CN108678399A - A kind of combination tool of quickly building a wall - Google Patents

A kind of combination tool of quickly building a wall Download PDF

Info

Publication number
CN108678399A
CN108678399A CN201810445054.7A CN201810445054A CN108678399A CN 108678399 A CN108678399 A CN 108678399A CN 201810445054 A CN201810445054 A CN 201810445054A CN 108678399 A CN108678399 A CN 108678399A
Authority
CN
China
Prior art keywords
angle
baffle
wall
building
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810445054.7A
Other languages
Chinese (zh)
Inventor
田君
王雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongguan University of Technology
Original Assignee
Dongguan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongguan University of Technology filed Critical Dongguan University of Technology
Priority to CN201810445054.7A priority Critical patent/CN108678399A/en
Publication of CN108678399A publication Critical patent/CN108678399A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/20Tools or apparatus for applying mortar
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/20Tools or apparatus for applying mortar
    • E04G21/206Devices to apply thin-bed mortar joints
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/22Tools or apparatus for setting building elements with mortar, e.g. bricklaying machines

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The present invention relates to a kind of combination tools of quickly building a wall.The combination tool of quickly building a wall, including mortar moulding device and the pouring can of building a wall, the mortar moulding device of building a wall includes two pieces of first baffles being symmetrically vertically arranged, parallel oblique is provided with front scrapping plate and rear scraper plate between the first baffle, and the first baffle, front scrapping plate and rear scraper plate form the cavity of upper and lower opening;The lower face of the front scrapping plate is symmetrically arranged with the first angle, and the lower face of the rear scraper plate is symmetrically arranged with the second angle, and first angle is more than second angle;The pouring can includes two pieces of second baffles of parallel vertical setting, and third baffle and fourth gear plate are tiltedly installed between the second baffle, and the third baffle and fourth gear plate are arranged in herringbone and form gap in lower face.Combination tool provided by the invention of quickly building a wall is applicable to the wall-building brick of various volume sizes, and speed of building a wall is fast, and effect is good.

Description

A kind of combination tool of quickly building a wall
Technical field
The invention belongs to construction walling field of tool, more particularly, to a kind of combination tool of quickly building a wall.
Background technology
With continuously improving and to environmentally friendly requirement for technology.Use brick from biography during building in building trade at present The common brick that system is fired is changed into present aerated bricks, foamed brick, Dinas brickes etc..The volume of wall brick also becomes bigger than previous common brick Very much, the volume of wall brick becomes larger so that efficiency of building a wall is greatly improved.It is currently used for the tool built a wall or traditional Cleaver and trowel, cleaver lightly can be good at for the wall brick as common brick small size.But for the wall-building brick of large volume For, as soon as can only once build the wall-building brick of piece large volume with cleaver, this limits the speed that worker builds a wall to a certain extent.
Therefore, a kind of tool of building a wall for the wall-building brick being applicable to build polylith large volume is developed, improving rate of building a wall has Important research significance and application value.
Invention content
It is an object of the invention to overcome existing cleaver and trowel to build the slow-footed defect of large volume wall-building brick and deficiency, Improve a kind of combination tool of quickly building a wall.Combination tool provided by the invention of quickly building a wall includes the mortar of building a wall to mortar moulding The pouring can that moulding device and the gap between brick and brick are filled.Wherein, mortar moulding device of building a wall can simultaneously turn polylith On mortar carry out moulding, ensure mortar it is moderate in the height of both sides of edges, help to put brick, the speed that can build a wall is fast, effect is good. Pouring can advantageously pour into mortar in the gap between brick and brick, realize the preferable filling at gap.Pass through the group of the two The wall-building brick for being applicable to all size is closed, speed of building a wall is fast, simple in structure, easy to operate, detachable to carry.
To realize that the purpose of foregoing invention, the present invention adopt the following technical scheme that:
A kind of quickly build a wall combination tool, including build a wall mortar moulding device and pouring can, the mortar moulding device of building a wall includes pair Claiming two pieces of first baffles being vertically arranged, parallel oblique is provided with front scrapping plate and rear scraper plate between the first baffle, and described the One baffle, front scrapping plate and rear scraper plate form the cavity of upper and lower opening;The lower face of the front scrapping plate is symmetrically arranged with the first angle, The lower face of scraper plate is symmetrically arranged with the second angle after described, and first angle is more than second angle;The cementation of fissures Device includes two pieces of second baffles of parallel vertical setting, and third baffle and fourth gear are tiltedly installed between the second baffle Plate, the third baffle and fourth gear plate are arranged in herringbone and form gap in lower face.
The present invention by build a wall mortar moulding device to mortar carry out moulding, by gap of the pouring can between brick and brick into Row filling.
On the one hand, mortar moulding device provided by the invention of building a wall can select the front scrapping plate of suitable dimension to be scraped with after as needed Plate(The wall-building brick of different volumes size selects the front scrapping plate of different in width and rear scraper plate, width herein refer to front scrapping plate and after The width of scraper plate lower face), it is widely portable to the wall-building brick of various volume sizes, it is applied widely.
Mortar moulding device build a wall when in use, first places mortar on the brick puzzled, then utilizes mortar moulding of building a wall Device moves to the other end from one end, and during the motion, the angle of front scrapping plate makes the mortar of brick edge enter sand of building a wall Starch moulding device in, then using the angle difference in size of front scrapping plate and rear scraper plate enable mortar some scraped after Then plate carries out moulding using rear scraper plate to mortar, ensure that mortar is moderate in the height of both sides of edges, help to put brick, build a wall Speed is fast, effect is good.Mortar moulding device provided by the invention of building a wall is applicable to the wall-building brick of all size, simple in structure, behaviour Facilitate, it is detachable to carry.
On the other hand, the gap between brick and brick can be filled using pouring can.
Now during building a wall, the gap gap between two bricks is all build a wall worker's cleaver or trowel lane mortar It is filled inside to gap, because gap both sides are not blocked, many mortars is had in filling process and are fallen down from both sides.Also some works People side with stick shift in the filling process, but the other side also has mortar and falls down.Both sides have centainly between not blocking mortar Stickiness, one piece of mortar fall may related polylith mortar fall together, seriously affect efficiency of building a wall.In addition, many times work It is artificial to improve efficiency of building a wall, mortar only is filled in from gap both sides with cleaver to the processing in gap, appearance looks at gap mortar It is full, in fact intermediate is empty.The insecurity during wall use later is also resulted in this way.
Pouring can provided by the invention can avoid the generation of the above problem.Pouring can provided by the invention when in use, will Gap position is aligned at the gap between two bricks, is then poured into gap from pouring can top by mortar, using cleaver mortar It downwards by one by the preferable filling achieved that at gap, realizes preferable at gap, avoids security risk.In addition, baffle can Prevent mortar from overflowing, it is easy-to-use.
Between first angle the second angle difference in size can according to allow mortar by amount chosen.
It should be understood that in order to suitable mortar amount is provided at gap, it is typically designed gap and is slightly larger than gap(As between The width of gap is wider 2 ~ 2.5cm than the width in gap).
Certainly, the wall-building brick of different volumes size can select the sloping baffle of different in width.
Preferably, the right-angle side h obliquely of first angle1With the right-angle side h obliquely of second angle2 Length ratio be 1.25 ~ 3:1, another right-angle side L of first angle1With another right-angle side L of second angle2Length It spends equal.
Signified right-angle side h obliquely of the invention1Refer to build a wall mortar moulding device front scrapping plate slant setting when, formed In vertical direction with that right-angle side of angle in the right-angle side of angle;And another right-angle side L1Corresponding is front scrapping plate lower face Right-angle side, it is vertical with vertical direction.h2And L2After then corresponding on scraper plate the second angle corresponding right-angle side.
Preferably, the L1Length be brick it is wide~
Preferably, the length ratio on the side and the right-angle side obliquely of second angle obliquely of first angle It is 2:1.
Preferably, the first bevel edge of first angle and the second bevel edge of the second angle are straight line or rounding off Curve.
It is further preferable that first bevel edge and the second bevel edge are straight line.
It is further preferable that the curve of the rounding off is the camber line to concave or the camber line of convex.
Preferably, the front scrapping plate and rear scraper plate are fixedly connected by bolt arrangement with baffle.
Bolt arrangement can be easy to disassemble, is conveniently replaceable front and back scraper plate.
In order to be more advantageously applicable in a variety of different volumes wall-building brick requirement, it is preferable that the third baffle packet Include centre the first inside sloping baffle of least partially overlapped setting and intermediate first outer side shield;It is also set in the third baffle It is equipped with the first sliding for driving the first outer side shield relative level sliding of the centre the first inside sloping baffle and centre Mechanism;The fourth gear plate includes centre the second inside sloping baffle of least partially overlapped setting and intermediate second outer side block Plate is additionally provided on the fourth gear plate for driving the centre the second inside sloping baffle and intermediate second outer side shield phase To the second sliding equipment of horizontal movement.
It is not androgynous to be applicable in by the total length of the adjustable inside sloping baffle and outer side shield of the setting of sliding equipment The wall-building brick of product size.
Preferably, first sliding equipment includes phase on intermediate first inside sloping baffle and intermediate first outer side shield The first slot hole that corresponding position opens up and the first bolt structure for penetrating first slot hole, first bolt structure can Along the described first long hole horizontal sliding;Second sliding equipment includes the second outside of intermediate second inside sloping baffle and centre Opposite position opens up on baffle the second slot hole and the second bolt structure for penetrating second slot hole, second screw Structure can be along the described second long hole horizontal sliding.
Preferably, the quantity of first slot hole is 2, and is arranged in parallel;The quantity of second slot hole is 2, and It is arranged in parallel.
Preferably, the first inside of centre sloping baffle, intermediate first outer side shield, intermediate second inside sloping baffle It is equal with the intermediate horizontal length of second outer side shield.
Preferably, the third baffle and fourth gear plate are symmetrical arranged.
Preferably, the centre the first inside sloping baffle and intermediate second inside sloping baffle are fixed by bolt arrangement It is arranged on the second baffle.
Compared with prior art, the present invention has the advantages that:
Mortar moulding device provided by the invention of building a wall is applicable to the wall-building brick of all size, and speed of building a wall is fast, effect is good, structure Simply, easy to operate, it is detachable to carry;Pouring can provided by the invention can carry out Fast Filling to the gap between brick and brick, It is easy to use.The combination tool of quickly building a wall that build a wall mortar moulding device and pouring can are combined, is applicable to various The wall-building brick of volume size, speed of building a wall is fast, and effect is good.
Description of the drawings
Fig. 1 is the structural schematic diagram for the mortar moulding device of building a wall that embodiment 1 provides;
Fig. 2 is the schematic diagram of the front scrapping plate and rear scraper plate for the mortar moulding device of building a wall that embodiment 1 provides;
Fig. 3 is the use state diagram for the mortar moulding device of building a wall that embodiment 1 provides;
Fig. 4 is the mortar schematic diagram after the mortar moulding device moulding of building a wall that embodiment 1 provides;
Fig. 5 is the structural schematic diagram for the pouring can that embodiment 1 provides;
Fig. 6 is the use state diagram for the pouring can that embodiment 1 provides;
Fig. 7 is the schematic diagram of the front scrapping plate and rear scraper plate for the mortar moulding device of building a wall that embodiment 2 provides.
Wherein, 11 be first baffle, and 12 be front scrapping plate, and 13 be rear scraper plate, and 14 first angles, 15 be the second angle, and 16 are Bolt arrangement;
21 be second baffle, and 22 third baffles, 221 be intermediate first inside sloping baffle, and 222 be intermediate first outer side shield, 23 be second baffle, and 231 be intermediate second inside sloping baffle, and 232 be intermediate second outer side shield, and 24 be the first skate machine Structure, 241 be the first slot hole, and 242 be the first bolt structure, and 25 be the second sliding equipment, and 251 be the second slot hole, and 252 be the second spiral shell Pin structure;
h1For the right-angle side obliquely of the first angle, h2For the right-angle side obliquely of the second angle, L1For the another of the first angle One right-angle side and L2For another right-angle side of the second angle, L is front scrapping plate or the width of rear scraper plate lower face;
A is the mortar before non-moulding, and B is the mortar after moulding, and C is brick, gaps of the D between brick and brick.
Specific implementation mode
In order to make the purpose , technical scheme and advantage of the present invention be clearer, real below in conjunction with Figure of description and specifically Example is applied, the present invention will be described in further detail.It should be appreciated that specific embodiment described herein is only explaining this hair It is bright, it is not intended to limit the present invention.In addition, technical characteristic involved in the various embodiments of the present invention described below It can be combined with each other as long as they do not conflict with each other.
It should be noted that when original paper is referred to as " being set to ", " install in " another element, it both can be directly another On element, there may also be original papers placed in the middle.When an element is considered " to connect " another element, it can be directly connected to To another element or it may be simultaneously present centering elements.
Embodiment 1
The present embodiment provides a kind of combination tool, including build a wall mortar moulding device 1 and pouring cans 2 of quickly building a wall.
As shown in Figure 1, this is built a wall, mortar moulding device 1 includes two pieces of first baffles 11 being symmetrically vertically arranged, first baffle Parallel oblique is provided with front scrapping plate 12 and rear scraper plate 13 between 11, and first baffle 11, front scrapping plate 12 and rear scraper plate 13 are formed up and down The cavity of opening;The lower face of front scrapping plate 12 is symmetrically arranged with the first angle 14, and the lower face of rear scraper plate 13 is symmetrically arranged with Two angles 15, the first angle 14 are more than the second angle 15, and front scrapping plate 12 and rear scraper plate 13 pass through bolt arrangement 16 and baffle 11 It is fixedly connected.
Bolt arrangement can realize the dismounting and replacement of front and back scraper plate, convenient for choosing suitable front and back scraper plate according to actual needs And it is cleaned.
Width 100mm ~ 250mm of conventional foamed brick is poor in order to further illustrate the first angle and the second angle size It is different how to choose, to build 600 × 250 × 250 mm(Size is followed successively by length, width and height)Foamed brick for, be described.
As shown in Fig. 2, the width L of front scrapping plate 12 and rear scraper plate 13 is 250mm, the right-angle side obliquely of the first angle h1Length be 50 ~ 60mm, another right-angle side L1Length be 100mm(The 2/5 of the width of brick), the first bevel edge is straight line;Second The right-angle side h of angle2Length be 20 ~ 40mm, another right-angle side L2Length be 100mm(The 2/5 of the width of brick), second tiltedly While being straight line.At this time using the difference in size between the first angle and the second angle so that part mortar by the second angle, Then moulding is carried out to mortar using rear scraper plate, ensures that mortar is moderate in the height of both sides of edges, helps to put brick, speed of building a wall Soon, effect is good.
If having other demands by the amount and final modeling requirement of the second angle to mortar amount, mortar certainly, The first angle and the second angle of other difference size designs can be selected.For example, as mortar demand and mortar are oblique by second The amount of mouth is few, can reduce the difference in size between the second angle and the first angle;As mortar demand and mortar are oblique by second The amount of mouth is big, it is possible to increase the difference in size between the second angle and the first angle.
As design h1:h2=2:1(Such as h1Length be 60mm, h2Length be 30mm)When, when building such brick, can pass through More suitable mortar amount, speed of building a wall more quickly, effect it is more preferable.
For the brick of other volume sizes, angle size can be designed according to actual needs.
Use state diagram such as Fig. 3 of the mortar moulding device of building a wall.In use, process of building a wall is first uniform in advance mortar Be placed on above brick.After one layer of wall-building brick puts mortar well, the other end is moved to from one end with mortar moulding device.It needs to use in the process Hand advances according to mortar moulding device downwards, and power in the process is determines according to actual conditions.Mortar moulding device moves one time along brick Afterwards, that is, the moulding to mortar is realized, the mortar after the finishing of mortar moulding device(Such as Fig. 4)For the high shape in intermediate low both sides. Such shape can allow brick to can be good at the brick keeping parallelism with next layer during piling up, while can also make the whole of wall Body stability is relatively good.It is durable for whole metope.
Mortar moulding device provided in this embodiment of building a wall is widely portable to the wall-building brick of various volume sizes, the scope of application Extensively;And speed of building a wall is fast, effect is good.
The pouring can of the present embodiment, as shown in figure 5, the pouring can includes two pieces of second baffles 21 of parallel vertical setting, Third baffle 22 and fourth gear plate 23 are tiltedly installed between second baffle 21, third baffle 22 and fourth gear plate 23 are in eight words Shape is arranged and forms gap in lower face, which is slightly wider than the width in the gap of brick(Such as wide 2 ~ 2.5cm).
In order to adapt to the brick of different volumes size, design is advanced optimized to third baffle 22 and fourth gear plate 23.
Third baffle 22 includes the first outside of the first inside of centre sloping baffle 221 and centre of least partially overlapped setting Baffle 222;It is additionally provided in third baffle 22 for driving the first inside sloping baffle of centre 221 and intermediate first outer side shield First sliding equipment 24 of 222 horizontal slidings.
Specifically, the first sliding equipment 24 includes the first inside sloping baffle of centre 221 and intermediate first outer side shield 222 The first slot hole 241 that upper opposite position opens up and the first bolt structure 242 for penetrating the first slot hole 241.The first inside of centre The one end mutually separate with intermediate first outer side shield 222 of sloping baffle 221 is fixed on by bolt arrangement on second baffle 21, First bolt structure 242 can drive intermediate first inside sloping baffle 221 and centre along the horizontal sliding of the first slot hole 241 First outer side shield 222 is slided towards or away from level.
Fourth gear plate 23 includes the second outside of the second inside of centre sloping baffle 231 and centre of least partially overlapped setting Baffle 232;It is additionally provided on fourth gear plate 23 for driving the second inside sloping baffle of centre 231 and intermediate second outer side shield Second sliding equipment 25 of 232 relative horizontal movements.
Specifically, the second sliding equipment 25 includes the second inside sloping baffle of centre 231 and intermediate second outer side shield 232 The second slot hole 251 that upper opposite position opens up and the second bolt structure 252 for penetrating the second slot hole 251.The second inside of centre The one end mutually separate with intermediate second outer side shield 232 of sloping baffle 231 is fixed on by bolt arrangement on second baffle 21. Second bolt structure 252 can drive intermediate second inside sloping baffle 231 and centre along the horizontal sliding of the second slot hole 251 Second outer side shield 232 is slided towards or away from level.
In order to further such that sliding equipment has better stability, specifically, the first slot hole 241 and the second slot hole 251 quantity is two, and is arranged in parallel.
The use state diagram of the pouring can such as Fig. 6.After brick is piled up on the mortar corrected, adjacent two pieces of bricks Between will there are gaps.This gap is also filled up with mortar, just can guarantee the quality of wall.In use, pouring can is placed on At gap between two bricks, makes at the covering gap of gap, then fill mortar into gap from the top of pouring can, pouring can the Two baffles ensure that mortar will not flow out.
Pouring can provided by the invention can be filled the gap between brick and brick.Additionally by the setting of sliding equipment The total length of adjustable inside sloping baffle and outer side shield, to be applicable in the wall-building brick of different volumes size.
The combination tool of quickly building a wall that the present invention combines build a wall mortar moulding device and pouring can, is applicable to The wall-building brick of various volume sizes, speed of building a wall is fast, and effect is good.
Embodiment 2
The present invention provides another combination tool, such as Fig. 7 of quickly building a wall.The main technical schemes of the present embodiment and 1 phase of embodiment Together, unaccounted feature is no longer repeated herein using the explanation in embodiment 1 in the present embodiment.The present embodiment and reality Apply example 1 difference lies in:The design and implementation example 1 of front scrapping plate and rear scraper plate is different.
Specifically, it is 400 × 150 × 200 mm for volume size(Size is followed successively by length, width and height)Foamed brick brick, it is preceding The width L of scraper plate 12 and rear scraper plate 13 is 150mm, the right-angle side h obliquely of the first angle1Length be 30mm, it is another Right-angle side L1Length be 45mm, the first bevel edge be convex smooth curved line;The right-angle side h of second angle2Length be 24mm, another right-angle side L2Length be 45mm, the second bevel edge be the convex consistent with the first bevel edge smooth curved line, At this time using the difference in size between the first angle and the second angle so that then part mortar is utilized by the second angle Scraper plate carries out moulding to mortar afterwards, ensures that mortar is moderate in the height of both sides of edges, helps to put brick, and speed of building a wall is fast, effect It is good.
Several embodiments of the invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that the general technical staff for this field comes It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention Range.

Claims (10)

1. a kind of combination tool of quickly building a wall, which is characterized in that including mortar moulding device of building a wall(1)And pouring can(2), the block Wall mortar moulding device(1)Including two pieces of first baffles being symmetrically vertically arranged(11), the first baffle(11)Between parallel incline Tiltedly it is provided with front scrapping plate(12)With rear scraper plate(13), the first baffle(11), front scrapping plate(12)With rear scraper plate(13)In formation The cavity of under shed;The front scrapping plate(12)Lower face be symmetrically arranged with the first angle(14), the rear scraper plate(13)Under End surface symmetric is provided with the second angle(15), first angle(14)More than second angle(15);The pouring can(2) Include two pieces of second baffles of parallel vertical setting(21), the second baffle(21)Between be tiltedly installed with third baffle(22) With fourth gear plate(23), the third baffle(22)With fourth gear plate(23)It is arranged in herringbone and forms sky in lower face Gap.
2. combination tool of quickly building a wall according to claim 1, which is characterized in that first angle(14)Obliquely Right-angle side h1With second angle(15)Right-angle side h obliquely2Length ratio be 1.25 ~ 3:1, first angle (14)Another right-angle side L1With second angle(15)Another right-angle side L2Equal length.
3. combination tool of quickly building a wall according to claim 2, which is characterized in that first angle(14)Obliquely Right-angle side h1With second angle(15)Right-angle side h obliquely2Length ratio be 2:1.
4. combination tool of quickly building a wall according to claim 1, which is characterized in that first angle(14)The first bevel edge With second angle(15)The second bevel edge be straight line or rounding off curve.
5. combination tool of quickly building a wall according to claim 4, which is characterized in that first bevel edge and the second bevel edge are Straight line.
6. combination tool of quickly building a wall according to claim 1, which is characterized in that the front scrapping plate(12)With rear scraper plate(13) Pass through bolt arrangement(16)With baffle(11)It is fixedly connected.
7. combination tool of quickly building a wall according to claim 1, which is characterized in that the third baffle(22)Including at least portion Divide the first inside of the centre sloping baffle overlapped(221)With intermediate first outer side shield(222);The third baffle(22) On be additionally provided with for driving the first inside of centre sloping baffle(221)With intermediate first outer side shield(222)Opposite water Smoothly the first dynamic sliding equipment(24);The fourth gear plate(23)It is rolled in centre second including least partially overlapped setting Slanting baffle(231)With intermediate second outer side shield(232), the fourth gear plate(23)On be additionally provided with for driving the centre Second inside sloping baffle(231)With intermediate second outer side shield(232)Second sliding equipment of relative horizontal movement(25).
8. combination tool of quickly building a wall according to claim 7, which is characterized in that first sliding equipment(24)Including in Between the first inside sloping baffle(221)With intermediate first outer side shield(222)The first slot hole that upper opposite position opens up (241)And penetrate first slot hole(241)The first bolt structure(242), first bolt structure(242)It being capable of edge First slot hole(241)Level sliding;Second sliding equipment(25)Including intermediate second inside sloping baffle(231)With Intermediate second outer side shield(232)The second slot hole that upper opposite position opens up(251)And penetrate second slot hole(251) The second bolt structure(252), second bolt structure(252)It can be along second slot hole(251)Level sliding.
9. combination tool of quickly building a wall according to claim 8, which is characterized in that first slot hole(241)Quantity be 2 It is a, and be arranged in parallel;Second slot hole(251)Quantity be 2, and be arranged in parallel.
10. combination tool of quickly building a wall according to claim 7, which is characterized in that the third baffle(22)And fourth gear Plate(23)It is symmetrical arranged.
CN201810445054.7A 2018-05-10 2018-05-10 A kind of combination tool of quickly building a wall Pending CN108678399A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810445054.7A CN108678399A (en) 2018-05-10 2018-05-10 A kind of combination tool of quickly building a wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810445054.7A CN108678399A (en) 2018-05-10 2018-05-10 A kind of combination tool of quickly building a wall

Publications (1)

Publication Number Publication Date
CN108678399A true CN108678399A (en) 2018-10-19

Family

ID=63806091

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810445054.7A Pending CN108678399A (en) 2018-05-10 2018-05-10 A kind of combination tool of quickly building a wall

Country Status (1)

Country Link
CN (1) CN108678399A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114592702A (en) * 2022-03-31 2022-06-07 中冶建工集团有限公司 Masonry mortar joint control device and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH680677A5 (en) * 1991-01-25 1992-10-15 Massey & Ingenieurs Associes S Mortar applicator for wall construction - comprising container open at top and bottom, equipped with handles and skids to deposit even layer of mortar on top of wall and fill vertical gaps between blocks
CN103938841A (en) * 2014-03-05 2014-07-23 冼日声 Efficient automatic ceramic tile plastering machine
RU2013120401A (en) * 2013-04-30 2014-11-10 Сергей Рудольфович Гроховский DEVICE FOR APPLICATION OF BUILDING SOLUTIONS ON THE SURFACE OF BUILDING ELEMENTS
CN207073291U (en) * 2017-07-02 2018-03-06 上海二十冶建设有限公司 Pave masonry mortar device
CN207194409U (en) * 2017-07-26 2018-04-06 中建八局第二建设有限公司 A kind of building block pouring can
CN208858171U (en) * 2018-05-10 2019-05-14 东莞理工学院 A kind of novel combination tool of quickly building a wall

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH680677A5 (en) * 1991-01-25 1992-10-15 Massey & Ingenieurs Associes S Mortar applicator for wall construction - comprising container open at top and bottom, equipped with handles and skids to deposit even layer of mortar on top of wall and fill vertical gaps between blocks
RU2013120401A (en) * 2013-04-30 2014-11-10 Сергей Рудольфович Гроховский DEVICE FOR APPLICATION OF BUILDING SOLUTIONS ON THE SURFACE OF BUILDING ELEMENTS
CN103938841A (en) * 2014-03-05 2014-07-23 冼日声 Efficient automatic ceramic tile plastering machine
CN207073291U (en) * 2017-07-02 2018-03-06 上海二十冶建设有限公司 Pave masonry mortar device
CN207194409U (en) * 2017-07-26 2018-04-06 中建八局第二建设有限公司 A kind of building block pouring can
CN208858171U (en) * 2018-05-10 2019-05-14 东莞理工学院 A kind of novel combination tool of quickly building a wall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114592702A (en) * 2022-03-31 2022-06-07 中冶建工集团有限公司 Masonry mortar joint control device and construction method

Similar Documents

Publication Publication Date Title
CN212505781U (en) Concrete pouring device for road repair
CN101629423A (en) Method for rigidly plugging overlength and ultra-thick block concrete foundation and board post poured band
CN214615531U (en) Masonry mortar smearing device for brick masonry engineering
CN208456049U (en) It can prevent the automatic rendering device of outdoor landscape tile laying hollowing
CN109930781A (en) A kind of accomodation ground construction method
CN108678399A (en) A kind of combination tool of quickly building a wall
CN208858171U (en) A kind of novel combination tool of quickly building a wall
CN206737184U (en) A kind of rammed earth feature wall
CN108532970A (en) A kind of pouring can and tool of building a wall
CN207513190U (en) A kind of wall pouring can
CN217232824U (en) Concrete hollow brick masonry device for building
CN108487652A (en) One kind is built a wall mortar moulding device and tool of building a wall
CN206987334U (en) Multi-angle regulation concrete blinding
CN214996143U (en) Stone laying pointing joint beautifying device for municipal construction
CN212389030U (en) Adjustable mortar spreader for mortar joints of building walls
CN204199726U (en) To build a wall pointing device
CN209025471U (en) Masonry masonry uses mortar machine
CN203960064U (en) A kind of pouring glaze device
CN208363658U (en) A kind of novel pouring can and tool of building a wall
CN212105002U (en) Copying type exterior wall painting device
CN207878800U (en) A kind of steel bar positioning fixture
CN206784969U (en) Construction paving slurry container
CN207092556U (en) A kind of Vehicular concrete conveying pump hydraulic means
CN214459315U (en) Prefabricated box culvert tongue-and-groove mortar colludes concave joint device
CN206707159U (en) A kind of wood grain antique brick applied to corner location

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination