CN108671976A - A kind of multi-function experimental rig - Google Patents

A kind of multi-function experimental rig Download PDF

Info

Publication number
CN108671976A
CN108671976A CN201810685126.5A CN201810685126A CN108671976A CN 108671976 A CN108671976 A CN 108671976A CN 201810685126 A CN201810685126 A CN 201810685126A CN 108671976 A CN108671976 A CN 108671976A
Authority
CN
China
Prior art keywords
rod
helical gear
fan
fixed plate
stage body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810685126.5A
Other languages
Chinese (zh)
Other versions
CN108671976B (en
Inventor
祁建成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong banzhou laboratory equipment Co.,Ltd.
Original Assignee
祁建成
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 祁建成 filed Critical 祁建成
Priority to CN201810685126.5A priority Critical patent/CN108671976B/en
Publication of CN108671976A publication Critical patent/CN108671976A/en
Application granted granted Critical
Publication of CN108671976B publication Critical patent/CN108671976B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01LCHEMICAL OR PHYSICAL LABORATORY APPARATUS FOR GENERAL USE
    • B01L9/00Supporting devices; Holding devices
    • B01L9/02Laboratory benches or tables; Fittings therefor
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/001Processes for the treatment of water whereby the filtration technique is of importance
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/28Treatment of water, waste water, or sewage by sorption
    • C02F1/283Treatment of water, waste water, or sewage by sorption using coal, charred products, or inorganic mixtures containing them
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2301/00General aspects of water treatment
    • C02F2301/08Multistage treatments, e.g. repetition of the same process step under different conditions

Landscapes

  • Chemical & Material Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Organic Chemistry (AREA)
  • Health & Medical Sciences (AREA)
  • Clinical Laboratory Science (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Devices For Use In Laboratory Experiments (AREA)

Abstract

The present invention relates to a kind of teaching aids, are in particular a kind of multi-function experimental rigs.Exhaust gas can be effectively handled, height is adjusted and is suitble to owner, effectively dispose waste liquid, be moved easily.Emission-control equipment is connect with experimental bench stage body, and emission-control equipment is located above test-bed body, wastewater treatment equipment is connect with water supply installation, and wastewater treatment equipment is located above water supply installation, lifting gear is connect with mobile device, and lifting gear is located above mobile device, experimental bench stage body is connect with wastewater treatment equipment, and wastewater treatment equipment is located inside experimental bench stage body, wastewater treatment equipment is connect with experimental bench stage body, and wastewater treatment equipment is located inside experimental bench stage body, lifting gear is connect with experimental bench stage body, and lifting gear is located at below experimental bench stage body, mobile device is connect with experimental bench stage body.

Description

A kind of multi-function experimental rig
Technical field
The present invention relates to a kind of teaching aids, are in particular a kind of multi-function experimental rigs.
Background technology
In chemistry teaching, experiment is an essential link, and old-fashioned testing stand movement is inconvenient, and And height can not be suitble to all people, the exhaust gas for testing generation discharges indoors naturally, some gases are not only pungent, can also be right Body damages, and test in clean it is inconvenient, so inventing a kind of multi-function experimental rig.
Invention content
The invention mainly solves the technical problem of providing a kind of multi-function test stand, the present apparatus can effectively handle useless Gas adjusts height and is suitble to owner, effectively disposes waste liquid, be moved easily.
In order to solve the above technical problems, the present invention relates to a kind of teaching aids, in particular it is a kind of Multi-function experimental Platform, including emission-control equipment, wastewater treatment equipment, water supply installation, lifting gear, mobile device, its feature of experimental bench stage body It is:The emission-control equipment includes that waste gas treatment tank, exhaust gas partition board, exhaust gas box bracket, fan protective net, fan blades are fixed Wheel, fan connecting rod, fan fan blades, fan supporting rod, fan control bar, fan control bar fixed plate, fan control bar are fixed Plate supporting rod, pedestal, waste gas treatment tank are fixedly connected with exhaust gas partition board, and exhaust gas partition board is located inside waste gas treatment tank, exhaust gas Box bracket is fixedly connected with waste gas treatment tank, and exhaust gas box bracket is located at waste gas treatment tank right end, the exhaust gas box bracket other end with Experimental bench stage body is fixedly connected, and tie point is located at experimental bench stage body left end, and fan protective net is fixedly connected with fan supporting rod, And fan protective net is located at fan supporting rod left, fan blades fast pulley coordinates with fan connecting rod, and fit system is clearance fit, And fan blades fast pulley and fan connecting rod are concentric, fan fan blades is fixedly connected with fan blades fast pulley, and fan fan blades is located at fan blades Fast pulley left end, fan fan blades coordinate with fan connecting rod, and fit system is clearance fit, and tie point is located at fan blades centre bit Set, fan connecting rod is fixedly connected with fan supporting rod, and fan connecting rod is located at fan supporting rod upper end, fan supporting rod with Pedestal is fixedly connected, and fan supporting rod is located above pedestal, and fan control bar is fixedly connected with fan control bar fixed plate, and Fan control bar is located at fan control bar fixed plate right end, and tie point is in fan control bar fixed plate marginal position, fan control Bar fixed plate is hinged with fan control bar fixed plate supporting rod, and fan control bar fixed plate is located at fan control bar fixed plate branch Above strut, tie point is located at fan control bar fixed plate center location, and fan control bar fixed plate supporting rod is fixed with pedestal Connection, and fan control bar fixed plate supporting rod is located above pedestal, pedestal is fixedly connected with experimental bench stage body, and pedestal is located at Above experimental bench stage body;
The wastewater treatment equipment includes waste water tank, cotton, activated carbon, filter paper, wire netting, one-way throttle valve, water injection valve, Waste water tank is fixedly connected with experimental bench stage body, and waste water tank is located inside experimental bench stage body, and cotton is contacted with waste water tank, and cotton Inside waste water tank, cotton is contacted with activated carbon, and cotton is located above activated carbon, and activated carbon is contacted with waste water tank, and living Property charcoal be located inside waste water tank, activated carbon is contacted with filter paper, and activated carbon is located above filter paper, and filter paper is contacted with waste water tank, and Filter paper is located inside waste water tank, and filter paper is contacted with wire netting, and filter paper is located above wire netting, and wire netting is fixed with waste water tank to be connected It connects, and wire netting is located inside waste water tank, one-way throttle valve is fixedly connected with waste water tank, and one-way throttle valve is located at waste water tank bottom Portion, waste water tank are fixedly connected with water supply installation, and waste water tank is located at water supply installation left, and one-way throttle valve connects with water supply installation It touches, and one-way throttle valve is located at water supply installation left, water injection valve is fixedly connected with waste water tank, and water injection valve is located at waste water tank bottom Portion,
The water supply installation include control-rod one, control-rod fixed plate one, connecting rod one, fixed block one, helical gear one, tiltedly Gear two, screw rod one, fixed block two, Rubber washer, Rubber washer fixed plate, water tank, control-rod one are fixed with control-rod fixed plate one Connection, and control-rod one is located at one left end of control-rod fixed plate, tie point is located at one marginal position of control-rod fixed plate, control-rod Fixed plate one is fixedly connected with connecting rod one, and control-rod fixed plate one is located at one left end of connecting rod, control-rod fixed plate one with Connecting rod one is concentric, and connecting rod one coordinates with experimental bench stage body, and fit system is clearance fit, connecting rod one in fixed block one Surface engagement, fit system are clearance fit, and fixed block one is fixedly connected with experimental bench stage body, and connecting rod one is solid with helical gear one Fixed connection, and connecting rod one is located at one left of helical gear, connecting rod one and helical gear one are concentric, and helical gear one is nibbled with helical gear two It closing, helical gear one is located at two top of helical gear, and helical gear two is threadedly coupled with screw rod one, and helical gear two and screw rod one are concentric, Screw rod one and fixed block two coordinate, and fit system is clearance fit, and fixed block two is fixedly connected with experimental bench stage body, Rubber washer and Screw rod one is threadedly coupled, and is connected and be located at Rubber washer center, and Rubber washer coordinates with water tank inner surface, and fit system is interference Cooperation, Rubber washer are connect with Rubber washer fixed plate, and Rubber washer is located above Rubber washer fixed plate, and Rubber washer is fixed with Rubber washer Plate is concentric, and Rubber washer fixed plate is threadedly coupled with screw rod one, and tie point is located at Rubber washer fixed plate center location, water tank and reality It tests platform stage body to be fixedly connected, and water tank is located inside experimental bench stage body;
The lifting gear include control-rod two, control-rod fixed plate two, driving screw, main helical gear one, main helical gear two, Limited block one, connecting rod two, secondary helical gear one, secondary helical gear two, sub-screw, connecting rod support plate, pedestal, limited block two;Control Bar two processed is fixedly connected with control-rod fixed plate two, and control-rod two is located at two top of control-rod fixed plate, and tie point is located at control Two marginal position of bar fixed plate processed, control-rod fixed plate two are fixedly connected with driving screw, and control-rod fixed plate two is located at main spiral shell Above bar, control-rod fixed plate two and driving screw are concentric, and driving screw is threadedly coupled with main helical gear one, and driving screw and main helical teeth With one heart, main helical gear one is fixedly connected wheel one with limited block two, and main helical gear one is located at two lower section of limited block, main helical gear one It being engaged with main helical gear two, main helical gear one is located at two top of main helical gear, and main helical gear two is fixedly connected with limited block one, And main helical gear two is located at one left of limited block, main helical gear two is fixedly connected with connecting rod two, and main helical gear two with connect Bar two is concentric, and limited block one is fixedly connected with connecting rod two, and limited block one and connecting rod two are concentric, secondary helical gear two with connect Bar two is fixedly connected, and secondary helical gear one is engaged with secondary helical gear two, and secondary helical gear one is located at two top of secondary helical gear, secondary helical teeth Wheel one is fixedly connected with limited block two, and secondary helical gear one is located at two lower section of limited block, and secondary helical gear one connects with sub-screw screw thread It connects, and secondary helical gear one and sub-screw are concentric, connecting rod support plate connecting rod support plate coordinates with connecting rod two, and fit system is Clearance fit, connecting rod support plate are fixedly connected with pedestal, and connecting rod support plate is limited there are two being arranged symmetrically in above pedestal Position block two is fixedly connected with experimental bench stage body, and limited block two is located at below experimental bench stage body, driving screw, sub-screw and experimental bench Stage body contacts, and driving screw, sub-screw are located at below experimental bench stage body.
The mobile device includes control-rod three, control-rod fixed plate, belt wheel one, belt, belt wheel two, wheel, wheel branch Frame, fixed link, fixed rod support bar, control-rod three are fixedly connected with control-rod fixed plate, and control-rod three is solid positioned at control-rod Fixed board marginal position, control-rod fixed plate are fixedly connected with belt wheel one, and control-rod fixed plate is located at one front of belt wheel, control-rod Fixed plate, belt wheel one are concentric, and belt wheel one and belt contacts, belt are contacted with belt wheel two, and belt wheel one is located at two top of belt wheel, belt wheel Two are fixedly connected with wheel, and belt wheel two and wheel are concentric, and wheel is hinged with wheel support, and tie point is located at wheel subcenter position It sets, wheel support is fixedly connected with lifting gear, and wheel support is located at below lifting gear, and fixed link is hinged with belt wheel one, And tie point is located at one center of belt wheel, fixed link is fixedly connected with fixed rod support bar, and fixed link is located at fixed link branch Above strut, fixed link is fixedly connected with experimental bench stage body, and fixed link is located at experimental bench stage body right, fixed rod support bar and Experimental bench stage body is fixedly connected, and fixed rod support bar is located at right;
The experimental bench stage body includes stage body, sink, sink supporting rod, upper hose, downcomer, and stage body is hinged with sink, And stage body is located at sink left, sink is hinged with sink supporting rod, and sink is located at sink supporting rod right, sink supporting rod and Stage body contacts, and sink supporting rod is located at stage body right, and upper hose is contacted with sink, and the other end is connect with water supply installation, under Water pipe is contacted with sink, and the other end is connect with wastewater treatment equipment;
Emission-control equipment is connect with experimental bench stage body, and emission-control equipment is located above test-bed body, wastewater treatment Device is connect with water supply installation, and wastewater treatment equipment is located above water supply installation, and lifting gear is connect with mobile device, and is risen Falling unit is located above mobile device, and experimental bench stage body is connect with wastewater treatment equipment, and wastewater treatment equipment is located at experimental bench Inside stage body, wastewater treatment equipment is connect with experimental bench stage body, and wastewater treatment equipment is located inside experimental bench stage body, lifting dress It sets and is connect with experimental bench stage body, and lifting gear is located at below experimental bench stage body, mobile device is connect with experimental bench stage body.
As advanced optimizing for the technical program, helical gear one, helical teeth described in a kind of multi-function experimental rig of the present invention Wheel two, main helical gear one, main helical gear two, secondary helical gear one, secondary helical gear two are chrome-silicon material.
As advanced optimizing for the technical program, the wheel described in a kind of multi-function experimental rig of the present invention is ABS plastic Material.
As advanced optimizing for the technical program, screw rod one, driving screw described in a kind of multi-function experimental rig of the present invention, The sub-screw number of being steel material.
As advanced optimizing for the technical program, sink, waste water tank, water described in a kind of multi-function experimental rig of the present invention Case is stainless steel.
As advanced optimizing for the technical program, belt wheel one, belt wheel two described in a kind of multi-function experimental rig of the present invention It is titanium alloy material.
A kind of multi-function experimental rig of the invention has the beneficial effect that:
A kind of multi-function experimental rig of the present invention, the present apparatus can effectively handle exhaust gas, adjust height and are suitble to owner, have Disposing waste liquid for effect, is moved easily.
Description of the drawings
The present invention will be further described in detail with specific implementation method below in conjunction with the accompanying drawings.
Fig. 1 is a kind of structural schematic diagram of multi-function experimental rig of the present invention.
Fig. 2 is a kind of structural schematic diagram of the emission-control equipment of multi-function experimental rig of the present invention.
Fig. 3 is a kind of structural schematic diagram of the fan of multi-function experimental rig of the present invention.
Fig. 4 is a kind of structural schematic diagram of the wastewater treatment equipment of multi-function experimental rig of the present invention.
Fig. 5 is a kind of structural schematic diagram of the water supply installation of multi-function experimental rig of the present invention.
Fig. 6 is a kind of structural schematic diagram of the lifting gear of multi-function experimental rig of the present invention.
Fig. 7 is a kind of structural schematic diagram of the mobile device of multi-function experimental rig of the present invention.
Fig. 8 is a kind of structural schematic diagram of the experimental bench stage body of multi-function experimental rig of the present invention.
In figure:Processing unit 1;Waste gas treatment tank 1-1;Exhaust gas partition board 1-2;Exhaust gas box bracket 1-3;Fan protective net 1-4; Fan blades fast pulley 1-5;Fan connecting rod 1-6;Fan fan blades 1-7;Fan supporting rod 1-8;Fan control bar 1-9;Fan control Bar fixed plate 1-10;Fan control bar fixed plate supporting rod 1-11;Pedestal 1-12;Wastewater treatment equipment 2;Waste water tank 2-1;Cotton 2-2;Activated carbon 2-3;Filter paper 2-4;Wire netting 2-5;One-way throttle valve 2-6;Water injection valve 2-7;Water supply installation 3;One 3- of control-rod 1;One 3-2 of control-rod fixed plate;One 3-3 of connecting rod;One 3-4 of fixed block;One 3-5 of helical gear;Two 3-6 of helical gear;One 3- of screw rod 7;Two 3-8 of fixed block;Rubber washer 3-9;Rubber washer fixed plate 3-10;Water tank 3-11;Lifting gear 4;Two 4-1 of control-rod;Control Two 4-2 of bar fixed plate;Driving screw 4-3;One 4-4 of main helical gear;Two 4-5 of main helical gear;One 4-6 of limited block;Two 4-7 of connecting rod; One 4-8 of secondary helical gear;Two 4-9 of secondary helical gear;Sub-screw 4-10;Connecting rod support plate 4-11;Pedestal 4-12;Two 4- of limited block 13;Mobile device 5;Three 5-1 of control-rod;Control-rod fixed plate 5-2;One 5-3 of belt wheel;Belt 5-4;Two 5-5 of belt wheel;Wheel 5-6; Wheel support 5-7;Fixed link 5-8;Fixed rod support bar 5-9;Experimental bench stage body 6;Stage body 6-1;Sink 6-2;Sink supporting rod 6-3;Upper hose 6-4;Downcomer 6-5.
Specific implementation mode
Specific implementation mode one:
Illustrate present embodiment with reference to Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, Fig. 8, the present invention relates to one kind In particular teaching aid is a kind of multi-function experimental rig, including emission-control equipment 1, wastewater treatment equipment 2, water supply dress 3, lifting gear 4, mobile device 5, experimental bench stage body 6 are set, the present apparatus can effectively handle exhaust gas, adjust height and be suitble to own People effectively disposes waste liquid, and is moved easily.
Emission-control equipment 1 includes waste gas treatment tank 1-1, exhaust gas partition board 1-2, exhaust gas box bracket 1-3, fan protective net 1- 4, fan blades fast pulley 1-5, fan connecting rod 1-6, fan fan blades 1-7, fan supporting rod 1-8, fan control bar 1-9, fan control Bar fixed plate 1-10 processed, fan control bar fixed plate supporting rod 1-11, pedestal 1-12, waste gas treatment tank 1-1 and exhaust gas partition board 1-2 It is fixedly connected, and exhaust gas partition board 1-2 is located inside waste gas treatment tank 1-1, exhaust gas partition board 1-2 controls exhaust gas flow direction, exhaust gas Dry ice is housed, exhaust gas box bracket 1-3 is fixedly connected with waste gas treatment tank 1-1, and exhaust gas box bracket 1-3 inside treatment box 1-1 In waste gas treatment tank 1-1 right ends, exhaust gas box bracket 1-3 plays the role of supporting waste gas treatment tank 1-1, exhaust gas box bracket 1-3 another End is fixedly connected with experimental bench stage body 6, and tie point is located at 6 left end of experimental bench stage body, fan protective net 1-4 and fan supporting rod 1-8 is fixedly connected, and fan protective net 1-4 is located at the lefts fan supporting rod 1-8, fan blades fast pulley 1-5 and fan connecting rod 1-6 Cooperation, fit system is clearance fit, and fan blades fast pulley 1-5 and fan connecting rod 1-6 are concentric, fan fan blades 1-7 and fan blades Fast pulley 1-5 is fixedly connected, and fan fan blades 1-7 is located at fan blades fast pulley 1-5 left ends, and fan blades fast pulley 1-5 plays transmission fortune Action is used, and fan fan blades 1-7 coordinates with fan connecting rod 1-6, and fit system is clearance fit, and tie point is located at fan blades center Position, fan connecting rod 1-6 are fixedly connected with fan supporting rod 1-8, and fan connecting rod 1-6 is located on fan supporting rod 1-8 End, fan supporting rod 1-8 are fixedly connected with pedestal 1-12, and fan supporting rod 1-8 plays the role of supporting fan, and fan supporting rod 1-8 is located above pedestal 1-12, and fan control bar 1-9 is fixedly connected with fan control bar fixed plate 1-10, and fan control bar 1-9 is located at fan control bar fixed plate 1-10 right ends, and tie point is in fan control bar fixed plate 1-10 marginal positions, fan control Bar fixed plate 1-10 and fan control bar fixed plate supporting rod 1-11 is hinged, and fan control bar fixed plate 1-10 is located at fan control Above bar fixed plate supporting rod 1-11 processed, tie point is located at fan control bar fixed plate 1-10 center locations, and fan control bar is solid Fixed board supporting rod 1-11 is fixedly connected with pedestal 1-12, and fan control bar fixed plate supporting rod 1-11 is located on pedestal 1-12 Side, pedestal 1-12 are fixedly connected with experimental bench stage body 6, and pedestal 1-12 is located at 6 top of experimental bench stage body;
The wastewater treatment equipment 2 includes waste water tank 2-1, cotton 2-2, activated carbon 2-3, filter paper 2-4, wire netting 2-5, list To throttle valve 2-6, water injection valve 2-7, waste water tank 2-1 is fixedly connected with experimental bench stage body 6, and waste water tank 2-1 is located at experimental bench platform Inside body 6, cotton 2-2 is contacted with waste water tank 2-1, and cotton 2-2 is located inside waste water tank 2-1, cotton 2-2 and activated carbon 2-3 Contact, and cotton 2-2 is located above activated carbon 2-3, activated carbon 2-3 is contacted with waste water tank 2-1, and activated carbon 2-3 is located at waste water Inside case 2-1, activated carbon 2-3 is contacted with filter paper 2-4, and activated carbon 2-3 is located above filter paper 2-4, filter paper 2-4 and waste water tank 2- 1 contact, and filter paper 2-4 is located inside waste water tank 2-1, cotton 2-2, activated carbon 2-3, filter paper 2-4 play filtering suction-operated, Filter paper 2-4 is contacted with wire netting 2-5, and filter paper 2-4 is located above wire netting 2-5, and wire netting 2-5 is fixed with waste water tank 2-1 to be connected It connects, and wire netting 2-5 is located inside waste water tank 2-1, wire netting 2-5 plays fixed cotton 2-2, activated carbon 2-3, filter paper 2-4 and makees With one-way throttle valve 2-6 is fixedly connected with waste water tank 2-1, and one-way throttle valve 2-6 is located at the bottoms waste water tank 2-1, waste water tank 2- 1 is fixedly connected with water supply installation 3, and waste water tank 2-1 is located at 3 left of water supply installation, and one-way throttle valve 2-6 connects with water supply installation 3 It touches, and one-way throttle valve 2-6 is located at 3 left of water supply installation and plays the role of controlling water (flow) direction, water injection valve 2-7 and waste water tank 2-1 It is fixedly connected, and water injection valve 2-7 is located at the bottoms waste water tank 2-1;
The water supply installation 3 includes one 3-1 of control-rod, one 3-2 of control-rod fixed plate, one 3-3 of connecting rod, one 3- of fixed block 4, one 3-5 of helical gear, two 3-6 of helical gear, one 3-7 of screw rod, two 3-8 of fixed block, Rubber washer 3-9, Rubber washer fixed plate 3-10, water Case 3-11, one 3-1 of control-rod are fixedly connected with one 3-2 of control-rod fixed plate, and one 3-1 of control-rod is located at control-rod fixed plate one 3-2 left ends, tie point are located at one 3-2 marginal positions of control-rod fixed plate, and one 3-1 of control-rod plays the role of providing power, control One 3-2 of bar fixed plate is fixedly connected with one 3-3 of connecting rod, and one 3-2 of control-rod fixed plate is located at one 3-3 left ends of connecting rod, control One 3-2 of bar fixed plate and one 3-3 of connecting rod processed are concentric, and one 3- of connecting rod plays the role of transmitting movement, one 3-3 of connecting rod and experiment Platform stage body coordinates, and fit system is clearance fit, and one 3-3 of connecting rod coordinates with one 3-4 inner surfaces of fixed block, between fit system is Gap coordinates, and one 3-4 of fixed block is fixedly connected with experimental bench stage body 6, and one 3-3 of connecting rod is fixedly connected with one 3-5 of helical gear, connection One 3-3 of bar plays the role of transmitting movement, and one 3-3 of connecting rod is located at one lefts 3-5 of helical gear, one 3-3 of connecting rod and helical gear One 3-5 is concentric, and one 3-5 of helical gear is engaged with two 3-6 of helical gear, realizes and changes direction of motion effect, and one 3-5 of helical gear is located at oblique Above two 3-6 of gear, two 3-6 of helical gear is threadedly coupled with one 3-7 of screw rod, and two 3-6 of helical gear and one 3-7 of screw rod are concentric, spiral shell One 3-7 of bar coordinates with two 3-8 of fixed block, and fit system is clearance fit, and two 3-8 of fixed block is fixedly connected with experimental bench stage body 6, Rubber washer 3-9 is threadedly coupled with one 3-7 of screw rod, and is connected and be located at the centers Rubber washer 3-9, Rubber washer 3-9 and water tank 3-11 Inner surface coordinates, and fit system is interference fit, and Rubber washer 3-9 is connect with Rubber washer fixed plate 3-10, and Rubber washer 3-9 is located at Above Rubber washer fixed plate 3-10, Rubber washer 3-9 and Rubber washer fixed plate 3-10 are concentric, Rubber washer fixed plate 3-10 and screw rod one 3-7 is threadedly coupled, and tie point is located at Rubber washer fixed plate 3-10 center locations, and water tank 3-11 is fixed with experimental bench stage body 6 to be connected It connects, and water tank 3-11 is located inside experimental bench stage body 6;
The lifting gear 4 includes two 4-1 of control-rod, two 4-2 of control-rod fixed plate, driving screw 4-3, one 4- of main helical gear 4, two 4-5 of main helical gear, one 4-6 of limited block, two 4-7 of connecting rod, one 4-8 of secondary helical gear, two 4-9 of secondary helical gear, sub-screw 4- 10, connecting rod support plate 4-11, pedestal 4-12, two 4-13 of limited block, two 4-1 of control-rod are fixed with two 4-2 of control-rod fixed plate Connection, and two 4-1 of control-rod is located at two lefts 4-2 of control-rod fixed plate, tie point is located at two 4-2 margin locations of control-rod fixed plate It sets, two 4-1 of control-rod plays the role of providing power, and two 4-2 of control-rod fixed plate is fixedly connected with two 4-7 of connecting rod, and controls Two 4-2 of bar fixed plate is located at two lefts 4-7 of connecting rod, and two 4-2 of control-rod fixed plate and two 4-7 of connecting rod are concentric, connecting rod two 4-7 plays the role of transmitting movement, and driving screw 4-3 is threadedly coupled with one 4-4 of main helical gear, and driving screw 4-3 and main helical gear one 4-4 is concentric, and one 4-4 of main helical gear is fixedly connected with two 4-13 of limited block, and one 4-4 of main helical gear is located under two 4-13 of limited block Side, two 4-13 of limited block play the role of one 4-4 of fixed helical gear, and one 4-4 of main helical gear is engaged with two 4-5 of main helical gear, realize Change rotation direction effect, one 4-4 of main helical gear is located above two 4-5 of main helical gear, two 4-5 of main helical gear and one 4- of limited block 6 are fixedly connected, and two 4-5 of main helical gear is located at one lefts 4-6 of limited block, and two 4-5 of main helical gear is fixed with two 4-7 of connecting rod to be connected It connects, and two 4-5 of main helical gear and two 4-7 of connecting rod are concentric, one 4-6 of limited block is fixedly connected with two 4-7 of connecting rod, and limited block One 4-6 and two 4-7 of connecting rod are concentric, and two 4-9 of secondary helical gear is fixedly connected with two 4-7 of connecting rod, and one 4-8 of secondary helical gear and pair are oblique Gear two 4-9 engagements are realized and change rotation direction effect, and one 4-8 of pair helical gear is located above two 4-9 of secondary helical gear, secondary oblique One 4-8 of gear is fixedly connected with two 4-13 of limited block, and pair one 4-8 of helical gear is located at below two 4-13 of limited block, secondary helical gear One 4-8 is threadedly coupled with sub-screw 4-10, and secondary helical gear one 4-8 and sub-screw 4-10 are concentric, and connecting rod support plate 4-11 connects Extension bar support plate 4-11 coordinates with two 4-7 of connecting rod, and fit system is clearance fit, connecting rod support plate 4-11 and pedestal 4-12 It is fixedly connected, and there are two be arranged symmetrically in the tops pedestal 4-12, two 4-13 of limited block and experimental bench by connecting rod support plate 4-11 Stage body 6 is fixedly connected, and two 4-13 of limited block is located at 6 lower section of experimental bench stage body, driving screw 4-3, sub-screw 4-10 and experimental bench Stage body 6 contacts, and driving screw 4-3, sub-screw 4-10 are located at 6 lower section of experimental bench stage body.
The mobile device 5 includes three 5-1 of control-rod, control-rod fixed plate 5-2, one 5-3 of belt wheel, belt 5-4, belt wheel two 5-5, wheel 5-6, wheel support 5-7, fixed link 5-8, fixed rod support bar 5-9, three 5-1 of control-rod and control-rod fixed plate 5- 2 are fixedly connected, and three 5-1 of control-rod is located at control-rod fixed plate 5-2 marginal positions, and three 5-1 of control-rod, which is played, provides power work With control-rod fixed plate 5-2 is fixedly connected with one 5-3 of belt wheel, and control-rod fixed plate 5-2 is located in front of one 5-3 of belt wheel, control Bar fixed plate 5-2, one 5-3 of belt wheel are concentric, and one 5-3 of belt wheel is contacted with belt 5-4, and belt 5-4 is contacted with two 5-5 of belt wheel, belt wheel One 5-3 is located above two 5-5 of belt wheel, and belt 5-4 plays the role of transmitting movement, and two 5-5 of belt wheel is fixedly connected with wheel 5-6, and Belt wheel two 5-5 and wheel 5-6 is concentric, and wheel 5-6 and wheel support 5-7 is hinged, and tie point is located at the centers wheel 5-6, Wheel support 5-7 is fixedly connected with lifting gear 4, and wheel support 5-7 is located at 4 lower section of lifting gear, fixed link 5-8 and belt wheel One 5-3 is hinged, and tie point is located at one centers 5-3 of belt wheel, and fixed link 5-8 is fixedly connected with fixed rod support bar 5-9, and Fixed link 5-8 is located above fixed rod support bar 5-9, and fixed link 5-8 is fixedly connected with experimental bench stage body 6, and fixed link 5-8 In 6 right of experimental bench stage body, fixed rod support bar 5-9 is fixedly connected with experimental bench stage body 6, and fixed rod support bar 5-9 is located at Right;
The experimental bench stage body 6 includes stage body 6-1, sink 6-2, sink supporting rod 6-3, upper hose 6-4, downcomer 6-5, Stage body 6-1 and sink 6-2 is hinged, and stage body 6-1 is located at the lefts sink 6-2, and sink 6-2 and sink supporting rod 6-3 is hinged, and water Slot 6-2 is located at the rights sink supporting rod 6-3, and sink supporting rod 6-3 plays the role of supporting sink 6-2, sink supporting rod 6-3 and platform Body 6-1 contacts, and sink supporting rod 6-3 is located at the rights stage body 6-1, upper hose 6-4 is contacted with sink 6-2, and the other end and confession Water installations 3 connect, and downcomer 6-5 is contacted with sink 6-2, and the other end is connect with wastewater treatment equipment 2;
Emission-control equipment 1 is connect with experimental bench stage body 6, and emission-control equipment 1 is located at 6 top of test-bed body, waste water Processing unit 2 is connect with water supply installation 3, and wastewater treatment equipment 2 is located at 3 top of water supply installation, lifting gear 4 and mobile device 5 connections, and lifting gear 4 is located at 5 top of mobile device, experimental bench stage body 6 is connect with wastewater treatment equipment 2, and wastewater treatment Device 2 is located inside experimental bench stage body 6, and wastewater treatment equipment 2 is connect with experimental bench stage body 6, and wastewater treatment equipment 2 is located in fact It tests inside platform stage body 6, lifting gear 4 is connect with experimental bench stage body 6, and lifting gear 4 is located at 6 lower section of experimental bench stage body, mobile Device 5 is connect with experimental bench stage body 6.
Specific implementation mode two:
Illustrate present embodiment with reference to Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, Fig. 8, present embodiment is to reality It applies mode one to be described further, one 3-5 of helical gear, two 3-6 of helical gear, one 4-4 of main helical gear, two 4- of main helical gear 5, one 4-8 of secondary helical gear, pair two 4-9 of helical gear are 38 chrome-silicon materials.
Specific implementation mode three:
Illustrate present embodiment with reference to Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, Fig. 8, present embodiment is to reality It applies mode one to be described further, the wheel 5-6 is ABS plastic material.
Specific implementation mode four:
Illustrate present embodiment with reference to Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, Fig. 8, present embodiment is to reality It applies mode one to be described further, one 3-7 of screw rod, driving screw 4-3, sub-screw 4-10 are No. 45 steel materials.
Specific implementation mode five:
Illustrate present embodiment with reference to Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, Fig. 8, present embodiment is to reality It applies mode one to be described further, the sink 6-2, waste water tank 2-1, water tank 3-11 are stainless steel.
Specific implementation mode six:
Illustrate present embodiment with reference to Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, Fig. 8, present embodiment is to reality It applies mode one to be described further, one 5-3 of belt wheel, two 5-5 of belt wheel are titanium alloy material.
By shaking fan control bar 1-9, so that fan control bar fixed plate 1-10 is rotated, so that fan blades is fixed by band transmission 1-5 rotations are taken turns, to make fan fan blades 1-7 rotate, so that exhaust gas is passed through fan using air flowing and enters waste gas treatment tank 1-1, It is equipped with exhaust gas partition board 1-2 in waste gas treatment tank 1-1, lengthens exhaust gas in waste gas treatment tank 1-1 flowing times, exhaust gas is in exhaust-gas treatment Case 1-1 is discharged by low temperature elimination peculiar smell in air;
Waste water is flowed into waste water tank 2-1 by downcomer 6-5, is filtered by cotton 2-2, activated carbon 2-3 absorption, filter paper 2- After 4 filterings, water tank 3-11 is flowed by one-way throttle valve 2-6, by shaking one 3-1 of control-rod, makes control-rod fixed plate one 3-2 is rotated, and by one 3-3 of connecting rod, rotation is passed to one 3-5 of helical gear, one 3-5 of helical gear is engaged with two 3-6 of helical gear Rotation direction is changed, two 3-6 of helical gear drives screw rod one 3-7 rotations, one 3-7 of screw rod to drive Rubber washer 3-9, glue by screw thread Leather packing fixed plate 3-10 is moved up, and water is pushed into upper hose 6-4;
By shaking two 4-1 of control-rod, two 4-2 of control-rod fixed plate is set to rotate, the two 4-2 rotations of control-rod fixed plate drive Connecting rod two 4-7 rotations, to make two 4-5 of main helical gear rotate, two 4-5 of main helical gear is engaged with one 4-4 of main helical gear, main oblique Gear one 4-4 rotations make driving screw 4-3 move up by screw thread, to realize elevating function;
By shaking three 5-1 of control-rod, control-rod fixed plate 5-2 is set to rotate, to make one 5-3 of belt wheel rotations, belt wheel one Rotation is passed to two 5-5 of belt wheel by 5-3 by belt 5-4, and belt wheel two 5-5 rotations drive wheel 5-6 rotations, to realize movement Function.
Certainly, above description is not limitation of the present invention, and the present invention is also not limited to the example above, the art The variations, modifications, additions or substitutions that those of ordinary skill is made in the essential scope of the present invention also belong to the guarantor of the present invention Protect range.

Claims (6)

1. a kind of multi-function experimental rig, including emission-control equipment (1), wastewater treatment equipment (2), water supply installation (3), lifting dress Set (4), mobile device (5), experimental bench stage body (6) it is characterized in that:The emission-control equipment (1) includes waste gas treatment tank (1-1), exhaust gas partition board (1-2), exhaust gas box bracket (1-3), fan protective net (1-4), fan blades fast pulley (1-5), fan connection Bar (1-6), fan fan blades (1-7), fan supporting rod (1-8), fan control bar (1-9), fan control bar fixed plate (1-10), Fan control bar fixed plate supporting rod (1-11), pedestal (1-12), waste gas treatment tank (1-1) and the fixed company of exhaust gas partition board (1-2) It connects, and exhaust gas partition board (1-2) is located at waste gas treatment tank (1-1) inside, exhaust gas box bracket (1-3) is solid with waste gas treatment tank (1-1) Fixed connection, and exhaust gas box bracket (1-3) is located at waste gas treatment tank (1-1) right end, exhaust gas box bracket (1-3) other end and experimental bench Stage body (6) is fixedly connected, and tie point is located at experimental bench stage body (6) left end, fan protective net (1-4) and fan supporting rod (1- 8) it is fixedly connected, and fan protective net (1-4) is located at the left fan supporting rod (1-8), fan blades fast pulley (1-5) is connect with fan Bar (1-6) coordinates, and fit system is clearance fit, and fan blades fast pulley (1-5) and fan connecting rod (1-6) are concentric, fan Piece (1-7) is fixedly connected with fan blades fast pulley (1-5), and fan fan blades (1-7) is located at fan blades fast pulley (1-5) left end, fan Fan blades (1-7) coordinates with fan connecting rod (1-6), and fit system is clearance fit, and tie point is located at fan blades center, wind Fan connecting rod (1-6) is fixedly connected with fan supporting rod (1-8), and fan connecting rod (1-6) is located in fan supporting rod (1-8) End, fan supporting rod (1-8) are fixedly connected with pedestal (1-12), and fan supporting rod (1-8) is located above pedestal (1-12), wind Fan control-rod (1-9) is fixedly connected with fan control bar fixed plate (1-10), and fan control bar (1-9) is located at fan control bar Fixed plate (1-10) right end, tie point is in fan control bar fixed plate (1-10) marginal position, fan control bar fixed plate (1- 10) hinged with fan control bar fixed plate supporting rod (1-11), and fan control bar fixed plate (1-10) is located at fan control bar Above fixed plate supporting rod (1-11), tie point is located at fan control bar fixed plate (1-10) center location, and fan control bar is solid Fixed board supporting rod (1-11) is fixedly connected with pedestal (1-12), and fan control bar fixed plate supporting rod (1-11) is located at pedestal Above (1-12), pedestal (1-12) is fixedly connected with experimental bench stage body (6), and pedestal (1-12) is located on experimental bench stage body (6) Side;
The wastewater treatment equipment (2) includes waste water tank (2-1), cotton (2-2), activated carbon (2-3), filter paper (2-4), wire netting (2-5), one-way throttle valve (2-6), water injection valve (2-7), waste water tank (2-1) is fixedly connected with experimental bench stage body (6), and waste water tank (2-1) is located at experimental bench stage body (6) inside, and cotton (2-2) is contacted with waste water tank (2-1), and cotton (2-2) is located at waste water tank (2-1) is internal, and cotton (2-2) is contacted with activated carbon (2-3), and cotton (2-2) is located above activated carbon (2-3), activated carbon (2- 3) it is contacted with waste water tank (2-1), and activated carbon (2-3) is located at waste water tank (2-1) inside, activated carbon (2-3) connects with filter paper (2-4) It touches, and activated carbon (2-3) is located above filter paper (2-4), filter paper (2-4) is contacted with waste water tank (2-1), and filter paper (2-4) is located at Waste water tank (2-1) is internal, and filter paper (2-4) is contacted with wire netting (2-5), and filter paper (2-4) is located above wire netting (2-5), iron Silk screen (2-5) is fixedly connected with waste water tank (2-1), and wire netting (2-5) is located at waste water tank (2-1) inside, one-way throttle valve (2- 6) it is fixedly connected with waste water tank (2-1), and one-way throttle valve (2-6) is located at the bottom waste water tank (2-1), waste water tank (2-1) and confession Water installations (3) are fixedly connected, and waste water tank (2-1) is located at water supply installation (3) left, one-way throttle valve (2-6) and water supply installation (3) it contacts, and one-way throttle valve (2-6) is located at water supply installation (3) left, water injection valve (2-7) and the fixed company of waste water tank (2-1) It connects, and water injection valve (2-7) is located at the bottom waste water tank (2-1),
The water supply installation (3) includes control-rod one (3-1), control-rod fixed plate one (3-2), connecting rod one (3-3), fixed block One (3-4), helical gear one (3-5), helical gear two (3-6), screw rod one (3-7), fixed block two (3-8), Rubber washer (3-9), glue Leather packing fixed plate (3-10), water tank (3-11), control-rod one (3-1) are fixedly connected with control-rod fixed plate one (3-2), and are controlled Bar one (3-1) is located at control-rod fixed plate one (3-2) left end, and tie point is located at control-rod fixed plate one (3-2) marginal position, control Bar fixed plate one (3-2) processed is fixedly connected with connecting rod one (3-3), and control-rod fixed plate one (3-2) is located at one (3- of connecting rod 3) left end, control-rod fixed plate one (3-2) and connecting rod one (3-3) are concentric, and connecting rod one (3-3) coordinates with experimental bench stage body, Fit system is clearance fit, and connecting rod one (3-3) coordinates with fixed block one (3-4) inner surface, and fit system is clearance fit, Fixed block one (3-4) is fixedly connected with experimental bench stage body (6), and connecting rod one (3-3) is fixedly connected with helical gear one (3-5), and Connecting rod one (3-3) is located at the left helical gear one (3-5), and connecting rod one (3-3) and helical gear one (3-5) are concentric, helical gear one (3-5) is engaged with helical gear two (3-6), and helical gear one (3-5) is located above helical gear two (3-6), helical gear two (3-6) and spiral shell Bar one (3-7) is threadedly coupled, and helical gear two (3-6) and screw rod one (3-7) are concentric, screw rod one (3-7) and fixed block two (3-8) Cooperation, fit system is clearance fit, and fixed block two (3-8) is fixedly connected with experimental bench stage body (6), Rubber washer (3-9) and spiral shell Bar one (3-7) is threadedly coupled, and is connected and be located at the center Rubber washer (3-9), Rubber washer (3-9) and water tank (3-11) inner surface Cooperation, fit system are interference fit, and Rubber washer (3-9) is connect with Rubber washer fixed plate (3-10), and Rubber washer (3-9) is located at Above Rubber washer fixed plate (3-10), Rubber washer (3-9) and Rubber washer fixed plate (3-10) are concentric, Rubber washer fixed plate (3-10) It is threadedly coupled with screw rod one (3-7), and tie point is located at Rubber washer fixed plate (3-10) center location, water tank (3-11) and experiment Platform stage body (6) is fixedly connected, and water tank (3-11) is located at experimental bench stage body (6) inside;
The lifting gear (4) includes control-rod two (4-1), control-rod fixed plate two (4-2), driving screw (4-3), main helical gear One (4-4), main helical gear two (4-5), limited block one (4-6), connecting rod two (4-7), secondary helical gear one (4-8), secondary helical gear Two (4-9), sub-screw (4-10), connecting rod support plate (4-11), pedestal (4-12), limited block two (4-13), two (4- of control-rod 1) it is fixedly connected with control-rod fixed plate two (4-2), and control-rod two (4-1) is located at the left control-rod fixed plate two (4-2), even Contact is located at control-rod fixed plate two (4-2) marginal position, control-rod fixed plate two (4-2) and the fixed company of connecting rod two (4-7) It connects, and control-rod fixed plate two (4-2) is located at the left connecting rod two (4-7), control-rod fixed plate two (4-2) and connecting rod two (4-7) with one heart, driving screw (4-3) is threadedly coupled with main helical gear one (4-4), and driving screw (4-3) and main helical gear one (4-4) With one heart, main helical gear one (4-4) is fixedly connected with limited block two (4-13), and main helical gear one (4-4) is located at two (4- of limited block 13) lower section, main helical gear one (4-4) are engaged with main helical gear two (4-5), and main helical gear one (4-4) is located at main helical gear two Above (4-5), main helical gear two (4-5) is fixedly connected with limited block one (4-6), and main helical gear two (4-5) is located at limited block One left (4-6), main helical gear two (4-5) are fixedly connected with connecting rod two (4-7), and main helical gear two (4-5) and connecting rod With one heart, limited block one (4-6) is fixedly connected two (4-7) with connecting rod two (4-7), and limited block one (4-6) and two (4- of connecting rod 7) with one heart, secondary helical gear two (4-9) is fixedly connected with connecting rod two (4-7), secondary helical gear one (4-8) and two (4- of secondary helical gear 9) it engages, and secondary helical gear one (4-8) is located above secondary helical gear two (4-9), secondary helical gear one (4-8) and two (4- of limited block 13) it is fixedly connected, and secondary helical gear one (4-8) is located at below limited block two (4-13), secondary helical gear one (4-8) and sub-screw (4-10) is threadedly coupled, and secondary helical gear one (4-8) and sub-screw (4-10) are concentric, connecting rod support plate (4-11) connecting rod branch Fagging (4-11) coordinates with connecting rod two (4-7), and fit system is clearance fit, connecting rod support plate (4-11) and pedestal (4- 12) it is fixedly connected, and there are two be arranged symmetrically in pedestal (4-12) top, limited block two (4-13) for connecting rod support plate (4-11) It is fixedly connected with experimental bench stage body (6), and limited block two (4-13) is located at below experimental bench stage body (6), driving screw (4-3), pair Screw rod (4-10) is contacted with experimental bench stage body (6), and driving screw (4-3), sub-screw (4-10) are located under experimental bench stage body (6) Side.
The mobile device (5) include control-rod three (5-1), control-rod fixed plate (5-2), belt wheel one (5-3), belt (5-4), Belt wheel two (5-5), wheel (5-6), wheel support (5-7), fixed link (5-8), fixed rod support bar (5-9), three (5- of control-rod 1) it is fixedly connected, and control-rod three (5-1) is located at control-rod fixed plate (5-2) marginal position, controls with control-rod fixed plate (5-2) Bar fixed plate (5-2) processed is fixedly connected with belt wheel one (5-3), and control-rod fixed plate (5-2) is located in front of belt wheel one (5-3), With one heart, belt wheel one (5-3) is contacted with belt (5-4) for control-rod fixed plate (5-2), belt wheel one (5-3), belt (5-4) and belt wheel Two (5-5) are contacted, and belt wheel one (5-3) is located above belt wheel two (5-5), and belt wheel two (5-5) is fixedly connected with wheel (5-6), and Belt wheel two (5-5) and wheel (5-6) are concentric, and wheel (5-6) is hinged with wheel support (5-7), and tie point is located at wheel (5-6) Center, wheel support (5-7) are fixedly connected with lifting gear (4), and wheel support (5-7) is located under lifting gear (4) Side, fixed link (5-8) and belt wheel one (5-3) are hinged, and tie point is located at the center belt wheel one (5-3), fixed link (5-8) with Fixed rod support bar (5-9) is fixedly connected, and fixed link (5-8) is located above fixed rod support bar (5-9), fixed link (5-8) It is fixedly connected with experimental bench stage body (6), and fixed link (5-8) is located at experimental bench stage body (6) right, fixed rod support bar (5-9) It is fixedly connected with experimental bench stage body (6), and fixed rod support bar (5-9) is located at right;
The experimental bench stage body (6) includes stage body (6-1), sink (6-2), sink supporting rod (6-3), upper hose (6-4), lower water It manages (6-5), stage body (6-1) is hinged with sink (6-2), and stage body (6-1) is located at the left sink (6-2), sink (6-2) and sink Supporting rod (6-3) is hinged, and sink (6-2) is located at the right sink supporting rod (6-3), sink supporting rod (6-3) and stage body (6-1) Contact, and sink supporting rod (6-3) is located at the right stage body (6-1), and upper hose (6-4) is contacted with sink (6-2), and the other end and Water supply installation (3) connects, and downcomer (6-5) is contacted with sink (6-2), and the other end is connect with wastewater treatment equipment (2);
Emission-control equipment (1) is connect with experimental bench stage body (6), and emission-control equipment (1) is located above test-bed body (6), Wastewater treatment equipment (2) is connect with water supply installation (3), and wastewater treatment equipment (2) is located above water supply installation (3), lifting dress It sets (4) to connect with mobile device (5), and lifting gear (4) is located above mobile device (5), at experimental bench stage body (6) and waste water It manages device (2) to connect, and wastewater treatment equipment (2) is located at experimental bench stage body (6) inside, wastewater treatment equipment (2) and experimental bench Stage body (6) connects, and wastewater treatment equipment (2) is located at experimental bench stage body (6) inside, lifting gear (4) and experimental bench stage body (6) Connection, and lifting gear (4) is located at below experimental bench stage body (6), mobile device (5) is connect with experimental bench stage body (6).
2. a kind of multi-function experimental rig according to claim 1, it is characterised in that:The helical gear one (3-5), helical teeth Two (3-6) of wheel, main helical gear one (4-4), main helical gear two (4-5), secondary helical gear one (4-8), secondary helical gear two (4-9) are 38 chrome-silicon materials.
3. a kind of multi-function experimental rig according to claim 1, it is characterised in that:The wheel (5-6) is ABS plastic Material.
4. a kind of multi-function experimental rig according to claim 1, it is characterised in that:The screw rod one (3-7), driving screw (4-3), sub-screw (4-10) are No. 45 steel materials.
5. a kind of multi-function experimental rig according to claim 1, it is characterised in that:The sink (6-2), waste water tank (2-1), water tank (3-11) are stainless steel.
6. a kind of multi-function experimental rig according to claim 1, it is characterised in that:The belt wheel one (5-3), belt wheel two (5-5) is titanium alloy material.
CN201810685126.5A 2018-06-28 2018-06-28 Multifunctional experiment table Active CN108671976B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810685126.5A CN108671976B (en) 2018-06-28 2018-06-28 Multifunctional experiment table

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810685126.5A CN108671976B (en) 2018-06-28 2018-06-28 Multifunctional experiment table

Publications (2)

Publication Number Publication Date
CN108671976A true CN108671976A (en) 2018-10-19
CN108671976B CN108671976B (en) 2021-01-08

Family

ID=63812418

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810685126.5A Active CN108671976B (en) 2018-06-28 2018-06-28 Multifunctional experiment table

Country Status (1)

Country Link
CN (1) CN108671976B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111257578A (en) * 2020-03-19 2020-06-09 莱芜职业技术学院 Multifunctional biochemical analysis device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19624506A1 (en) * 1995-06-19 1997-03-20 Kaltenbach & Voigt Work table, esp. for medical or dental laboratory
CN203812135U (en) * 2014-04-28 2014-09-03 黑龙江工程学院 Abacus with adjustable height and gradient
CN206868277U (en) * 2017-07-05 2018-01-12 海南热带海洋学院 A kind of teaching bench for chemistry experiment
CN207187808U (en) * 2017-08-25 2018-04-06 太原师范学院 A kind of organic chemistry multifunction experiment apparatus
CN108161851A (en) * 2018-03-20 2018-06-15 安徽工程大学 A kind of lifting adjustable bed
CN108164019A (en) * 2016-12-07 2018-06-15 甘肃秦洁环境科技有限公司 A kind of domestic sewage filter device
CN108187777A (en) * 2018-02-05 2018-06-22 赵国瑾 A kind of middle school student's bench for chemistry experiment

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19624506A1 (en) * 1995-06-19 1997-03-20 Kaltenbach & Voigt Work table, esp. for medical or dental laboratory
CN203812135U (en) * 2014-04-28 2014-09-03 黑龙江工程学院 Abacus with adjustable height and gradient
CN108164019A (en) * 2016-12-07 2018-06-15 甘肃秦洁环境科技有限公司 A kind of domestic sewage filter device
CN206868277U (en) * 2017-07-05 2018-01-12 海南热带海洋学院 A kind of teaching bench for chemistry experiment
CN207187808U (en) * 2017-08-25 2018-04-06 太原师范学院 A kind of organic chemistry multifunction experiment apparatus
CN108187777A (en) * 2018-02-05 2018-06-22 赵国瑾 A kind of middle school student's bench for chemistry experiment
CN108161851A (en) * 2018-03-20 2018-06-15 安徽工程大学 A kind of lifting adjustable bed

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111257578A (en) * 2020-03-19 2020-06-09 莱芜职业技术学院 Multifunctional biochemical analysis device
CN111257578B (en) * 2020-03-19 2020-09-11 莱芜职业技术学院 Multifunctional biochemical analysis device

Also Published As

Publication number Publication date
CN108671976B (en) 2021-01-08

Similar Documents

Publication Publication Date Title
CN105771529A (en) Efficient environment-friendly indoor air purifying device
CN210452632U (en) Electronic product's that facilitates use maintenance device
CN208483376U (en) A kind of novel USB data line buckle full-automatic material-feeding laser-beam welding machine
CN108671976A (en) A kind of multi-function experimental rig
CN110960946A (en) Dustproof protective cover
CN205287935U (en) Height -adjustable's air purification device of being convenient for removal with placing
CN206872586U (en) A kind of sewage disposal carrier easy to remove
CN107897324A (en) A kind of fish process operation equipment easy to categorised collection
CN210818894U (en) Numerical control equipment dust keeper
CN106345212A (en) Industrial smoke purification equipment with high efficiency and environmental friendliness
CN207081051U (en) A kind of packaged type smoke exhaust ventilator
CN206622145U (en) A kind of novel and multifunctional experimental bench
CN209189218U (en) A kind of pitch special purification filter
CN205042264U (en) Processing apparatus is collected to oil flue waste gas
CN208130742U (en) A kind of emission-control equipment
CN209532470U (en) A kind of dust exhaust apparatus on components welding bench
CN204582839U (en) A kind of comminutor emission-control equipment
CN208757219U (en) A kind of industrial waste gas treatment equipment convenient to use
CN209392950U (en) A kind of adsorbing powder dust purification device of commercial wood processing workshop
CN207980785U (en) A kind of organic waste gas treatment equipment
CN207507239U (en) A kind of automatic washing emission-control equipment
CN207361966U (en) A kind of efficient sewage-treatment plant
CN207196577U (en) A kind of multijaw automatically adjusts smoke exhaust ventilator
CN208097773U (en) A kind of rubber house exhaust processing unit
CN207707266U (en) A kind of agaric drying unit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20201015

Address after: No.90 Lanzi community, Hetoudian Town, Laixi City, Qingdao City, Shandong Province

Applicant after: Laixi Hengyuan industrial Internet Center

Address before: 150050 Heilongjiang Engineering College, 199 Hongqi Street, Daowai District, Harbin City, Heilongjiang Province

Applicant before: Qi Jiancheng

TA01 Transfer of patent application right

Effective date of registration: 20201221

Address after: 510000 south side of Shiji Village section of Shinan highway, Dongyong Town, Nansha District, Guangzhou City, Guangdong Province (plant 2)

Applicant after: Guangdong banzhou laboratory equipment Co.,Ltd.

Address before: 266000 No. 90, Lanzi community, Hetoudian Town, Laixi City, Qingdao City, Shandong Province

Applicant before: Laixi Hengyuan industrial Internet Center

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A multifunctional experimental platform

Effective date of registration: 20211216

Granted publication date: 20210108

Pledgee: China Co. truction Bank Corp Guangdong FTA pilot area branch

Pledgor: Guangdong banzhou laboratory equipment Co.,Ltd.

Registration number: Y2021440000381

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230803

Granted publication date: 20210108

Pledgee: China Co. truction Bank Corp Guangdong FTA pilot area branch

Pledgor: Guangdong banzhou laboratory equipment Co.,Ltd.

Registration number: Y2021440000381