CN108643920A - A kind of blast working structure and construction method for the interim ditch in tunnel - Google Patents

A kind of blast working structure and construction method for the interim ditch in tunnel Download PDF

Info

Publication number
CN108643920A
CN108643920A CN201810344180.3A CN201810344180A CN108643920A CN 108643920 A CN108643920 A CN 108643920A CN 201810344180 A CN201810344180 A CN 201810344180A CN 108643920 A CN108643920 A CN 108643920A
Authority
CN
China
Prior art keywords
ditch
interim
eye
interim ditch
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810344180.3A
Other languages
Chinese (zh)
Inventor
黄仁雄
宋远兵
李忠
金宇松
柏明忠
秦文
申伟
姚猛
夏云
田茂林
陈鹏
吴育磷
黎文东
赖凡
简云林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Kailin Group Co Ltd
Original Assignee
Guizhou Kailin Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Kailin Group Co Ltd filed Critical Guizhou Kailin Group Co Ltd
Priority to CN201810344180.3A priority Critical patent/CN108643920A/en
Publication of CN108643920A publication Critical patent/CN108643920A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/006Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by making use of blasting methods
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

A kind of blast working structure and construction method for the interim ditch in tunnel, the present invention is just meeting first cycle constructing structure and method using ditch eye lag tunnel, effectively reduce the clamping action of interim ditch eye explosion, promote demolition effect, it effectively controls roadway floor and backbreaks and repeat the interim ditch eye of explosion rectification, it reduces artificial, the input of material cost, it is horizontal to promote the comprehensive treatment of roadway highly civilized health, demolition effect with interim ditch is good, the advantages that applied widely, the secondary artificial and material input for mending big gun rectification in interim ditch is greatly reduced simultaneously, it effectively reduces artificial, material consumption, reduce the excavation cost in tunnel, increase income, in addition interim ditch is excavated timely, in place, effectively control road surface accumulated slag, seeping phenomenon, it is beneficial to the promotion of underground highly civilized health comprehensive treatment level.

Description

A kind of blast working structure and construction method for the interim ditch in tunnel
Technical field
The invention belongs to mine blasting construction fields, and in particular to a kind of blast working structure for the interim ditch in tunnel And construction method.
Background technology
Currently, in the driving of development engineering, when to encounter rock Protodyakonov coefficient be f=8-12, rock is relatively hard, construction Ditch eye is more than 1000mm with the depth that has a down dip of tunnel bottom eye synchronous construction, ditch eye, is more than minimum burden, explosion folder It makes of greatly, demolition effect is poor, and foundation phenomenon is frequent, and the repetition explosion rectification of ditch eye causes firer's cost to waste, time-consuming to take Power takes roadway floor rectification body to backbreak 300mm, roadway floor paving barren rock to solve the foundation phenomenon in interim ditch Interim ditch is excavated out after 300mm, this method causes the expenses such as firer's cost, transportation cost to increase, while tunnel being caused to pass through It is unsmooth.
Invention content
In order to solve the above technical problems, the present invention provides a kind of blast working structure for the interim ditch in tunnel and applying Work method.
The present invention is achieved by the following technical programs.
A kind of constructing structure for the interim ditch in tunnel provided by the invention, including interim ditch, wait excavating interim water Ditch, rock mass to be excavated and interim ditch eye, wherein interim ditch and wait that excavating interim ditch is respectively positioned on tunnel bottom, temporarily Ditch with wait that excavating interim ditch connect, wait excavating the bottom that interim ditch extends to rock mass to be excavated;Interim ditch eye setting In waiting excavating in interim ditch, at the center for waiting excavating interim ditch, the aperture of interim ditch eye is connect with interim ditch, It is described wait excavating interim ditch and be located at the plane of rock mass to be excavated fallen back at a construction cyclic advance length toward access adit.
Further, the depth of the interim ditch eye is 350-450mm.
Further, the width in the interim ditch is 300-350mm, is highly 300-350mm.
Further, the eyelet plane of the interim ditch eye is parallel with waiting excavating the explosion scope of freedom in interim ditch.
Further, the eyelet depth of the interim ditch eye and roadway excavation rock mass cyclic advance are isometric.
Further, the explosive loading line density of the interim ditch eye is 0.3kg/m, and powder charge total amount is 0.6kg.
A kind of construction method using the interim ditch constructing structure in above-mentioned tunnel includes the following steps:
Step 1 organizes the normal driving of tunnel rock mass to be excavated, in tunneling process, tunnel rock mass construction to be excavated bottom At the moment, the construction ditch eye not in the rock mass, ensures that the bottom plate after the roadway excavation is smooth;
Step 2 is moved back in roadway excavation rock mass at a construction circulation position, interim ditch of constructing, and at interim ditch It constructs interim ditch eye, keeps the eyelet depth of interim ditch eye and roadway excavation rock mass cyclic advance isometric;
Step 3 installs explosive in interim ditch intraocular, and the powder charge line density of explosive is 0.3kg/m, and explosive payload is 0.6kg;
Step 4, the explosive for the interim ditch intraocular that detonates, then clears up demolition site.
Further, the construction size in interim ditch is 300mm × 300mm in the step 2.
Further, it when carrying out interim ditch eye construction in the step 2, is carried out less than at the 400mm of tunnelling bottom It constructs into eye, the depth that has a down dip for drill steel of constructing is less than 200mm.
The beneficial effects of the present invention are:Implementation through the invention is just being met first using ditch eye lag tunnel and is being followed Ring constructing structure and method effectively reduce the clamping action of interim ditch eye explosion, promote demolition effect, effectively control tunnel Bottom plate is backbreak and is repeated explosion and rectifies and improves interim ditch eye, reduces artificial, material cost input, it is comprehensive to promote roadway highly civilized health The level of improvement is closed, has many advantages, such as that the demolition effect in interim ditch is good, applied widely, while greatly reducing interim ditch two The secondary artificial and material input for mending big gun rectification, effectively reduces artificial, material consumption, reduces the excavation cost in tunnel, increase warp Ji is taken in, and interim ditch is excavated in time, in place in addition, is effectively controlled road surface accumulated slag, seeping phenomenon, is beneficial to underground civilization and defends The promotion of raw comprehensive treatment level.
Description of the drawings
Fig. 1 is the structural schematic diagram of the present invention;
Fig. 2 is the A-A direction views of Fig. 1 of the present invention;
In figure:The interim ditches 1-, 2- wait excavating interim ditch, 3- rock mass to be excavated, the interim ditch eyes of 4-.
Specific implementation mode
Be described further below technical scheme of the present invention, but claimed range be not limited to it is described.
As shown in Figs. 1-2, a kind of constructing structure for the interim ditch in tunnel, including interim ditch 1, wait excavating interim water Ditch 2, rock mass to be excavated 3 and interim ditch eye 4, wherein interim ditch 1 with wait that excavating interim ditch 2 is respectively positioned on tunnel bottom, Interim ditch 1 with wait that excavating interim ditch 2 connect, wait excavating the bottom that interim ditch 2 extends to rock mass 3 to be excavated;Interim water Ditch eye 4, which is set to, to be waited excavating in interim ditch 2, at the center for waiting excavating interim ditch 2, the aperture of interim ditch eye 4 with Interim ditch 1 connects, it is described wait excavating interim ditch 2 and be located at the plane of rock mass 3 to be excavated followed toward access adit one construction of retroversion At ring drilling depth length.
Further, the depth of the interim ditch eye 4 is 350-450mm.
Further, the width in the interim ditch 1 is 300-350mm, is highly 300-350mm.
Further, the eyelet plane of the interim ditch eye 4 is parallel with waiting excavating the explosion scope of freedom in interim ditch 2. The eyelet of interim ditch eye 4 is parallel with the explosion scope of freedom, and the explosion clamping action that can be greatly reduced improves demolition effect.
Further, the eyelet depth of the interim ditch eye 4 and roadway excavation rock mass cyclic advance are isometric.
Further, the explosive loading line density of the interim ditch eye 4 is 0.3kg/m, and powder charge total amount is 0.6kg.
A kind of construction method using the interim ditch constructing structure in above-mentioned tunnel includes the following steps:
Step 1 organizes the normal driving of tunnel rock mass 3 to be excavated, and in tunneling process, tunnel rock mass 3 to be excavated is constructed When bottom eye, ditch eye of constructing not in the rock mass ensures that the bottom plate after the roadway excavation is smooth;
Step 2 is moved back in roadway excavation rock mass at a construction circulation position, interim ditch 1 of constructing, and in interim ditch 1 The interim ditch eye 4 of place's construction, keeps the eyelet depth of interim ditch eye 4 and roadway excavation rock mass cyclic advance isometric;
Step 3 installs explosive in interim ditch eye 4, and the powder charge line density of explosive is 0.3kg/m, and explosive payload is 0.6kg;
Step 4, the explosive to detonate in interim ditch eye 4, then clears up demolition site.In addition, to prevent interim ditch eye The non-fulgurite of roadway excavation rock mass is damaged when 4 explosion, is miss-fired, the auxiliary being arranged in interim ditch eye 4 and tunnel Eye detonates with section.
Further, the construction size in interim ditch 1 is 300mm × 300mm in the step 2.
Further, when carrying out interim ditch eye 4 in the step 2 and constructing, at less than tunnelling bottom 400mm into Traveling eye is constructed, and the depth that has a down dip for drill steel of constructing is less than 200mm.
The present invention is just meeting first cycle constructing structure and method using ditch eye lag tunnel, effectively reduces interim ditch The clamping action of eye explosion, promotes demolition effect, effectively controls roadway floor and backbreaks and repeat the interim ditch eye of explosion rectification, Artificial, material cost input is reduced, roadway highly civilized health comprehensive treatment level, the demolition effect with interim ditch are promoted The advantages that good, applied widely, while the secondary artificial and material input for mending big gun rectification in interim ditch is greatly reduced, effectively drop Low artificial, material consumption, reduces the excavation cost in tunnel, increases income, and interim ditch is excavated in time, in place in addition, Road surface accumulated slag, seeping phenomenon effectively are controlled, is beneficial to the promotion of underground highly civilized health comprehensive treatment level.

Claims (9)

1. a kind of constructing structure for the interim ditch in tunnel, it is characterised in that:Including interim ditch (1), wait excavating interim water Ditch (2), rock mass to be excavated (3) and interim ditch eye (4), wherein interim ditch (1) and wait excavating interim ditch (2) equal position In tunnel bottom, interim ditch (1) with wait that excavating interim ditch (2) connect, wait that excavating interim ditch (2) extends to rock to be excavated The bottom of body (3);Interim ditch eye (4), which is set to, waits excavating in interim ditch (2), positioned at waiting excavating in interim ditch (2) At the heart, the aperture of interim ditch eye (4) is connect with interim ditch (1), described to wait that excavating interim ditch (2) is located at rock mass to be excavated (3) plane is fallen back toward access adit at a construction cyclic advance length.
2. being used for the constructing structure in the interim ditch in tunnel as described in claim 1, it is characterised in that:The interim ditch eye (4) depth is 350-450mm.
3. being used for the constructing structure in the interim ditch in tunnel as described in claim 1, it is characterised in that:The interim ditch (1) Width be 300-350mm, be highly 300-350mm.
4. being used for the constructing structure in the interim ditch in tunnel as described in claim 1, it is characterised in that:The interim ditch eye (4) eyelet plane is parallel with waiting excavating the explosion scope of freedom in interim ditch (2).
5. being used for the constructing structure in the interim ditch in tunnel as described in claim 1, it is characterised in that:The interim ditch eye (4) eyelet depth and roadway excavation rock mass cyclic advance are isometric.
6. being used for the constructing structure in the interim ditch in tunnel as described in claim 1, it is characterised in that:The interim ditch eye (4) explosive loading line density is 0.3kg/m, and powder charge total amount is 0.6kg.
7. a kind of construction method using the interim ditch constructing structure in above-mentioned tunnel, it is characterised in that include the following steps:
Step 1, the normal driving of tissue tunnel rock mass to be excavated (3), in tunneling process, tunnel rock mass to be excavated (3) construction When bottom eye, ditch eye of constructing not in the rock mass ensures that the bottom plate after the roadway excavation is smooth;
Step 2 is moved back in roadway excavation rock mass at a construction circulation position, interim ditch (1) of constructing, and in interim ditch (1) The interim ditch eye (4) of place's construction, keeps the eyelet depth of interim ditch eye (4) and roadway excavation rock mass cyclic advance isometric;
Step 3 installs explosive in interim ditch eye (4), and the powder charge line density of explosive is 0.3kg/m, and explosive payload is 0.6kg;
Step 4, the explosive to detonate in interim ditch eye (4), then clears up demolition site.
8. construction method as claimed in claim 7, it is characterised in that:The construction size of interim ditch (1) in the step 2 For 300mm × 300mm.
9. construction method as claimed in claim 7, it is characterised in that:Interim ditch eye (4) construction is carried out in the step 2 When, it constructs into traveling eye at less than tunnelling bottom 400mm, the depth that has a down dip for drill steel of constructing is less than 200mm.
CN201810344180.3A 2018-04-17 2018-04-17 A kind of blast working structure and construction method for the interim ditch in tunnel Pending CN108643920A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810344180.3A CN108643920A (en) 2018-04-17 2018-04-17 A kind of blast working structure and construction method for the interim ditch in tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810344180.3A CN108643920A (en) 2018-04-17 2018-04-17 A kind of blast working structure and construction method for the interim ditch in tunnel

Publications (1)

Publication Number Publication Date
CN108643920A true CN108643920A (en) 2018-10-12

Family

ID=63746308

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810344180.3A Pending CN108643920A (en) 2018-04-17 2018-04-17 A kind of blast working structure and construction method for the interim ditch in tunnel

Country Status (1)

Country Link
CN (1) CN108643920A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61165490A (en) * 1985-01-17 1986-07-26 清水建設株式会社 Method and device for forming ditch
CN102296962A (en) * 2011-06-14 2011-12-28 中国水电顾问集团华东勘测设计研究院 Adverse slope excavating construction method of large-section tunnel in water-rich tunnel section
CN102678174A (en) * 2012-05-28 2012-09-19 中交第一公路勘察设计研究院有限公司 Tunnel drainage system passing through permafrost region and non-frozen ground region and arrangement method thereof
CN103291307A (en) * 2013-05-22 2013-09-11 中南大学 Advanced drainage method by aid of drilled holes for water-rich rock strata

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61165490A (en) * 1985-01-17 1986-07-26 清水建設株式会社 Method and device for forming ditch
CN102296962A (en) * 2011-06-14 2011-12-28 中国水电顾问集团华东勘测设计研究院 Adverse slope excavating construction method of large-section tunnel in water-rich tunnel section
CN102678174A (en) * 2012-05-28 2012-09-19 中交第一公路勘察设计研究院有限公司 Tunnel drainage system passing through permafrost region and non-frozen ground region and arrangement method thereof
CN103291307A (en) * 2013-05-22 2013-09-11 中南大学 Advanced drainage method by aid of drilled holes for water-rich rock strata

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈壮文、周晋华: "湘潭锰矿平巷一次成巷施工的经验", 《工业建筑》 *

Similar Documents

Publication Publication Date Title
CN102493806B (en) Mechanized continuous mining method for wall-type gentle-inclined thin ore body
CN108661705B (en) Strip goaf four-in-one comprehensive treatment construction method
CN104863592B (en) A kind of big structure sublevel drill and benching ore removal afterwards filling mining method
CN106223958A (en) The slant middle thick orebody subregion rock drilling stage ore deposit afterwards filling that falls works in coordination with mining codes
CN102182461A (en) Efficient mining method for thick metal ore body in slanting
CN105626073B (en) A kind of mining methods for reserving cutting groove based on the method for mining by the way of filling
CN107989614A (en) The mining methods of the inclined thick ore body of disk rock crusher in a kind of back production
CN102953732A (en) Room-and-pillar major-diameter longhole inverted-step-like segmented lateral caving subsequent filling mining method
CN107829742A (en) Caving-filling-open stope-caving mining method
CN105804748B (en) A kind of method of block mining Wall ore under open air transport system
WO2019109602A1 (en) Short-face coal-pillar-free mining method having zero gangue discharge
CN106869936A (en) It is a kind of to be suitable to the surface mining new method of steep slope topography
CN103114855A (en) Jamb recovery and cushion layer formation integrated technology in process of mining from outdoors into underground
CN104594910A (en) Hydraulic rock-soil milling and excavating equipment and method for tunnel in soft and weak surrounding rock
CN103437766B (en) In-situ fragmentation mining method
CN110080774A (en) Mine Dry-placed fill mining is fallen based on the vertical medium-length hole retrusive of high-dipping ore block
CN103470263A (en) New-level development method for open-pit metal mine
CN103982186B (en) The vertical Inclined strips sublevel caving of oper cylinler retrusive
CN106150509A (en) A kind of double track tunnel is non-bores quick-fried mechanized construction method
CN108489350A (en) Smooth blasting construction method for rapid tunneling of upper step of grade-III surrounding rock tunnel
CN104234716A (en) Bagged-cofferdam filling mining method
CN108678745A (en) A kind of narrow vein concrete bed course scarps filling mining method
WO2019109535A1 (en) Clean and efficient coal mining method
CN105971605A (en) A non-waste mining method for underground mines
CN107687339A (en) A kind of efficient mining methods of Media thick and rake ore body

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181012

RJ01 Rejection of invention patent application after publication