CN108678716A - A composite pipe layered water injection intelligent control system and method - Google Patents
A composite pipe layered water injection intelligent control system and method Download PDFInfo
- Publication number
- CN108678716A CN108678716A CN201810496580.6A CN201810496580A CN108678716A CN 108678716 A CN108678716 A CN 108678716A CN 201810496580 A CN201810496580 A CN 201810496580A CN 108678716 A CN108678716 A CN 108678716A
- Authority
- CN
- China
- Prior art keywords
- layered
- pipe
- composite pipe
- downhole
- water injection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/20—Displacing by water
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
- E21B34/08—Valve arrangements for boreholes or wells in wells responsive to flow or pressure of the fluid obtained
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
- E21B47/07—Temperature
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geophysics (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
Description
技术领域technical field
本发明属于油田采出水回注井技术领域,具体涉及一种复合管分层注水智能控制系统及方法。The invention belongs to the technical field of oilfield produced water reinjection wells, and in particular relates to an intelligent control system and method for composite pipe layered water injection.
背景技术Background technique
目前,精细注水技术快速发展,推动油藏水驱开发效果大幅提升,但是定向井、深井逐年增多,常规工艺测调难度大,遇阻情况突出,制约了注水效果的进一步提升。同时常规分注管柱多采用上提解封方式的普通封隔器作为套管保护封隔器,注水井完井坐封时采用打压方式,另外伴随注水工况变化,定向深井管柱会发生频繁蠕动,导致封隔器解封失效,制约了套管的长期应用可靠性。虽然近几年研发了非金属水力锚,一定程度控制了管柱蠕动,避免了封隔器的失效,但是后期管柱检串时,管柱解封难度大,未能减少人工井下作业次数,降低井下作业风险。At present, the rapid development of fine water injection technology has greatly improved the effect of water flooding development in reservoirs. However, the number of directional wells and deep wells has increased year by year, and the measurement and adjustment of conventional technology is difficult. At the same time, conventional split injection strings mostly use ordinary packers in the way of lifting and unsealing as casing protection packers. When water injection wells are completed and set, pressure is used. In addition, with changes in water injection conditions, directional deep well strings will occur. Frequent peristalsis leads to packer unsealing failure, which restricts the long-term application reliability of the casing. Although non-metallic hydraulic anchors have been developed in recent years, which have controlled the peristalsis of the pipe string to a certain extent and avoided the failure of the packer, but it is difficult to unseal the pipe string during the string inspection later, and the number of manual downhole operations has not been reduced. Reduce the risk of downhole operations.
发明内容Contents of the invention
本发明的目的是提供一种复合管分层注水智能控制系统及方法,克服现有分层管柱分层合格率低、人工作业风险大的问题。The object of the present invention is to provide an intelligent control system and method for layered water injection of composite pipes, which can overcome the problems of low pass rate of layered pipe strings and high risk of manual operation in the existing layered pipe strings.
为此,本发明提供了一种复合管分层注水智能控制系统,包括地面控制器,还包括复合管,复合管下端通过管件连接器连接着油管,油管上串接着上下布设的封隔器和井下自动控制结构,封隔器和井下自动控制结构设有多组,油管尾部自上至下安装着单向阀、筛管和丝堵;For this reason, the present invention provides an intelligent control system for composite pipe layered water injection, which includes a ground controller and a composite pipe. Downhole automatic control structure, packer and downhole automatic control structure are equipped with multiple groups, and the tail of the tubing is installed with a check valve, screen and plug from top to bottom;
所述地面控制器通过电缆与井下自动控制结构电连接,封隔器采用过电缆封隔器。The surface controller is electrically connected to the downhole automatic control structure through cables, and the packer is a cable packer.
所述井下自动控制结构由壳体、井下自动监测装置和分层控制阀组成,井下自动监测装置和分层控制阀安装在壳体内,电缆由信号线和供电线组成,信号线一端连接地面控制器,另一端穿过复合管与井下自动监测装置电连接,井下自动监测装置将采集到的注水井数据通过信号线传输给地面控制器,供电线一端连接地面控制器,另一端穿过复合管与分层控制阀电连接。The downhole automatic control structure is composed of a casing, an automatic downhole monitoring device and a layered control valve, the downhole automatic monitoring device and the layered control valve are installed in the casing, the cable is composed of a signal line and a power supply line, and one end of the signal line is connected to the ground control The other end passes through the composite pipe and is electrically connected to the downhole automatic monitoring device. The downhole automatic monitoring device transmits the collected water injection well data to the ground controller through the signal line. One end of the power supply line is connected to the ground controller, and the other end passes through the composite pipe. Electrically connected to the stratified control valve.
所述井下自动监测装置由压力传感器、温度传感器和流量传感器集成组成。The downhole automatic monitoring device is composed of a pressure sensor, a temperature sensor and a flow sensor.
所述分层控制阀自上至下由电机、一体化水嘴结构、连杆和阀芯依次连接组成,地面控制器根据井下自动监测装置传输的压力、温度和流量数据控制一体化水嘴结构中水嘴的开度。The layered control valve is composed of a motor, an integrated faucet structure, a connecting rod and a valve core sequentially connected from top to bottom, and the surface controller controls the integrated faucet structure according to the pressure, temperature and flow data transmitted by the downhole automatic monitoring device. The opening of the faucet.
所述复合管采用非金属材质制成,内腔设有主管,信号线和供电线复合在复合管的管壁上。The composite pipe is made of non-metallic material, the inner cavity is provided with a main pipe, and the signal line and the power supply line are combined on the pipe wall of the composite pipe.
一种复合管分层注水智能控制系统的控制方法,包括如下步骤:A control method for a composite pipe layered water injection intelligent control system, comprising the following steps:
步骤一:连接复合管、管件连接器、油管、封隔器、井下自动控制结构、单向阀、筛管和丝堵成为管柱,并通过电缆电连接地面控制器与井下自动控制结构,然后下入井内进行电通性测试,使井下电路通畅;Step 1: Connect composite pipes, pipe connectors, tubing, packers, downhole automatic control structures, check valves, screens and plugs to form pipe strings, and electrically connect the ground controller and downhole automatic control structures through cables, and then Go down into the well for electrical continuity test to make the downhole circuit unobstructed;
步骤二:对井内管柱进行打压坐封,使封隔器坐封,然后再次进行电通性测试,使井下电路通畅;Step 2: Pressurize and set the tubing string in the well to set the packer, and then perform the electrical conductivity test again to make the downhole circuit unobstructed;
步骤三:通过地面控制器向井下自动控制结构发送指令,分层控制阀打开一体化水嘴结构的水嘴,进行供水开注,然后地面控制器发送对封隔器的验封指令,完成对封隔器的验封;Step 3: Send instructions to the downhole automatic control structure through the ground controller, and the layered control valve opens the nozzle of the integrated nozzle structure to start water supply and injection, and then the surface controller sends an instruction to check the seal of the packer to complete the inspection. Sealing of packers;
步骤四:在地面控制器设定四个不同注水压力,进行井下分层注水,井下自动控制结构自动测试分层流量,每一次注水压力测定30分钟,然后根据分层流量绘制吸水指示曲线;Step 4: Set four different water injection pressures on the ground controller to perform downhole stratified water injection. The downhole automatic control structure automatically tests the stratified flow rate. The water injection pressure is measured for 30 minutes each time, and then the water absorption indicator curve is drawn according to the stratified flow rate;
步骤五:通过远程控制系统与地面控制器建立通讯,地面控制器与井下自动控制结构、分层控制阀建立通讯,地面控制器将调节指令发送给分层控制阀,分层控制阀接收指令后,按照指令内容,调节分层流量,然后将调节结果反馈给地面控制器,地面控制器根据地质配注要求,重复前面测调过程,直至分层注水量满足配注要求为止。Step 5: Establish communication with the ground controller through the remote control system. The ground controller establishes communication with the downhole automatic control structure and the layered control valve. The ground controller sends adjustment instructions to the layered control valve. After receiving the instruction, the layered control valve , adjust the stratified flow according to the instruction content, and then feed back the adjustment result to the ground controller. The ground controller repeats the previous measurement and adjustment process according to the geological injection requirements until the layered water injection volume meets the injection requirements.
地面控制器分为手动测调模式和自动测调模式,步骤五中地面控制器可选择为自动测调模式,分层控制阀根据地质配水量,自动调节分层流量,达到分层配水合格。The ground controller is divided into manual measurement and adjustment mode and automatic measurement and adjustment mode. In step 5, the ground controller can be selected as the automatic measurement and adjustment mode. The layered control valve automatically adjusts the layered flow according to the geological water distribution to achieve the qualified layered water distribution.
本发明的有益效果:本发明提供的这种复合管分层注水智能控制系统及方法,复合管抗腐蚀能力强,可以有效提升管柱长期应用可靠性,减小现场作业风险;复合管内集成供电线和信号线结构设计,满足井下控制结构供电及分层动态实时监测;井下工具采用过电缆结构设计,确保信号与供电的顺利实现,提高实时控制的可靠性;分层流量实时控制及远程实时监控,将大幅提升分层注水合格率。Beneficial effects of the present invention: the composite pipe layered water injection intelligent control system and method provided by the present invention have strong anti-corrosion ability of the composite pipe, can effectively improve the long-term application reliability of the pipe string, and reduce the risk of on-site operation; integrated power supply in the composite pipe Cable and signal line structure design to meet the downhole control structure power supply and layered dynamic real-time monitoring; downhole tools adopt cable structure design to ensure the smooth realization of signal and power supply, and improve the reliability of real-time control; layered flow real-time control and remote real-time Monitoring will greatly increase the qualification rate of layered water injection.
以下将结合附图对本发明做进一步详细说明。The present invention will be described in further detail below in conjunction with the accompanying drawings.
附图说明Description of drawings
图1是复合管分层注水智能控制系统的结构示意图。Figure 1 is a structural schematic diagram of an intelligent control system for layered water injection of composite pipes.
附图标记说明:1.地面控制器;2.复合管;3.管件连接器;4.信号线;5.封隔器;6.井下自动监测装置;7.井下自动控制结构;8.单向阀;9.筛管;10.丝堵;11.供电线;12.分层控制阀;13.油管;14.电缆。Explanation of reference signs: 1. Surface controller; 2. Composite pipe; 3. Pipe connector; 4. Signal line; 5. Packer; 6. Downhole automatic monitoring device; 7. Downhole automatic control structure; 8. Single Directional valve; 9. Screen pipe; 10. Plug; 11. Power supply line; 12. Layered control valve; 13. Oil pipe; 14. Cable.
具体实施方式Detailed ways
实施例1:Example 1:
为了克服现有分层管柱分层合格率低、人工作业风险大的问题,本实施例提供了一种复合管分层注水智能控制系统,如图1所示,包括地面控制器1,还包括复合管2,复合管2下端通过管件连接器3连接着油管13,油管13上串接着上下布设的封隔器5和井下自动控制结构7,封隔器5和井下自动控制结构7设有多组,油管13尾部自上至下安装着单向阀8、筛管9和丝堵10;所述地面控制器1通过电缆14与井下自动控制结构7电连接,所述封隔器5采用过电缆封隔器。过电缆封隔器采用过电缆结构设计,实现封隔器密封结构跨电缆,封隔器上下管柱满足供电及信号连接。需要说明的是,地面控制器和过电缆封隔器是现有技术,其具体的结构不作为本发明的保护点,在此不作详细的说明。如图1所示,每一个井下自动控制结构7对应一个注水层。In order to overcome the problems of low qualified rate of delamination of existing delamination strings and high risk of manual operation, this embodiment provides an intelligent control system for delamination water injection of composite pipes, as shown in Figure 1, including a ground controller 1, It also includes composite pipe 2, the lower end of composite pipe 2 is connected to oil pipe 13 through pipe connector 3, and oil pipe 13 is connected in series with packer 5 and downhole automatic control structure 7 arranged up and down, and packer 5 and downhole automatic control structure 7 are set There are multiple groups, and the tail of the tubing 13 is equipped with a one-way valve 8, a screen 9 and a plug 10 from top to bottom; the ground controller 1 is electrically connected to the downhole automatic control structure 7 through a cable 14, and the packer 5 Cable packers are used. The over-cable packer adopts over-cable structure design to realize the seal structure of the packer across the cable, and the upper and lower strings of the packer can meet the power supply and signal connection. It should be noted that the ground controller and the cable-passing packer are prior art, and their specific structures are not used as the protection point of the present invention, and will not be described in detail here. As shown in FIG. 1 , each downhole automatic control structure 7 corresponds to a water injection layer.
复合管分层注水智能控制系统的使用过程如下:The use process of the composite pipe layered water injection intelligent control system is as follows:
测试调配技术人员通过远程控制系统与地面控制器1建立通讯,地面控制器1与井下自动控制结构7建立通讯,地面控制器1将调节指令发送给井下自动控制结构7,井下自动控制结构7接收指令后,按照指令内容,调节分层流量,然后将调节结果反馈给地面控制器1,地面控制器1根据地质配注要求,重复前面测调过程,直至分层注水量满足配注要求为止。The testing and deployment technicians establish communication with the ground controller 1 through the remote control system, and the ground controller 1 establishes communication with the downhole automatic control structure 7. The ground controller 1 sends adjustment instructions to the downhole automatic control structure 7, and the downhole automatic control structure 7 receives After the instruction, adjust the stratified flow rate according to the instruction content, and then feed back the adjustment result to the ground controller 1. The ground controller 1 repeats the previous measurement and adjustment process according to the geological injection requirements until the layered water injection volume meets the injection requirements.
地面控制器1分为手动测调模式和自动测调模式,步骤五中采用是的是手动测调模式,地面控制器1也可选择为自动测调模式,井下自动控制结构7根据地质配水量,自动调节分层流量,达到分层配水合格。The ground controller 1 is divided into a manual measurement and adjustment mode and an automatic measurement and adjustment mode. The manual measurement and adjustment mode is adopted in step 5, and the ground controller 1 can also be selected as the automatic measurement and adjustment mode. , Automatically adjust the stratified flow to achieve qualified stratified water distribution.
地面控制器1采用电缆方式与远程控制系统及井下工具建立通讯,实现远程双向通讯控制及数据传输。The surface controller 1 establishes communication with the remote control system and downhole tools by means of cables to realize remote two-way communication control and data transmission.
实施例2:Example 2:
在实施例1的基础上,所述井下自动控制结构7由壳体、井下自动监测装置6和分层控制阀12组成,井下自动监测装置6和分层控制阀12安装在壳体内,电缆14由信号线4和供电线11组成,信号线4一端连接地面控制器1,另一端穿过复合管2与井下自动监测装置6电连接,井下自动监测装置6将采集到的注水井数据通过信号线4传输给地面控制器1,供电线11一端连接地面控制器1,另一端穿过复合管2与分层控制阀12电连接。On the basis of Embodiment 1, the downhole automatic control structure 7 is composed of a housing, a downhole automatic monitoring device 6 and a layered control valve 12, the downhole automatic monitoring device 6 and the layered control valve 12 are installed in the housing, and the cable 14 It is composed of a signal line 4 and a power supply line 11. One end of the signal line 4 is connected to the ground controller 1, and the other end is electrically connected to the downhole automatic monitoring device 6 through the composite pipe 2. The downhole automatic monitoring device 6 passes the collected water injection well data through the signal The line 4 is transmitted to the ground controller 1 , one end of the power supply line 11 is connected to the ground controller 1 , and the other end is electrically connected to the layered control valve 12 through the composite pipe 2 .
复合管2采用非金属材质设计,满足井下封隔器坐封15MPa抗内压及正常注水技术要求,内部集成设计一个主管结构,管壁复合供电线11和信号线4,井口与地面控制器1、井下通过复合管柱连接器3分别与下部分层注水管供电线11和信号线4连接,然后与井下自动监测装置6、分层控制阀12电连接,满足远程实时监控目的。通过地面控制器1采集注水井井下分层流量、压力、温度等动态数据数据,同时实现远程实时控制分层流量,提升控制的可靠性及后期维护方便性,降低井下作业风险,并大幅提升分层注水合格率,提升分注井管理水平。Composite pipe 2 is designed with non-metallic materials to meet the technical requirements of downhole packer setting 15MPa anti-internal pressure and normal water injection. A main pipe structure is designed internally, pipe wall composite power supply line 11 and signal line 4, wellhead and surface controller 1 , downhole through the composite pipe string connector 3 respectively connected with the power supply line 11 and the signal line 4 of the lower stratified water injection pipe, and then electrically connected with the downhole automatic monitoring device 6 and the stratified control valve 12 to meet the purpose of remote real-time monitoring. The ground controller 1 collects dynamic data such as flow rate, pressure, and temperature of downhole layers of water injection wells, and at the same time realizes remote real-time control of layered flow rates, improves the reliability of control and the convenience of later maintenance, reduces the risk of downhole operations, and greatly improves the level of distribution. The pass rate of layer water injection was improved, and the management level of separate injection wells was improved.
测试调配技术人员通过远程控制系统与地面控制器1建立通讯,地面控制器1与井下自动控制结构7、分层控制阀12建立通讯,地面控制器1将调节指令发送给分层控制阀12,分层控制阀12接收指令后,按照指令内容,调节分层流量,然后将调节结果反馈给地面控制器1,地面控制器1根据地质配注要求,重复前面测调过程,直至分层注水量满足配注要求为止。The test deployment technician establishes communication with the ground controller 1 through the remote control system, and the ground controller 1 establishes communication with the downhole automatic control structure 7 and the layered control valve 12, and the ground controller 1 sends the adjustment instruction to the layered control valve 12, After receiving the instruction, the stratified control valve 12 adjusts the stratified flow rate according to the content of the instruction, and then feeds back the adjustment result to the ground controller 1. The ground controller 1 repeats the previous measurement and adjustment process according to the geological injection requirements until the stratified water injection volume Until the allocation requirements are met.
实施例3:Example 3:
在实施例2的基础上,所述井下自动监测装置6由压力传感器、温度传感器和流量传感器集成组成,实时监测分层动态数据并实时传输。On the basis of Embodiment 2, the downhole automatic monitoring device 6 is composed of a pressure sensor, a temperature sensor and a flow sensor, and real-time monitoring and real-time transmission of layered dynamic data.
实施例4:Example 4:
在实施例2的基础上,所述分层控制阀12自上至下由电机、一体化水嘴结构、连杆和阀芯依次连接组成,地面控制器1根据井下自动监测装置6传输的压力、温度和流量数据控制一体化水嘴结构中水嘴的开度。分层控制阀12集成电机及一体化水嘴结构设计,实时控制分层流量。On the basis of Embodiment 2, the layered control valve 12 is composed of a motor, an integrated faucet structure, a connecting rod and a valve core connected sequentially from top to bottom, and the ground controller 1 is based on the pressure transmitted by the downhole automatic monitoring device 6. , temperature and flow data to control the opening of the faucet in the integrated faucet structure. The layered control valve 12 is designed with an integrated motor and an integrated faucet structure to control the layered flow in real time.
实施例5:Example 5:
在实施例2的基础上,所述复合管2采用非金属材质制成,内腔设有主管,信号线4和供电线11复合在复合管2的管壁上。On the basis of Example 2, the composite pipe 2 is made of non-metallic material, the inner cavity is provided with a main pipe, and the signal line 4 and the power supply line 11 are composited on the pipe wall of the composite pipe 2 .
实施例6:Embodiment 6:
一种复合管分层注水智能控制系统的控制方法,包括如下步骤:A control method for a composite pipe layered water injection intelligent control system, comprising the following steps:
步骤一:连接复合管2、管件连接器3、油管13、封隔器5、井下自动控制结构7、单向阀8、筛管9和丝堵10成为管柱,并通过电缆14电连接地面控制器1与井下自动控制结构7,然后下入井内进行电通性测试,使井下电路通畅;Step 1: Connect composite pipe 2, pipe connector 3, tubing 13, packer 5, downhole automatic control structure 7, check valve 8, screen pipe 9 and plug 10 to form a pipe string, and electrically connect to the ground through cable 14 The controller 1 and the downhole automatic control structure 7 are then lowered into the well for electrical continuity testing to make the downhole circuit unobstructed;
步骤二:对井内管柱进行打压坐封,使封隔器5坐封,然后再次进行电通性测试,使井下电路通畅;Step 2: Pressurize and set the tubing string in the well to set the packer 5, and then perform the electrical conductivity test again to make the downhole circuit unobstructed;
步骤三:通过地面控制器1向井下自动控制结构7发送指令,分层控制阀12打开一体化水嘴结构的水嘴,进行供水开注,然后地面控制器1发送对封隔器5的验封指令,完成对封隔器5的验封;Step 3: The ground controller 1 sends an instruction to the downhole automatic control structure 7, and the layered control valve 12 opens the water nozzle of the integrated water nozzle structure to start water supply and injection, and then the surface controller 1 sends a test for the packer 5. seal instruction, and complete the seal inspection of the packer 5;
步骤四:在地面控制器1设定四个不同注水压力,进行井下分层注水,井下自动控制结构7自动测试分层流量,每一次注水压力测定30分钟,然后根据分层流量绘制吸水指示曲线;Step 4: Set four different water injection pressures on the surface controller 1, and carry out downhole stratified water injection. The downhole automatic control structure 7 automatically tests the stratified flow rate, and measures the water injection pressure for 30 minutes each time, and then draws the water absorption indicator curve according to the stratified flow rate ;
步骤五:测试调配技术人员通过远程控制系统与地面控制器1建立通讯,地面控制器1与井下自动控制结构7、分层控制阀12建立通讯,地面控制器1将调节指令发送给分层控制阀12,分层控制阀12接收指令后,按照指令内容,调节分层流量,然后将调节结果反馈给地面控制器1,地面控制器1根据地质配注要求,重复前面测调过程,直至分层注水量满足配注要求为止。Step 5: Test and deployment technicians establish communication with the ground controller 1 through the remote control system, the ground controller 1 establishes communication with the downhole automatic control structure 7, and the layered control valve 12, and the ground controller 1 sends adjustment instructions to the layered control After the valve 12 and the stratification control valve 12 receive the instructions, they adjust the stratification flow according to the contents of the instructions, and then feed back the adjustment results to the ground controller 1. The ground controller 1 repeats the previous measurement and adjustment process according to the geological distribution requirements until Layer water injection volume meets the distribution requirements.
地面控制器1分为手动测调模式和自动测调模式,步骤五中地面控制器1可选择为自动测调模式,分层控制阀12根据地质配水量,自动调节分层流量,达到分层配水合格。The ground controller 1 is divided into manual measurement and adjustment mode and automatic measurement and adjustment mode. In step 5, the ground controller 1 can be selected as the automatic measurement and adjustment mode. The stratification control valve 12 automatically adjusts the stratification flow according to the geological water distribution to achieve stratification. The water distribution is qualified.
以上例举仅仅是对本发明的举例说明,并不构成对本发明的保护范围的限制,凡是与本发明相同或相似的设计均属于本发明的保护范围之内。本实施例没有详细叙述的部件和结构属本行业的公知部件和常用结构或常用手段,这里不一一叙述。The above examples are only illustrations of the present invention, and do not constitute a limitation to the protection scope of the present invention. All designs that are the same as or similar to the present invention fall within the protection scope of the present invention. The components and structures not described in detail in this embodiment are known components and common structures or common means in this industry, and are not described here one by one.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810496580.6A CN108678716A (en) | 2018-05-22 | 2018-05-22 | A composite pipe layered water injection intelligent control system and method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810496580.6A CN108678716A (en) | 2018-05-22 | 2018-05-22 | A composite pipe layered water injection intelligent control system and method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN108678716A true CN108678716A (en) | 2018-10-19 |
Family
ID=63807661
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201810496580.6A Pending CN108678716A (en) | 2018-05-22 | 2018-05-22 | A composite pipe layered water injection intelligent control system and method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN108678716A (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109538179A (en) * | 2018-12-26 | 2019-03-29 | 中国石油天然气股份有限公司 | A kind of downhole self-adaptive water injection control device and control method |
| CN109630077A (en) * | 2018-12-21 | 2019-04-16 | 中国石油天然气股份有限公司 | A flexible composite pipe built-in cable underground layered direct reading control string |
| CN111878069A (en) * | 2020-08-04 | 2020-11-03 | 华信唐山石油装备有限公司 | Composite continuous pipe cable oil-water well casing leakage finding system and method |
| CN116006139A (en) * | 2023-03-20 | 2023-04-25 | 西安洛科电子科技股份有限公司 | Cable intelligent dispensing system using wireless power transmission |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103362486A (en) * | 2012-04-05 | 2013-10-23 | 中国石油天然气股份有限公司 | Digital Downhole Layered Water Injection Measuring and Adjusting Process String and Its Operation Method |
| CA2903661A1 (en) * | 2015-08-17 | 2017-02-17 | L. Murray Dallas | Method of completing and producing long lateral wellbores |
| CN107630689A (en) * | 2017-11-10 | 2018-01-26 | 中国石油化工股份有限公司 | Ground controls time-sharing layered water-filling method and cable control water dispensing apparatus and its application method |
| CN208718633U (en) * | 2018-05-22 | 2019-04-09 | 中国石油天然气股份有限公司 | A composite pipe layered water injection intelligent control system |
-
2018
- 2018-05-22 CN CN201810496580.6A patent/CN108678716A/en active Pending
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103362486A (en) * | 2012-04-05 | 2013-10-23 | 中国石油天然气股份有限公司 | Digital Downhole Layered Water Injection Measuring and Adjusting Process String and Its Operation Method |
| CA2903661A1 (en) * | 2015-08-17 | 2017-02-17 | L. Murray Dallas | Method of completing and producing long lateral wellbores |
| CN107630689A (en) * | 2017-11-10 | 2018-01-26 | 中国石油化工股份有限公司 | Ground controls time-sharing layered water-filling method and cable control water dispensing apparatus and its application method |
| CN208718633U (en) * | 2018-05-22 | 2019-04-09 | 中国石油天然气股份有限公司 | A composite pipe layered water injection intelligent control system |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109630077A (en) * | 2018-12-21 | 2019-04-16 | 中国石油天然气股份有限公司 | A flexible composite pipe built-in cable underground layered direct reading control string |
| CN109538179A (en) * | 2018-12-26 | 2019-03-29 | 中国石油天然气股份有限公司 | A kind of downhole self-adaptive water injection control device and control method |
| CN109538179B (en) * | 2018-12-26 | 2023-10-31 | 中国石油天然气股份有限公司 | An underground adaptive water injection control device and control method |
| CN111878069A (en) * | 2020-08-04 | 2020-11-03 | 华信唐山石油装备有限公司 | Composite continuous pipe cable oil-water well casing leakage finding system and method |
| CN116006139A (en) * | 2023-03-20 | 2023-04-25 | 西安洛科电子科技股份有限公司 | Cable intelligent dispensing system using wireless power transmission |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108374654B (en) | An intelligent water distribution device and process method for high-pressure wells | |
| CN103362486B (en) | Digital Downhole Layered Water Injection Measuring and Adjusting Process String and Its Operation Method | |
| CN202531143U (en) | Digital Downhole Layered Water Injection Measuring and Adjusting Process String | |
| CN106703763A (en) | Intelligent layered mining system applicable to offshore oilfield sand control well completion | |
| CN209603960U (en) | Underground wet butt joint intelligent separate injection pipe column | |
| CN206554900U (en) | A layered intelligent water injection string for a water injection well | |
| CN206220877U (en) | A Downhole Cable Wet Joint Suitable for Cable Digital Dispensing | |
| CN109707334B (en) | A water injection well intelligent distribution cable wellhead sealing device | |
| CN204511401U (en) | A kind of Intelligent testing adjusts selective sand control separate layer water injection string | |
| CN108756838A (en) | Non-metal coiled tube measurement and control layered water injection system with pre-embedded cables and its operation method | |
| CN211874464U (en) | Underground separate-layer water injection process system | |
| CN209067183U (en) | A pressure wave code intelligent layered water injection system for water injection wells | |
| CN215718697U (en) | Cable separate mining test system for tubular pump | |
| CN109538179B (en) | An underground adaptive water injection control device and control method | |
| CN209742867U (en) | A pipe string device for oilfield layered water injection process | |
| CN115726747A (en) | Electro-hydraulic integrated layered polymer injection device, tubular column and using method | |
| CN209603954U (en) | Horizontal well cable-passing intelligent water distributor and horizontal well underground segmented water injection pipe column | |
| CN204941496U (en) | A direct-reading digital intelligent layered water injection process string | |
| CN209742865U (en) | An intelligent layered water injection and layered production string for horizontal wells | |
| CN209603962U (en) | Water injection well remote monitoring and automatic control system | |
| CN209603959U (en) | Process pipe column for cabled digital separate injection under-pressure operation | |
| CN114458259B (en) | Control device and control method for double-medium layered injection flow | |
| CN113669036A (en) | Hydraulic control layered oil production system | |
| CN208718633U (en) | A composite pipe layered water injection intelligent control system | |
| CN115680587B (en) | Intelligent layered injection allocation pipe column of water-gathering separate injection well and operation method thereof |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181019 |
|
| RJ01 | Rejection of invention patent application after publication |