- Publication number
- CN108648100A CN108648100A CN201810212020.3A CN201810212020A CN108648100A CN 108648100 A CN108648100 A CN 108648100A CN 201810212020 A CN201810212020 A CN 201810212020A CN 108648100 A CN108648100 A CN 108648100A
- Authority
- CN
- China
- Prior art keywords
- welding
- bim
- management
- weld
- bridge location
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 35
- 238000005516 engineering process Methods 0.000 title claims abstract description 22
- 238000003466 welding Methods 0.000 claims abstract description 132
- 238000007726 management method Methods 0.000 claims abstract description 77
- 230000004044 response Effects 0.000 claims abstract description 28
- 238000004458 analytical method Methods 0.000 claims abstract description 10
- 230000008569 process Effects 0.000 claims abstract description 10
- 238000007689 inspection Methods 0.000 claims description 8
- 239000000463 material Substances 0.000 claims description 7
- 230000006855 networking Effects 0.000 claims description 6
- 238000013523 data management Methods 0.000 claims description 4
- 238000004519 manufacturing process Methods 0.000 claims description 4
- 239000003292 glue Substances 0.000 claims 1
- 238000010276 construction Methods 0.000 description 6
- 238000011161 development Methods 0.000 description 3
- 238000005259 measurement Methods 0.000 description 3
- 238000012800 visualization Methods 0.000 description 2
- 238000003326 Quality management system Methods 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06K—GRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
- G06K17/00—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations
- G06K17/0022—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device
Abstract
The method for the bridge location weld information management based on BiM technologies that the invention discloses a kind of, by the generation of Quick Response Code, the recording step of stickup Quick Response Code, wireless network arrangements and welding machine upgrading, the management of welding data and welding data, the method for completing the bridge location weld information management based on BiM technologies;By BIM technology, can be networked the present invention welding machine by digitlization, and welding process data are uploaded to BIM management platforms in real time, automatically generate welding record form.The weld information and welding that every bridge location weld seam can be can be visually seen in the model of BIM management platforms record, while can complete the filing of welding data, avoid the workload manually filed, realize the automated information management of bridge location welding;Realize welding conditions management simultaneously, supergage alarm, history welds waveform inquiry and industrial analysis, and programming count is averaged welding parameter, the function of welding wire dosage.
Description
Technical field
The present invention relates to a kind of methods of bridge location weld information management, and in particular to one kind is based on
The method of the bridge location weld information management of BiM technologies.
Background technology
With the continuous intensification of urbanization process, the scale of construction project is increasing, and involved profession is also more multiple
Miscellaneous, steel construction industry is also faced with baptism while fast development.BIM as current domestic project construction field most by
The application technology pursued just is paid close attention to by more and more people.
BIM is built by digital information analogue simulation based on every relevant information data of construction-engineering project
Real information possessed by object is built, by three-dimensional building model, realizes that project supervision, estate management, equipment management, digitlization add
The functions such as work, engineering management.It has information completeness, information relevance, consistency on messaging, visualization, harmony, mould
Intend property, optimization property and eight big feature of figure can be gone out.The projects such as construction unit, designing unit, unit in charge of construction, supervisor are participated in
Same building information model is shared in identical platform in side.It is built conducive to project visualization, fining.BIM is no longer as CAD mono-
Sample is a software, but a kind of management means, is to realize construction industry fining, the important tool of information system management.
Traditional weld data acquisition can only be by being further filled with table after manual measurement, process is cumbersome, and manual measurement is grasped
The otherness of work is larger, and measurement result is inaccurate, and especially when bridge location is set up, operating space is small and time-consuming and laborious.By existing
In the bim technologies of high speed development, can be networked welding machine by digitlization, and welding process data are uploaded to bim management platforms in real time,
Automatically generate welding record form.Welding conditions management, supergage alarm, history weld waveform inquiry and industrial analysis, automatically
Statistical average welding parameter, welding wire dosage etc. are feature-rich to be helped to further increase welding quality, reinforces standardized management.
Can coordinate three-dimensional layout design and process integration technology, Intelligent welding robot, Internet of Things management simultaneously, realization from
Technique preparation, part blanking, rod piece assembling, the information system management of whole shipping whole process, push wisdom bridging, scientific and technological bridging
Development.
Invention content
In view of the above-mentioned deficiencies in the prior art, it is an object of the present invention to now provide a kind of filing for completing welding data, keep away
Exempt from the workload of artificial filing, realizes the bridge location weld information based on BiM technologies of the automated information management of bridge location welding
The method of management.
In order to solve the above technical problems, the technical solution adopted by the present invention is:A kind of bridge location welding letter based on BiM technologies
The method of management is ceased, innovative point is:Change by the generation of Quick Response Code, stickup Quick Response Code, wireless network arrangements and welding machine upgrading
It makes, the recording step of the management of welding data and welding data, completes the side of the bridge location weld information management based on BiM technologies
Method;It is as follows:
(1)The generation of Quick Response Code:All bridge location weld seams are generated corresponding weld seam two by BIM management platforms automatically according to bridge model
Tie up code;
(2)Paste Quick Response Code:The weld seam Quick Response Code of generation is pasted onto correspondingly on the position of bridge location welding;
(3)Wireless network arrangements and welding machine upgrading:The wireless network arrangements of gamut are realized to manufacturing field, in order to weld connection
Net, while existing welding machine is subjected to upgrading, so that it is had weld information acquisition upload function;
(4)The management of welding data:Welder, first by logging in BIM management platform mobile phone A pp, sweeps when carrying out weld job
The welding that this weld seam is carried out after weld seam Quick Response Code is retouched, it is flat that weld information is uploaded to BIM management by digitlization networking welding in real time
Platform, BIM management platforms are analyzed automatically, if welding is more than code requirement in welding process, will be carried by mobile phone A pp
It wakes up, and is sent to corresponding administrative staff;
(5)The record of welding data:After completing weld job, BIM management platforms automatically extract analysis welding data, generate this
The welding record form of weld seam sends quality inspection personnel and carries out inspection declaration, after passed examination, carries out Electronic Countersign, completes welding record
The filing of table.
Further, the step(1)In the specific method of generation of Quick Response Code be:By the model of BIM management platforms
In the weld seam welding seam No existing with bridge location corresponded, and it is specified not according to different welding methods, welding material
Same welding conditions, then automatically generate the corresponding Quick Response Code of every weld seam.
Further, the step(4)The management of welding data needs first to build welding data in BIM management platforms
Management module for user management, receiving and analysis welding data, also, generates welding record form.
Further, the step(4)In weld information include electric current, voltage and welding material.
Beneficial effects of the present invention are as follows:By BIM technology, can be networked the present invention welding machine by digitlization, will be welded
Number of passes factually when be uploaded to BIM management platforms, automatically generate welding record form.It can be intuitive in the model of BIM management platforms
The weld information and welding for seeing every bridge location weld seam record, while can complete the filing of welding data, avoid artificial filing
Workload, realize bridge location welding automated information management;Welding conditions management is realized simultaneously, and supergage alarm is gone through
History welds waveform inquiry and industrial analysis, programming count are averaged welding parameter, the function of welding wire dosage.
Specific implementation mode
Illustrate that embodiments of the present invention, those skilled in the art can be by this explanations by particular specific embodiment below
Content disclosed by book understands other advantages and effect of the present invention easily.
A method of the bridge location weld information management based on BiM technologies, by the generation of Quick Response Code, paste Quick Response Code,
The recording step of wireless network arrangements and welding machine upgrading, the management of welding data and welding data, is completed based on BiM technologies
The method of bridge location weld information management;It is as follows:
(1)The generation of Quick Response Code:All bridge location weld seams are generated corresponding weld seam two by BIM management platforms automatically according to bridge model
Tie up code;
(2)Paste Quick Response Code:The weld seam Quick Response Code of generation is pasted onto correspondingly on the position of bridge location welding;
(3)Wireless network arrangements and welding machine upgrading:The wireless network arrangements of gamut are realized to manufacturing field, in order to weld connection
Net, while existing welding machine is subjected to upgrading, so that it is had weld information acquisition upload function;
(4)The management of welding data:Welder, first by logging in BIM management platform mobile phone A pp, sweeps when carrying out weld job
The welding that this weld seam is carried out after weld seam Quick Response Code is retouched, it is flat that weld information is uploaded to BIM management by digitlization networking welding in real time
Platform, BIM management platforms are analyzed automatically, if welding is more than code requirement in welding process, will be carried by mobile phone A pp
It wakes up, and is sent to corresponding administrative staff;
(5)The record of welding data:After completing weld job, BIM management platforms automatically extract analysis welding data, generate this
The welding record form of weld seam sends quality inspection personnel and carries out inspection declaration, after passed examination, carries out Electronic Countersign, completes welding record
The filing of table.
Step(1)In the specific method of generation of Quick Response Code be:By the weld seam and bridge location in the model of BIM management platforms
Existing welding seam No is corresponded, and different welding conditions are specified according to different welding methods, welding material, so
After automatically generate the corresponding Quick Response Code of every weld seam.
Step(4)The management of welding data is needed first to build welding data management module in BIM management platforms, is used for
User management, receiving and analysis welding data, also, generate welding record form.
Step(4)In weld information include electric current, voltage and welding material.
Welder, by logging in BIM management platform mobile phone A pp, scans the Quick Response Code beside weld seam when carrying out weld job
Afterwards, welding machine automatically obtains the welding conditions of this weld seam, automatically adjusts welding parameter, including voltage and current, is then somebody's turn to do
The welding of weld seam, while digitizing networking welding and weld information is uploaded to BIM management platforms in real time, platform is remembered in real time
Record, after completing weld job, BIM management platforms automatically extract analysis welding data, generate the welding record form of this weld seam,
It sends quality inspection personnel and carries out inspection declaration, after passed examination, carry out Electronic Countersign, and complete the filing of welding record form.
Major Difficulties are the upgrading of digital welding and building for BIM platform welding Data Analysis Software.
1. weld seam encodes
Weld seam in the model of BIM platforms is corresponded with existing welding seam No, and according to different welding methods,
Material specifies different welding conditions, generates the corresponding Quick Response Code of every weld seam.
2. wireless network arrangements and welding machine upgrading
The wireless network arrangements of gamut are realized to manufacturing field, in order to weld networking, while existing welding machine is subjected to upgrading and is changed
It makes, it is made to have weld information acquisition upload function.
3. building BIM platform welding data management module server-sides and cell phone application client.
It in BIM platform building welding data management modules, for user management, receives, analyzes welding data, and generate and apply
Weld record sheet
The login of cell phone application client-side management personnel and welding personnel.
4. function debugging comes into operation
Each module is attached, is debugged, is put into the quality management system of factory after reaching serviceable condition.
By BIM technology, can be networked the present invention welding machine by digitlization, and welding process data are uploaded to BIM pipes in real time
Platform automatically generates welding record form.The welding of every bridge location weld seam can be can be visually seen in the model of BIM management platforms
Information and welding record, while can complete the filing of welding data, avoid the workload manually filed, and realize bridge location welding
Automated information management;Welding conditions management, supergage alarm are realized simultaneously, and history welds waveform inquiry and technique point
Analysis, programming count are averaged welding parameter, the function of welding wire dosage.
Above-described embodiment is presently preferred embodiments of the present invention, is not the limitation to technical solution of the present invention, as long as
Without the technical solution that creative work can be realized on the basis of the above embodiments, it is regarded as falling into patent of the present invention
Rights protection scope in.
Claims (4)
1. a kind of method of the bridge location weld information management based on BiM technologies, it is characterised in that:By the generation of Quick Response Code, glue
The recording step of patch Quick Response Code, wireless network arrangements and welding machine upgrading, the management of welding data and welding data, completes to be based on
The method of the bridge location weld information management of BiM technologies;It is as follows:
The generation of Quick Response Code:All bridge location weld seams are generated corresponding weld seam two dimension by BIM management platforms automatically according to bridge model
Code;
Paste Quick Response Code:The weld seam Quick Response Code of generation is pasted onto correspondingly on the position of bridge location welding;
Wireless network arrangements and welding machine upgrading:The wireless network arrangements of gamut are realized to manufacturing field, in order to weld networking, together
When by existing welding machine carry out upgrading, make it have weld information acquisition upload function;
(4)The management of welding data:Welder, first by logging in BIM management platform mobile phone A pp, sweeps when carrying out weld job
The welding that this weld seam is carried out after weld seam Quick Response Code is retouched, it is flat that weld information is uploaded to BIM management by digitlization networking welding in real time
Platform, BIM management platforms are analyzed automatically, if welding is more than code requirement in welding process, will be carried by mobile phone A pp
It wakes up, and is sent to corresponding administrative staff;
(5)The record of welding data:After completing weld job, BIM management platforms automatically extract analysis welding data, generate this
The welding record form of weld seam sends quality inspection personnel and carries out inspection declaration, after passed examination, carries out Electronic Countersign, completes welding record
The filing of table.
2. a kind of method of bridge location weld information management based on BiM technologies according to claim 1, it is characterised in that:
The step(1)In the specific method of generation of Quick Response Code be:By in the model of BIM management platforms weld seam and bridge location it is existing
Welding seam No corresponded, and different welding conditions are specified according to different welding methods, welding material, then from
It is dynamic to generate the corresponding Quick Response Code of every weld seam.
3. a kind of method of bridge location weld information management based on BiM technologies according to claim 1, it is characterised in that:
The step(4)The management of welding data needs first to build welding data management module in BIM management platforms, is used for user
Management receives and analyzes welding data, also, generates welding record form.
4. a kind of method of bridge location weld information management based on BiM technologies according to claim 1, it is characterised in that:
The step(4)In weld information include electric current, voltage and welding material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810212020.3A CN108648100A (en) | 2018-03-15 | 2018-03-15 | A method of the bridge location weld information management based on BiM technologies |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810212020.3A CN108648100A (en) | 2018-03-15 | 2018-03-15 | A method of the bridge location weld information management based on BiM technologies |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108648100A true CN108648100A (en) | 2018-10-12 |
Family
ID=63744165
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810212020.3A Pending CN108648100A (en) | 2018-03-15 | 2018-03-15 | A method of the bridge location weld information management based on BiM technologies |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108648100A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109408959A (en) * | 2018-10-24 | 2019-03-01 | 长安大学 | A kind of acquisition method of steel structure bridge manufacture information |
CN110298533A (en) * | 2019-05-06 | 2019-10-01 | 广州文冲船厂有限责任公司 | A kind of welding process management method and system |
CN111624325A (en) * | 2019-02-28 | 2020-09-04 | 上海捷规建筑工程咨询有限公司 | Steel structure weld nondestructive testing method and system based on BIM |
CN112561017A (en) * | 2020-12-25 | 2021-03-26 | 东方电气集团科学技术研究院有限公司 | Snake-shaped pipe weld joint mark tracing system |
CN112882996A (en) * | 2021-01-05 | 2021-06-01 | 唐山松下产业机器有限公司 | Welding data processing method, processing device and processing system |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007167915A (en) * | 2005-12-22 | 2007-07-05 | Ohbayashi Corp | Welding control method, welding control system, steel frame structure, and ic tag |
JP2008059116A (en) * | 2006-08-30 | 2008-03-13 | Hitachi-Ge Nuclear Energy Ltd | Welding work management and recording system using rfid tag |
CN105678464A (en) * | 2016-01-13 | 2016-06-15 | 上海振华重工(集团)股份有限公司 | Welding information management method |
CN107067269A (en) * | 2017-04-02 | 2017-08-18 | 天津大学 | Oil platform Steel Structure Weld information Life cycle tracking |
CN107194588A (en) * | 2017-05-24 | 2017-09-22 | 中铁建设投资集团有限公司 | A kind of bridge construction management system and method based on Quick Response Code and BIM technology |
-
2018
- 2018-03-15 CN CN201810212020.3A patent/CN108648100A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007167915A (en) * | 2005-12-22 | 2007-07-05 | Ohbayashi Corp | Welding control method, welding control system, steel frame structure, and ic tag |
JP2008059116A (en) * | 2006-08-30 | 2008-03-13 | Hitachi-Ge Nuclear Energy Ltd | Welding work management and recording system using rfid tag |
CN105678464A (en) * | 2016-01-13 | 2016-06-15 | 上海振华重工(集团)股份有限公司 | Welding information management method |
CN107067269A (en) * | 2017-04-02 | 2017-08-18 | 天津大学 | Oil platform Steel Structure Weld information Life cycle tracking |
CN107194588A (en) * | 2017-05-24 | 2017-09-22 | 中铁建设投资集团有限公司 | A kind of bridge construction management system and method based on Quick Response Code and BIM technology |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109408959A (en) * | 2018-10-24 | 2019-03-01 | 长安大学 | A kind of acquisition method of steel structure bridge manufacture information |
CN109408959B (en) * | 2018-10-24 | 2022-09-27 | 长安大学 | Method for acquiring manufacturing information of steel structure bridge |
CN111624325A (en) * | 2019-02-28 | 2020-09-04 | 上海捷规建筑工程咨询有限公司 | Steel structure weld nondestructive testing method and system based on BIM |
CN110298533A (en) * | 2019-05-06 | 2019-10-01 | 广州文冲船厂有限责任公司 | A kind of welding process management method and system |
CN112561017A (en) * | 2020-12-25 | 2021-03-26 | 东方电气集团科学技术研究院有限公司 | Snake-shaped pipe weld joint mark tracing system |
CN112882996A (en) * | 2021-01-05 | 2021-06-01 | 唐山松下产业机器有限公司 | Welding data processing method, processing device and processing system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108648100A (en) | A method of the bridge location weld information management based on BiM technologies | |
CN110782154B (en) | Construction planning management system based on BIM+GIS | |
CN108971807B (en) | Intelligent management control method and management system for field welding construction process | |
CN106330618A (en) | Gateway routing automatic test system and test method based on CAN/LIN/MOST hybrid buses | |
CN108646689B (en) | Virtual production manufacturing method and system based on welding | |
CN101118430A (en) | On-line monitoring and optimizing method of processing parameter during process of aluminium alloy fusion welding | |
CN113673104A (en) | Manufacturing workshop process planning system based on digital twin | |
CN109664008A (en) | A kind of repair welding system and intelligent repair method | |
CN107570926A (en) | Weld job managing and control system | |
CN109759750B (en) | Method for on-site welding construction inspection and remote monitoring | |
Lin et al. | Concept and implementation of a cyber-pbysical digital twin for a SMT line | |
CN113313431B (en) | Three-dimensional digital workshop system for multi-source heterogeneous data | |
CN112231816A (en) | Digital delivery method based on process pipeline | |
CN108631358A (en) | Method and apparatus are determined based on the directly driven wind-powered unit impedance of control hardware in loop | |
CN107563089A (en) | The method and computing device of PC components generation task list based on BIM | |
CN111143921A (en) | Method for automatically designing digital space derivative structure | |
CN201116976Y (en) | On-line monitoring and technological parameter optimizing system for aluminum alloy fusion welding process | |
CA3187787A1 (en) | Digital assembly and manufacturing method for flame exhaust pipe of servo mechanism | |
CN109657321B (en) | Electronic assembly rapid process design system for printed board assembly and use method | |
CN102479359A (en) | Power grid overhauling plan compilation method based on graphic operations | |
CN102385344A (en) | Automatic welding method based on reading of DXF-format file of Visual C# | |
CN116010398A (en) | Method and system for constructing power load modeling data based on station line-to-household relationship | |
Zhang et al. | The life cycle state evaluation of electrical equipment based on digital Twins | |
CN203992755U (en) | The welding machine with the accurate short circuiting transfer control circuit of arc welding based on AVR single-chip microcomputer | |
CN206966920U (en) | A kind of automatic intelligent pipe plate tube pipe welding system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20181012 |
|