.
背景技术Background technique
光伏电站的接入对配电网的运行有很大影响,尤其是对配电网电压抬升的影响不可忽视,尤其是当光伏电站的渗透率较高时,容易发生接入点电压过高,从而造成该点电压越限的情况。目前,10kV及以下三相供电电压允许偏差为额定电压的±7%,由于外部环境对光伏出力的决定性和全天负荷需求的变化特性,根据配电线路输出功率方向和大小的不同,配电网的节点电压可能出现过高或过低的状况,而供电电压质量对配电网电气设备的性能具有较大的影响,因此对光伏电站接入点的电压控制显得尤为重要,采用简单快速有效的电压控制措施对含高渗透率光伏电站的稳定运行具有重要意义。The access of photovoltaic power plants has a great impact on the operation of the distribution network, especially the impact on the voltage rise of the distribution network cannot be ignored, especially when the penetration rate of photovoltaic power plants is high, the voltage at the access point is prone to be too high, As a result, the voltage at this point exceeds the limit. At present, the allowable deviation of the three-phase power supply voltage of 10kV and below is ±7% of the rated voltage. Due to the decisiveness of the external environment on the photovoltaic output and the changing characteristics of the load demand throughout the day, according to the direction and magnitude of the output power of the distribution line, the power distribution The node voltage of the grid may be too high or too low, and the quality of the power supply voltage has a great impact on the performance of electrical equipment in the distribution network. Therefore, it is particularly important to control the voltage at the access point of the photovoltaic power station. Simple, fast and effective The voltage control measures are of great significance to the stable operation of photovoltaic power plants with high permeability.
电压控制是配电网日常的一项重要任务,目前,文献中关于光伏电站接入点的电压的控制大多通过并联静止无功补偿器(SVC)实现的,但投入SVC不能进行连续调节并且存在当节点电压下降较大时,其无功出力下降等弊端。Voltage control is an important daily task of the distribution network. At present, the control of the voltage at the access point of the photovoltaic power station in the literature is mostly realized through a parallel static var compensator (SVC), but the input SVC cannot be continuously adjusted and there are When the node voltage drops greatly, its reactive power output will drop and other disadvantages.
因此,需要提供一种光伏电站并网的电压控制方法,来克服上述缺陷。Therefore, it is necessary to provide a voltage control method for grid-connected photovoltaic power plants to overcome the above defects.
发明内容Contents of the invention
针对现有技术的不足,本发明提出了一种基于光伏逆变器调节的配电网电压控制方法,其通过光伏逆变器进行配电网电压控制不但可以节省设备投资,并且能够充分利用逆变器容量实现对接入点的快速连续调节,能够较好的实现光伏电站接入点的电压控制。Aiming at the deficiencies of the existing technology, the present invention proposes a distribution network voltage control method based on photovoltaic inverter regulation, which can not only save equipment investment, but also make full use of the inverter to control the distribution network voltage. The capacity of the transformer can realize the rapid and continuous adjustment of the access point, which can better realize the voltage control of the access point of the photovoltaic power station.
本发明解决其技术问题采取的技术方案是:The technical scheme that the present invention solves its technical problem to take is:
一方面,本发明实施例提供的一种基于光伏逆变器调节的配电网电压控制方法包括以下步骤:On the one hand, a distribution network voltage control method based on photovoltaic inverter regulation provided by an embodiment of the present invention includes the following steps:
当节点(光伏电站接入点)电压越限且逆变器功率因数角还未达到容量限制角,进入逆变器电压控制策略的无功补偿阶段;When the node (photovoltaic power station access point) voltage exceeds the limit and the power factor angle of the inverter has not reached the capacity limit angle, enter the reactive power compensation stage of the inverter voltage control strategy;
在节点电压越限的情况下,当逆变器达到最大功率但还未达到最大功率因数角时则进入逆变器的最大功率调整阶段;When the node voltage exceeds the limit, when the inverter reaches the maximum power but has not yet reached the maximum power factor angle, it enters the maximum power adjustment stage of the inverter;
在节点电压越限的情况下,若逆变器已经达到最大功率因数角,则在逆变器保持在最大功率因数角的状态下进入逆变器的功率缩减阶段。In the case that the node voltage exceeds the limit, if the inverter has reached the maximum power factor angle, enter the power reduction stage of the inverter when the inverter remains at the maximum power factor angle.
作为本实施例一种可能的实现方式,所述进入逆变器电压控制策略的无功补偿阶段的过程包括以下步骤:As a possible implementation of this embodiment, the process of entering the reactive power compensation stage of the inverter voltage control strategy includes the following steps:
当光伏电站接入点电压Uk超过限制电压Uk,lim且逆变器功率S未达到最大,则进入逆变器的无功补偿阶段;When the voltage U k of the access point of the photovoltaic power station exceeds the limit voltage U k,lim and the power S of the inverter does not reach the maximum, it enters the reactive power compensation stage of the inverter;
在逆变器的无功补偿阶段中,光伏逆变器所需发出的无功功率QPV,b采用下式计算:In the reactive power compensation stage of the inverter, the reactive power Q PV,b required to be emitted by the photovoltaic inverter is calculated by the following formula:
其中, 为光伏电站接入点到主变压器低压母线路径的电抗值;in, is the reactance value of the path from the access point of the photovoltaic power station to the low-voltage busbar of the main transformer;
通过调整逆变器功率因数角投入QPV,b的无功功率,此时光伏接入点k的节点电压记为Uk,b;By adjusting the power factor angle of the inverter, the reactive power of Q PV,b is input, and the node voltage of the photovoltaic access point k is recorded as U k,b at this time;
根据逆变器的无功功率补偿后的节点电压Uk,b对逆变器所输出的无功功率QPV,b采用下式进行修正:According to the node voltage U k,b after reactive power compensation of the inverter, the reactive power Q PV,b output by the inverter is corrected by the following formula:
QPV=QPV,b+ΔQPV,b Q PV = Q PV,b +ΔQ PV,b
其中,ΔQPV,b为逆变器无功补偿阶段的无功功率修正量,其计算公式如下:Among them, ΔQ PV,b is the reactive power correction amount in the reactive power compensation stage of the inverter, and its calculation formula is as follows:
作为本实施例一种可能的实现方式,所述进入逆变器的最大功率调整阶段的过程包括以下步骤:As a possible implementation of this embodiment, the process of entering the maximum power adjustment phase of the inverter includes the following steps:
在逆变器功率S达到其最大容量Smax但还未到达最大功率因数角θmax时,光伏电站接入点电压依旧越限,记光伏电站接入点的电压为Uk,l,并转入逆变器的最大功率调整阶段;When the power S of the inverter reaches its maximum capacity S max but has not yet reached the maximum power factor angle θ max , the voltage at the access point of the photovoltaic power station still exceeds the limit, record the voltage at the access point of the photovoltaic power station as U k,l , and switch to Enter the maximum power adjustment stage of the inverter;
在逆变器的最大功率调整阶段中,光伏逆变器所需发出的有功功率PPV,t采用下式计算:In the maximum power adjustment phase of the inverter, the active power P PV,t required to be emitted by the photovoltaic inverter is calculated by the following formula:
其中 和分别为光伏电站接入点到主变压器低压母线路径的电阻值和电抗值;in and Respectively, the resistance value and reactance value of the path from the access point of the photovoltaic power station to the low-voltage busbar of the main transformer;
调整逆变器投入PPV,t的有功功率,此时光伏接入点k的节点电压记为Uk,t;Adjust the active power that the inverter puts into PP PV, t , at this time, the node voltage of the photovoltaic access point k is recorded as U k,t ;
根据逆变器的最大功率调整阶段后的节点电压Uk,t对逆变器所输出的有功功率PPV,t采用下式进行修正:According to the node voltage U k,t after the maximum power adjustment stage of the inverter, the active power PP PV,t output by the inverter is corrected by the following formula:
PPV=PPV,t+ΔPPV,t P PV =P PV,t +ΔP PV,t
其中,ΔPPV,t为逆变器最大功率调整阶段的有功功率修正量,其计算公式如下:Among them, ΔP PV,t is the active power correction amount in the inverter maximum power adjustment stage, and its calculation formula is as follows:
作为本实施例一种可能的实现方式,所述进入逆变器的最大功率调整阶段的过程包括以下步骤:As a possible implementation of this embodiment, the process of entering the maximum power adjustment phase of the inverter includes the following steps:
在逆变器功率因数角θ达到最大值θmax时,光伏电站接入点电压依旧越限,记此时光伏电站接入点的电压为Uk,m,并转入逆变器的功率缩减阶段;When the inverter power factor angle θ reaches the maximum value θ max , the voltage of the access point of the photovoltaic power station is still beyond the limit, record the voltage of the access point of the photovoltaic power station at this time as U k,m , and transfer to the power reduction of the inverter stage;
在逆变器的功率缩减阶段中,光伏逆变器所需发出的有功功率PPV,s采用下式计算:In the power reduction stage of the inverter, the active power PP PV,s required to be emitted by the photovoltaic inverter is calculated by the following formula:
其中,和分别为光伏电站接入点到主变压器低压母线路径的电阻值和电抗值;in, and Respectively, the resistance value and reactance value of the path from the access point of the photovoltaic power station to the low-voltage busbar of the main transformer;
调整逆变器输出的有功功率PPV,s,记此时光伏电站接入点k的节点电压为Uk,s;Adjust the active power PP PV,s output by the inverter, and record the node voltage of the photovoltaic power plant access point k at this time as U k,s ;
根据逆变器功率缩减阶段后的节点电压Uk,s对逆变器所输出的有功功率PPV,s采用下式进行修正:According to the node voltage U k,s after the inverter power reduction stage, the active power PP PV,s output by the inverter is corrected by the following formula:
PPV=PPV,s+ΔPPV,s P PV =P PV,s +ΔP PV,s
其中,ΔPPV,s为逆变器最大功率调整阶段中的有功功率修正量,其计算公式如下:Among them, ΔP PV,s is the active power correction amount in the inverter maximum power adjustment stage, and its calculation formula is as follows:
第二方面,本发明实施例提供的一种基于光伏逆变器调节的配电网电压控制方法,在进入逆变器电压控制策略的无功补偿阶段之前,还包括以下步骤:In the second aspect, a distribution network voltage control method based on photovoltaic inverter regulation provided by an embodiment of the present invention further includes the following steps before entering the reactive power compensation stage of the inverter voltage control strategy:
设置光伏电站接入点的目标电压限值和逆变器容量,并且对逆变器的功率、功率因数角和节点电压进行监测。Set the target voltage limit and inverter capacity of the access point of the photovoltaic power station, and monitor the power, power factor angle and node voltage of the inverter.
作为本实施例一种可能的实现方式,所述对逆变器的功率、功率因数角和节点电压进行监测的过程包括以下步骤:As a possible implementation of this embodiment, the process of monitoring the power, power factor angle and node voltage of the inverter includes the following steps:
设置光伏电站节点的限制电压Uk,lim,光伏逆变器的最大功率Smax和最大功率因数角θmax;Set the limit voltage U k,lim of the photovoltaic power station node, the maximum power S max and the maximum power factor angle θ max of the photovoltaic inverter;
实时监测光伏电站接入点电压Uk和主变压器低压母线的电压U0、逆变器功率S和功率因数角θ;Real-time monitoring of the voltage U k of the access point of the photovoltaic power station, the voltage U 0 of the low-voltage bus of the main transformer, the power S of the inverter, and the angle θ of the power factor;
计算光伏电站接入点到主变压器低压母线路径的电阻值和电抗值 Calculate the resistance value of the path from the access point of the photovoltaic power station to the low-voltage busbar of the main transformer and reactance value
第三方面,本发明实施例提供的一种基于光伏逆变器调节的配电网电压控制方法,在进入逆变器的最大功率调整阶段之后,还包括以下步骤:In the third aspect, a distribution network voltage control method based on photovoltaic inverter regulation provided by an embodiment of the present invention further includes the following steps after entering the maximum power adjustment stage of the inverter:
经过执行逆变器电压调整策略后,继续对节点电压进行监测,形成闭环控制。After implementing the inverter voltage adjustment strategy, continue to monitor the node voltage to form a closed-loop control.
作为本实施例一种可能的实现方式,所述继续对节点电压进行监测形成闭环控制的过程包括以下步骤:As a possible implementation of this embodiment, the process of continuing to monitor the node voltage to form a closed-loop control includes the following steps:
经过光伏电站逆变器的电压控制策略调整后,光伏电站接入点的电压稳定在限制电压Uk,lim;After the voltage control strategy adjustment of the inverter of the photovoltaic power station, the voltage of the access point of the photovoltaic power station is stabilized at the limit voltage U k,lim ;
继续监测光伏电站接入点电压Uk和主变压器低压母线的电压U0、逆变器功率S和功率因数角θ,形成闭环控制。Continue to monitor the voltage U k of the access point of the photovoltaic power station, the voltage U 0 of the low-voltage bus of the main transformer, the inverter power S and the power factor angle θ to form a closed-loop control.
本发明实施例的技术方案可以具有的有益效果如下:The beneficial effects that the technical solutions of the embodiments of the present invention may have are as follows:
为简便有效地实现对光伏电站接入点的电压控制,本发明实施例技术方案提出的电压控制策略根据逆变器的不同运行状态分为三个阶段,在不同运行阶段中通过调整光伏逆变器的有功/无功功率进行电压调整;采用的有功/无功功率计算方法仅与光伏电站接入点的电压、线路阻抗值和逆变器功率因数角有关,且皆为线性公式,计算量少。In order to easily and effectively realize the voltage control of the access point of the photovoltaic power station, the voltage control strategy proposed by the technical solution of the embodiment of the present invention is divided into three stages according to the different operating states of the inverter. The active/reactive power of the inverter is used to adjust the voltage; the active/reactive power calculation method adopted is only related to the voltage of the photovoltaic power plant access point, the line impedance value and the inverter power factor angle, and all of them are linear formulas. few.
本发明实施例技术方案首先针对光伏电站接入点的越限电压估算并调整逆变器的有功/无功功率,然后根据调整后的电压对逆变器的有功/无功功率进行修正。该方法计算简便、不涉及复杂的数学计算、无需获取配电网系统的负荷分布情况、计算结果精度高,可以准确控制光伏电站接入点的电压幅值,具有较强的工程实用价值。The technical solution of the embodiment of the present invention first estimates and adjusts the active/reactive power of the inverter according to the over-limit voltage of the access point of the photovoltaic power station, and then corrects the active/reactive power of the inverter according to the adjusted voltage. This method is simple to calculate, does not involve complex mathematical calculations, does not need to obtain the load distribution of the distribution network system, and has high calculation accuracy. It can accurately control the voltage amplitude of the photovoltaic power station access point, and has strong engineering practical value.
本发明实施例技术方案通过光伏逆变器进行配电网电压控制不但可以节省设备投资,并且能够充分利用逆变器容量实现对接入点的快速连续调节,能够较好的实现光伏电站接入点的电压控制,无需通信获取馈线负荷水平和分布情况,并且能够充分利用逆变器容量进行快速电压调整,具有良好的控制效果和经济性。The technical scheme of the embodiment of the present invention uses the photovoltaic inverter to control the voltage of the distribution network, which can not only save equipment investment, but also make full use of the inverter capacity to realize rapid and continuous adjustment of the access point, and can better realize the connection of photovoltaic power stations Point voltage control, without communication to obtain feeder load level and distribution, and can make full use of inverter capacity for fast voltage adjustment, with good control effect and economy.
附图说明Description of drawings
图1是根据一示例性实施例示出的一种基于光伏逆变器调节的配电网电压控制方法的流程图;Fig. 1 is a flow chart of a distribution network voltage control method based on photovoltaic inverter regulation shown according to an exemplary embodiment;
图2是根据一示例性实施例示出的具有光伏电站接入的馈线接线示意图;Fig. 2 is a schematic diagram of feeder wiring with photovoltaic power station access shown according to an exemplary embodiment;
图3是运用本发明提出的一种基于光伏逆变器调节的配电网电压控制方法得到的计算结果比较图。Fig. 3 is a comparison diagram of calculation results obtained by using a distribution network voltage control method based on photovoltaic inverter regulation proposed by the present invention.
具体实施方式Detailed ways
为能清楚说明本方案的技术特点,下面通过具体实施方式,并结合其附图,对本发明进行详细阐述。下文的公开提供了许多不同的实施例或例子用来实现本发明的不同结构。为了简化本发明的公开,下文中对特定例子的部件和设置进行描述。此外,本发明可以在不同例子中重复参考数字和/或字母。这种重复是为了简化和清楚的目的,其本身不指示所讨论各种实施例和/或设置之间的关系。应当注意,在附图中所图示的部件不一定按比例绘制。本发明省略了对公知组件和处理技术及工艺的描述以避免不必要地限制本发明。In order to clearly illustrate the technical features of this solution, the present invention will be described in detail below through specific implementation modes and in conjunction with the accompanying drawings. The following disclosure provides many different embodiments or examples for implementing different structures of the present invention. To simplify the disclosure of the present invention, components and arrangements of specific examples are described below. Furthermore, the present invention may repeat reference numerals and/or letters in different instances. This repetition is for the purpose of simplicity and clarity and does not in itself indicate a relationship between the various embodiments and/or arrangements discussed. It should be noted that components illustrated in the figures are not necessarily drawn to scale. Descriptions of well-known components and processing techniques and processes are omitted herein to avoid unnecessarily limiting the present invention.
实施例1Example 1
如图1至图3所示,本发明实施例提供的一种基于光伏逆变器调节的配电网电压控制方法可以包括以下步骤:As shown in Figures 1 to 3, a distribution network voltage control method based on photovoltaic inverter regulation provided by an embodiment of the present invention may include the following steps:
当节点电压越限且逆变器功率因数角还未达到容量限制角,进入逆变器电压控制策略的无功补偿阶段;When the node voltage exceeds the limit and the inverter power factor angle has not reached the capacity limit angle, enter the reactive power compensation stage of the inverter voltage control strategy;
在节点电压越限的情况下,当逆变器达到最大功率但还未达到最大功率因数角时则进入逆变器的最大功率调整阶段;When the node voltage exceeds the limit, when the inverter reaches the maximum power but has not yet reached the maximum power factor angle, it enters the maximum power adjustment stage of the inverter;
在节点电压越限的情况下,若逆变器已经达到最大功率因数角,则在逆变器保持在最大功率因数角的状态下进入逆变器的功率缩减阶段。In the case that the node voltage exceeds the limit, if the inverter has reached the maximum power factor angle, enter the power reduction stage of the inverter when the inverter remains at the maximum power factor angle.
在一种可能的实现方式中,所述进入逆变器电压控制策略的无功补偿阶段的过程包括以下步骤:In a possible implementation manner, the process of entering the reactive power compensation phase of the inverter voltage control strategy includes the following steps:
当光伏电站接入点电压Uk超过限制电压Uk,lim且逆变器功率S未达到最大,则进入逆变器的无功补偿阶段;When the voltage U k of the access point of the photovoltaic power station exceeds the limit voltage U k,lim and the power S of the inverter does not reach the maximum, it enters the reactive power compensation stage of the inverter;
在逆变器的无功补偿阶段中,光伏逆变器所需发出的无功功率QPV,b采用下式计算:In the reactive power compensation stage of the inverter, the reactive power Q PV,b required to be emitted by the photovoltaic inverter is calculated by the following formula:
其中, 为光伏电站接入点到主变压器低压母线路径的电抗值;in, is the reactance value of the path from the access point of the photovoltaic power station to the low-voltage busbar of the main transformer;
通过调整逆变器功率因数角投入QPV,b的无功功率,此时光伏接入点k的节点电压记为Uk,b;By adjusting the power factor angle of the inverter, the reactive power of Q PV,b is input, and the node voltage of the photovoltaic access point k is recorded as U k,b at this time;
根据逆变器的无功功率补偿后的节点电压Uk,b对逆变器所输出的无功功率QPV,b采用下式进行修正:According to the node voltage U k,b after reactive power compensation of the inverter, the reactive power Q PV,b output by the inverter is corrected by the following formula:
QPV=QPV,b+ΔQPV,b Q PV = Q PV,b +ΔQ PV,b
其中,ΔQPV,b为逆变器无功补偿阶段的无功功率修正量,其计算公式如下:Among them, ΔQ PV,b is the reactive power correction amount in the reactive power compensation stage of the inverter, and its calculation formula is as follows:
在一种可能的实现方式中,所述进入逆变器的最大功率调整阶段的过程包括以下步骤:In a possible implementation manner, the process of entering the maximum power adjustment phase of the inverter includes the following steps:
在逆变器功率S达到其最大容量Smax但还未到达最大功率因数角θmax时,光伏电站接入点电压依旧越限,记光伏电站接入点的电压为Uk,l,并转入逆变器的最大功率调整阶段;When the power S of the inverter reaches its maximum capacity S max but has not yet reached the maximum power factor angle θ max , the voltage at the access point of the photovoltaic power station still exceeds the limit, record the voltage at the access point of the photovoltaic power station as U k,l , and switch to Enter the maximum power adjustment stage of the inverter;
在逆变器的最大功率调整阶段中,光伏逆变器所需发出的有功功率PPV,t采用下式计算:In the maximum power adjustment phase of the inverter, the active power P PV,t required to be emitted by the photovoltaic inverter is calculated by the following formula:
其中 和分别为光伏电站接入点到主变压器低压母线路径的电阻值和电抗值;in and Respectively, the resistance value and reactance value of the path from the access point of the photovoltaic power station to the low-voltage busbar of the main transformer;
调整逆变器投入PPV,t的有功功率,此时光伏接入点k的节点电压记为Uk,t;Adjust the active power that the inverter puts into PP PV, t , at this time, the node voltage of the photovoltaic access point k is recorded as U k,t ;
根据逆变器的最大功率调整阶段后的节点电压Uk,t对逆变器所输出的有功功率PPV,t采用下式进行修正:According to the node voltage U k,t after the maximum power adjustment stage of the inverter, the active power PP PV,t output by the inverter is corrected by the following formula:
PPV=PPV,t+ΔPPV,t P PV =P PV,t +ΔP PV,t
其中,ΔPPV,t为逆变器最大功率调整阶段的有功功率修正量,其计算公式如下: Among them, ΔP PV,t is the active power correction amount in the inverter maximum power adjustment stage, and its calculation formula is as follows:
在一种可能的实现方式中,所述进入逆变器的最大功率调整阶段的过程包括以下步骤:In a possible implementation manner, the process of entering the maximum power adjustment phase of the inverter includes the following steps:
在逆变器功率因数角θ达到最大值θmax时,光伏电站接入点电压依旧越限,记此时光伏电站接入点的电压为Uk,m,并转入逆变器的功率缩减阶段;When the inverter power factor angle θ reaches the maximum value θ max , the voltage of the access point of the photovoltaic power station is still beyond the limit, record the voltage of the access point of the photovoltaic power station at this time as U k,m , and transfer to the power reduction of the inverter stage;
在逆变器的功率缩减阶段中,光伏逆变器所需发出的有功功率PPV,s采用下式计算:In the power reduction stage of the inverter, the active power PP PV,s required to be emitted by the photovoltaic inverter is calculated by the following formula:
其中,和分别为光伏电站接入点到主变压器低压母线路径的电阻值和电抗值;in, and Respectively, the resistance value and reactance value of the path from the access point of the photovoltaic power station to the low-voltage busbar of the main transformer;
调整逆变器输出的有功功率PPV,s,记此时光伏电站接入点k的节点电压为Uk,s;Adjust the active power PP PV,s output by the inverter, and record the node voltage of the photovoltaic power plant access point k at this time as U k,s ;
根据逆变器功率缩减阶段后的节点电压Uk,s对逆变器所输出的有功功率PPV,s采用下式进行修正:According to the node voltage U k,s after the inverter power reduction stage, the active power PP PV,s output by the inverter is corrected by the following formula:
PPV=PPV,s+ΔPPV,s P PV =P PV,s +ΔP PV,s
其中,ΔPPV,s为逆变器最大功率调整阶段中的有功功率修正量,其计算公式如下:Among them, ΔP PV,s is the active power correction amount in the inverter maximum power adjustment stage, and its calculation formula is as follows:
为简便有效地实现对光伏电站接入点的电压控制,本实施例提出的电压控制策略根据逆变器的不同运行状态分为三个阶段,在不同运行阶段中通过调整光伏逆变器的有功/无功功率进行电压调整;采用的有功/无功功率计算方法仅与光伏电站接入点的电压、线路阻抗值和逆变器功率因数角有关,且皆为线性公式,计算量少。In order to easily and effectively realize the voltage control of the access point of the photovoltaic power station, the voltage control strategy proposed in this embodiment is divided into three stages according to the different operating states of the inverter. In different operating stages, by adjusting the active power of the photovoltaic /Reactive power for voltage adjustment; the active/reactive power calculation method adopted is only related to the voltage of the photovoltaic power plant access point, the line impedance value and the inverter power factor angle, and they are all linear formulas with less calculation.
实施例2Example 2
如图1至图3所示,本发明实施例提供的一种基于光伏逆变器调节的配电网电压控制方法可以包括以下步骤:As shown in Figures 1 to 3, a distribution network voltage control method based on photovoltaic inverter regulation provided by an embodiment of the present invention may include the following steps:
设置光伏电站接入点的目标电压限值和逆变器容量,并且对逆变器的功率、功率因数角和节点电压进行监测;Set the target voltage limit and inverter capacity of the access point of the photovoltaic power station, and monitor the power, power factor angle and node voltage of the inverter;
当节点电压越限且逆变器功率因数角还未达到容量限制角,进入逆变器电压控制策略的无功补偿阶段;When the node voltage exceeds the limit and the inverter power factor angle has not reached the capacity limit angle, enter the reactive power compensation stage of the inverter voltage control strategy;
在节点电压越限的情况下,当逆变器达到最大功率但还未达到最大功率因数角时则进入逆变器的最大功率调整阶段;When the node voltage exceeds the limit, when the inverter reaches the maximum power but has not yet reached the maximum power factor angle, it enters the maximum power adjustment stage of the inverter;
在节点电压越限的情况下,若逆变器已经达到最大功率因数角,则在逆变器保持在最大功率因数角的状态下进入逆变器的功率缩减阶段。In the case that the node voltage exceeds the limit, if the inverter has reached the maximum power factor angle, enter the power reduction stage of the inverter when the inverter remains at the maximum power factor angle.
在一种可能的实现方式中,所述对逆变器的功率、功率因数角和节点电压进行监测的过程包括以下步骤:In a possible implementation manner, the process of monitoring the power of the inverter, the power factor angle and the node voltage includes the following steps:
设置光伏电站节点的限制电压Uk,lim,光伏逆变器的最大功率Smax和最大功率因数角θmax;Set the limit voltage U k,lim of the photovoltaic power station node, the maximum power S max and the maximum power factor angle θ max of the photovoltaic inverter;
实时监测光伏电站接入点电压Uk和主变压器低压母线的电压U0、逆变器功率S和功率因数角θ;Real-time monitoring of the voltage U k of the access point of the photovoltaic power station, the voltage U 0 of the low-voltage bus of the main transformer, the power S of the inverter, and the angle θ of the power factor;
计算光伏电站接入点到主变压器低压母线路径的电阻值和电抗值 Calculate the resistance value of the path from the access point of the photovoltaic power station to the low-voltage busbar of the main transformer and reactance value
所述进入逆变器电压控制策略的无功补偿阶段、进入逆变器的最大功率调整阶段和进入逆变器的功率缩减阶段的过程与实施例1相同。The processes of entering the reactive power compensation phase of the inverter voltage control strategy, entering the maximum power adjustment phase of the inverter, and entering the power reduction phase of the inverter are the same as those in Embodiment 1.
本实施例首先设置光伏电站接入点的目标电压限值和逆变器容量,并且对逆变器的功率、功率因数角和节点电压进行监测,其次针对光伏电站接入点的越限电压估算并调整逆变器的有功/无功功率,然后根据调整后的电压对逆变器的有功/无功功率进行修正。该方法计算简便、不涉及复杂的数学计算、无需获取配电网系统的负荷分布情况、计算结果精度高,可以准确控制光伏电站接入点的电压幅值,具有较强的工程实用价值。In this embodiment, first set the target voltage limit and inverter capacity of the access point of the photovoltaic power station, and monitor the power, power factor angle and node voltage of the inverter, and then estimate the over-limit voltage of the access point of the photovoltaic power station And adjust the active/reactive power of the inverter, and then correct the active/reactive power of the inverter according to the adjusted voltage. This method is simple to calculate, does not involve complex mathematical calculations, does not need to obtain the load distribution of the distribution network system, and has high calculation accuracy. It can accurately control the voltage amplitude of the photovoltaic power station access point, and has strong engineering practical value.
实施例3Example 3
如图1至图3所示,本发明实施例提供的一种基于光伏逆变器调节的配电网电压控制方法可以包括以下步骤:As shown in Figures 1 to 3, a distribution network voltage control method based on photovoltaic inverter regulation provided by an embodiment of the present invention may include the following steps:
当节点电压越限且逆变器功率因数角还未达到容量限制角,进入逆变器电压控制策略的无功补偿阶段;When the node voltage exceeds the limit and the inverter power factor angle has not reached the capacity limit angle, enter the reactive power compensation stage of the inverter voltage control strategy;
在节点电压越限的情况下,当逆变器达到最大功率但还未达到最大功率因数角时则进入逆变器的最大功率调整阶段;When the node voltage exceeds the limit, when the inverter reaches the maximum power but has not yet reached the maximum power factor angle, it enters the maximum power adjustment stage of the inverter;
在节点电压越限的情况下,若逆变器已经达到最大功率因数角,则在逆变器保持在最大功率因数角的状态下进入逆变器的功率缩减阶段;In the case that the node voltage exceeds the limit, if the inverter has reached the maximum power factor angle, enter the power reduction stage of the inverter when the inverter remains at the maximum power factor angle;
经过执行逆变器电压调整策略后,继续对节点电压进行监测,形成闭环控制。After implementing the inverter voltage adjustment strategy, continue to monitor the node voltage to form a closed-loop control.
在一种可能的实现方式中,所述继续对节点电压进行监测形成闭环控制的过程包括以下步骤:In a possible implementation manner, the process of continuing to monitor the node voltage to form a closed-loop control includes the following steps:
经过光伏电站逆变器的电压控制策略调整后,光伏电站接入点的电压稳定在限制电压Uk,lim;After the voltage control strategy adjustment of the inverter of the photovoltaic power station, the voltage of the access point of the photovoltaic power station is stabilized at the limit voltage U k,lim ;
继续监测光伏电站接入点电压Uk和主变压器低压母线的电压U0、逆变器功率S和功率因数角θ,形成闭环控制。Continue to monitor the voltage U k of the access point of the photovoltaic power station, the voltage U 0 of the low-voltage bus of the main transformer, the inverter power S and the power factor angle θ to form a closed-loop control.
所述进入逆变器电压控制策略的无功补偿阶段、进入逆变器的最大功率调整阶段和进入逆变器的功率缩减阶段的过程与实施例1相同。The processes of entering the reactive power compensation phase of the inverter voltage control strategy, entering the maximum power adjustment phase of the inverter, and entering the power reduction phase of the inverter are the same as those in Embodiment 1.
本实施例首先针对光伏电站接入点的越限电压估算并调整逆变器的有功/无功功率,其次根据调整后的电压对逆变器的有功/无功功率进行修正,然后继续监测光伏电站接入点电压Uk和主变压器低压母线的电压U0、逆变器功率S和功率因数角θ,形成闭环控制。该方法计算简便、不涉及复杂的数学计算、无需获取配电网系统的负荷分布情况、计算结果精度高,可以准确控制光伏电站接入点的电压幅值,具有较强的工程实用价值。In this embodiment, firstly, the active/reactive power of the inverter is estimated and adjusted according to the over-limit voltage of the access point of the photovoltaic power station, and then the active/reactive power of the inverter is corrected according to the adjusted voltage, and then the monitoring of the photovoltaic The voltage U k of the access point of the power station, the voltage U 0 of the low-voltage bus of the main transformer, the power S of the inverter and the angle θ of the power factor form a closed-loop control. This method is simple to calculate, does not involve complex mathematical calculations, does not need to obtain the load distribution of the distribution network system, and has high calculation accuracy. It can accurately control the voltage amplitude of the photovoltaic power station access point, and has strong engineering practical value.
实施例4Example 4
如图1至图3所示,本发明实施例提供的一种基于光伏逆变器调节的配电网电压控制方法可以包括以下步骤:As shown in Figures 1 to 3, a distribution network voltage control method based on photovoltaic inverter regulation provided by an embodiment of the present invention may include the following steps:
设置光伏电站接入点的目标电压限值和逆变器容量,并且对逆变器的功率、功率因数角和节点电压进行监测;Set the target voltage limit and inverter capacity of the access point of the photovoltaic power station, and monitor the power, power factor angle and node voltage of the inverter;
当节点电压越限且逆变器功率因数角还未达到容量限制角,进入逆变器电压控制策略的无功补偿阶段;When the node voltage exceeds the limit and the inverter power factor angle has not reached the capacity limit angle, enter the reactive power compensation stage of the inverter voltage control strategy;
在节点电压越限的情况下,当逆变器达到最大功率但还未达到最大功率因数角时则进入逆变器的最大功率调整阶段;When the node voltage exceeds the limit, when the inverter reaches the maximum power but has not yet reached the maximum power factor angle, it enters the maximum power adjustment stage of the inverter;
在节点电压越限的情况下,若逆变器已经达到最大功率因数角,则在逆变器保持在最大功率因数角的状态下进入逆变器的功率缩减阶段;In the case that the node voltage exceeds the limit, if the inverter has reached the maximum power factor angle, enter the power reduction stage of the inverter when the inverter remains at the maximum power factor angle;
经过执行逆变器电压调整策略后,继续对节点电压进行监测,形成闭环控制。After implementing the inverter voltage adjustment strategy, continue to monitor the node voltage to form a closed-loop control.
本实施例首先设置光伏电站接入点的目标电压限值和逆变器容量,并且对逆变器的功率、功率因数角和节点电压进行监测,其次针对光伏电站接入点的越限电压估算并调整逆变器的有功/无功功率,然后根据调整后的电压对逆变器的有功/无功功率进行修正,最后继续监测光伏电站接入点电压Uk和主变压器低压母线的电压U0、逆变器功率S和功率因数角θ,形成闭环控制。该方法计算简便、不涉及复杂的数学计算、无需获取配电网系统的负荷分布情况、计算结果精度高,可以准确控制光伏电站接入点的电压幅值,具有较强的工程实用价值。In this embodiment, first set the target voltage limit and inverter capacity of the access point of the photovoltaic power station, and monitor the power, power factor angle and node voltage of the inverter, and then estimate the over-limit voltage of the access point of the photovoltaic power station And adjust the active/reactive power of the inverter, then correct the active/reactive power of the inverter according to the adjusted voltage, and finally continue to monitor the voltage Uk of the access point of the photovoltaic power station and the voltage U0 of the low-voltage bus of the main transformer , inverter power S and power factor angle θ, forming a closed-loop control. This method is simple to calculate, does not involve complex mathematical calculations, does not need to obtain the load distribution of the distribution network system, and has high calculation accuracy. It can accurately control the voltage amplitude of the photovoltaic power station access point, and has strong engineering practical value.
在一种可能的实现方式中,本发明实施例的具体实施过程包括以下步骤:In a possible implementation manner, the specific implementation process of the embodiment of the present invention includes the following steps:
步骤1,设置光伏电站接入点的限制电压Uk,lim,光伏逆变器的最大功率Smax和最大功率因数角θmax。Step 1, set the limit voltage U k,lim of the access point of the photovoltaic power station, the maximum power S max and the maximum power factor angle θ max of the photovoltaic inverter.
步骤2,实时监测光伏电站接入点电压Uk和主变压器低压母线的电压U0、逆变器功率S和功率因数角θ。Step 2, real-time monitoring of the voltage U k of the access point of the photovoltaic power station, the voltage U 0 of the low-voltage bus of the main transformer, the power S of the inverter, and the angle θ of the power factor.
步骤3,根据光伏电站的接入位置和配电线路的具体参数,确定光伏电站接入点k到主变压器低压母线的计算路径,并计算光伏电站接入点到主变压器低压母线路径的电阻值和电抗值 Step 3, according to the access location of the photovoltaic power station and the specific parameters of the distribution line, determine the calculation path from the photovoltaic power station access point k to the main transformer low-voltage busbar, and calculate the resistance value of the path from the photovoltaic power station access point to the main transformer low-voltage busbar and reactance value
步骤4,当光伏电站接入点电压Uk超过限制电压Uk,lim且逆变器功率S未达到最大,则进入逆变器的无功补偿阶段。Step 4, when the voltage U k at the access point of the photovoltaic power station exceeds the limit voltage U k,lim and the power S of the inverter does not reach the maximum, enter the reactive power compensation stage of the inverter.
步骤5,在逆变器的无功补偿阶段中,光伏逆变器所需发出的无功功率QPV,b采用下式计算 Step 5, in the reactive power compensation phase of the inverter, the reactive power Q PV,b required to be emitted by the photovoltaic inverter is calculated using the following formula
其中 in
步骤6,通过调整逆变器功率因数角投入QPV,b的无功功率,此时光伏接入点k的节点电压记为Uk,b。Step 6: Input the reactive power of Q PV,b by adjusting the power factor angle of the inverter. At this time, the node voltage of the photovoltaic access point k is denoted as U k,b .
步骤7,根据逆变器的无功功率补偿后的节点电压Uk,b对逆变器所输出的无功功率QPV,b进行修正:Step 7: Correct the reactive power Q PV, b output by the inverter according to the node voltage U k,b after reactive power compensation of the inverter:
QPV=QPV,b+ΔQPV,b Q PV = Q PV,b +ΔQ PV,b
其中ΔQPV,b为逆变器无功补偿阶段的无功功率修正量,其计算方法如下式:Among them, ΔQ PV, b is the reactive power correction amount in the reactive power compensation stage of the inverter, and its calculation method is as follows:
步骤8,经过逆变器的无功功率补偿阶段,在逆变器功率S达到其最大容量Smax但还未到达最大功率因数角θmax时,光伏电站接入点电压依旧越限,记光伏电站接入点的电压为Uk,l,并转入逆变器的最大功率调整阶段。Step 8: After the reactive power compensation phase of the inverter, when the inverter power S reaches its maximum capacity S max but has not yet reached the maximum power factor angle θ max , the voltage at the access point of the photovoltaic power station still exceeds the limit. The voltage of the access point of the power station is U k,l , and it is transferred to the maximum power adjustment stage of the inverter.
步骤9,在逆变器的最大功率调整阶段中,光伏逆变器所需发出的有功功率PPV,t采用下式计算:Step 9, in the phase of maximum power adjustment of the inverter, the active power P PV,t required to be emitted by the photovoltaic inverter is calculated by the following formula:
其中 in
步骤10,调整逆变器投入PPV,t的有功功率,此时光伏接入点k的节点电压记为Uk,t。Step 10, adjust the active power of the inverter input PP PV,t , at this time, the node voltage of the photovoltaic access point k is denoted as U k,t .
步骤11,根据逆变器的最大功率调整阶段后的节点电压Uk,t对逆变器所输出的有功功率PPV,t进行修正:Step 11, correct the active power P PV,t output by the inverter according to the node voltage U k,t after the maximum power adjustment stage of the inverter:
PPV=PPV,t+ΔPPV,t P PV =P PV,t +ΔP PV,t
其中ΔPPV,t为逆变器最大功率调整阶段的有功功率修正量,其计算方法如下式:Among them, ΔP PV, t is the active power correction amount in the inverter maximum power adjustment stage, and its calculation method is as follows:
步骤12,经过逆变器的最大功率调整阶段,在逆变器功率因数角达到最大值时,光伏电站接入点电压依旧越限,记此时光伏电站接入点的电压为,并转入逆变器的功率缩减阶段。Step 12, after the maximum power adjustment stage of the inverter, when the power factor angle of the inverter reaches the maximum value, the voltage of the access point of the photovoltaic power station still exceeds the limit, record the voltage of the access point of the photovoltaic power station at this time, and transfer to The power reduction phase of the inverter.
步骤13,在逆变器的功率缩减阶段中,光伏逆变器所需发出的有功功率PPV,s采用下式计算:Step 13, in the power reduction phase of the inverter, the active power P PV,s required to be emitted by the photovoltaic inverter is calculated by the following formula:
步骤14,调整逆变器输出的有功功率PPV,s,记此时光伏电站接入点k的节点电压为Uk,s。Step 14, adjust the active power P PV,s output by the inverter, record the node voltage of the photovoltaic power plant access point k at this time as U k,s .
步骤15,根据逆变器功率缩减阶段后的节点电压Uk,s对逆变器所输出的有功功率PPV,s进行修正:Step 15, correct the active power P PV,s output by the inverter according to the node voltage U k,s after the inverter power reduction stage:
PPV=PPV,s+ΔPPV,s P PV =P PV,s +ΔP PV,s
其中ΔPPV,s为逆变器最大功率调整阶段中的有功功率修正量,其计算方法如下式:Among them, ΔP PV,s is the active power correction amount in the inverter maximum power adjustment stage, and its calculation method is as follows:
步骤16,经过光伏电站逆变器的电压控制策略调整后,光伏电站接入点的电压稳定在限制电压Uk,lim。Step 16, after adjusting the voltage control strategy of the inverter of the photovoltaic power station, the voltage of the access point of the photovoltaic power station is stabilized at the limit voltage U k,lim .
步骤17,继续监测光伏电站接入点电压Uk和主变压器低压母线的电压U0、逆变器功率S和功率因数角θ,形成闭环控制。当电压出现越限,继续通过逆变器进行电压控制。Step 17, continue to monitor the voltage U k of the access point of the photovoltaic power station, the voltage U 0 of the low-voltage bus of the main transformer, the inverter power S and the power factor angle θ to form a closed-loop control. When the voltage exceeds the limit, continue to carry out voltage control through the inverter.
为简便有效地实现对光伏电站接入点的电压控制,本实施例提出的电压控制策略根据逆变器的不同运行状态主要分为无功功率补偿、最大功率调整和功率缩减三个阶段,在不同运行阶段中通过调整光伏逆变器的有功/无功功率进行电压调整。在实际的运行中它包括以下步骤:设置光伏电站接入点的目标电压限值和逆变器容量,并且对逆变器的功率、功率因数角和节点电压进行监测;当节点电压越限且逆变器功率因数角还未达到容量限制角,进入逆变器电压控制策略的无功补偿阶段;在节点电压Uk越限的情况下,当逆变器达到最大功率但还未达到最大功率因数角时则进入逆变器的最大功率调整阶段;在节点电压越限的情况下,若逆变器已经达到最大功率因数角,则在逆变器保持在最大功率因数角的状态下进入逆变器的功率缩减阶段;经过执行逆变器电压调整策略后,继续对节点电压进行监测,形成闭环控制。本发明无需通信获取馈线负荷水平和分布情况,并且能够充分利用逆变器容量进行快速电压调整,具有良好的控制效果和经济性。In order to easily and effectively realize the voltage control of the access point of the photovoltaic power station, the voltage control strategy proposed in this embodiment is mainly divided into three stages: reactive power compensation, maximum power adjustment and power reduction according to the different operating states of the inverter. Voltage regulation is performed by adjusting the active/reactive power of the photovoltaic inverter in different operating stages. In actual operation, it includes the following steps: set the target voltage limit and inverter capacity of the photovoltaic power station access point, and monitor the power, power factor angle and node voltage of the inverter; when the node voltage exceeds the limit and The inverter power factor angle has not yet reached the capacity limit angle, and enters the reactive power compensation stage of the inverter voltage control strategy; when the node voltage Uk exceeds the limit, when the inverter reaches the maximum power but has not yet reached the maximum power If the inverter has reached the maximum power factor angle, it will enter the maximum power adjustment stage of the inverter. The power reduction stage of the inverter; after implementing the inverter voltage adjustment strategy, continue to monitor the node voltage to form a closed-loop control. The invention does not need to communicate to obtain the load level and distribution of the feeder, and can make full use of the capacity of the inverter to adjust the voltage quickly, and has good control effect and economy.
以上所述只是本发明的优选实施方式,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也被视为本发明的保护范围。The above is only a preferred embodiment of the present invention. For those of ordinary skill in the art, without departing from the principle of the present invention, some improvements and modifications can also be made, and these improvements and modifications are also considered as the present invention. protection scope of the invention.
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810608230.4A CN108695892B (en) | 2018-06-13 | 2018-06-13 | Power distribution network voltage control method based on photovoltaic inverter regulation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810608230.4A CN108695892B (en) | 2018-06-13 | 2018-06-13 | Power distribution network voltage control method based on photovoltaic inverter regulation |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108695892A true CN108695892A (en) | 2018-10-23 |
CN108695892B CN108695892B (en) | 2022-03-15 |
Family
ID=63848178
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810608230.4A Active CN108695892B (en) | 2018-06-13 | 2018-06-13 | Power distribution network voltage control method based on photovoltaic inverter regulation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108695892B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110011329A (en) * | 2018-11-26 | 2019-07-12 | 国电南瑞科技股份有限公司 | Low-voltage power distribution station area powerless control method containing distributed photovoltaic |
CN112583020A (en) * | 2020-12-22 | 2021-03-30 | 国网江苏省电力有限公司苏州供电分公司 | Two-stage voltage control method for low-voltage distribution network |
CN114268107A (en) * | 2021-12-23 | 2022-04-01 | 广东电网有限责任公司 | Power distribution network voltage control method and device, electronic equipment and storage medium |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102640378A (en) * | 2009-09-15 | 2012-08-15 | 西安大略大学 | Utilization of distributed generator inverters as statcom |
CN103346584A (en) * | 2013-06-27 | 2013-10-09 | 深圳市汇川技术股份有限公司 | Photovoltaic grid-connected system and power compensation method |
CN104079007A (en) * | 2014-03-06 | 2014-10-01 | 西安理工大学 | Distributed grid-connected photovoltaic power generation control method for inhibiting overvoltage of low-voltage feeder line |
WO2015016006A1 (en) * | 2013-07-30 | 2015-02-05 | 株式会社日立産機システム | System and method for controlling solar power generation system |
CN107658909A (en) * | 2017-09-26 | 2018-02-02 | 湖南大学 | A kind of low and medium voltage distribution network voltage lifting suppressing method of the access containing photovoltaic |
-
2018
- 2018-06-13 CN CN201810608230.4A patent/CN108695892B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102640378A (en) * | 2009-09-15 | 2012-08-15 | 西安大略大学 | Utilization of distributed generator inverters as statcom |
CN103346584A (en) * | 2013-06-27 | 2013-10-09 | 深圳市汇川技术股份有限公司 | Photovoltaic grid-connected system and power compensation method |
WO2015016006A1 (en) * | 2013-07-30 | 2015-02-05 | 株式会社日立産機システム | System and method for controlling solar power generation system |
CN104079007A (en) * | 2014-03-06 | 2014-10-01 | 西安理工大学 | Distributed grid-connected photovoltaic power generation control method for inhibiting overvoltage of low-voltage feeder line |
CN107658909A (en) * | 2017-09-26 | 2018-02-02 | 湖南大学 | A kind of low and medium voltage distribution network voltage lifting suppressing method of the access containing photovoltaic |
Non-Patent Citations (4)
Title |
---|
周林等: "低压网络中并网光伏逆变器调压策略", 《电网技术》 * |
李清然等: "含储能分布式光伏系统并网点电压调整方案设计", 《现代电力》 * |
李清然等: "含分布式光伏电源的配电网电压越限解决方案", 《电力系统自动化》 * |
赵倩等: "并网逆变器的有功无功综合控制策略研究", 《电力电容器与无功补偿》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110011329A (en) * | 2018-11-26 | 2019-07-12 | 国电南瑞科技股份有限公司 | Low-voltage power distribution station area powerless control method containing distributed photovoltaic |
CN110011329B (en) * | 2018-11-26 | 2022-08-16 | 国电南瑞科技股份有限公司 | Reactive power control method for low-voltage distribution area containing distributed photovoltaic |
CN112583020A (en) * | 2020-12-22 | 2021-03-30 | 国网江苏省电力有限公司苏州供电分公司 | Two-stage voltage control method for low-voltage distribution network |
CN114268107A (en) * | 2021-12-23 | 2022-04-01 | 广东电网有限责任公司 | Power distribution network voltage control method and device, electronic equipment and storage medium |
Also Published As
Publication number | Publication date |
---|---|
CN108695892B (en) | 2022-03-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2021217900A1 (en) | Droop control-based method for accurate distribution of reactive power of micro-grid | |
CN110086193A (en) | Adaptive droop control method suitable for flexible direct current distribution system | |
CN110176790B (en) | Power control method and system of new energy power station with fast frequency response | |
CN107248756A (en) | The control method of multi-inverter parallel power distribution precision in a kind of raising micro-capacitance sensor | |
CN105281360A (en) | Distributed photovoltaic automatic generating control method based on sensitivity | |
WO2015054878A1 (en) | Change rate-based method and system for controlling energy storage power station in smoothing wind/light fluctuations | |
CN107026470A (en) | Automatic voltage for photovoltaic system is adjusted | |
CN110266048B (en) | A VSG control method under grid voltage symmetric sag fault | |
CN107732956A (en) | Low-voltage ride-through method for two-stage photovoltaic grid-connected system with variable power tracking trajectory | |
CN108075491A (en) | The power quality treatment method of APF, SVC combination based on micro-grid energy storage system | |
CN109755953B (en) | Phase modulator participated steady-state voltage cooperative control method for alternating current and direct current power transmission system | |
CN109802413B (en) | Active support power grid frequency response control method and system | |
CN104538988B (en) | Voltage stability regulation system connected to distributed power supply and its control method | |
CN108695892B (en) | Power distribution network voltage control method based on photovoltaic inverter regulation | |
CN107645166A (en) | A new unified power quality adjustment device with integrated photovoltaics and its control method | |
CN110048438A (en) | A kind of distribution feeder stage load Poewr control method based on Model Predictive Control | |
CN105406488A (en) | Overvoltage inhibition method based on reactive power regulation of photovoltaic inverter | |
CN106712098A (en) | Local voltage control method of distributed power supply | |
CN112260287A (en) | Novel photovoltaic microgrid droop reactive compensation control method | |
CN108418231A (en) | A Hybrid Multiport Railway Power Converter and Its Power Coordinated Control Method | |
CN108336743B (en) | A local voltage control method based on distributed power grid-connected inverter | |
CN111030173B (en) | Control method and device of new energy power plant grid-connected inverter and inverter | |
CN103490450B (en) | Energy storage parallel control method for middle-voltage and low-voltage micro-grid and device | |
CN109586305B (en) | A distribution network operation control strategy based on flexible multi-state switches | |
CN109713711B (en) | A coordinated reactive power control strategy for distributed photovoltaic inverters under voltage sag |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |