CN108648100A - A method of the bridge location weld information management based on BiM technologies - Google Patents

A method of the bridge location weld information management based on BiM technologies Download PDF

Info

Publication number
CN108648100A
CN108648100A CN201810212020.3A CN201810212020A CN108648100A CN 108648100 A CN108648100 A CN 108648100A CN 201810212020 A CN201810212020 A CN 201810212020A CN 108648100 A CN108648100 A CN 108648100A
Authority
CN
China
Prior art keywords
welding
bim
management
weld
bridge location
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810212020.3A
Other languages
Chinese (zh)
Inventor
陈涛
闫志刚
王钦国
王建国
林长青
赵钰
谭永超
张贵忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
China State Railway Group Co Ltd
Jiangsu Zhongtie Shanqiao Heavy Industry Co Ltd
Original Assignee
China Railway Major Bridge Engineering Group Co Ltd MBEC
China Railway Corp
Jiangsu Zhongtie Shanqiao Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Group Co Ltd MBEC, China Railway Corp, Jiangsu Zhongtie Shanqiao Heavy Industry Co Ltd filed Critical China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority to CN201810212020.3A priority Critical patent/CN108648100A/en
Publication of CN108648100A publication Critical patent/CN108648100A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06KGRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
    • G06K17/00Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations
    • G06K17/0022Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device

Abstract

The method for the bridge location weld information management based on BiM technologies that the invention discloses a kind of, by the generation of Quick Response Code, the recording step of stickup Quick Response Code, wireless network arrangements and welding machine upgrading, the management of welding data and welding data, the method for completing the bridge location weld information management based on BiM technologies;By BIM technology, can be networked the present invention welding machine by digitlization, and welding process data are uploaded to BIM management platforms in real time, automatically generate welding record form.The weld information and welding that every bridge location weld seam can be can be visually seen in the model of BIM management platforms record, while can complete the filing of welding data, avoid the workload manually filed, realize the automated information management of bridge location welding;Realize welding conditions management simultaneously, supergage alarm, history welds waveform inquiry and industrial analysis, and programming count is averaged welding parameter, the function of welding wire dosage.

Description

A method of the bridge location weld information management based on BiM technologies
Technical field
The present invention relates to a kind of methods of bridge location weld information management, and in particular to one kind is based on
The method of the bridge location weld information management of BiM technologies.
Background technology
With the continuous intensification of urbanization process, the scale of construction project is increasing, and involved profession is also more multiple Miscellaneous, steel construction industry is also faced with baptism while fast development.BIM as current domestic project construction field most by The application technology pursued just is paid close attention to by more and more people.
BIM is built by digital information analogue simulation based on every relevant information data of construction-engineering project Real information possessed by object is built, by three-dimensional building model, realizes that project supervision, estate management, equipment management, digitlization add The functions such as work, engineering management.It has information completeness, information relevance, consistency on messaging, visualization, harmony, mould Intend property, optimization property and eight big feature of figure can be gone out.The projects such as construction unit, designing unit, unit in charge of construction, supervisor are participated in Same building information model is shared in identical platform in side.It is built conducive to project visualization, fining.BIM is no longer as CAD mono- Sample is a software, but a kind of management means, is to realize construction industry fining, the important tool of information system management.
Traditional weld data acquisition can only be by being further filled with table after manual measurement, process is cumbersome, and manual measurement is grasped The otherness of work is larger, and measurement result is inaccurate, and especially when bridge location is set up, operating space is small and time-consuming and laborious.By existing In the bim technologies of high speed development, can be networked welding machine by digitlization, and welding process data are uploaded to bim management platforms in real time, Automatically generate welding record form.Welding conditions management, supergage alarm, history weld waveform inquiry and industrial analysis, automatically Statistical average welding parameter, welding wire dosage etc. are feature-rich to be helped to further increase welding quality, reinforces standardized management.
Can coordinate three-dimensional layout design and process integration technology, Intelligent welding robot, Internet of Things management simultaneously, realization from Technique preparation, part blanking, rod piece assembling, the information system management of whole shipping whole process, push wisdom bridging, scientific and technological bridging Development.
Invention content
In view of the above-mentioned deficiencies in the prior art, it is an object of the present invention to now provide a kind of filing for completing welding data, keep away Exempt from the workload of artificial filing, realizes the bridge location weld information based on BiM technologies of the automated information management of bridge location welding The method of management.
In order to solve the above technical problems, the technical solution adopted by the present invention is:A kind of bridge location welding letter based on BiM technologies The method of management is ceased, innovative point is:Change by the generation of Quick Response Code, stickup Quick Response Code, wireless network arrangements and welding machine upgrading It makes, the recording step of the management of welding data and welding data, completes the side of the bridge location weld information management based on BiM technologies Method;It is as follows:
(1)The generation of Quick Response Code:All bridge location weld seams are generated corresponding weld seam two by BIM management platforms automatically according to bridge model Tie up code;
(2)Paste Quick Response Code:The weld seam Quick Response Code of generation is pasted onto correspondingly on the position of bridge location welding;
(3)Wireless network arrangements and welding machine upgrading:The wireless network arrangements of gamut are realized to manufacturing field, in order to weld connection Net, while existing welding machine is subjected to upgrading, so that it is had weld information acquisition upload function;
(4)The management of welding data:Welder, first by logging in BIM management platform mobile phone A pp, sweeps when carrying out weld job The welding that this weld seam is carried out after weld seam Quick Response Code is retouched, it is flat that weld information is uploaded to BIM management by digitlization networking welding in real time Platform, BIM management platforms are analyzed automatically, if welding is more than code requirement in welding process, will be carried by mobile phone A pp It wakes up, and is sent to corresponding administrative staff;
(5)The record of welding data:After completing weld job, BIM management platforms automatically extract analysis welding data, generate this The welding record form of weld seam sends quality inspection personnel and carries out inspection declaration, after passed examination, carries out Electronic Countersign, completes welding record The filing of table.
Further, the step(1)In the specific method of generation of Quick Response Code be:By the model of BIM management platforms In the weld seam welding seam No existing with bridge location corresponded, and it is specified not according to different welding methods, welding material Same welding conditions, then automatically generate the corresponding Quick Response Code of every weld seam.
Further, the step(4)The management of welding data needs first to build welding data in BIM management platforms Management module for user management, receiving and analysis welding data, also, generates welding record form.
Further, the step(4)In weld information include electric current, voltage and welding material.
Beneficial effects of the present invention are as follows:By BIM technology, can be networked the present invention welding machine by digitlization, will be welded Number of passes factually when be uploaded to BIM management platforms, automatically generate welding record form.It can be intuitive in the model of BIM management platforms The weld information and welding for seeing every bridge location weld seam record, while can complete the filing of welding data, avoid artificial filing Workload, realize bridge location welding automated information management;Welding conditions management is realized simultaneously, and supergage alarm is gone through History welds waveform inquiry and industrial analysis, programming count are averaged welding parameter, the function of welding wire dosage.
Specific implementation mode
Illustrate that embodiments of the present invention, those skilled in the art can be by this explanations by particular specific embodiment below Content disclosed by book understands other advantages and effect of the present invention easily.
A method of the bridge location weld information management based on BiM technologies, by the generation of Quick Response Code, paste Quick Response Code, The recording step of wireless network arrangements and welding machine upgrading, the management of welding data and welding data, is completed based on BiM technologies The method of bridge location weld information management;It is as follows:
(1)The generation of Quick Response Code:All bridge location weld seams are generated corresponding weld seam two by BIM management platforms automatically according to bridge model Tie up code;
(2)Paste Quick Response Code:The weld seam Quick Response Code of generation is pasted onto correspondingly on the position of bridge location welding;
(3)Wireless network arrangements and welding machine upgrading:The wireless network arrangements of gamut are realized to manufacturing field, in order to weld connection Net, while existing welding machine is subjected to upgrading, so that it is had weld information acquisition upload function;
(4)The management of welding data:Welder, first by logging in BIM management platform mobile phone A pp, sweeps when carrying out weld job The welding that this weld seam is carried out after weld seam Quick Response Code is retouched, it is flat that weld information is uploaded to BIM management by digitlization networking welding in real time Platform, BIM management platforms are analyzed automatically, if welding is more than code requirement in welding process, will be carried by mobile phone A pp It wakes up, and is sent to corresponding administrative staff;
(5)The record of welding data:After completing weld job, BIM management platforms automatically extract analysis welding data, generate this The welding record form of weld seam sends quality inspection personnel and carries out inspection declaration, after passed examination, carries out Electronic Countersign, completes welding record The filing of table.
Step(1)In the specific method of generation of Quick Response Code be:By the weld seam and bridge location in the model of BIM management platforms Existing welding seam No is corresponded, and different welding conditions are specified according to different welding methods, welding material, so After automatically generate the corresponding Quick Response Code of every weld seam.
Step(4)The management of welding data is needed first to build welding data management module in BIM management platforms, is used for User management, receiving and analysis welding data, also, generate welding record form.
Step(4)In weld information include electric current, voltage and welding material.
Welder, by logging in BIM management platform mobile phone A pp, scans the Quick Response Code beside weld seam when carrying out weld job Afterwards, welding machine automatically obtains the welding conditions of this weld seam, automatically adjusts welding parameter, including voltage and current, is then somebody's turn to do The welding of weld seam, while digitizing networking welding and weld information is uploaded to BIM management platforms in real time, platform is remembered in real time Record, after completing weld job, BIM management platforms automatically extract analysis welding data, generate the welding record form of this weld seam, It sends quality inspection personnel and carries out inspection declaration, after passed examination, carry out Electronic Countersign, and complete the filing of welding record form.
Major Difficulties are the upgrading of digital welding and building for BIM platform welding Data Analysis Software.
1. weld seam encodes
Weld seam in the model of BIM platforms is corresponded with existing welding seam No, and according to different welding methods, Material specifies different welding conditions, generates the corresponding Quick Response Code of every weld seam.
2. wireless network arrangements and welding machine upgrading
The wireless network arrangements of gamut are realized to manufacturing field, in order to weld networking, while existing welding machine is subjected to upgrading and is changed It makes, it is made to have weld information acquisition upload function.
3. building BIM platform welding data management module server-sides and cell phone application client.
It in BIM platform building welding data management modules, for user management, receives, analyzes welding data, and generate and apply Weld record sheet
The login of cell phone application client-side management personnel and welding personnel.
4. function debugging comes into operation
Each module is attached, is debugged, is put into the quality management system of factory after reaching serviceable condition.
By BIM technology, can be networked the present invention welding machine by digitlization, and welding process data are uploaded to BIM pipes in real time Platform automatically generates welding record form.The welding of every bridge location weld seam can be can be visually seen in the model of BIM management platforms Information and welding record, while can complete the filing of welding data, avoid the workload manually filed, and realize bridge location welding Automated information management;Welding conditions management, supergage alarm are realized simultaneously, and history welds waveform inquiry and technique point Analysis, programming count are averaged welding parameter, the function of welding wire dosage.
Above-described embodiment is presently preferred embodiments of the present invention, is not the limitation to technical solution of the present invention, as long as Without the technical solution that creative work can be realized on the basis of the above embodiments, it is regarded as falling into patent of the present invention Rights protection scope in.

Claims (4)

1. a kind of method of the bridge location weld information management based on BiM technologies, it is characterised in that:By the generation of Quick Response Code, glue The recording step of patch Quick Response Code, wireless network arrangements and welding machine upgrading, the management of welding data and welding data, completes to be based on The method of the bridge location weld information management of BiM technologies;It is as follows:
The generation of Quick Response Code:All bridge location weld seams are generated corresponding weld seam two dimension by BIM management platforms automatically according to bridge model Code;
Paste Quick Response Code:The weld seam Quick Response Code of generation is pasted onto correspondingly on the position of bridge location welding;
Wireless network arrangements and welding machine upgrading:The wireless network arrangements of gamut are realized to manufacturing field, in order to weld networking, together When by existing welding machine carry out upgrading, make it have weld information acquisition upload function;
(4)The management of welding data:Welder, first by logging in BIM management platform mobile phone A pp, sweeps when carrying out weld job The welding that this weld seam is carried out after weld seam Quick Response Code is retouched, it is flat that weld information is uploaded to BIM management by digitlization networking welding in real time Platform, BIM management platforms are analyzed automatically, if welding is more than code requirement in welding process, will be carried by mobile phone A pp It wakes up, and is sent to corresponding administrative staff;
(5)The record of welding data:After completing weld job, BIM management platforms automatically extract analysis welding data, generate this The welding record form of weld seam sends quality inspection personnel and carries out inspection declaration, after passed examination, carries out Electronic Countersign, completes welding record The filing of table.
2. a kind of method of bridge location weld information management based on BiM technologies according to claim 1, it is characterised in that: The step(1)In the specific method of generation of Quick Response Code be:By in the model of BIM management platforms weld seam and bridge location it is existing Welding seam No corresponded, and different welding conditions are specified according to different welding methods, welding material, then from It is dynamic to generate the corresponding Quick Response Code of every weld seam.
3. a kind of method of bridge location weld information management based on BiM technologies according to claim 1, it is characterised in that: The step(4)The management of welding data needs first to build welding data management module in BIM management platforms, is used for user Management receives and analyzes welding data, also, generates welding record form.
4. a kind of method of bridge location weld information management based on BiM technologies according to claim 1, it is characterised in that: The step(4)In weld information include electric current, voltage and welding material.
CN201810212020.3A 2018-03-15 2018-03-15 A method of the bridge location weld information management based on BiM technologies Pending CN108648100A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810212020.3A CN108648100A (en) 2018-03-15 2018-03-15 A method of the bridge location weld information management based on BiM technologies

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810212020.3A CN108648100A (en) 2018-03-15 2018-03-15 A method of the bridge location weld information management based on BiM technologies

Publications (1)

Publication Number Publication Date
CN108648100A true CN108648100A (en) 2018-10-12

Family

ID=63744165

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810212020.3A Pending CN108648100A (en) 2018-03-15 2018-03-15 A method of the bridge location weld information management based on BiM technologies

Country Status (1)

Country Link
CN (1) CN108648100A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109408959A (en) * 2018-10-24 2019-03-01 长安大学 A kind of acquisition method of steel structure bridge manufacture information
CN110298533A (en) * 2019-05-06 2019-10-01 广州文冲船厂有限责任公司 A kind of welding process management method and system
CN111624325A (en) * 2019-02-28 2020-09-04 上海捷规建筑工程咨询有限公司 Steel structure weld nondestructive testing method and system based on BIM
CN112561017A (en) * 2020-12-25 2021-03-26 东方电气集团科学技术研究院有限公司 Snake-shaped pipe weld joint mark tracing system
CN112882996A (en) * 2021-01-05 2021-06-01 唐山松下产业机器有限公司 Welding data processing method, processing device and processing system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007167915A (en) * 2005-12-22 2007-07-05 Ohbayashi Corp Welding control method, welding control system, steel frame structure, and ic tag
JP2008059116A (en) * 2006-08-30 2008-03-13 Hitachi-Ge Nuclear Energy Ltd Welding work management and recording system using rfid tag
CN105678464A (en) * 2016-01-13 2016-06-15 上海振华重工(集团)股份有限公司 Welding information management method
CN107067269A (en) * 2017-04-02 2017-08-18 天津大学 Oil platform Steel Structure Weld information Life cycle tracking
CN107194588A (en) * 2017-05-24 2017-09-22 中铁建设投资集团有限公司 A kind of bridge construction management system and method based on Quick Response Code and BIM technology

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007167915A (en) * 2005-12-22 2007-07-05 Ohbayashi Corp Welding control method, welding control system, steel frame structure, and ic tag
JP2008059116A (en) * 2006-08-30 2008-03-13 Hitachi-Ge Nuclear Energy Ltd Welding work management and recording system using rfid tag
CN105678464A (en) * 2016-01-13 2016-06-15 上海振华重工(集团)股份有限公司 Welding information management method
CN107067269A (en) * 2017-04-02 2017-08-18 天津大学 Oil platform Steel Structure Weld information Life cycle tracking
CN107194588A (en) * 2017-05-24 2017-09-22 中铁建设投资集团有限公司 A kind of bridge construction management system and method based on Quick Response Code and BIM technology

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109408959A (en) * 2018-10-24 2019-03-01 长安大学 A kind of acquisition method of steel structure bridge manufacture information
CN109408959B (en) * 2018-10-24 2022-09-27 长安大学 Method for acquiring manufacturing information of steel structure bridge
CN111624325A (en) * 2019-02-28 2020-09-04 上海捷规建筑工程咨询有限公司 Steel structure weld nondestructive testing method and system based on BIM
CN110298533A (en) * 2019-05-06 2019-10-01 广州文冲船厂有限责任公司 A kind of welding process management method and system
CN112561017A (en) * 2020-12-25 2021-03-26 东方电气集团科学技术研究院有限公司 Snake-shaped pipe weld joint mark tracing system
CN112882996A (en) * 2021-01-05 2021-06-01 唐山松下产业机器有限公司 Welding data processing method, processing device and processing system

Similar Documents

Publication Publication Date Title
CN108648100A (en) A method of the bridge location weld information management based on BiM technologies
CN110782154B (en) Construction planning management system based on BIM+GIS
CN108971807B (en) Intelligent management control method and management system for field welding construction process
CN106330618A (en) Gateway routing automatic test system and test method based on CAN/LIN/MOST hybrid buses
CN108646689B (en) Virtual production manufacturing method and system based on welding
CN101118430A (en) On-line monitoring and optimizing method of processing parameter during process of aluminium alloy fusion welding
CN113673104A (en) Manufacturing workshop process planning system based on digital twin
CN109664008A (en) A kind of repair welding system and intelligent repair method
CN107570926A (en) Weld job managing and control system
CN109759750B (en) Method for on-site welding construction inspection and remote monitoring
Lin et al. Concept and implementation of a cyber-pbysical digital twin for a SMT line
CN113313431B (en) Three-dimensional digital workshop system for multi-source heterogeneous data
CN112231816A (en) Digital delivery method based on process pipeline
CN108631358A (en) Method and apparatus are determined based on the directly driven wind-powered unit impedance of control hardware in loop
CN107563089A (en) The method and computing device of PC components generation task list based on BIM
CN111143921A (en) Method for automatically designing digital space derivative structure
CN201116976Y (en) On-line monitoring and technological parameter optimizing system for aluminum alloy fusion welding process
CA3187787A1 (en) Digital assembly and manufacturing method for flame exhaust pipe of servo mechanism
CN109657321B (en) Electronic assembly rapid process design system for printed board assembly and use method
CN102479359A (en) Power grid overhauling plan compilation method based on graphic operations
CN102385344A (en) Automatic welding method based on reading of DXF-format file of Visual C#
CN116010398A (en) Method and system for constructing power load modeling data based on station line-to-household relationship
Zhang et al. The life cycle state evaluation of electrical equipment based on digital Twins
CN203992755U (en) The welding machine with the accurate short circuiting transfer control circuit of arc welding based on AVR single-chip microcomputer
CN206966920U (en) A kind of automatic intelligent pipe plate tube pipe welding system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181012

WD01 Invention patent application deemed withdrawn after publication