CN108643370A - A kind of kitchen and toilet assembled sealing platform construction method - Google Patents
A kind of kitchen and toilet assembled sealing platform construction method Download PDFInfo
- Publication number
- CN108643370A CN108643370A CN201810527090.8A CN201810527090A CN108643370A CN 108643370 A CN108643370 A CN 108643370A CN 201810527090 A CN201810527090 A CN 201810527090A CN 108643370 A CN108643370 A CN 108643370A
- Authority
- CN
- China
- Prior art keywords
- sealing platform
- prefabricated component
- kitchen
- concrete
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/66—Sealings
- E04B1/68—Sealings of joints, e.g. expansion joints
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/66—Sealings
- E04B1/68—Sealings of joints, e.g. expansion joints
- E04B1/6801—Fillings therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/66—Sealings
- E04B1/68—Sealings of joints, e.g. expansion joints
- E04B1/6806—Waterstops
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
Abstract
A kind of kitchen and toilet assembled sealing platform construction method, belongs to fabricated construction technical field.It is characterized in that, step includes:Sealing platform is segmented, segmental concrete sealing platform prefabricated component is made in the shape and size being segmented according to each sealing platform, and the bottom of segmental concrete sealing platform prefabricated component is equipped with connection reinforcing bar;Roof plate template fixes unwrapping wire and is laid with bar frame(7)Afterwards, each segmental concrete sealing platform prefabricated component is put to designated position, and utilizes split heads(11)Support, by connection reinforcing bar and bar frame(7)It is welded and fixed;Carry out the concreting of floor;Piece pours into high-strength grout, and maintenance is completed to obtain the final product.The method sealing platform of the present invention is easy for construction, quick, saves the cost duration, kicks masonry project after being conducive to and complete as early as possible, and it is good to cut assembled sealing platform Construction Anti-seepage effect, reliable in quality, can will device maintenance cost later.
Description
Technical field
A kind of kitchen and toilet assembled sealing platform construction method, belongs to fabricated construction technical field.
Background technology
In life, requirement of the people to living quality is higher and higher, higher and higher to residential usage functional requirement, each
In class residential housing, kitichen and toilet is often influenced by water since pipeline is more, and the improper leakage that easily causes of construction method is asked
Topic, causes to do over again and reprocess, time-consuming and laborious, and later maintenance cost is high.There are mainly two types of traditional kitchen toilet water-stopping platform construction methods.
First, being poured simultaneously with floor by supporting module;Second is that formwork pours again after main structure construction, the former quality has one
Fixed guarantee, but various reserved pipelines are not easy to control, the latter is secondary pour it is time-consuming and laborious, it is of high cost;Anti-seepage effect is poor.Therefore,
Inventor designs a kind of new kitchen toilet water-stopping platform construction method, and has important inspiration, the construction of this kitchen and toilet assembled sealing platform
Method uses prefabricated components, and speed of application is fast and floor pours simultaneously, and various chases are reserved, has good anti-seepage effect,
It ensure that construction quality.
Invention content
The technical problem to be solved by the present invention is to:Overcome the deficiencies of the prior art and provide a kind of time saving, saving of labor, antiseepage effect
Fruit is good, the kitchen and toilet assembled sealing platform construction method of reliable construction quality.
The technical solution adopted by the present invention to solve the technical problems is:The kitchen and toilet assembled sealing platform construction method,
It is characterized in that, step includes:Conceptual design-processing and fabricating-installation reinforcing-concreting-piece grouting;
Conceptual design:Sealing platform is segmented according to design drawing, is that a sealing platform is segmented with every face wall, each sealing platform point
The connecting pin of Duan Liuyou and the segmentation of similar sealing platform;
Processing and fabricating:Segmental concrete sealing platform prefabricated component is made in the shape and size being segmented according to each sealing platform, is segmented coagulation
The bottom of native sealing platform prefabricated component is equipped with connection reinforcing bar;
Installation is reinforced:After roof plate template fixes unwrapping wire and is laid with bar frame, according to design drawing and step 1)Conceptual design
Each segmental concrete sealing platform prefabricated component is put to designated position, and is supported using split heads, by connection reinforcing bar and bar frame
It is welded and fixed;
Concreting:Pour floorslab concrete;
Piece is in the milk:The piece between each segmental concrete sealing platform prefabricated component is cleared up, high-strength grouting is poured into piece and the mouth that vibrates
Material, maintenance are completed to obtain the final product.
The sealing platform of the present invention uses segmented, small, the allocation and transportation convenience of each segmental concrete sealing platform prefabricated component;Weight
Amount is light, and at mounting and adjusting position, one moves worker, easy to operate.Design safety, economy, conjunction in conceptual design step
Reason, size marking is clear, is segmented position, sealing platform height according to layout design sealing platform, sealing platform matches mould size and support side
Formula, while pipeline slotting position is determined according to the professional drawing of installation, reserve groove.By two toilet sealing platform segmentations.According to
Fragment size is individually designed to every section of progress in combination with water power spool position;It is drawn using CAD, REVIT Software for Design.Processing
Mold simplicity is stablized in making step, and scantling is accurate, and processing is required with mould size and component material according to conceptual design
It makes, precision panel saw blanking is used according to design drawing.Manufactured each component of prefabricated component is divided into several relatively small components,
It is readily transported and stores.Installation reinforces in step and requires to put component to designated position according to conceptual design, and supports, welds
Securely, installation is reinforced simple, does not influence the construction of other work posts.Ensure component in concreting process in concreting step
It does not shift, topple over, ensure that component comes into full contact with floorslab concrete, the schematic design phase formulates detailed Scheme of Strengthening, determines structure
Part bearing height.Piece is tight after piece grouting, impermeable, clears up piece, pours into high-strength grout and take measures to conserve.
It is pre- that pipeline is reserved with according to the water power spool position of architectural drawing on the segmental concrete sealing platform prefabricated component
Stay groove.
Set at interval of 500 mm ~ 700mm that there are one shaking up and down on the segmental concrete sealing platform prefabricated component
Smash reserving hole;It passes through the reserving hole that vibrates to be inserted into segmental concrete using vibrating head in the concreting step to stop
Water platform prefabricated component bottom is to concrete vibrating.Set spacing can be to the concrete below segmental concrete sealing platform prefabricated component
It is effectively vibrated, ensures concrete compaction.
The corner of the segmental concrete sealing platform prefabricated component, which is equipped with, adjusts strut drawknot node hole to be provided;The installation
Reinforce step in each segmental concrete sealing platform prefabricated component turning using rod-adjurstable carry out intersect drawknot fix.By room pair
Linea angulata is attached reinforcing with rod-adjurstable to segmental concrete sealing platform prefabricated component, prevents sealing platform prefabricated component from toppling over.
The end face that the segmental concrete sealing platform prefabricated component is contacted with shear wall is equipped with contact groove.Increase and cuts
Power wall contact area reduces risk of leakage.
The seam crossing of the adjacent segmental concrete sealing platform prefabricated component is equipped with the tongue and groove of docking, and seam crossing tongue and groove stays
Abutment joint, abutment joint slit width 20mm.
The fixed split heads gasket of the barricades support of the split heads inverted U and barricades support bottom, the split heads gasket
On be provided with nail hole;The installation reinforces in step and split heads is fixed on floor bottom mould plate across nail hole with nail.Such as:Horse
Stool is welded by 12 reinforcing bars of φ with angle steel.Segmental concrete sealing platform prefabricated component is placed on horizontal reinforcement when use, horse
Angle steel is arranged as split heads gasket, by split heads nail in template in stool bottom.As toilet plate thickness 10cm, the high 9cm of split heads is designed,
After ensureing that concreting is complete, sealing platform prefabricated component is embedded to 1cm in concrete.Angle steel reserves nail hole, facilitates and split heads nail is existed with nail
In template.
After segmental concrete sealing platform prefabricated component is placed in corresponding position in the installation reinforcing step, in its both sides
Split heads that a positioning bar is respectively welded is clamping by segmental concrete sealing platform prefabricated component.Prevent segmental concrete sealing platform prefabricated
Part moves left and right.Preferably, after segmental concrete sealing platform prefabricated component is fixed with positioning bar, then will be adjacent and do not dock directly
Two sections of segmental concrete sealing platform prefabricated component flitches and step fastener reinforcement by connection.
Two sections of sealing platform seam crossing tongue and groove ways, the long 100mm of tongue and groove.Every 500 ~ 700mm/, seam crossing tongue and groove stays docking
Seam, slit width 20mm wait for that floor concrete casting completion high strength grout fills real.Slit width effectively can prevent heat bridge from producing
It is raw, and can guarantee adhesive strength.
Installation reinforces roof plate template in step and is laid with completion, and toilet sealing edge of table is first played in template before plate muscle binding
Split heads vertical wall string pendulum is put after sideline bullet is complete, then stool is fixed in template with nail by line.
Compared with prior art, advantageous effect possessed by a kind of kitchen and toilet assembled sealing platform construction method of the invention
It is:It is poured together with floor concrete in the present invention segmental concrete sealing platform prefabricated component is made, is avoided that risk of leakage;Used
Segmental concrete sealing platform prefabricated component can concentrate place regularization to process volume production, can guarantee concrete formation quality;And
Concentrated processing, time saving, material saving, saving of labor.The cost duration is saved, masonry project is kicked after being conducive to and completes as early as possible, cut assembled sealing
Platform Construction Anti-seepage effect is good, reliable in quality, can will device maintenance cost later.Segmental concrete sealing platform prefabricated component makes in advance,
Then it is hoisted to after the completion of being reinforced on floor and is poured together with floor concrete, installation speed is very fast, and construction cost is low, maintenance cost
It is low.Using segment design, small, storage and the allocation and transportation convenience of prefabricated component;It is light-weight, worker at mounting and adjusting position one
It is i.e. removable, it is easy to operate.
Description of the drawings
Fig. 1 puts signal for what a kind of each sealing platform of kitchen and toilet assembled sealing platform construction method of the present invention was segmented
Figure.
Fig. 2 is that a kind of segmentation position of each sealing platform segmentation of kitchen and toilet assembled sealing platform construction method of the present invention shows
It is intended to.
Fig. 3 is a kind of split heads support signal of the sealing platform segmentation of kitchen and toilet assembled sealing platform construction method of the present invention
Figure.
Fig. 4 is a kind of split heads front view of kitchen and toilet assembled sealing platform construction method of the present invention.
Fig. 5 is a kind of split heads vertical view of kitchen and toilet assembled sealing platform construction method of the present invention.
Wherein, the 1, first segmental concrete sealing platform prefabricated component 2, the second segmental concrete sealing platform prefabricated component 3,
Three segmental concrete sealing platform prefabricated components 4, the 4th segmental concrete sealing platform prefabricated component 5, the 5th segmental concrete sealing
Platform prefabricated component 6, the 6th segmental concrete sealing platform prefabricated component 7, bar frame 8, rod-adjurstable 9, shear force wall reinforcing steel bar
Frame 10, reserved slot 11, split heads 1101, split heads gasket 1102, barricades support 1103, positioning bar.
Specific implementation mode
Below in conjunction with the accompanying drawings and specific embodiment the present invention will be further described, wherein embodiment 1 is best implements.
Embodiment
Conceptual design:Sealing platform is segmented according to architectural drawing, with reference to attached drawing 2:With every face wall for a sealing platform
Segmentation, design sealing platform is segmented position, and number is the first segmental concrete sealing platform prefabricated component 1, second segmentation coagulation respectively
Native sealing platform prefabricated component 2, third segmental concrete sealing platform prefabricated component 3, the 4th segmental concrete sealing platform prefabricated component the 4, the 5th
Segmental concrete sealing platform prefabricated component 5, the 6th segmental concrete sealing platform prefabricated component 6, the segmentation of each sealing platform there are with it is similar
The connecting pin of sealing platform segmentation, is drawn using CAD, REVIT Software for Design;Design safety, economy, rationally, size marking is clear;
Processing and fabricating:Segmental concrete is made using concrete blinding casting craft in the shape and size being segmented according to each sealing platform
The bottom of sealing platform prefabricated component, segmental concrete sealing platform prefabricated component is equipped with connection reinforcing bar, so as to solid with the welding of bar frame 7
It is fixed;The seam crossing of segmental concrete sealing platform prefabricated component is equipped with the tongue and groove of docking, and mold simplicity is stablized, and scantling is accurate;
It is equipped with a variety of reserved slots 10 with reference to attached drawing 1 and 3 segmental concrete sealing platform prefabricated component of attached drawing:Segmental concrete sealing
Pipeline is reserved with according to the water power spool position of architectural drawing on platform prefabricated component and reserves groove;Segmental concrete sealing platform prefabricated component
On at interval of 500 mm ~ 700mm set the reserving hole that vibrates there are one up and down, so that vibrating head is inserted into segmentation
Concrete sealing platform Prefabricated part bottom;The corner of segmental concrete sealing platform prefabricated component, which is equipped with, adjusts strut drawknot node hole to be provided;Point
The end face that section concrete sealing platform prefabricated component is contacted with shear wall is equipped with contact groove, increase and shear wall contact area, subtracts
Small risk of leakage;
Installation is reinforced:Roof plate template, which is laid with, to be completed, and toilet sealing edge of table line, sideline bullet are first played in template before plate muscle binding
Split heads vertical wall string pendulum is put after complete, is then fixed on split heads 11 according to the conceptual design nail of architectural drawing and step 1
In template;With reference to attached drawing 1, after bar frame 7 and part or all of shear force wall reinforcing steel bar frame 9 are fixed and be laid with to roof plate template, according to
Architectural drawing and the conceptual design of step 1 put each segmental concrete sealing platform prefabricated component to designated position, and utilize split heads
Connection reinforcing bar is welded and fixed by 11 supports with bar frame 7;Adjacent sectional concrete sealing platform prefabricated component seam crossing tongue and groove stays pair
Seam, abutment joint slit width 20mm;The turning of each segmental concrete sealing platform prefabricated component carries out intersection drawknot using rod-adjurstable 8 and consolidates
It is fixed, reinforcing is attached to sealing platform with rod-adjurstable by room diagonal line, prevents sealing platform from toppling over;Installation is reinforced simply, no
Influence the construction of other work posts;
With reference to attached drawing 4,5:Split heads 11 includes the fixed split heads gasket of barricades support 1102 and 1102 bottom of barricades support of inverted U
1101, nail hole, split heads split heads made of reinforcement fabrication barricades support 1102 and angle steel of this example are provided on split heads gasket 1101
Gasket 1101 is welded;Sealing platform is placed on the horizontal reinforcement at 1102 top of barricades support when installing and using, this example is defended
Plate thickness 10cm between life, therefore the high 9cm of split heads is designed, after ensureing that concreting is complete, sealing platform can be embedded to 1cm in concrete;Split heads pad
It is provided with nail hole on piece 1101, split heads 11 is fixed on floor bottom mould plate across nail hole with nail;Segmental concrete sealing platform is pre-
After product is placed in corresponding position, a positioning bar 1103 is respectively welded by segmental concrete sealing in the split heads 11 in its both sides
Platform prefabricated component is clamping, prevents it from moving left and right;
Each segmental concrete sealing platform prefabricated component fixed with positioning bar 1103 after again by adjacent and do not dock directly two sections points
Section concrete sealing platform prefabricated component flitch and step fastener reinforcement by connection.
Concreting:It is abundant with the concrete of concrete floor slab placement that the concreting of progress floor keeps segmental concrete prefabricated
Contact;Ensure that component does not shift, topples in concreting process, ensures that component comes into full contact with floorslab concrete, scheme is set
The meter stage formulates detailed Scheme of Strengthening, determines component bearing height;It is pre- across vibrating using vibrating head in concreting step
Hole of boxing out is inserted into segmental concrete sealing platform prefabricated component bottom to concrete vibrating.
Piece is in the milk:After clearing up the piece between each segmental concrete sealing platform prefabricated component, height is poured into piece and the mouth that vibrates
Strength grouting material, condensation cure.
Structure water storage experiment is carried out to all toilets of 3 high levels using above-described embodiment technique, amounts to 76 health
Between, water-storing test, the depth of water(Most shallow place)30mm, storage time 24 hours.Wherein there is the toilet of leakage phenomenon to only have 2, closes
Lattice rate is up to 97.36%.
The above described is only a preferred embodiment of the present invention, being not that the invention has other forms of limitations, appoint
What those skilled in the art changed or be modified as possibly also with the technology contents of the disclosure above equivalent variations etc.
Imitate embodiment.But it is every without departing from technical solution of the present invention content, according to the technical essence of the invention to above example institute
Any simple modification, equivalent variations and the remodeling made, still fall within the protection domain of technical solution of the present invention.
Claims (8)
1. a kind of kitchen and toilet assembled sealing platform construction method, which is characterized in that step includes:Conceptual design-processing and fabricating-peace
Fill reinforcing-concreting-piece grouting;
Conceptual design:Sealing platform is segmented according to design drawing, is that a sealing platform is segmented with every face wall, each sealing platform point
The connecting pin of Duan Liuyou and the segmentation of similar sealing platform;
Processing and fabricating:Segmental concrete sealing platform prefabricated component is made in the shape and size being segmented according to each sealing platform, is segmented coagulation
The bottom of native sealing platform prefabricated component is equipped with connection reinforcing bar;
Installation is reinforced:Roof plate template fixes unwrapping wire and is laid with bar frame(7)Afterwards, according to design drawing and step 1)Scheme set
Meter puts each segmental concrete sealing platform prefabricated component to designated position, and utilizes split heads(11)Support, by connection reinforcing bar and steel
Muscle rack(7)It is welded and fixed;
Concreting:Pour floorslab concrete;
Piece is in the milk:The piece between each segmental concrete sealing platform prefabricated component is cleared up, high-strength grouting is poured into piece and the mouth that vibrates
Material, maintenance are completed to obtain the final product.
2. a kind of kitchen and toilet assembled sealing platform construction method according to claim 1, it is characterised in that:The segmentation
Pipeline is reserved with according to the water power spool position of architectural drawing on concrete sealing platform prefabricated component and reserves groove.
3. a kind of kitchen and toilet assembled sealing platform construction method according to claim 1, it is characterised in that:The segmentation
The reserving hole that vibrates there are one up and down is set at interval of 500 mm ~ 700mm on concrete sealing platform prefabricated component;Described
The reserving hole that vibrates is passed through to be inserted into segmental concrete sealing platform prefabricated component bottom pair using vibrating head in concreting step
Concrete vibrating.
4. a kind of kitchen and toilet assembled sealing platform construction method according to claim 1, it is characterised in that:The segmentation
The corner of concrete sealing platform prefabricated component, which is equipped with, adjusts strut drawknot node hole to be provided;The installation is reinforced respectively to be segmented in step and be mixed
The turning of solidifying soil sealing platform prefabricated component utilizes rod-adjurstable(8)Intersection drawknot is carried out to fix.
5. a kind of kitchen and toilet assembled sealing platform construction method according to claim 1, it is characterised in that:The segmentation
The end face that concrete sealing platform prefabricated component is contacted with shear wall is equipped with contact groove.
6. a kind of kitchen and toilet assembled sealing platform construction method according to claim 1, it is characterised in that:Adjacent is described
The seam crossing of segmental concrete sealing platform prefabricated component be equipped with the tongue and groove of docking, seam crossing tongue and groove stays abutment joint, abutment joint slit width
20mm。
7. a kind of kitchen and toilet assembled sealing platform construction method according to claim 1, it is characterised in that:The split heads
(11)The barricades support of inverted U(1102)And barricades support(1102)The fixed split heads gasket in bottom(1101), the split heads
Gasket(1101)On be provided with nail hole;The installation is reinforced in step passes through nail hole by split heads with nail(11)It is fixed on floor bottom
In template.
8. a kind of kitchen and toilet assembled sealing platform construction method according to claim 1, it is characterised in that:The installation
After segmental concrete sealing platform prefabricated component is placed in corresponding position in reinforcing step, the split heads in its both sides(11)It is respectively welded
A piece positioning bar(1103)Segmental concrete sealing platform prefabricated component is clamping.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810527090.8A CN108643370A (en) | 2018-05-29 | 2018-05-29 | A kind of kitchen and toilet assembled sealing platform construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810527090.8A CN108643370A (en) | 2018-05-29 | 2018-05-29 | A kind of kitchen and toilet assembled sealing platform construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108643370A true CN108643370A (en) | 2018-10-12 |
Family
ID=63758449
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810527090.8A Pending CN108643370A (en) | 2018-05-29 | 2018-05-29 | A kind of kitchen and toilet assembled sealing platform construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108643370A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101158236A (en) * | 2007-10-30 | 2008-04-09 | 山东天齐置业集团股份有限公司 | Kitchen toilet water-stopping platform formwork controlling device and construction method |
CN201109999Y (en) * | 2007-10-30 | 2008-09-03 | 山东天齐置业集团股份有限公司 | Control apparatus for kitchen-toilet room water stop bench formwork |
CN205677235U (en) * | 2016-06-23 | 2016-11-09 | 中天建设集团有限公司 | A kind of prefabricated anti-bank constructing structure applied in toilet |
CN206299117U (en) * | 2016-12-14 | 2017-07-04 | 山东电力建设第一工程公司 | A kind of kitchen toilet water-stopping platform pours formwork support body with floor integrated |
CN206681142U (en) * | 2017-03-14 | 2017-11-28 | 中天建设集团有限公司 | A kind of prefabricated anti-bank in toilet |
-
2018
- 2018-05-29 CN CN201810527090.8A patent/CN108643370A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101158236A (en) * | 2007-10-30 | 2008-04-09 | 山东天齐置业集团股份有限公司 | Kitchen toilet water-stopping platform formwork controlling device and construction method |
CN201109999Y (en) * | 2007-10-30 | 2008-09-03 | 山东天齐置业集团股份有限公司 | Control apparatus for kitchen-toilet room water stop bench formwork |
CN205677235U (en) * | 2016-06-23 | 2016-11-09 | 中天建设集团有限公司 | A kind of prefabricated anti-bank constructing structure applied in toilet |
CN206299117U (en) * | 2016-12-14 | 2017-07-04 | 山东电力建设第一工程公司 | A kind of kitchen toilet water-stopping platform pours formwork support body with floor integrated |
CN206681142U (en) * | 2017-03-14 | 2017-11-28 | 中天建设集团有限公司 | A kind of prefabricated anti-bank in toilet |
Non-Patent Citations (1)
Title |
---|
张豫: "《建筑与装饰工程施工工艺 第2版》", 31 March 2016, 北京理工大学出版社 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108678258B (en) | Large-span hemispherical reinforced concrete dome structure and construction method thereof | |
CN104652830B (en) | The construction method that a kind of Prefabricated construction panel and prefabricated panel are built | |
CN104594500B (en) | Integrated slab column formwork structure system and construction method | |
CN105804395B (en) | Stair continuously poured in one molding construction method based on monoblock type typified form | |
CN104831932B (en) | A kind of construction technology of high-grade concrete suspension column | |
CN109113245A (en) | A kind of construction method and device of reinforced concrete double plate | |
CN106968435A (en) | A kind of formwork reinforcement system of L-type shear wall with short piers one-piece casting construction | |
CN106948504A (en) | Assembled wallboard water seepage prevention vertical abutment joint structure and its construction method | |
CN108590008A (en) | Fold shape roof system cast-in-place concrete construction method | |
CN206396966U (en) | A kind of assembled laminated floor slab plate seam node component | |
CN109577377A (en) | Basement post-pouring zone structure and its construction method | |
CN206438529U (en) | Beam and slab type raft foundation formwork support structure | |
CN107724540A (en) | Steel plate shear force wall and the attachment structure and its construction method of steel bar girder floor plates | |
CN106193340A (en) | Cast-in-place prestressing without bondn ultralong floor combination type reinforcing strip anti-cracking structure and construction method | |
CN106284653A (en) | The construction method that a kind of balcony construct capital interspaces in advance | |
CN103603452B (en) | Assembly type profile of tooth laminated floor slab | |
CN208502236U (en) | A kind of edge banding apparatus for concrete floor edge in steel construction | |
CN111851827A (en) | Assembly type prefabricated steel bar truss disassembly-free template system and manufacturing method thereof | |
CN209260922U (en) | Band girder rib laminated floor slab pre-tensioning system connecting joint structure | |
CN209556195U (en) | Fabricated Beam-Slab connection structure | |
CN105317146A (en) | Steel structure earthquake-resistant floor for construction and manufacturing method | |
CN108643370A (en) | A kind of kitchen and toilet assembled sealing platform construction method | |
CN105952044B (en) | A kind of full precast prestressed concrete floor construction and prestressing force assembly method | |
CN212802185U (en) | Prefabricated steel bar truss floor of assembled form removal-free | |
CN108266036B (en) | Construction method of concrete silo roof plate structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181012 |