CN108690893A - The restorative procedure in blast furnace taphole stream iron duct - Google Patents

The restorative procedure in blast furnace taphole stream iron duct Download PDF

Info

Publication number
CN108690893A
CN108690893A CN201710236297.5A CN201710236297A CN108690893A CN 108690893 A CN108690893 A CN 108690893A CN 201710236297 A CN201710236297 A CN 201710236297A CN 108690893 A CN108690893 A CN 108690893A
Authority
CN
China
Prior art keywords
blast furnace
hole
taphole
furnace taphole
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710236297.5A
Other languages
Chinese (zh)
Inventor
闵良建
朱丙峰
刘卫健
关丕东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201710236297.5A priority Critical patent/CN108690893A/en
Publication of CN108690893A publication Critical patent/CN108690893A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B7/00Blast furnaces
    • C21B7/14Discharging devices, e.g. for slag

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Furnace Housings, Linings, Walls, And Ceilings (AREA)
  • Blast Furnaces (AREA)

Abstract

The invention discloses a kind of restorative procedure in blast furnace taphole stream iron duct, this method drills out through-hole on the carbon brick of the stream iron duct position of blast furnace taphole using tapping machine first, which is to be in 7~12 degree of angles with horizontal direction and tilt down;Boring procedure is drilled through using dry method and coring and deashing, drilling depth are 2.5~3 meters in time;Through-hole both sides carry out formwork using steel plate, run through the through-hole drilled out using the pipeline of suitable diameter and both ends are respectively welded on the formwork of through-hole both sides;Gap between pipeline and through-hole carries out closely knit cast using high fluidity, the resistance to material castable of self drainage, so that pipeline forms the stream iron duct of blast furnace taphole.This method thoroughly solve iron mouth tap a blast furnace with deslagging is obstructed, gas leakage, beat mud emit mud, tap a blast furnace splash the problems such as, effectively increase the overhaul efficiency of blast furnace taphole, reduce the cost of overhaul, it is ensured that safe, the normal production of blast furnace.

Description

The restorative procedure in blast furnace taphole stream iron duct
Technical field
The present invention relates to a kind of restorative procedures in blast furnace taphole stream iron duct.
Background technology
Blast furnace taphole is located at cupola well lower edge, mainly by taphole frame frame, protection board, brick set, mud set, stream iron duct and mud drum group At working environment is severe, by the erosion of high temperature slag iron and washes away for a long time, and blast furnace taphole region is link most weak in cupola well One of, the quality of iron mouth work not only influences the normal production of blast furnace, but also can shorten blast furnace service life.
The stream iron duct of especially blast furnace taphole is subjected in blast furnace ironmaking process in stove, outside stove temperature acute variation, it is high Stove tap a blast furnace before, tap a blast furnace after by external impacts such as tapping machine, clay gun machines, slag iron convection current iron duct refractory material during tapping a blast furnace It washes away, corrode, therefore flow the weak link that iron duct is blast furnace taphole.
Stream iron duct is damaged seriously in periodically smelting iron operation, often results in slag iron storage capacity increase in stove, coal gas leakage Gas, beat mud emit mud, tap a blast furnace splash phenomena such as, seriously may occur in which production accident.Realize the complete reparation of stream iron duct damage brick fuel, Replacement process need to be done in the part for flowing iron duct brick fuel breakage, i.e., remove the carbon brick of tapping hole, then with new brick fuel It builds by laying bricks or stones.This method is long there are the period, expends that big, labor intensity is big, quantities is big, carbon brick builds difficulty by laying bricks or stones, situation is unknown etc. in stove Disadvantage, to seriously affect safe, the normal production of blast furnace.
Invention content
Technical problem to be solved by the invention is to provide a kind of restorative procedure in blast furnace taphole stream iron duct, this method is thorough Bottom solve iron mouth tap a blast furnace with deslagging is obstructed, gas leakage, beat mud emit mud, tap a blast furnace splash the problems such as, effectively increase blast furnace The overhaul efficiency of iron mouth reduces the cost of overhaul, it is ensured that safe, the normal production of blast furnace.
In order to solve the above technical problems, the restorative procedure in blast furnace taphole stream iron duct of the present invention includes the following steps:
Step 1: drilling out through-hole using tapping machine on the carbon brick of the stream iron duct position of blast furnace taphole, through-hole diameter is according to iron Mouth size, taphole frame size simultaneously combine the Aperture precision of tapping machine to determine, it is in 7~12 degree of angles that through-hole angle, which is with horizontal direction, And it tilts down;
Step 2: boring procedure is drilled through using dry method and removes carbon brick core and dust in drilling tool in time, drilling depth is 2.5~3 meters;
Step 3: carrying out formwork in the through-hole both sides of blast furnace taphole, formwork welds rectangular, shape using steel plate on the inside of blast furnace taphole At special mud drum on the inside of blast furnace taphole, formwork is sealed using steel plate with taphole frame on the outside of blast furnace taphole and welding is vented upwards Hole, while formwork height is more than the outer iron open height of stove in stove;
Step 4: selecting the suitable pipeline of diameter according to blast furnace iron notch size, pipeline is run through into the through-hole drilled out and both ends It is respectively welded on the formwork of through-hole both sides;
Step 5: closely knit cast is carried out using the gap of high fluidity, the resistance to material castable of self drainage between pipeline and through-hole, So that pipeline forms the stream iron duct of blast furnace taphole.
Further, the diameter of the through-hole is 300mm.
Further, it is 1700 × 1000 that the formwork, which uses 6mm steel plates, the rectangular dimension,.
Further, unilateral cast is taken in the cast of the pipeline and via clearance, and castable liquid level is more than through-hole Highly, to ensure that castable is fully filled with pipeline and via clearance.
Since the restorative procedure in blast furnace taphole stream iron duct of the present invention uses above-mentioned technical proposal, i.e., this method is first in blast furnace Through-hole is drilled out using tapping machine on the carbon brick of the stream iron duct position of iron mouth, it is in 7~12 degree which, which is with horizontal direction, It angle and tilts down;Boring procedure is drilled through using dry method and coring and deashing, drilling depth are 2.5~3 meters in time; Through-hole both sides carry out formwork using steel plate, run through the through-hole drilled out using the pipeline of suitable diameter and both ends are respectively welded in logical On the formwork of hole both sides;Gap between pipeline and through-hole is carried out closely knit using high fluidity, the resistance to material castable of self drainage Cast, so that pipeline forms the stream iron duct of blast furnace taphole.This method thoroughly solve iron mouth tap a blast furnace with deslagging it is obstructed, Gas leakage, beat mud emit mud, tap a blast furnace splash the problems such as, effectively increase the overhaul efficiency of blast furnace taphole, reduce the cost of overhaul, really Safe, the normal production of blast furnace is protected.
Description of the drawings
The present invention is described in further detail with embodiment below in conjunction with the accompanying drawings:
Fig. 1 is the blast furnace taphole stream iron duct schematic diagram using this method reparation.
Specific implementation mode
Embodiment is as shown in Figure 1, the restorative procedure in blast furnace taphole stream iron duct of the present invention includes the following steps:
Step 1: drill out through-hole 2 using tapping machine on the carbon brick 1 of the stream iron duct position of blast furnace taphole, 2 diameter of through-hole according to Iron mouth size, taphole frame size simultaneously combine the Aperture precision of tapping machine to determine, it is in 7~12 degree that 2 angle of through-hole, which is with horizontal direction, It angle and tilts down;
Step 2: boring procedure is drilled through using dry method and removes carbon brick core and dust in drilling tool in time, drilling depth is 2.5~3 meters;Usual blast furnace repaiies period without enough baking times in, therefore brick fuel is drilled through and can only be drilled through using dry method, is avoided Influence of the moisture to blast furnace casting;
Step 3: in 2 both sides of through-hole of blast furnace taphole progress formwork, formwork is welded rectangular using steel plate 3 on the inside of blast furnace taphole, Special mud drum on the inside of blast furnace taphole is formed, formwork is arranged using steel plate 4 and taphole frame sealing and upwards welding on the outside of blast furnace taphole Stomata 5, while formwork height is more than the outer iron open height of stove in stove;
Step 4: selecting the suitable pipeline 6 of diameter according to blast furnace iron notch size, pipeline 6 is run through to the through-hole 2 and two drilled out End is respectively welded on the formwork of 2 both sides of through-hole;The embedded of the pipeline need to be accurately positioned so that opening function is from the pipeline It squeezes into stove;
Step 5: carrying out closely knit pour using the gap of high fluidity, the resistance to material castable 7 of self drainage between pipeline 6 and through-hole 2 Note, so that pipeline 6 forms the stream iron duct of blast furnace taphole.
Preferably, the diameter of the through-hole 2 is 300mm.
Preferably, it is 1700 × 1000 that the formwork, which uses 6mm steel plates, the rectangular dimension,.
Preferably, unilateral cast is taken in the cast in the pipeline 6 and 2 gap of through-hole, and pours into a mould 71 height of feed liquid surface and be more than 2 height of through-hole, to ensure that castable is fully filled with pipeline and via clearance.
This method is easy to operate, easy for construction, and the stream iron duct of blast furnace is formed by buried pipeline after drilling on carbon brick, Thoroughly solve blast furnace taphole tap a blast furnace with deslagging is unsmooth, iron mouth string coal gas, beat mud emit mud, tap a blast furnace splash the problems such as, and raising Remediation efficiency, reduces construction cost.

Claims (4)

1. a kind of restorative procedure in blast furnace taphole stream iron duct, it is characterised in that this method includes the following steps:
Step 1: drilling out through-hole using tapping machine on the carbon brick of the stream iron duct position of blast furnace taphole, through-hole diameter is according to iron Mouth size, taphole frame size simultaneously combine the Aperture precision of tapping machine to determine, it is in 7~12 degree of angles that through-hole angle, which is with horizontal direction, And it tilts down;
Step 2: boring procedure is drilled through using dry method and removes carbon brick core and dust in drilling tool in time, drilling depth is 2.5~3 meters;
Step 3: carrying out formwork in the through-hole both sides of blast furnace taphole, formwork welds rectangular, shape using steel plate on the inside of blast furnace taphole At special mud drum on the inside of blast furnace taphole, formwork is sealed using steel plate with taphole frame on the outside of blast furnace taphole and welding is vented upwards Hole, while formwork height is more than the outer iron open height of stove in stove;
Step 4: selecting the suitable pipeline of diameter according to blast furnace iron notch size, pipeline is run through into the through-hole drilled out and both ends It is respectively welded on the formwork of through-hole both sides;
Step 5: closely knit cast is carried out using the gap of high fluidity, the resistance to material castable of self drainage between pipeline and through-hole, So that pipeline forms the stream iron duct of blast furnace taphole.
2. the restorative procedure in blast furnace taphole stream iron duct according to claim 1, it is characterised in that:The diameter of the through-hole It is 300mm.
3. the restorative procedure in blast furnace taphole stream iron duct according to claim 1 or 2, it is characterised in that:The formwork is adopted With 6mm steel plates, the rectangular dimension is 1700 × 1000.
4. the restorative procedure in blast furnace taphole stream iron duct according to claim 3, it is characterised in that:The pipeline and through-hole Unilateral cast is taken in the cast in gap, and castable liquid level is more than via height, to ensure that castable is fully filled with pipeline With via clearance.
CN201710236297.5A 2017-04-12 2017-04-12 The restorative procedure in blast furnace taphole stream iron duct Pending CN108690893A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710236297.5A CN108690893A (en) 2017-04-12 2017-04-12 The restorative procedure in blast furnace taphole stream iron duct

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710236297.5A CN108690893A (en) 2017-04-12 2017-04-12 The restorative procedure in blast furnace taphole stream iron duct

Publications (1)

Publication Number Publication Date
CN108690893A true CN108690893A (en) 2018-10-23

Family

ID=63843854

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710236297.5A Pending CN108690893A (en) 2017-04-12 2017-04-12 The restorative procedure in blast furnace taphole stream iron duct

Country Status (1)

Country Link
CN (1) CN108690893A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110195137A (en) * 2019-05-14 2019-09-03 鞍钢股份有限公司 A kind of new masonry iron mouth pore passage preparation method
CN110607410A (en) * 2019-10-16 2019-12-24 首钢京唐钢铁联合有限责任公司 Manufacturing method of blast furnace taphole mud sleeve and manufactured mud sleeve
CN111216216A (en) * 2019-11-22 2020-06-02 安阳钢铁股份有限公司 Plastic pouring process for blast furnace taphole channel
CN112048585A (en) * 2020-08-07 2020-12-08 山西太钢不锈钢股份有限公司 Blast furnace taphole hole opening method
CN114111332A (en) * 2021-11-26 2022-03-01 攀钢集团攀枝花钢钒有限公司 Method for improving discharge efficiency of smelting furnace
CN116287517A (en) * 2023-02-24 2023-06-23 新疆八一钢铁股份有限公司 High-temperature molten slag iron discharge port for smelting molten iron by using total oxygen of European smelting furnace and slag discharge method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101781693A (en) * 2009-12-24 2010-07-21 马鞍山钢铁股份有限公司 Tap hole integral pouring mud sleeve for blast furnace and manufacturing method thereof
CN102912051A (en) * 2012-10-26 2013-02-06 莱芜钢铁集团有限公司 Method for exchanging cooling wall of blast furnace taphole online
CN205188326U (en) * 2015-06-29 2016-04-27 宝钢不锈钢有限公司 Can prevent iron notch of blast furnace structure of gas leakage
CN105838833A (en) * 2016-05-25 2016-08-10 河南华西耐火材料有限公司 Blast furnace bottom and hearth integral seamless casting refractory overhaul and maintenance method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101781693A (en) * 2009-12-24 2010-07-21 马鞍山钢铁股份有限公司 Tap hole integral pouring mud sleeve for blast furnace and manufacturing method thereof
CN102912051A (en) * 2012-10-26 2013-02-06 莱芜钢铁集团有限公司 Method for exchanging cooling wall of blast furnace taphole online
CN205188326U (en) * 2015-06-29 2016-04-27 宝钢不锈钢有限公司 Can prevent iron notch of blast furnace structure of gas leakage
CN105838833A (en) * 2016-05-25 2016-08-10 河南华西耐火材料有限公司 Blast furnace bottom and hearth integral seamless casting refractory overhaul and maintenance method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110195137A (en) * 2019-05-14 2019-09-03 鞍钢股份有限公司 A kind of new masonry iron mouth pore passage preparation method
CN110607410A (en) * 2019-10-16 2019-12-24 首钢京唐钢铁联合有限责任公司 Manufacturing method of blast furnace taphole mud sleeve and manufactured mud sleeve
CN110607410B (en) * 2019-10-16 2021-12-21 首钢京唐钢铁联合有限责任公司 Manufacturing method of blast furnace taphole mud sleeve and manufactured mud sleeve
CN111216216A (en) * 2019-11-22 2020-06-02 安阳钢铁股份有限公司 Plastic pouring process for blast furnace taphole channel
CN112048585A (en) * 2020-08-07 2020-12-08 山西太钢不锈钢股份有限公司 Blast furnace taphole hole opening method
CN114111332A (en) * 2021-11-26 2022-03-01 攀钢集团攀枝花钢钒有限公司 Method for improving discharge efficiency of smelting furnace
CN114111332B (en) * 2021-11-26 2023-11-21 攀钢集团攀枝花钢钒有限公司 Method for improving smelting furnace discharging efficiency
CN116287517A (en) * 2023-02-24 2023-06-23 新疆八一钢铁股份有限公司 High-temperature molten slag iron discharge port for smelting molten iron by using total oxygen of European smelting furnace and slag discharge method

Similar Documents

Publication Publication Date Title
CN108690893A (en) The restorative procedure in blast furnace taphole stream iron duct
CN106435073A (en) Blast furnace liner overall pouring construction method for replacing spraying materials and refractory bricks
CN102399926B (en) Furnace halt residue iron outlet method for middle and large-sized blast furnaces
CN106282480A (en) Mammoth conveter furnace lining and building method
CN101250598A (en) Maintaining method for blast furnace
CN101790587A (en) Tap hole structure of melting furnace and method of repairing same
CN204939506U (en) A kind of device stoping blast furnace hearth bottom temp to raise
CN205556724U (en) A smooth hammer of improved generation for quick replacement blast -furnace tuyere
CN101892337B (en) Method for maintaining blast furnace taphole
CN101921887B (en) Maintenance method of blast furnace liner
CN110184412B (en) Method for replacing bottom blowing brick cup of converter
CN104390468B (en) A kind of industrial silicon smelting furnace eye restorative procedure
CN107779556A (en) A kind of RH refining furnace vacuum chambers base channel restorative procedure
CN106702072A (en) Converter combined blowing method with bottom tuyeres being visible in full furnace campaign
CN105605924A (en) Repair method of fixed anode copper metallurgical furnace bottom bricks
CN101851692A (en) Construction method for curing non-aqueous slurry at normal temperature in blast furnace
CN208872112U (en) A kind of mineral hot furnace dirt-excluding groove new construction
CN110567274B (en) Digging and repairing method for sidewall of impoverishment furnace
CN206308387U (en) A kind of RH vacuum chambers bottom masonry construction
CN201436540U (en) Iron mouth structure of fusion reduction ironmaking furnace
CN105033235A (en) Smelting steel ladle
CN103512361B (en) Furnace brick patching method of oxygen enrichment top-blown copper metallurgical furnace
CN218666122U (en) Novel slag-iron separation structure for blast furnace
CN115627319A (en) Method for quickly replacing tubular bricks of steel tapping hole of converter
CN220393785U (en) Novel precast block of blast furnace main channel skimming device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181023

RJ01 Rejection of invention patent application after publication