CN108678425A - prefabricated cabin - Google Patents
prefabricated cabin Download PDFInfo
- Publication number
- CN108678425A CN108678425A CN201810291205.8A CN201810291205A CN108678425A CN 108678425 A CN108678425 A CN 108678425A CN 201810291205 A CN201810291205 A CN 201810291205A CN 108678425 A CN108678425 A CN 108678425A
- Authority
- CN
- China
- Prior art keywords
- keel
- plate layer
- prefabricated cabin
- plate
- piece
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000010410 layer Substances 0.000 claims abstract description 133
- 239000011229 interlayer Substances 0.000 claims abstract description 4
- 229910000831 Steel Inorganic materials 0.000 claims description 43
- 239000010959 steel Substances 0.000 claims description 43
- 238000005096 rolling process Methods 0.000 claims description 9
- 238000003466 welding Methods 0.000 claims description 9
- 239000000463 material Substances 0.000 claims description 5
- 239000012528 membrane Substances 0.000 claims description 5
- 239000012530 fluid Substances 0.000 claims description 3
- 239000002184 metal Substances 0.000 claims description 3
- 229910052751 metal Inorganic materials 0.000 claims description 3
- 239000000565 sealant Substances 0.000 claims description 3
- PCHJSUWPFVWCPO-UHFFFAOYSA-N gold Chemical compound [Au] PCHJSUWPFVWCPO-UHFFFAOYSA-N 0.000 claims description 2
- 239000010931 gold Substances 0.000 claims description 2
- 229910052737 gold Inorganic materials 0.000 claims description 2
- 238000010586 diagram Methods 0.000 description 13
- 238000009423 ventilation Methods 0.000 description 8
- 238000009434 installation Methods 0.000 description 7
- 108010066057 cabin-1 Proteins 0.000 description 6
- 238000004378 air conditioning Methods 0.000 description 5
- 238000010276 construction Methods 0.000 description 4
- 230000017525 heat dissipation Effects 0.000 description 3
- 229920000742 Cotton Polymers 0.000 description 2
- 210000000988 bone and bone Anatomy 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000002265 prevention Effects 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 238000010923 batch production Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000008094 contradictory effect Effects 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 238000007747 plating Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 239000002356 single layer Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/12—Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
- E04H1/1205—Small buildings erected in the open air
- E04H1/1238—Shelters for engines, e.g. electrical meter housings
Abstract
This application discloses a kind of prefabricated cabin, prefabricated cabin includes side wall, and side wall includes the first plate layer and the second plate layer, and the first plate layer and the second plate interlayer are provided with hanger between setting, the first plate layer and the second plate layer, and the second plate layer is fixed on by hanger on the second plate layer.The application prefabricated cabin includes multiple plate layers, and hanger is provided between plate layer, and adjacent plate layer is connected by hanger, can effectively improve the intensity and install convenient degree of side wall.
Description
Technical field
This application involves prefabricated cabin fields, more particularly to a kind of prefabricated cabin.
Background technology
With the development of economy, new demand is proposed to the efficiency of power construction.In order to further shorten power construction
Period, the pattern of " batch production processing, assembled construction " are just gradually becoming the trend of power construction.And an important ring therein is just
It is prefabricated cabin.Prefabricated cabin is a kind of power equipment carrier, and size meets highway transportation requirement, and inside can accommodate more electric power and set
It is standby, prefabricated processing is completed in factory, after internal unit installation, wiring, whole Transporting to use site.Nacelle has inside
Ambient control capability can provide good service condition for internal unit.
The nacelle of prefabricated cabin is all made of corrugated plating at present, and assembly is welded using single layer, and intensity is not high, and installs not
Just.
Invention content
The application can improve the intensity and peace of prefabricated cabin side wall mainly solving the technical problems that provide a kind of prefabricated cabin
Fill convenient degree.
In order to solve the above technical problems, the technical solution that the application uses is:A kind of prefabricated cabin, prefabricated cabin packet are provided
Side wall is included, side wall includes the first plate layer and the second plate layer, and the first plate layer and the second plate interlayer are every setting, the first plate layer and the second plate
It is provided with hanger between layer, the second plate layer is fixed on by hanger on the second plate layer.
Wherein, hanger includes the keel of a plurality of vertical direction, and the side of keel is spirally connected with the second plate layer, the other side of keel
Multiple pendants are vertically provided with, the position that the first plate layer corresponds to pendant is provided with multiple card slots, and the first plate layer passes through card
Slot and pendant are fixed on the second plate layer.
Wherein, keel include main joist and secondary joist, and the cross-sectional area of main joist is more than the cross-sectional area of secondary joist, main dragon
Bone is arranged in by pre-determined distance on side wall, and secondary joist is equidistantly arranged between two adjacent main joists.
Wherein, side wall includes doorframe, and doorframe is rectangular box, and the both sides of doorframe are equipped with door anti-rolling chock, and door anti-rolling chock includes
The first keel portion and the second keel portion for being welded to each other or being spirally connected, the first keel portion are located at the both sides of doorframe, the second keel position
In the bottom and top of doorframe.
Wherein, keel include corner keel, and corner keel includes being fixedly connected and orthogonal two sides, is formed by even
The right-angle structure that place extends is connect, two sides are screwed onto respectively on the two piece of second plate layer to form external corner.
Wherein, pendant is "T"-shaped lug boss, and the second plate layer includes multiple golden nation plates, adjacent Liang Kuaijin nations plate
Be connected together, and card slot formed at the position that it is connected together, and be connected together by card slot and pendant, multiple golden nations plates it
Between gap position be filled with fluid sealant.
Wherein, keel include multiple keel pieces, and keel piece is rectangular metal sheet, and the long side of keel piece passes through welding or one
Molding mode is fixed together, and preset angle is formed between adjacent keel piece, to form skeleton structure.
Wherein, be provided with angle steel at the inner corner trim of the connecting portion of adjacent keel piece, the both ends of angle steel respectively with keel piece
Connection, to keep the angle between keel piece.
Wherein, prefabricated cabin includes steelframe, and the second plate layer is fixed on the outside of steelframe by way of being spirally connected or being connected together,
The both ends of keel contradict or are spirally connected with the top and bottom of steelframe respectively.
Wherein, the material of the second plate layer is Europe deals, and damp-proof membrane is provided on an at least side surface for Europe deals.
The advantageous effect of the application is:It is different from the prior art, the application prefabricated cabin includes multiple plate layers, is set between plate layer
It is equipped with hanger, adjacent plate layer is connected by hanger, can effectively improve the intensity and install convenient degree of side wall.
Description of the drawings
Fig. 1 is the overall schematic of one embodiment of the application prefabricated cabin;
Fig. 2 is the diagrammatic cross-section of one embodiment of the application prefabricated cabin;
Fig. 3 is the thin portion schematic diagram of a-quadrant in Fig. 2;
Fig. 4 is the thin portion schematic diagram of B area in Fig. 2;
Fig. 5 is the thin portion schematic diagram in the regions C in Fig. 2;
Fig. 6 is the overall schematic of the keel in one embodiment of the application prefabricated cabin;
Fig. 7 is the structural schematic diagram of secondary joist in one embodiment of the application prefabricated cabin;
Fig. 8 is the structural schematic diagram of door anti-rolling chock in one embodiment of the application prefabricated cabin;
Fig. 9 is the structural schematic diagram of corner keel in one embodiment of the application prefabricated cabin;
Figure 10 is the overall schematic of steelframe in one embodiment of the application prefabricated cabin;
Figure 11 is the thin portion schematic diagram in the regions D in Figure 10.
Specific implementation mode
Below in conjunction with the attached drawing in the embodiment of the present application, technical solutions in the embodiments of the present application carries out clear, complete
Site preparation describes, it is clear that described embodiments are only a part of embodiments of the present application, instead of all the embodiments.It is based on
Embodiment in the application, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment belongs to the range of the application protection.
Refering to fig. 1 and Fig. 2, Fig. 1 be one embodiment of the application prefabricated cabin overall schematic, Fig. 2 is that the application is prefabricated
The diagrammatic cross-section of one embodiment of cabin.
The application prefabricated cabin 1 includes side wall 11 combined with Figure 1 and Figure 2, and industrial air-conditioning 12 and exhaust are provided on side wall 11
Fan, exhaust fan includes first exhaust fan 131 and second exhaust fan 132.Industrial air-conditioning 12 is bolted or other modes are solid
It is scheduled on side wall 11, air-conditioning 12 is mounted on opposite two side, for being aerated heat dissipation to prefabricated cabin 1.First exhaust fan
131 and second exhaust fan 132 is bolted or other modes are fixed on side wall 11, for radiating to prefabricated cabin 1
Ventilation.Further, first exhaust fan 131 and second exhaust fan 132 are located on opposite two side, and first exhaust fan 131
Height be less than the height of second exhaust fan 132, exhaust fan is oppositely arranged and height is different to form cross-ventilation, realizes ventilation
Heat dissipation.In other embodiments, industrial air-conditioning 12 and exhaust fan can also be mounted on other positions of prefabricated cabin 1, installation side
Formula can also be the modes such as clamping and overhanging, and the application is not construed as limiting this.Alternatively, in other embodiments, can be used only
One of industrial air-conditioning 12 or exhaust fan, also, in exhaust fan, can also only use first exhaust fan 131 or second exhaust
One of fan 132.In addition, exhaust fan can be also changed to the device of the ventilations such as ventilation fan.
It is the thin portion schematic diagram of a-quadrant in Fig. 2 further referring to Fig. 3, Fig. 4 and Fig. 5, Fig. 3;Fig. 4 is the areas Tu2Zhong B
The thin portion schematic diagram in domain;Fig. 5 is the thin portion schematic diagram in the regions C in Fig. 2.
Side wall 11 includes at least two plate layers that set gradually from inside to outside, at least partly adjacent plate interlayer every setting, with
Form gas channel 115.Gas channel 115 is connect with the ventilation opening of first exhaust fan 131 and second exhaust fan 132, so that gas
Stream is aerated heat dissipation by side wall 11 to prefabricated cabin 1.In the present embodiment, side wall 11 includes setting gradually from inside to outside
Third plate layer 112, the first plate layer 111 and the second plate layer 112.First is equipped between third plate layer 112 and the first plate layer 111
Gas channel 1151 is equipped with the second gas channel 1152 between first plate layer 111 and the second plate layer 112.In other embodiment
In, the number of plate layer and gas channel determines as the case may be, such as the wherein two plate layers fitting among three plate layers, and with the
Gas channel is set between three pieces of plate layers, the application does not limit this.Since the side wall of the application is made of multi-layer board, and it is more
Multiple gas channels are equipped between laminate, it can be to prefabricated cabin ventilation and heat, to ensure the normal work of prefabricated cabin internal unit.
In present embodiment, the steelframe 14 with pierced pattern is equipped between third plate layer 112 and the first plate layer 111, the
Three plate layers 112 are fixed on the inside of steelframe 14 by way of being spirally connected, and the first plate layer 111 is fixed on steelframe by way of being spirally connected
14 outside, the first gas channel 1151 are the pierced pattern of steelframe 14.Further, steelframe 14 include side framework 141 with
And reinforce keel 142, and reinforce keel 142 and is fixed on by way of being spirally connected or welding in side framework 141, side framework 141
Inside and outside be bonded respectively with third plate layer 112 and the first plate layer 111, and fixed by way of being spirally connected or welding.
In other embodiment, connection types and the steel such as third plate layer 112 and the first plate layer 111 can also be connected by a snap or be bonded
14 fixed-link of frame, the application are not construed as limiting this.Third plate layer 112 and the first plate layer 111 are fixed on steelframe 14, side wall
Weight is by 14 load-bearing of steelframe, the deformation of plate layer, deflection caused by plate layer can be effectively prevent to be squeezed because of situations such as its own gravity.
In present embodiment, the material of the second plate layer 112 is golden nation plate, and the outside of the first plate layer 111 is fixed with hanger
116, the outside of hanger 116 is equipped with pendant 1161.Preferably, pendant 1161 is "T"-shaped lug boss, and hanger 116 passes through "T"-shaped convex
The portion of rising is connected together with golden nation's plate, and hanger 116 is located at the hollow out figure of hanger 116 with pierced pattern, the second gas channel 1152
Case.Golden nation's plate can effectively carry out waterproof, fire prevention, antidetonation etc. as the outer layer of side wall, and golden nation plate pattern is various, color is rich
Richness can improve the aesthetics of prefabricated cabin.
Further, the second plate layer 112 includes multiple golden nation plates, is connected together between adjacent golden nation's plate to be formed
Card slot 1131, and be connected together by card slot 1131 and "T"-shaped lug boss, the gap position between multiple gold nations plate is filled with
Fluid sealant.It is connected together by multiple golden nation plates, improves the convenient degree of plate layer installation, meanwhile, gap position is filled with close
Sealing can carry out waterproof.Alternatively, in other embodiments, the second plate layer 112 is golden nation plate whole plate, inner surface setting
There is the groove being connected together with "T"-shaped lug boss.
Further, the material of the first plate layer 111 is Europe deals, and damp-proof membrane is provided on the outer surface of Europe deals
1121.The effects that Europe deals and the damp-proof membrane 1121 being disposed thereon can carry out moisture-proof, vertical load-bearing has good moisture-proof
And anti-seismic performance, and Europe deals density is smaller, can mitigate the burden of steelframe, improves the stability of steelframe.In other embodiment party
In formula, the first plate layer 111 can also use other materials, can also be respectively provided with damp-proof membrane inside and outside the deals of Europe, this Shen
Please this is not construed as limiting.
In present embodiment, the first channel steel 143, the first channel steel 143 are equipped between third plate layer 112 and the first plate layer 111
Middle part be fixed on by way of being spirally connected on steelframe 14, the both ends of the first channel steel 143 are separately connected third plate layer 112 and first
Plate layer 111, to keep the distance between third plate layer 112 and the first plate layer 111.Since the both ends of the first channel steel 143 are pasted respectively
Third plate layer 112 and the first plate layer 111 are closed, third plate layer 112 and the first plate layer 111 can be made to be maintained at a certain distance, is prevented
Only prefabricated cabin wall deformation.
Further, steelframe 14 includes bottom framework 144, and the bottom of bottom framework 144 is equipped with I-steel 1441 and second
Channel steel 1442, the middle part of the first channel steel 143 are fixed on the surface of I-steel 1441, the second channel steel by way of being spirally connected or welding
1442 are located at the inside of third plate layer 112, the inner opposite end formation bottom receiving portion of the second channel steel 1442 and the first channel steel 143
1111 with inlay card third plate layer 112.Further, steelframe 14 further includes top receiving portion 1112, top receiving portion 1112
In the top of steelframe 14, top receiving portion 1112 accommodates the top of third plate layer 112, and engages the top of third plate layer 112.By
It is engaged in receiving portion in the top and bottom of third plate layer 112, third plate layer 112 can be firmly fixed to steelframe very much
On 14.Therefore, if the both ends of third plate layer 112 are connected together with the receiving portion on steelframe 14, third plate layer 112 its
His position can not also need to be attached with steelframe 14, and the surface of third plate layer 112 does not have any installation hole, third plate layer
112 globality can greatly improve, and can improve the leakproofness of plate layer.
Further, first exhaust fan 131 and second exhaust fan 132 are fixed on by way of being spirally connected on steelframe 14, the
One exhaust fan 131 and the ventilation opening of second exhaust fan 132 are connect with gas channel 115, the gas in gas channel 115 is discharged
Stream forms convection current.
Further, the first plate layer 113 be filled board, filled board include both sides color steel and centre rock cotton board,
The thickness of color steel is 0.5mm, and the density of rock cotton board is 120kg/m3.The filled board is big with intensity, density is small and fire prevention
Equal excellent performances, are effectively protected prefabricated cabin.
It is this refering to Fig. 6, Fig. 7, Fig. 8 and Fig. 9, Fig. 6 in order to illustrate the concrete structure of keel in the application hanger 116
Apply for the overall schematic of the keel in one embodiment of prefabricated cabin;Fig. 7 is secondary joist in one embodiment of the application prefabricated cabin
Structural schematic diagram;Fig. 8 is the structural schematic diagram of door anti-rolling chock in one embodiment of the application prefabricated cabin;Fig. 9 is that the application is pre-
The structural schematic diagram of corner keel in one embodiment of cabin processed.
In conjunction with Fig. 1-9, hanger 116 is equipped between the first plate layer 111 and the second plate layer 112, hanger 116 includes a plurality of vertical
The keel 15 in direction, the side of keel 15 are spirally connected with the first plate layer 111, and the other side of keel is vertically provided with multiple extensions
Part 1161, the position that the second plate layer 112 corresponds to pendant are provided with multiple card slots 1131, the second plate layer 112 by card slot 1131 with
Pendant 1161 is fixed on the first plate layer 111.The both ends of keel 15 can be by the modes such as being spirally connected or welding or be clamped
It is fixed on steelframe 14, can also be directly placed on the I-steel 1441 of bottom framework 144, vertical force is reached into bottom framework
On 144.In other embodiments, the side of keel 15 can also be connect with the first plate layer 111 by modes such as clampings, this Shen
Please this is not construed as limiting.
Further, keel 15 include main joist 151 and secondary joist 152, and the cross-sectional area of main joist 151 is more than secondary joist
152 cross-sectional area, main joist 151 are arranged in by pre-determined distance on the first plate layer 111 on side wall 11, and secondary joist 152 is two
It equidistantly arranges between 151 adjacent main joists.Further, secondary joist 152 includes the first keel piece 1521, the second keel piece
1522 and third keel piece 1523, the first keel piece 1521, the second keel piece 1522 and third keel piece 1523 are square
Shape sheet metal, the first keel piece 1521 and third keel piece 1523 are located at the both sides of the second keel piece 1522.First keel piece
One long side of 1521 long side and the second keel piece 1522 is welded on one piece, the first keel piece 1521 and the second keel piece 1522
Between form right angle, another long side of the second keel piece 1522 and a long side of third keel piece 1523 are welded on one piece, second
Right angle is formed between keel piece 1522 and third keel piece 1523.First keel piece 1521 is mutually parallel with third keel piece 1523
And extend in the direction away from each other along the both ends of the second keel piece 1522.First keel piece 1521 is equipped with through-hole, the first dragon
Osteocomma 1521 is bolted by through-hole and the first plate layer 111, and then secondary joist 152 is fixed on the first plate layer 111, pendant
1161 are set on third keel piece 1523, and the second plate layer 112 is fixed on secondary joist 152 by pendant 1161.In other implementations
In mode, the number of keel piece can also be other numerical value, and the side such as can also be integrally formed or be spirally connected or be clamped between keel piece
Formula is fixed together, and forms other preset angles between adjacent keel piece and is determined according to specific needs with forming skeleton structure
Fixed, the application is not construed as limiting this.
Further, it is provided with angle steel 155 at the inner corner trim of the connecting portion of the keel piece of secondary joist 152, the two of angle steel 155
End is connect with keel piece respectively, to keep the angle between keel piece.Angle steel 155 can be made by contradicting adjacent keel piece
Keel keep its skeleton structure, avoid keel stress Collapse Deformation.It should be noted that other kinds of keel bone in keel 15
Frame structure is similar with secondary joist, subsequently repeats no more.
Further, side wall 11 includes doorframe 16, and doorframe 16 is rectangular box, and the both sides of doorframe 16 are equipped with door anti-rolling chock
153, door anti-rolling chock 153 includes the first keel portion 1531 and the second keel portion 1532 for being welded to each other or being spirally connected, the first keel portion
1531 are located at the both sides of doorframe 16, and the second keel portion 1532 is located at the bottom and top of doorframe 16.Due to the presence of doorframe, doorframe
Edge belongs to the weakness zone of side wall, by 1532 reinforced door anti-rolling chock 153 of the second keel portion, can improve the entirety of keel
Intensity.Doorframe 16 is used to carry out the installation of door.
Further, keel 15 include corner keel 154, corner keel 154 include be fixedly connected first side 1541,
Second side 1542 and right angle portion 1543, first side 1541 and second side 1542 are screwed onto to form two piece of external corner respectively
On one plate layer 111, first side 1541 and second side 1542 are mutually perpendicular to form the right-angle structure extended by junction.Example
Such as, right angle external corner is formed between the corner of prefabricated cabin 1, two piece of first plate layer 111, first side 1541 is spirally connected wherein one
The first plate of block layer 111, second side 1542 are screwed onto on another piece of the first plate layer 111, and right angle portion 1543 covers two piece of first plate
The right angle external corner formed between layer 111.It is similar with secondary joist 152, first side 1541, second side 1542 and right angle portion 1543
On be both provided with angle steel 155 to keep its skeleton structure.In other embodiment, side can also pass through welding.The side such as clamping
Formula is fixedly connected with the second plate layer, and the application is not construed as limiting this.
For the clearer concrete structure and connection type for illustrating the application prefabricated cabin steelframe, refering to fig. 10 and figure
11, Figure 10 be the overall schematic of steelframe in one embodiment of the application prefabricated cabin, and Figure 11 is the thin portion signal in the regions D in Figure 10
Figure.
In conjunction with Fig. 1-11, steelframe 14 is equipped with receiving portion, and receiving portion accommodates the end of side wall 11, and with the end of side wall 11
Engaging is with fixed sidewall 11.Steelframe 14 includes bottom framework 144 and side framework 141, and the edge of bottom framework 144 is provided with work
Word steel 1441, receiving portion are located at the upper surface of I-steel 1441, and the bottom of side framework 141 is consolidated by way of welding or being spirally connected
It is scheduled on the upper surface of I-steel 1441.I-steel 1441 has superior mechanical property, mitigates while keeping steelframe stress
The quality of structure.In other embodiments, the edge of bottom framework 144 can also use other kinds of primary structure member,
The application is not construed as limiting this.
In another embodiment, steelframe 14 includes the first receiving portion and the second receiving portion, and the first receiving portion is located at side
The inside of surface frame body 141, the second receiving portion are located at the outside of side framework 141, end and the first receiving portion of third plate layer 112
Engaging, and is bonded with the inside of side framework 141, and the end of the first plate layer 111 engages with the second receiving portion, and with side framework
141 outside fitting.The number of receiving portion determines that the application is not construed as limiting this according to the number of plate layer.
Further, the bottom of steelframe 14 is equipped with the first channel steel 143, and the first channel steel 143 is set with the interval of side framework 141
Set, the top of the first channel steel 143 is higher than I-steel 1441, the first channel steel 143, side framework 141 and I-steel 1441 top
Portion forms the first receiving portion, to accommodate third plate layer 112.Further, the first receiving portion includes 1112 He of top receiving portion
Bottom receiving portion 1111, the first channel steel 143, side framework 141 and I-steel 1141 form bottom receiving portion 1111 to engage
The bottom of third plate layer 112, top receiving portion 1112 are located at the top of steelframe 14, and top receiving portion 1112 engages third plate layer
112 top.Due to the presence of the first receiving portion, when the second plate layer 114 is installed, it is only necessary to receive plate layer by first
Second plate layer 114 is pushed into the first receiving portion and installation can be completed by the side in appearance portion, improves the convenience of plate layer installation.Together
When, it is connected together by this, the leakproofness of the second plate layer 114 is improved.
Further, steelframe 14 includes the second channel steel 1442, and the middle part of the second channel steel 1442 is fixed by way of being spirally connected
In the upper surface of I-steel 1441, the both ends of the second channel steel 1442 are separately connected third plate layer 112 and the first plate layer 111, and second
Channel steel 1442, the first channel steel 143 and I-steel 1441 form the first receiving portion.Due to the presence of the second channel steel 143, steelframe 14
Side framework 141 and the first plate layer 111 contact area increase, can prevent from causing first due to subregion stress concentration
The damage on 111 surface of plate layer.
Further, the side framework 141 of steelframe 14 includes the column 1412 of the crossbeam 1411 of horizontal direction, vertical direction
And reinforce keel 142, crossbeam 1411 is connected with column 1412 by way of welding or being spirally connected, and forms network, is reinforced
Keel 142 are fixed in network, and crossbeam 1411 is identical with the thickness of column 1412, and more than the thickness for reinforcing keel 142.
Further, it includes vertical keel 1421 and oblique keel 1422 to reinforce keel 142, and the both ends of vertical keel 1421 are distinguished
It welds or is screwed onto on crossbeam 1411, a crossbeam 1411 or column 1412 are welded or be screwed onto in one end of oblique keel 1422
On, the other end of oblique keel 1422 is welded or is screwed onto on another crossbeam 1411 or column 1412.In other embodiment
In, it further includes lateral keel to reinforce keel 142, and the both ends of lateral keel are respectively welded or are screwed onto on column.
It is different from the prior art, the application prefabricated cabin includes multiple plate layers, and hanger, adjacent plate layer are provided between plate layer
It is connected by hanger, can effectively improve the intensity and install convenient degree of side wall.
It these are only presently filed embodiment, be not intended to limit the scope of the claims of the application, it is every to utilize the application
Equivalent structure or equivalent flow shift made by specification and accompanying drawing content is applied directly or indirectly in other relevant technologies
Field includes similarly in the scope of patent protection of the application.
Claims (10)
1. a kind of prefabricated cabin, which is characterized in that the prefabricated cabin includes side wall, and the side wall includes the first plate layer and the second plate
Layer, the first plate layer and the second plate interlayer are provided with extension between setting, the first plate layer and the second plate layer
Frame, the second plate layer are fixed on by the hanger on the second plate layer.
2. prefabricated cabin according to claim 1, which is characterized in that the hanger includes the keel of a plurality of vertical direction, institute
The side and the second plate layer for stating keel are spirally connected, and the other side of the keel is vertically provided with multiple pendants, described
The position that first plate layer corresponds to the pendant is provided with multiple card slots, and the first plate layer passes through the card slot and the pendant
Be fixed on the second plate layer.
3. prefabricated cabin according to claim 2, which is characterized in that the keel include main joist and secondary joist, the master
The cross-sectional area of keel is more than the cross-sectional area of the secondary joist, and the main joist is arranged in by pre-determined distance on the side wall,
The secondary joist is equidistantly arranged between the two adjacent main joists.
4. prefabricated cabin according to claim 2, which is characterized in that the side wall includes doorframe, and the doorframe is rectangle frame
Body, the both sides of the doorframe are equipped with door anti-rolling chock, and the door anti-rolling chock includes the first keel portion for being welded to each other or being spirally connected and the
Two keel portions, first keel portion are located at the both sides of the doorframe, second keel portion be located at the doorframe bottom and
Top.
5. prefabricated cabin according to claim 2, which is characterized in that the keel include corner keel, the corner keel
Including being fixedly connected and orthogonal two sides, the right-angle structure extended by junction is formed, the two sides are spirally connected respectively
On two pieces of the second plate layers for forming external corner.
6. prefabricated cabin according to claim 2, which is characterized in that the pendant is "T"-shaped lug boss, the second plate layer
Include multiple golden nations' plates, adjacent two pieces of golden nation plates are connected together, and form institute at the position that it is connected together
Card slot is stated, and is connected together by the card slot and the pendant, the gap position between the multiple gold nation plate is filled with
Fluid sealant.
7. prefabricated cabin according to claim 2, which is characterized in that the keel include multiple keel pieces, the keel piece
Long side for rectangular metal sheet, the keel piece is fixed together by welding or integrally formed mode, the adjacent dragon
Preset angle is formed between osteocomma, to form skeleton structure.
8. prefabricated cabin according to claim 7, which is characterized in that at the inner corner trim of the connecting portion of the adjacent keel piece
It is provided with angle steel, the both ends of the angle steel are connect with the keel piece respectively, to keep the angle between the keel piece.
9. according to any prefabricated cabins of claim 2-8, which is characterized in that the prefabricated cabin includes steelframe, and described second
Plate layer is fixed on the outside of the steelframe by way of being spirally connected or being connected together, the both ends of the keel respectively with the steelframe
Top and bottom contradict or be spirally connected.
10. according to any prefabricated cabins of claim 1-8, which is characterized in that the material of the second plate layer is Europe deals,
It is provided with damp-proof membrane on an at least side surface for the Europe deals.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810291205.8A CN108678425A (en) | 2018-04-03 | 2018-04-03 | prefabricated cabin |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810291205.8A CN108678425A (en) | 2018-04-03 | 2018-04-03 | prefabricated cabin |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108678425A true CN108678425A (en) | 2018-10-19 |
Family
ID=63799482
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810291205.8A Pending CN108678425A (en) | 2018-04-03 | 2018-04-03 | prefabricated cabin |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108678425A (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2014156770A (en) * | 2014-04-22 | 2014-08-28 | Kyowa-Seisan Co Ltd | Partition wall and construction method of partition wall |
CN104143774A (en) * | 2014-08-08 | 2014-11-12 | 国家电网公司 | Prefabricated cabin structure of intelligent substation secondary equipment |
CN204343499U (en) * | 2014-12-05 | 2015-05-20 | 浙江亚厦装饰股份有限公司 | A kind of syndeton of potter's clay curtain wall panel |
CN104806049A (en) * | 2015-03-23 | 2015-07-29 | 国家电网公司 | Combined structure of prefabricated cabin type transformer substation with low cost |
CN105350666A (en) * | 2015-11-24 | 2016-02-24 | 安庆市大成防腐保温材料有限责任公司 | Compound silicate plate convenient to disassemble and heat preservation wall using same |
CN205776883U (en) * | 2016-06-20 | 2016-12-07 | 李明勋 | Cladding wall group |
CN205935293U (en) * | 2016-07-18 | 2017-02-08 | 衡水中铁建土工材料制造有限公司 | Prefabricated building wall body |
CN208329721U (en) * | 2018-04-03 | 2019-01-04 | 深圳市怡富通讯科技有限公司 | prefabricated cabin |
-
2018
- 2018-04-03 CN CN201810291205.8A patent/CN108678425A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2014156770A (en) * | 2014-04-22 | 2014-08-28 | Kyowa-Seisan Co Ltd | Partition wall and construction method of partition wall |
CN104143774A (en) * | 2014-08-08 | 2014-11-12 | 国家电网公司 | Prefabricated cabin structure of intelligent substation secondary equipment |
CN204343499U (en) * | 2014-12-05 | 2015-05-20 | 浙江亚厦装饰股份有限公司 | A kind of syndeton of potter's clay curtain wall panel |
CN104806049A (en) * | 2015-03-23 | 2015-07-29 | 国家电网公司 | Combined structure of prefabricated cabin type transformer substation with low cost |
CN105350666A (en) * | 2015-11-24 | 2016-02-24 | 安庆市大成防腐保温材料有限责任公司 | Compound silicate plate convenient to disassemble and heat preservation wall using same |
CN205776883U (en) * | 2016-06-20 | 2016-12-07 | 李明勋 | Cladding wall group |
CN205935293U (en) * | 2016-07-18 | 2017-02-08 | 衡水中铁建土工材料制造有限公司 | Prefabricated building wall body |
CN208329721U (en) * | 2018-04-03 | 2019-01-04 | 深圳市怡富通讯科技有限公司 | prefabricated cabin |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107148540A (en) | The floor used between floors and ceiling panel | |
US20090307994A1 (en) | Module with moment frame and composite panels for a building structure | |
KR101569405B1 (en) | Outer wall insulation panel for modular building and manufacture method | |
WO2007111151A1 (en) | Marine partition module | |
KR101381281B1 (en) | Bracket connection type modular structure | |
KR102182115B1 (en) | Connecting structure for modular units to be fastened indoors | |
JP2012528961A (en) | Structure | |
CN208329721U (en) | prefabricated cabin | |
CN217151449U (en) | Garage and building for motor vehicle or non-motor vehicle | |
CN208486593U (en) | Prefabricated cabin | |
CN208486592U (en) | Prefabricated cabin | |
CN108678425A (en) | prefabricated cabin | |
CN108487683A (en) | prefabricated cabin | |
CN108683105A (en) | prefabricated cabin | |
CN216840198U (en) | High-performance composite floor slab for box house | |
CN210562591U (en) | Connecting node structure between wall body module and assembly type building | |
CN103912141A (en) | Camping house and method for manufacturing same | |
CN210562590U (en) | Connecting node structure of wall module and corner post and assembly type building | |
KR100966539B1 (en) | A wall structure for load bearing | |
KR101592254B1 (en) | Enhanced thermal insulation casing structure for air conditioner | |
CN209837429U (en) | Steel construction building pipeline arrangement structure | |
JP6353304B2 (en) | building | |
JP6422694B2 (en) | building | |
CN210622008U (en) | Light steel structure wall | |
JP6422687B2 (en) | Insulated airtight outer wall structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181019 |