CN108632905A - Development method, device, terminal and the computer readable storage medium of broadband user - Google Patents
Development method, device, terminal and the computer readable storage medium of broadband user Download PDFInfo
- Publication number
- CN108632905A CN108632905A CN201810461145.XA CN201810461145A CN108632905A CN 108632905 A CN108632905 A CN 108632905A CN 201810461145 A CN201810461145 A CN 201810461145A CN 108632905 A CN108632905 A CN 108632905A
- Authority
- CN
- China
- Prior art keywords
- user
- broadband
- development
- latency
- target user
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W28/00—Network traffic management; Network resource management
- H04W28/02—Traffic management, e.g. flow control or congestion control
- H04W28/10—Flow control between communication endpoints
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W24/00—Supervisory, monitoring or testing arrangements
- H04W24/08—Testing, supervising or monitoring using real traffic
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W8/00—Network data management
- H04W8/18—Processing of user or subscriber data, e.g. subscribed services, user preferences or user profiles; Transfer of user or subscriber data
Abstract
The present invention provides a kind of development method of broadband user, device, terminal and computer readable storage medium, methods to include:It obtains shifting net registration user and fixed network at operator and registers user;The user for netting the registration user of the non-fixed network in registration user will be moved and be determined as target user;Analysis is monitored using data to the flow of target user;According to monitoring analysis result judge target user whether be broadband services latency development user.Technical solution provided by the invention, by obtaining, the shifting net at operator registers user and fixed network registers user, according to moving, net registers user and fixed network registration user determines target user, and analysis is monitored using data to the flow of target user, to judge target user whether be broadband services latency development user, it is effectively guaranteed the accurate reliability of latency development user determination, and Objective is stronger, at low cost, efficient, it is effectively improved the rate of signing a bill of broadband services, convenient for the new user of extension broadband services.
Description
Technical field
The present invention relates to field of communication technology more particularly to a kind of development method of broadband user, device, terminal and calculating
Machine readable storage medium storing program for executing.
Background technology
With the gradually implementation of national " internet+" strategy, broadband network plays more and more important as basic facility
Effect.And the focus competed for market share as the developing superior product of telecommunication service and each operator.
Carrier side thinks little of broadband side (fixed network) data collection task at present, and valid data field largely lacks, together
When for development broadband user do not form effective method system yet.Usually use the method for development broadband user still now
More traditional method relies primarily on " waiting by thought ", and user to shop carries out consulting broadband tariff information, bundlees the letters such as preferential
When breath, business personnel just carry out the recommendation of broadband transacting business.In addition, telecom business office is irregular or festivals or holidays hold rush
Pin activity is handled drawing banner, distributing leaflets and carrying out broadband in such a way that the roadside of shops's attachment carries out " drainage passerby ".
However, when implementing the technical program, the method for finding traditional development broadband user, not only of high cost, efficiency
It is low, rate of signing a bill is low, and Objective is poor, broadband user increases that difficulty is big, storage user's off-network increases newly.
Invention content
An embodiment of the present invention provides a kind of development method of broadband user, device, terminal and computer-readable storage mediums
Matter can effectively increase user's stickiness, improve the permeability of broadband services, realize increasing income for broadband services.
First aspect of the embodiment of the present invention provides a kind of development method of broadband user, including:
It obtains shifting net registration user and fixed network at operator and registers user;
The user that the non-fixed network moved in net registration user registers user is determined as target user;
Analysis is monitored using data to the flow of the target user;
According to monitoring analysis result judge the target user whether be broadband services latency development user.
Method as described above, according to monitoring analysis result judge the target user whether be broadband services potential hair
User is opened up, including:
The target user's flow obtained in default free time section presets base using the frequency and access of data
The number stood;
If the frequency is greater than or equal to preset frequency threshold, and the number is greater than or equal to preset number threshold
Value, it is determined that the target user is the first latency development user of broadband services;Alternatively,
If the frequency be less than preset frequency threshold, obtain the target user flow use data key when
Between inflection point and location information;
If the material time inflection point in the default free time section is consistent with location information, it is determined that the target is used
Family is the second latency development user of broadband services.
Method as described above, the method further include:
It obtains the broadband access network daily record of the operator and the fixed network registers user in preset operating time section
Internet log;
If there are the internet records of rete mirabile user in the internet log, the rete mirabile is determined according to the internet records
The rete mirabile number of user;
Internet behavior of the rete mirabile user in section of preset time of having a rest is monitored according to the rete mirabile number;
If the internet behavior of the rete mirabile user is not present in the broadband access network daily record, it is determined that the rete mirabile user is
The third latency development user of broadband services.
Method as described above, the method further include:
Judge that the net that moves register whether user does not handle as other regional operators and the user of broadband services;
If so, determining that the shifting net registers user as the 4th latency development user of broadband services.
Method as described above, the method further include:
Obtain the geographical location information of the latency development user;
Judge whether the latency development user meets the width of the operator of location according to the geographical location information
Band mounting condition;
If meeting, preset business development operation is carried out to the latency development user.
Second aspect of the embodiment of the present invention provides a kind of development device of broadband user, including:
Acquisition module, for obtaining shifting net registration user and fixed network registration user at operator;
Determining module, the user for the non-fixed network moved in net registration user to be registered user are determined as target and use
Family;
Monitoring modular is monitored analysis for the flow to the target user using data;
Judgment module, for according to monitoring analysis result judge the target user whether be broadband services latency development
User.
Device as described above, the judgment module, is used for:
The target user's flow obtained in default free time section presets base using the frequency and access of data
The number stood;
If the frequency is greater than or equal to preset frequency threshold, and the number is greater than or equal to preset number threshold
Value, it is determined that the target user is the first latency development user of broadband services;Alternatively,
If the frequency be less than preset frequency threshold, obtain the target user flow use data key when
Between inflection point and location information;
If the material time inflection point in the default free time section is consistent with location information, it is determined that the target is used
Family is the second latency development user of broadband services.
Device as described above, the acquisition module are additionally operable to obtain the broadband access network daily record of the operator and institute
State internet log of the fixed network registration user in preset operating time section;
Described device further includes:Analysis module is used for:
If there are the internet records of rete mirabile user in the internet log, the rete mirabile is determined according to the internet records
The rete mirabile number of user;
Internet behavior of the rete mirabile user in section of preset time of having a rest is monitored according to the rete mirabile number;
If the internet behavior of the rete mirabile user is not present in the broadband access network daily record, it is determined that the rete mirabile user is
The third latency development user of broadband services.
Device as described above, the judgment module, is additionally operable to:
Judge that the net that moves register whether user does not handle as other regional operators and the user of broadband services;
If so, determining that the shifting net registers user as the 4th latency development user of broadband services.
Device as described above, the acquisition module are additionally operable to obtain the geographical location information of the latency development user;
The judgment module, is additionally operable to:
Judge whether the latency development user meets the width of the operator of location according to the geographical location information
Band mounting condition;
If meeting, preset business development operation is carried out to the latency development user.
The third aspect of the embodiment of the present invention provides a kind of development terminal of broadband user, including:
Memory;
Processor;And
Computer program;
Wherein, the computer program is stored in the memory, and is configured as being executed with reality by the processor
The development method of broadband user described in existing above-mentioned first aspect a kind of.
Fourth aspect of the embodiment of the present invention provides a kind of computer readable storage medium, is stored thereon with computer program;
The computer program is executed by processor to realize the development of broadband user described in above-mentioned first aspect a kind of
Method.
Development method, device, terminal and the computer readable storage medium of broadband user provided in an embodiment of the present invention leads to
Shifting net registration user and the fixed network registration user obtained at operator is crossed, registration user is netted according to shifting and fixed network registration user determines
Target user, and analysis is monitored using data to the flow of target user, to judge whether target user is broadband industry
The latency development user of business is effectively guaranteed the accurate reliability of latency development user determination, also, the mesh of the development method
Mark property is stronger, at low cost, efficient, is effectively improved the rate of signing a bill of broadband services, convenient for extending the new user of broadband services,
To ensure that the practicability of this method, be conducive to the popularization and application in market.
Description of the drawings
Fig. 1 is a kind of flow diagram of the development method of broadband user provided in an embodiment of the present invention;
Fig. 2 be it is provided in an embodiment of the present invention according to monitoring analysis result judge whether the target user is broadband services
Latency development user flow diagram;
Fig. 3 is the flow diagram of the development method of another broadband user provided in an embodiment of the present invention;
Fig. 4 is the flow diagram of the development method of another broadband user provided in an embodiment of the present invention;
Fig. 5 is the flow diagram of the development method of another broadband user provided in an embodiment of the present invention;
Fig. 6 is that the flow for the first latency development user that Application Example of the present invention provides is illustrated using the feature of data
Figure;
Fig. 7 is that the flow for the second latency development user that Application Example of the present invention provides is illustrated using the feature of data
Figure;
Fig. 8 is a kind of structural schematic diagram of the development device of broadband user provided in an embodiment of the present invention;
Fig. 9 is a kind of structural schematic diagram of the development terminal of broadband user provided in an embodiment of the present invention.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
The term " comprising " and " having " of description and claims of this specification and their any deformation, it is intended that
Be to cover it is non-exclusive include, for example, the device of the process or structure that contain series of steps is not necessarily limited to clearly arrange
Those of go out structure or step but may include not listing clearly or for the intrinsic other steps of these processes or device
Rapid or structure.
Fig. 1 is a kind of flow diagram of the development method of broadband user provided in an embodiment of the present invention;Refer to the attached drawing 1 can
Know, present embodiments provides a kind of development method of broadband user, specially a kind of broadband user development side based on big data
Method, specifically, this method includes:
S101:It obtains shifting net registration user and fixed network at operator and registers user;
Wherein, it moves net and registers the user information that user is registered as the mobile terminal of user at operator, such as:It is right
For unicom operator, when user A registers unicom number at unicom operator, the user A that is stored at unicom operator
Information;Alternatively, for mobile operator, when user B registers mobile number at mobile operator, it is stored in mobile fortune
Seek the information etc. of the user B at quotient;When fixed network registers user as the fixed-sites such as family or house progress networked deployment,
The stored user information at operator.For above-mentioned shifting net registration user and fixed network registration user, transported by inquiring
The database of battalion quotient can stablize acquisition.
S102:The user for netting the registration user of the non-fixed network in registration user will be moved and be determined as target user;
Get move net registration user and fixed network registration user after, to move net registration user and fixed network register user into
It goes and screens, specifically, will only be that shifting net registers user rather than the user of fixed network registration user is determined as target user.
S103:Analysis is monitored using data to the flow of target user;
Since target user is to inquire corresponding log-on message at above-mentioned operator, in order to determine target
Whether user handles the broadband services of other operators, and analysis is monitored using data to the flow of target user, specific to examine
When surveying analysis, the flow that can be detected in a period of time uses data, to improve the accuracy of monitoring analysis.
S104:According to monitoring analysis result judge target user whether be broadband services latency development user.
After being monitored analysis, monitoring analysis result can be got, so can according to monitoring analysis result come
Judge target user whether be broadband services latency development user, such as:Flow in target user during idle time section
It is larger using data, then it can determine that target user does not handle corresponding broadband services, at this point it is possible to which target user is determined as
The latency development user of broadband services;It, then can be with alternatively, when the flow in section is smaller using data during idle time by target user
Determine that target user has handled the broadband services of other operators, at this point it is possible to exclude target user in latency development user
Except;Of course, those skilled in the art can also use other determination strategies, as long as can accurately judge potential hair
User is opened up, details are not described herein.
The development method of broadband user provided in this embodiment registers user and fixed network by obtaining the shifting net at operator
User is registered, registration user is netted according to shifting and fixed network registration user determines target user, and number is used to the flow of target user
According to be monitored analysis, to judge target user whether be broadband services latency development user, be effectively guaranteed potential
The accurate reliability that ownership determines, also, the Objective of the development method is stronger, at low cost, efficient, effectively improves
The rate of signing a bill of broadband services, the new user convenient for extension broadband services are conducive to city to ensure that the practicability of this method
The popularization and application of field.
Fig. 2 be it is provided in an embodiment of the present invention according to monitoring analysis result judge target user whether be broadband services dive
In the flow diagram of ownership;On the basis of the above embodiments, with continued reference to attached drawing 2 it is found that the present embodiment is for root
Judge whether target user is that the specific implementation of latency development user of broadband services does not limit according to monitoring analysis result,
Those skilled in the art can be configured according to specific design requirement, more preferably, in the present embodiment according to monitoring
Analysis result judges whether target user is that the latency development user of broadband services may include:
S1041:It is default using the frequency of data and access to obtain target user's flow in default free time section
The number of base station;
Wherein, it is that user is pre-set to preset free time section, and specific temporal information user can be according to specific
Design requirement or investigation situation are configured, for example, can 18 be set as section of default free time:00-24:00, alternatively,
May also mean that be 19:00-24:00、20:00-24:00 etc..Under normal circumstances, in section of default free time, target is used
The online demand at family can realize that therefore, flow can be more larger using the frequency of use of data, convenient for mesh by data on flows
It marks user and carries out accurate judgement, and when target user uses data on flows, target user's demand is linked into preset base station, leads to
Geographical location where target user can be primarily determined by crossing access and presetting the number of base station, consequently facilitating the life to target user
Custom living is grasped.
S1042:If frequency is greater than or equal to preset frequency threshold, and number is greater than or equal to preset frequency threshold value,
Then determine that target user is the first latency development user of broadband services;Alternatively,
Wherein, frequency threshold and frequency threshold value are pre-set, and those skilled in the art can be according to specifically setting
Meter demand is configured, for example, can set frequency threshold value to 15 times, 20 times or 25 times etc., frequency threshold is arranged
It it is 15min/ times, 20min/ times or 25min/ times etc., when frequency is greater than or equal to frequency threshold, number is greater than or equal to secondary
When number threshold value, then illustrate that the shifting net that the target user is operator registers user, but therefore can be with for installation broadband in family
Determine that target user is the first latency development user of broadband services.
S1043:If frequency is less than preset frequency threshold, the flow for obtaining target user uses the material time of data
Inflection point and location information;
S1044:If the material time inflection point in default free time section is consistent with location information, it is determined that target user
For the second latency development user of broadband services.
If frequency is less than frequency threshold, it may be considered that target user, which does not occur flow, uses data, at this point, in order to improve
To the accurate reliability that target user judges, target user's flow can be obtained and believed using the material time inflection point of data and positioning
Breath, wherein critical event inflection point can be the difference for the latter time that flow uses data using the previous time of data and flow
Value is more than preset difference in flow, it may be considered that the previous time is material time inflection point, and can get target user and close
Location information when key time inflection point, if continuous, material time inflection point, location information occur within more days consistent, it may be considered that should
Target user is the shifting net registration user of operator, while being rete mirabile broadband registration user, at this point it is possible to which target user is denoted as
For the second latency development user of broadband services.
Judge through the above way target user whether be broadband services latency development user (the first latency development user
Or the second latency development user), be effectively guaranteed the accurate reliability of judgement, further improve this method use it is accurate
Degree.
Fig. 3 is the flow diagram of the development method of another broadband user provided in an embodiment of the present invention;In above-mentioned reality
On the basis of applying example, with continued reference to attached drawing 3 it is found that the method in the present embodiment can also include:
S201:Obtain the online of the broadband access network daily record and fixed network registration user of operator in preset operating time section
Daily record;
Wherein, preset operating time section is that user is pre-set, and specific temporal information user can be according to specific
Design requirement or investigation situation are configured, for example, can 8 be set as preset operating time section:00-17:00, alternatively,
May also mean that be 9:00-18:00、8:30-17:30 etc..Due to fixed network, registration user registered at operator,
When fixed network registration user surfs the Internet, internet log can be obtained by operator's monitor supervision platform.
S202:If there are the internet records of rete mirabile user in internet log, determine rete mirabile user's according to internet records
Rete mirabile number;
After getting internet log, analyzing processing can be carried out to internet log, so as to judge day of surfing the Internet
Rete mirabile user in will and fixed network user, specifically, rete mirabile user and fixed network user can be distinguished according to user identifier, true
When there is rete mirabile user surely, the internet records of rete mirabile user can be obtained, and can determine rete mirabile user's according to internet records
Rete mirabile number.
S203:Internet behavior of the rete mirabile user in section of preset time of having a rest is monitored according to rete mirabile number;
S204:If the internet behavior of rete mirabile user is not present in broadband access network daily record, it is determined that rete mirabile user is broadband industry
The third latency development user of business.
When being monitored to internet behavior, if finding, above-mentioned internet behavior does not appear in the broadband access network daily record of operator
In, then prove that the certain customers are that rete mirabile moves network users, and the broadband services of Wei Banyou operators, at this point it is possible to by the rete mirabile
User is the third latency development user of broadband services.
The internet behavior for registering user to fixed network through the above way carries out analyzing processing, to judge that fixed network registers user
Side whether there is third latency development user, is effectively guaranteed the accurate reliability of latency development user judgement, further carries
The levels of precision that high this method uses.
Fig. 4 is the flow diagram of the development method of another broadband user provided in an embodiment of the present invention;In above-mentioned reality
On the basis of applying example, with continued reference to attached drawing 4 it is found that the method in the present embodiment can also include:
S301:Judge to move net and register whether user does not handle as other regional operators and the user of broadband services;
Wherein, the operator in other areas refers to the operator in other provinces, such as:User's first is lived in Beijing,
The number of the mobile terminal used is unicom number, and the unicom number is the unicom registered at operator of Liaoning Province
Whether number then the user is to move net registration user, and is the operator in other areas, specifically, being other areas
Whether operator handles broadband services and can register user information by transferring shifting net at operator and judge.
S302:User is registered as the 4th latency development user of broadband services if so, determining and moving net.
The 4th latency development user is determined through the above way, and analysis population-wide is extensive, and Objective is stronger, effectively protects
The accurate reliability for having demonstrate,proved latency development user determination, further improves the levels of precision that this method uses.
Fig. 5 is the flow diagram of the development method of another broadband user provided in an embodiment of the present invention;In above-mentioned reality
On the basis of applying example, with continued reference to attached drawing 5 it is found that in order to improve the practicability of this method, method in the present embodiment can be with
Including:
S401:Obtain the geographical location information of latency development user;
After determining latency development user, the letters such as living habit, internet records to latency development user can be passed through
It ceases to estimate the geographical location information of latency development user, such as:Take-away behavior that latency development user can be got, about vehicle
The internet behaviors such as behavior, access base station estimate the geographical location of latency development user according to above-mentioned behavior.
S402:Judge whether latency development user meets the broadband peace of the operator of location according to geographical location information
Dress condition;
After getting geographical location information, the geographical location information of latency development user can be judged that operator exists
Whether this area there is broadband mounting condition to be compared, can be into industry if condition has and (has broadband mounting condition)
Operation is expanded in business, if condition does not have, to latency development, user is labeled, and business is carried out when having in order to post-conditions
Expand operation.
S403:If meeting, preset business development operation is carried out to latency development user.
After being determined for compliance with mounting condition, business development operation can be carried out to latency development user, wherein specific
The form of business development operation is different according to different types of latency development user, for example, for the first above-mentioned potential hair
It, can be to emphasize that the first method for networking preferential carries out business marketing for opening up user and the 4th latency development user, wherein the
One mode may include at least one of:Short massage notice, the page ad of application APP, telemarketing etc.;And for upper
For the second latency development user and third latency development user that state, can with emphasize to instigate rebellion within enemy camp the second method of marketing activity into
Row business marketing, wherein second method may include at least one of:Short massage notice, application APP page ad,
Telemarketing etc..Of course, those skilled in the art can also use other modes to carry out business development operation, as long as can
Ensure that stablizing for business development operation carries out.
Business development operation is carried out to latency development user through the above way, Objective is stronger, is effectively improved battalion
Quality and efficiency are sold, cost of marketing is reduced, further improves the practicability of this method, is conducive to the popularization in market and answers
With.
When concrete application, this application embodiment provides a kind of side for being realized based on telecommunications big data and developing new broadband user
Method determines that the broadband in subscriber household uses number by the flow usage behavior and base station location information to user in one day
It is believed that breath carries out user discovery, development, to solve telecom operators development broadband user is of high cost, efficiency is low, and sign a bill
The low problem of rate.
Background check:2,180,000 family of Beijing unicom broadband, Beijing unicom 3/4G user 9,600,000
Premise 1:According to premise background check and common sense it is found that a certain area broadband registration number of users (fixed network registration use
Family) it is less than and moves net (mobile phone user) registration user.
Premise 2:The user information of the program only known telecommunications quotient first, and be also to be sent out from the angle of telecom operation first
Open up new user.
Based on above-mentioned data, the key step of this method is as follows:
Step 1:Data are obtained, following two parts data are obtained from telecom operators' first.One, net registration user's letter is moved
Breath, flow, voice, internet log information, this partial information are denoted as A data.Two, fixed network registration user information (including it is personal and
Enterprise) internet log information, this partial information is denoted as B data.
Step 2:Screening selection is carried out to A data in step 1 and B data part, obtain only be move net registration user and
It is not the User Part of fixed network registration user, using the User Part as target user.
Step 3:To the target user screened in step 2, daily 18:00--24:The flow of 00 period uses data
It is analyzed.
Step 4:When being analyzed using data flow, if analysis result is:Daily 18:00--24:When 00
Section, 1, occur flow use phenomenon, i.e., every 15 minutes interval in have flow consumption;2, monthly identical base is accessed in the period
Number of standing is more than 20 times.Meet above-mentioned 2 conditions, as shown in Figure 6, you can prove that the user is that the shifting net registration of operator's first is used
Family, but without broadband in family, is potential broadband services development client, this certain customers is denoted as user group a, as above-mentioned first
Latency development user.
Step 5:Daily 18:00--24:00 period did not occurred the target user that flow uses phenomenon, and more days continuous
Appearance material time inflection point, location information are consistent, are determined as the shifting net registration user that the target user is operator's first, simultaneously
It is rete mirabile broadband registration user, this certain customers is denoted as user group b, the second as above-mentioned latency development user, such as Fig. 7 institutes
Show.
Step 6:B data in step 1 is analyzed, is 9 in the period:00--18:00, it finds in internet log
Rete mirabile user internet records (such as:It is found that mobile subscriber in unicom broadband access network daily record), meanwhile, according to internet records
Determine its move network No. code, to its period be 18:00--24:00 internet behavior is into line trace, if not finding in operator
In the broadband access network daily record of first, then prove that the certain customers are that rete mirabile moves network users, and the broadband services of Wei Banyou operators first,
This certain customers is denoted as user group c, as above-mentioned third latency development user.
Step 7:A data in step 1 are analyzed, it is with choosing shifting net side user's registration non-local, but 30 days
Inherent local activity (such as its flow use is this area), and during its daily internet log, it is found that it was retrieved and " rent
The key words such as room ", " broadband " then prove it as his operator of province party a subscriber, and do not handle broadband services, this certain customers remembers
Make user group d, the 4th as above-mentioned latency development user.
Step 8:Place position is carried out to above-mentioned potential user group a, b, c, d to be identified, it specifically can be by thereon
Order takeaway in net behavior, chauffeur, daily access base station position identify, to further increase user trajectory recognition accuracy,
Also the longitude and latitude number of degrees in a certain moment location of user can be obtained by the O numeric field datas (mainly acquiring url field) of acquisition user
According to.It should be noted that because of url field and the non real-time latitude and longitude information for including user, therefore in the present embodiment, can be
Carry out auxiliary verification.
Step 9:To the home location information of above-mentioned acquired latency development user and operator's first this area whether
It is compared with broadband mounting condition, if condition has, then carries out business development.
Step 10:Above-mentioned acquired targeted user population a, d user (the shifting net side user of operator's first) is carried out
Marketing.The mode of marketing includes the marketing methods such as " advertisement " notice and phone before short massage notice, common APP access.Recommend
Have a preferential dynamics for targetedly merging set meal and contemporary broadband business, Special attention will be given to network the discounted products just given/
Bonus.
Step 11:For above-mentioned acquired targeted user population b, c user (the Web vector graphic user of operator's first)
It markets.The mode of marketing includes the modes such as " advertisement " notice and phone before short massage notice, common APP access, is concentrated
Carry out and marketing activity is instigated rebellion within enemy camp for the rete mirabile broadband user of high-value user.
The development method of broadband user provided in this embodiment is directed to moves net registration user and fixed network registration user respectively,
Data are handled by the user basic information, flow use, voice, terminal type, internet internet behavior and the broadband that are provided
Information identifies that the tendency for increasing the networking of broadband user newly, being customized marketing, reduction develop new user cost, improve efficiency,
The practicability for further ensuring this method is conducive to the popularization and application in market.
Fig. 8 is a kind of structural schematic diagram of the development device of broadband user provided in an embodiment of the present invention;Refer to the attached drawing 8 can
Know, present embodiments provide a kind of development device of broadband user, which can execute above-mentioned development method, specifically
, which may include:
Acquisition module 1, for obtaining shifting net registration user and fixed network registration user at operator;
Determining module 2 is determined as target user for will move the user for netting the registration user of the non-fixed network in registration user;
Monitoring modular 3 is monitored analysis for the flow to target user using data;
Judgment module 4, for according to monitoring analysis result judge target user whether be broadband services latency development use
Family.
The present embodiment for acquisition module 1, determining module 2, monitoring modular 3 and judgment module 4 concrete shape structure not
It limits, those skilled in the art can carry out arbitrary setting according to the function of its realization to it, and details are not described herein;Separately
Outside, the specific reality for the operating procedure that acquisition module 1, determining module 2, monitoring modular 3 and judgment module 4 are realized in the present embodiment
Existing process and realization effect are identical as the specific implementation process of step S101-S104 in above-described embodiment and realization effect,
Above statement content is specifically referred to, details are not described herein.
On the basis of the above embodiments, refer to the attached drawing 8 is it is found that the present embodiment analyzes judgment module 4 according to monitoring
As a result judge whether target user is that the specific implementation of latency development user of broadband services does not limit, art technology
Personnel can be configured according to specific design requirement, more preferably, be judged according to monitoring analysis result in judgment module 4
When whether target user is the latency development user of broadband services, which can be used for executing following steps:
The target user's flow obtained in default free time section presets base station using the frequency and access of data
Number;If frequency is greater than or equal to preset frequency threshold, and number is greater than or equal to preset frequency threshold value, it is determined that target
User is the first latency development user of broadband services;Alternatively, if frequency is less than preset frequency threshold, target user is obtained
Flow use data material time inflection point and location information;If the material time inflection point in default free time section and positioning
Information is consistent, it is determined that target user is the second latency development user of broadband services.
On the basis of the above embodiments, refer to the attached drawing 8 is it is found that the acquisition module 1 in the present embodiment can be also used for holding
Row:Obtain the internet log of the broadband access network daily record and fixed network registration user of operator in preset operating time section;
At this point, the device can also include:Analysis module 5, is used for:If there are the online of rete mirabile user notes in internet log
Record, then determine the rete mirabile number of rete mirabile user according to internet records;According to rete mirabile number to rete mirabile user in preset rest
Between internet behavior in section be monitored;If the internet behavior of rete mirabile user is not present in broadband access network daily record, it is determined that rete mirabile
User is the third latency development user of broadband services.
In order to improve the practicability of the device, with continued reference to attached drawing 8 it is found that judgment module 4 in the present embodiment can be with
For executing:
Judge to move net and register whether user does not handle as other regional operators and the user of broadband services;If so,
Determine that moving net registers user as the 4th latency development user of broadband services.
Further, the acquisition module 1 in the present embodiment and judgment module 4 can be also used for executing following step:
Acquisition module 1 is additionally operable to obtain the geographical location information of latency development user;
Judgment module 4, is additionally operable to:Judge whether latency development user meets the fortune of location according to geographical location information
Seek the broadband mounting condition of quotient;If meeting, preset business development operation is carried out to latency development user.
The development device of broadband user provided in this embodiment can be used in executing the side corresponding to Fig. 2-Fig. 7 embodiments
Method, specific executive mode is similar with advantageous effect, repeats no more herein.
The another aspect of the present embodiment provides a kind of development terminal of broadband user, including:
Memory;
Processor;And
Computer program;
Wherein, computer program stores in memory, and is configured as being executed to realize such as above-mentioned one by processor
The development method of kind broadband user.
Specifically, Fig. 9 is a kind of structural schematic diagram of the development terminal of broadband user provided in an embodiment of the present invention.
As shown in figure 9, development terminal 800 may include following one or more components:Processing component 802, memory
804, power supply module 806, multimedia component 808, audio component 810, input/output (I/O) interface 812, sensor module
814 and communication component 816.
The integrated operation of the usually control development terminal 800 of processing component 802, such as with display, call, data are logical
Letter, camera operation and record operate associated operation.Processing component 802 may include one or more processors 820 to hold
Row instruction, to perform all or part of the steps of the methods described above.In addition, processing component 802 may include one or more moulds
Block, convenient for the interaction between processing component 802 and other assemblies.For example, processing component 802 may include multi-media module, with
Facilitate the interaction between multimedia component 808 and processing component 802.
Memory 804 is configured as storing various types of data to support the operation in development terminal 800.These data
Example include the instruction of any application program or method for being operated in development terminal 800, contact data, telephone directory
Data, message, picture, video etc..Memory 804 can by any kind of volatibility or non-volatile memory device or it
Combination realize, such as static RAM (SRAM), electrically erasable programmable read-only memory (EEPROM) is erasable
Except programmable read only memory (EPROM), programmable read only memory (PROM), read-only memory (ROM), magnetic memory, soon
Flash memory, disk or CD.
Power supply module 806 provides electric power to develop the various assemblies of terminal 800.Power supply module 806 may include power supply pipe
Reason system, one or more power supplys and other generated with for development terminal 800, management and the associated component of distribution electric power.
Multimedia component 808 is included in the screen of one output interface of offer between development terminal 800 and user.One
In a little embodiments, screen may include liquid crystal display (LCD) and touch panel (TP).If screen includes touch panel, screen
Curtain may be implemented as touch screen, to receive input signal from the user.Touch panel includes one or more touch sensings
Device is to sense the gesture on touch, slide, and touch panel.Touch sensor can not only sense the side of touch or sliding action
Boundary, but also detect and touch or the relevant duration and pressure of slide.
Audio component 810 is configured as output and/or input audio signal.For example, audio component 810 includes a Mike
Wind (MIC) is in operation mode when developing terminal 800, when such as call model, logging mode and speech recognition mode, microphone
It is configured as receiving external audio signal.The received audio signal can be further stored in memory 804 or via logical
Believe that component 816 is sent.In some embodiments, audio component 810 further includes a loud speaker, is used for exports audio signal.
I/O interfaces 812 provide interface between processing component 802 and peripheral interface module, and above-mentioned peripheral interface module can
To be keyboard, click wheel, button etc..These buttons may include but be not limited to:Home button, volume button, start button and lock
Determine button.
Sensor module 814 includes one or more sensors, the state for providing various aspects for development terminal 800
Assessment.For example, sensor module 814 can detect that development terminal 800 opens/closes state, the relative positioning of component, example
If component is the display and keypad for developing terminal 800, sensor module 814 can also detect development terminal 800 or development
The position change of 800 1 components of terminal, the existence or non-existence that user contacts with development terminal 800,800 orientation of development terminal
Or the temperature change of acceleration/deceleration and development terminal 800.Sensor module 814 may include proximity sensor, be configured to
It detects the presence of nearby objects without any physical contact.Sensor module 814 can also include CCD camera assembly, take the photograph
As head can be used such as CMOS or ccd image sensor, for being used in imaging applications.In some embodiments, the sensor
Component 814 can also include acceleration transducer, gyro sensor, Magnetic Sensor, pressure sensor or temperature sensor.
Communication component 816 is configured to facilitate the communication of wired or wireless way between development terminal 800 and other equipment.
Development terminal 800 can access the wireless network based on communication standard, such as WiFi, 2G or 3G or combination thereof.Show at one
In example property embodiment, communication component 816 receives broadcast singal or broadcast from external broadcasting management system via broadcast channel
Relevant information.In one exemplary embodiment, communication component 816 further includes near-field communication (NFC) module, to promote short distance logical
Letter.For example, radio frequency identification (RFID) technology, Infrared Data Association (IrDA) technology, ultra wide band (UWB) can be based in NFC module
Technology, bluetooth (BT) technology and other technologies are realized.
In the exemplary embodiment, development terminal 800 can be by one or more application application-specific integrated circuit (ASIC), number
Word signal processor (DSP), digital signal processing appts (DSPD), programmable logic device (PLD), field programmable gate array
(FPGA), controller, microcontroller, microprocessor or other electronic components are realized, for executing the above method.
On the other hand the embodiment of the present invention provides a kind of computer readable storage medium, be stored thereon with computer journey
Sequence;Computer program is executed by processor to realize the development method of above-mentioned broadband user a kind of.
Finally, it should be noted that one of ordinary skill in the art will appreciate that whole in above-described embodiment method or
Part flow is that relevant hardware can be instructed to complete by computer program, and the program can be stored in a computer
In readable storage medium storing program for executing, the program is when being executed, it may include such as the flow of the embodiment of above-mentioned each method.Wherein, described to deposit
Storage media can be disk, CD, read-only memory (ROM) or random access memory (RAM) etc..
Each functional unit in the embodiment of the present invention can be integrated in a processing module, can also be each unit
Individually be physically present, can also two or more units be integrated in a module.Above-mentioned integrated module both can be with
It is realized, can also be realized in the form of software function module in the form of hardware.If the integrated module is with software
The form of function module realizes, and when sold or used as an independent product, can also be stored in one and computer-readable deposit
In storage media.Storage medium mentioned above can be read-only memory, disk or CD etc..
The above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;Although with reference to aforementioned each reality
Applying example, invention is explained in detail, it will be understood by those of ordinary skill in the art that:It still can be to aforementioned each
Technical solution recorded in embodiment is modified, and either carries out equivalent replacement to which part or all technical features;And
These modifications or replacements, the range for various embodiments of the present invention technical solution that it does not separate the essence of the corresponding technical solution.
Claims (12)
1. a kind of development method of broadband user, which is characterized in that including:
It obtains shifting net registration user and fixed network at operator and registers user;
The user that the non-fixed network moved in net registration user registers user is determined as target user;
Analysis is monitored using data to the flow of the target user;
According to monitoring analysis result judge the target user whether be broadband services latency development user.
2. according to the method described in claim 1, it is characterized in that, whether judging the target user according to monitoring analysis result
For the latency development user of broadband services, including:
The target user's flow obtained in default free time section presets base station using the frequency and access of data
Number;
If the frequency is greater than or equal to preset frequency threshold, and the number is greater than or equal to preset frequency threshold value, then
Determine that the target user is the first latency development user of broadband services;Alternatively,
If the frequency is less than preset frequency threshold, the flow for obtaining the target user is turned using the material time of data
Point and location information;
If the material time inflection point in default free time section is consistent with location information, it is determined that the target user is
Second latency development user of broadband services.
3. according to the method described in claim 1, it is characterized in that, the method further includes:
Obtain the online of the broadband access network daily record and fixed network registration user of the operator in preset operating time section
Daily record;
If there are the internet records of rete mirabile user in the internet log, the rete mirabile user is determined according to the internet records
Rete mirabile number;
Internet behavior of the rete mirabile user in section of preset time of having a rest is monitored according to the rete mirabile number;
If the internet behavior of the rete mirabile user is not present in the broadband access network daily record, it is determined that the rete mirabile user is broadband
The third latency development user of business.
4. according to the method described in claim 1, it is characterized in that, the method further includes:
Judge that the net that moves register whether user does not handle as other regional operators and the user of broadband services;
If so, determining that the shifting net registers user as the 4th latency development user of broadband services.
5. according to the method described in any one of claim 1-4, which is characterized in that the method further includes:
Obtain the geographical location information of the latency development user;
Judge whether the latency development user meets the broadband peace of the operator of location according to the geographical location information
Dress condition;
If meeting, preset business development operation is carried out to the latency development user.
6. the development device of broadband user a kind of, which is characterized in that including:
Acquisition module, for obtaining shifting net registration user and fixed network registration user at operator;
Determining module, the user for the non-fixed network moved in net registration user to be registered user are determined as target user;
Monitoring modular is monitored analysis for the flow to the target user using data;
Judgment module, for according to monitoring analysis result judge the target user whether be broadband services latency development use
Family.
7. device according to claim 6, which is characterized in that the judgment module is used for:
The target user's flow obtained in default free time section presets base station using the frequency and access of data
Number;
If the frequency is greater than or equal to preset frequency threshold, and the number is greater than or equal to preset frequency threshold value, then
Determine that the target user is the first latency development user of broadband services;Alternatively,
If the frequency is less than preset frequency threshold, the flow for obtaining the target user is turned using the material time of data
Point and location information;
If the material time inflection point in default free time section is consistent with location information, it is determined that the target user is
Second latency development user of broadband services.
8. device according to claim 6, which is characterized in that
The acquisition module is additionally operable to obtain the broadband access network daily record of the operator and fixed network registration user default
Internet log in working time section;
Described device further includes:Analysis module is used for:
If there are the internet records of rete mirabile user in the internet log, the rete mirabile user is determined according to the internet records
Rete mirabile number;
Internet behavior of the rete mirabile user in section of preset time of having a rest is monitored according to the rete mirabile number;
If the internet behavior of the rete mirabile user is not present in the broadband access network daily record, it is determined that the rete mirabile user is broadband
The third latency development user of business.
9. device according to claim 6, which is characterized in that the judgment module is additionally operable to:
Judge that the net that moves register whether user does not handle as other regional operators and the user of broadband services;
If so, determining that the shifting net registers user as the 4th latency development user of broadband services.
10. according to the device described in any one of claim 6-9, which is characterized in that
The acquisition module is additionally operable to obtain the geographical location information of the latency development user;
The judgment module, is additionally operable to:
Judge whether the latency development user meets the broadband peace of the operator of location according to the geographical location information
Dress condition;
If meeting, preset business development operation is carried out to the latency development user.
11. the development terminal of broadband user a kind of, which is characterized in that including:
Memory;
Processor;And
Computer program;
Wherein, the computer program is stored in the memory, and is configured as being executed to realize such as by the processor
The development method of broadband user described in any one of claim 1-5 a kind of.
12. a kind of computer readable storage medium, which is characterized in that be stored thereon with computer program;
The computer program is executed by processor to realize a kind of broadband user as described in any one of claim 1-5
Development method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810461145.XA CN108632905B (en) | 2018-05-15 | 2018-05-15 | Development method, device, terminal and computer readable storage medium for broadband user |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810461145.XA CN108632905B (en) | 2018-05-15 | 2018-05-15 | Development method, device, terminal and computer readable storage medium for broadband user |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108632905A true CN108632905A (en) | 2018-10-09 |
CN108632905B CN108632905B (en) | 2021-09-07 |
Family
ID=63693232
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810461145.XA Active CN108632905B (en) | 2018-05-15 | 2018-05-15 | Development method, device, terminal and computer readable storage medium for broadband user |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108632905B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109903088A (en) * | 2019-02-18 | 2019-06-18 | 北京市天元网络技术股份有限公司 | A kind of broadband marketing strategy formulating method and system based on big data |
CN112559586A (en) * | 2020-12-03 | 2021-03-26 | 中国联合网络通信集团有限公司 | Method and system for acquiring home user characteristic data |
CN112653989A (en) * | 2020-12-14 | 2021-04-13 | 中国联合网络通信集团有限公司 | Broadband user positioning method, device, electronic equipment and storage medium |
CN113612620A (en) * | 2021-07-12 | 2021-11-05 | 中国联合网络通信集团有限公司 | Fusion package recommendation method and device, server and storage medium |
CN114158002A (en) * | 2021-11-29 | 2022-03-08 | 中国联合网络通信集团有限公司 | Broadband service recommendation method, server, system, device and medium |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101631343A (en) * | 2008-07-14 | 2010-01-20 | 中国移动通信集团河南有限公司 | Method and device for identifying mobile user affiliation region |
WO2010148655A1 (en) * | 2009-12-24 | 2010-12-29 | 中兴通讯股份有限公司 | Method and device for establishing service route |
CN103078956A (en) * | 2013-02-01 | 2013-05-01 | 杭州蓝谷科技有限公司 | Information interaction system for realizing accurate data mining |
CN103517090A (en) * | 2013-07-11 | 2014-01-15 | 国家广播电影电视总局广播科学研究院 | Method for measuring and calculating network flows |
CN105007171A (en) * | 2015-05-25 | 2015-10-28 | 上海欣方软件有限公司 | User data analysis system and method based on big data in communication field |
US20170330234A1 (en) * | 2016-05-16 | 2017-11-16 | Allon Caidar | Video commerce system |
US20180041404A1 (en) * | 2016-08-05 | 2018-02-08 | Network Design Decisions, Inc. | Virtual Broadband Communication Service Platform |
CN107818133A (en) * | 2017-09-21 | 2018-03-20 | 北京市天元网络技术股份有限公司 | A kind of residential block network capabilities analysis method and system based on big data |
-
2018
- 2018-05-15 CN CN201810461145.XA patent/CN108632905B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101631343A (en) * | 2008-07-14 | 2010-01-20 | 中国移动通信集团河南有限公司 | Method and device for identifying mobile user affiliation region |
WO2010148655A1 (en) * | 2009-12-24 | 2010-12-29 | 中兴通讯股份有限公司 | Method and device for establishing service route |
CN103078956A (en) * | 2013-02-01 | 2013-05-01 | 杭州蓝谷科技有限公司 | Information interaction system for realizing accurate data mining |
CN103517090A (en) * | 2013-07-11 | 2014-01-15 | 国家广播电影电视总局广播科学研究院 | Method for measuring and calculating network flows |
CN105007171A (en) * | 2015-05-25 | 2015-10-28 | 上海欣方软件有限公司 | User data analysis system and method based on big data in communication field |
US20170330234A1 (en) * | 2016-05-16 | 2017-11-16 | Allon Caidar | Video commerce system |
US20180041404A1 (en) * | 2016-08-05 | 2018-02-08 | Network Design Decisions, Inc. | Virtual Broadband Communication Service Platform |
CN107818133A (en) * | 2017-09-21 | 2018-03-20 | 北京市天元网络技术股份有限公司 | A kind of residential block network capabilities analysis method and system based on big data |
Non-Patent Citations (1)
Title |
---|
陈业: ""转型背景下的江苏电信公司宽带业务发展策略研究"", 《南京理工大学硕士论文》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109903088A (en) * | 2019-02-18 | 2019-06-18 | 北京市天元网络技术股份有限公司 | A kind of broadband marketing strategy formulating method and system based on big data |
CN112559586A (en) * | 2020-12-03 | 2021-03-26 | 中国联合网络通信集团有限公司 | Method and system for acquiring home user characteristic data |
CN112559586B (en) * | 2020-12-03 | 2023-06-09 | 中国联合网络通信集团有限公司 | Method and system for acquiring home user characteristic data |
CN112653989A (en) * | 2020-12-14 | 2021-04-13 | 中国联合网络通信集团有限公司 | Broadband user positioning method, device, electronic equipment and storage medium |
CN113612620A (en) * | 2021-07-12 | 2021-11-05 | 中国联合网络通信集团有限公司 | Fusion package recommendation method and device, server and storage medium |
CN114158002A (en) * | 2021-11-29 | 2022-03-08 | 中国联合网络通信集团有限公司 | Broadband service recommendation method, server, system, device and medium |
CN114158002B (en) * | 2021-11-29 | 2023-03-14 | 中国联合网络通信集团有限公司 | Broadband service recommendation method, server, system, device and medium |
Also Published As
Publication number | Publication date |
---|---|
CN108632905B (en) | 2021-09-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108632905A (en) | Development method, device, terminal and the computer readable storage medium of broadband user | |
CN104320525B (en) | Telephone number recognition methods and device | |
CN104836924B (en) | Number mark method and device | |
CN104580637B (en) | Telephone number labeling method, terminal and Cloud Server | |
CN104980580B (en) | Short message inspection method and device | |
CN107666540B (en) | Terminal control method, device and storage medium | |
CN104361486A (en) | Alarm clock reminding method and device | |
CN107577513A (en) | A kind of method, apparatus and storage medium for showing painted eggshell | |
CN106157602A (en) | The method and apparatus of calling vehicle | |
CN108573135A (en) | Terminal management-control method, apparatus and system | |
CN105912450A (en) | Method and device for displaying state information of application | |
CN106791646A (en) | Show the method and device of video information | |
CN107864225A (en) | Information-pushing method, device and electronic equipment based on AR | |
CN106412227A (en) | Anti-lost alarm method and device and device for anti-lost alarm | |
CN107454204A (en) | User profile mask method and device | |
CN106664335A (en) | Method for managing a call journal, device, computer program, and software product for this purpose | |
CN106777016A (en) | The method and device of information recommendation is carried out based on instant messaging | |
CN108574777A (en) | Information prompting method and device | |
CN107493366A (en) | Address list information update method, device and storage medium | |
CN107316207A (en) | A kind of method and apparatus for obtaining bandwagon effect information | |
CN105094364B (en) | Vocabulary display methods and device | |
CN106101464A (en) | Number mark method and device | |
CN108650305A (en) | Terminal management-control method, apparatus and system | |
CN104536753B (en) | Backlog labeling method and device | |
CN104063423B (en) | A kind of method and device for determining position |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |