- CN108678323A CN108678323A CN201810684811.6A CN201810684811A CN108678323A CN 108678323 A CN108678323 A CN 108678323A CN 201810684811 A CN201810684811 A CN 201810684811A CN 108678323 A CN108678323 A CN 108678323A
- Authority
- CN
- China
- Prior art keywords
- parts
- fixinig plate
- fixing piece
- dry
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0801—Separate fastening elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Compositions Of Oxide Ceramics (AREA)
- Finishing Walls (AREA)
Abstract
The present invention relates to building field more particularly to a kind of dry-hang stone fixing pieces.The dry-hang stone fixing piece includes chemical anchor bolts, connector, fixed strip, fixinig plate and bolt;Wherein, the chemical anchor bolts are fixed on the inside of lithotome to be fixed;The chemical anchor bolts are bolted with the connector, the connector is fixedly connected with the fixed strip, the fixinig plate is set on the fixed strip, is both provided with several screw holes on the fixinig plate and the lithotome to be fixed, is corresponded with the bolt;Fixinig plate described in the bolt-through so that the fixinig plate is bolted with the lithotome to be fixed;The fixinig plate is at least set to the both ends of the fixed strip.The anchor structure is simple, and manufacturing cost is low, and fixing piece stability greatly improves, and the service life is longer, anti-seismic performance is more preferable;In addition the material of fixinig plate uses high-strength ceramic in the fixing piece, overcomes the existing defect easily got rusty using metalwork.
Description
Technical field
The present invention relates to building field more particularly to a kind of dry-hang stone fixing pieces.
Background technology
Lithotome application amount increases year by year at present, but lithotome nature is more crisp to be not easy to transport, carry, apply
Work.Especially large span dry-hang stone needs to carry out special consolidation process to avoid stone material fracture before installation.
It is a kind of novel construction technology in current wall decoration at present usually using stone material dry-hanging method also known as hang-in-air method.
Ornamental stone is directly hung on metope with metal hanger for this method or sky is hung on steelframe, without the need of grouting and pasting, former
Reason is to set main stress point on the body construction, and stone material is fixed on building by metal hanger, forms stone decoration curtain
Wall.That there are service lifes is short, firm poor performance, get rusty easily, anti-seismic performance is weak etc. for the fixing piece employed in this method at present
Disadvantage.
Invention content
Technical problem solved by the invention is to provide a kind of dry-hang stone fixing piece, to extend the use of fixing piece
Service life solves the problems, such as that existing fixing piece consolidates poor performance, gets rusty easily and anti-seismic performance is weak.
Technical problem solved by the invention is realized using following technical scheme:
A kind of dry-hang stone fixing piece is applied on lithotome, and the dry-hang stone fixing piece includes chemical anchor bolts, connects
Fitting, fixed strip, fixinig plate and bolt;
Wherein, the chemical anchor bolts are fixed on the inside of lithotome to be fixed;The chemical anchor bolts and the connection
Part bolts, and the connector is fixedly connected with the fixed strip, and the fixinig plate is set on the fixed strip, the fixinig plate
Several screw holes are both provided with on the lithotome to be fixed, are corresponded with the bolt;The bolt-through institute
State fixinig plate so that the fixinig plate is bolted with the lithotome to be fixed;The fixinig plate is at least arranged
In the both ends of the fixed strip.
Preferably, the fixed strip material is high-strength ceramic, and the high-strength ceramic each component is counted in parts by weight, is wrapped
It includes:
10-20 parts of yellow ground;20-25 parts of barite;14-18 parts of dolomite;7-17 parts of volcanic rock;15-25 parts of water;Three oxidations
Two 14-16 parts of iron;1-3 parts of tricalcium phosphate;1.5-2.6 parts of barium carbonate;1-2.7 parts of silicon carbide;1-2 parts of nano aluminium oxide;Poly- second
3-5 parts of glycol.
It is furthermore preferred that the high-strength ceramic each component is counted in parts by weight, including:
14 parts of yellow ground;21 parts of barite;16 parts of dolomite;10 parts of volcanic rock;16 parts of water;15 parts of di-iron trioxide;Phosphoric acid
1 part of tricalcium;2 parts of barium carbonate;1 part of silicon carbide;1 part of nano aluminium oxide;3 parts of polyethylene glycol.
Preferably, the fixinig plate is ellipse.
Preferably, the fixinig plate is steel disc.It is furthermore preferred that the fixinig plate is stainless steel steel disc.
Preferably, the fixinig plate is set to the both ends of the fixed strip.
It is furthermore preferred that the centre position of the fixed strip is additionally provided with fixinig plate.
Preferably, the bolt is hex bolts.
Preferably, the fixed strip is evenly distributed on the surface of the lithotome to be fixed.
Preferably, the fixinig plate is rectangle.
Foregoing invention at least has the following advantages that or advantageous effect:
The invention discloses a kind of dry-hang stone fixing pieces, and the anchor structure is simple, and manufacturing cost is low, pass through chemical anchors
Combining closely between bolt, connector, fixed strip, fixinig plate and bolt so that the fixing piece stability greatly improves, and makes
It is more preferable with longer life expectancy, anti-seismic performance;In addition the material of fixinig plate uses high-strength ceramic in the fixing piece, overcomes existing
The defect easily got rusty using metalwork.
Description of the drawings
Using attached drawing, the invention will be further described, but the embodiment in attached drawing does not constitute any limit to the present invention
System.
Fig. 1 is the schematic diagram of dry-hang stone fixing piece in the embodiment of the present invention.
Specific implementation mode
Present invention will be further explained below with reference to specific examples.It should be understood that these embodiments be only used for the present invention without
For limiting the scope of the invention.
Embodiment 1
As shown in Figure 1, present embodiment discloses a kind of dry-hang stone fixing pieces, specifically, the dry-hang stone fixing piece packet
Include chemical anchor bolts, connector, fixed strip 1, fixinig plate 2 and bolt 3;
Wherein, the chemical anchor bolts are fixed on the inside of lithotome 4 to be fixed;The chemical anchor bolts and the connection
Part bolts, and the connector is fixedly connected with the fixed strip 1, and the fixinig plate 2 is set on the fixed strip 1, described solid
Several screw holes are both provided on stator 2 and the lithotome to be fixed, are corresponded with the bolt;The bolt 3
Through the fixinig plate 1 so that the fixinig plate 1 is connect with the lithotome 4 to be fixed by bolt 3;The fixation
Piece 1 is at least set to the both ends of the fixed strip 1.
Connector in the present embodiment is the generic connectivity part being sold in the market, as long as the connector can connect chemical anchors
Bolt and fixed strip.
1 material of the fixed strip is high-strength ceramic, and the high-strength ceramic each component is counted in parts by weight, including:
10-20 parts of yellow ground;20-25 parts of barite;14-18 parts of dolomite;7-17 parts of volcanic rock;15-25 parts of water;Three oxidations
Two 14-16 parts of iron;1-3 parts of tricalcium phosphate;1.5-2.6 parts of barium carbonate;1-2.7 parts of silicon carbide;1-2 parts of nano aluminium oxide;Poly- second
3-5 parts of glycol.
The fixinig plate 2 is ellipse.
The fixinig plate 2 is stainless steel steel disc.
The fixinig plate 2 is set to the both ends of the fixed strip 1.
The bolt 3 is hex bolts.
The fixed strip 1 is evenly distributed on the surface of the lithotome to be fixed.
Dry-hang stone anchor structure disclosed in the present embodiment is simple, and manufacturing cost is low, by chemical anchor bolts, connector,
Combining closely between fixed strip, fixinig plate and bolt so that the fixing piece stability greatly improves, and service life is more
Length, anti-seismic performance are more preferable;In addition in the fixing piece fixinig plate material use high-strength ceramic, overcome it is existing use metal
The defect that part easily gets rusty.
Embodiment 2
Present embodiment discloses a kind of dry-hang stone fixing pieces, are applied on lithotome, the dry-hang stone fixing piece
Including chemical anchor bolts, connector, fixed strip, fixinig plate and bolt;
Wherein, the chemical anchor bolts are fixed on the inside of lithotome to be fixed;The chemical anchor bolts and the connection
Part bolts, and the connector is fixedly connected with the fixed strip, and the fixinig plate is set on the fixed strip, the fixinig plate
Several screw holes are both provided with on the lithotome to be fixed, are corresponded with the bolt;The bolt-through institute
State fixinig plate so that the fixinig plate is bolted with the lithotome to be fixed;The fixinig plate is set to institute
State the both ends and centre position of fixed strip.
The fixed strip material is high-strength ceramic, and the high-strength ceramic each component is counted in parts by weight, including:
14 parts of yellow ground;21 parts of barite;16 parts of dolomite;10 parts of volcanic rock;16 parts of water;15 parts of di-iron trioxide;Phosphoric acid
1 part of tricalcium;2 parts of barium carbonate;1 part of silicon carbide;1 part of nano aluminium oxide;3 parts of polyethylene glycol.By optimizing ceramics in the present embodiment
Each component weight ratio, obtained high rigidity and non-friable high-strength ceramic, more optimized the performance of fixinig plate.
In addition, fixinig plate is rectangle.
Specific embodiments of the present invention are described in detail above, but it is intended only as example, the present invention is simultaneously unlimited
It is formed on particular embodiments described above.To those skilled in the art, it is any to the equivalent modifications that carry out of the present invention and
It substitutes also all among scope of the invention.Therefore, without departing from the spirit and scope of the invention made by impartial conversion and
Modification, all should be contained within the scope of the invention.
Claims (10)
1. a kind of dry-hang stone fixing piece is applied on lithotome, which is characterized in that the dry-hang stone fixing piece includes changing
Learn anchor bolt, connector, fixed strip, fixinig plate and bolt;
Wherein, the chemical anchor bolts are fixed on the inside of lithotome to be fixed;The chemical anchor bolts and the connector bolt
It connects, the connector is fixedly connected with the fixed strip, and the fixinig plate is set on the fixed strip, the fixinig plate and institute
It states and is both provided with several screw holes on lithotome to be fixed, corresponded with the bolt;It is solid described in the bolt-through
Stator so that the fixinig plate is bolted with the lithotome to be fixed;The fixinig plate is at least set to institute
State the both ends of fixed strip.
2. dry-hang stone fixing piece according to claim 1, which is characterized in that the fixed strip material is made pottery for high intensity
Porcelain, the high-strength ceramic each component are counted in parts by weight, including:
10-20 parts of yellow ground;20-25 parts of barite;14-18 parts of dolomite;7-17 parts of volcanic rock;15-25 parts of water;Di-iron trioxide
14-16 parts;1-3 parts of tricalcium phosphate;1.5-2.6 parts of barium carbonate;1-2.7 parts of silicon carbide;1-2 parts of nano aluminium oxide;Polyethylene glycol
3-5 parts.
3. dry-hang stone fixing piece according to claim 2, which is characterized in that the high-strength ceramic each component is by weight
Number meter, including:
14 parts of yellow ground;21 parts of barite;16 parts of dolomite;10 parts of volcanic rock;16 parts of water;15 parts of di-iron trioxide;Tricalcium phosphate 1
Part;2 parts of barium carbonate;1 part of silicon carbide;1 part of nano aluminium oxide;3 parts of polyethylene glycol.
4. dry-hang stone fixing piece according to claim 1, which is characterized in that the fixinig plate is ellipse.
5. dry-hang stone fixing piece according to claim 1, which is characterized in that the fixinig plate is steel disc.
6. dry-hang stone fixing piece according to claim 1, which is characterized in that the fixinig plate is set to the fixed strip
Both ends.
7. dry-hang stone fixing piece according to claim 6, which is characterized in that the centre position of the fixed strip is also set up
There is fixinig plate.
8. dry-hang stone fixing piece according to claim 1, which is characterized in that the bolt is hex bolts.
9. dry-hang stone fixing piece according to claim 1, which is characterized in that the fixed strip is evenly distributed on described wait for
The surface of fixed lithotome.
10. dry-hang stone fixing piece according to claim 1, which is characterized in that the fixinig plate is rectangle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810684811.6A CN108678323A (en) | 2018-06-28 | 2018-06-28 | Dry-hang stone fixing piece |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810684811.6A CN108678323A (en) | 2018-06-28 | 2018-06-28 | Dry-hang stone fixing piece |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108678323A true CN108678323A (en) | 2018-10-19 |
Family
ID=63812490
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810684811.6A Pending CN108678323A (en) | 2018-06-28 | 2018-06-28 | Dry-hang stone fixing piece |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108678323A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20100026925A (en) * | 2008-09-01 | 2010-03-10 | 주식회사 에프엠테크 | Stone plate fixing apparatus of the building |
CN201665939U (en) * | 2010-01-29 | 2010-12-08 | 中山盛兴股份有限公司 | Junior-unit dry-handing stone curtain wall |
CN202899361U (en) * | 2012-10-09 | 2013-04-24 | 福州兴科达建筑技术开发有限公司 | Drilling avoiding device with hook type connection piece for stone or porcelain plate curtain wall plate blocks and cross rod |
CN105888179A (en) * | 2016-06-03 | 2016-08-24 | 中冶建工集团有限公司 | Facing brick dry-hanging structure and facing brick dry-hanging technology |
CN205712627U (en) * | 2016-06-08 | 2016-11-23 | 陈师华 | A kind of curtain wall back bolting type connection part |
CN107673746A (en) * | 2017-10-31 | 2018-02-09 | 桂林加宏汽车修理有限公司 | A kind of high-strength ceramic |
-
2018
- 2018-06-28 CN CN201810684811.6A patent/CN108678323A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20100026925A (en) * | 2008-09-01 | 2010-03-10 | 주식회사 에프엠테크 | Stone plate fixing apparatus of the building |
CN201665939U (en) * | 2010-01-29 | 2010-12-08 | 中山盛兴股份有限公司 | Junior-unit dry-handing stone curtain wall |
CN202899361U (en) * | 2012-10-09 | 2013-04-24 | 福州兴科达建筑技术开发有限公司 | Drilling avoiding device with hook type connection piece for stone or porcelain plate curtain wall plate blocks and cross rod |
CN105888179A (en) * | 2016-06-03 | 2016-08-24 | 中冶建工集团有限公司 | Facing brick dry-hanging structure and facing brick dry-hanging technology |
CN205712627U (en) * | 2016-06-08 | 2016-11-23 | 陈师华 | A kind of curtain wall back bolting type connection part |
CN107673746A (en) * | 2017-10-31 | 2018-02-09 | 桂林加宏汽车修理有限公司 | A kind of high-strength ceramic |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105507539B (en) | A kind of lightweight exterior wall point hangs thermal-insulation decorative board combination and is anchored system and its construction method | |
CN209397721U (en) | Structure is built in a kind of dismountable room | |
CN104912443B (en) | Hollow slab wafts window | |
CN209837310U (en) | Connecting structure of outer wall and foundation beam | |
CN108678323A (en) | Dry-hang stone fixing piece | |
CN103276892B (en) | A kind of pulp spraying that is applicable to is coated with filling lightgauge steel joist system | |
CN208167768U (en) | Prefabricated buildings basis | |
CN209457163U (en) | A kind of attachment device of assembled superimposed sheet | |
CN208293809U (en) | A kind of prefabricated heat preservation wall body | |
CN105625667B (en) | A kind of vertical steel band fixed setting method of hanging piece for stone | |
CN207560930U (en) | A kind of large span, without stent, tatou structure canopy body | |
CN102261184A (en) | Method for building anti-seismic storied building by utilizing steel wire mesh frame polystyrene sandwich plates | |
CN202450657U (en) | Novel external heat-preserving plate wall structure of sunlight greenhouse | |
CN204959967U (en) | Hoop reinforcing concrete filled steel tube | |
CN209011313U (en) | A kind of novel prefabricated primary and secondary beam composite joint node | |
CN208167762U (en) | The house foundation of fast demountable | |
CN207919771U (en) | A kind of building assembly precast floor slab attachment device | |
CN208168041U (en) | A kind of economical prefabricated daughter's wall construction facilitating construction | |
CN206408612U (en) | A kind of pressure dispersing anchorage cable | |
CN205777810U (en) | A kind of steel tower being applicable to high slope | |
CN108978890A (en) | Novel prefabricated primary and secondary beam composite joint node of one kind and attaching method thereof | |
CN207107250U (en) | It is easy to the device of partition plate transport and installation | |
CN206859463U (en) | Celluar concrete brick | |
CN205776953U (en) | Adjustable building element connects unit and scalable elevation of building system | |
CN104263302B (en) | A kind of anticracking tackiness agent and preparation method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |