CN108625836A - A kind of highly aqueous well control water method for increasing of hyposmosis bottom water reservoir - Google Patents

A kind of highly aqueous well control water method for increasing of hyposmosis bottom water reservoir Download PDF

Info

Publication number
CN108625836A
CN108625836A CN201810491995.4A CN201810491995A CN108625836A CN 108625836 A CN108625836 A CN 108625836A CN 201810491995 A CN201810491995 A CN 201810491995A CN 108625836 A CN108625836 A CN 108625836A
Authority
CN
China
Prior art keywords
water
reservoir
hyposmosis
increasing
oil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810491995.4A
Other languages
Chinese (zh)
Other versions
CN108625836B (en
Inventor
王玉功
武龙
李志航
李勇
吴增智
宋振云
邹鸿江
唐冬珠
赵晨君
徐洋
汪小宇
王所良
蒋文学
万向辉
金娜
王玲
陈建刚
王小文
张�林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
Engineering Technology Research Institute of CNPC Chuanqing Drilling Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Engineering Technology Research Institute of CNPC Chuanqing Drilling Engineering Co ltd filed Critical Engineering Technology Research Institute of CNPC Chuanqing Drilling Engineering Co ltd
Priority to CN201810491995.4A priority Critical patent/CN108625836B/en
Publication of CN108625836A publication Critical patent/CN108625836A/en
Application granted granted Critical
Publication of CN108625836B publication Critical patent/CN108625836B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/42Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells
    • C09K8/46Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells containing inorganic binders, e.g. Portland cement
    • C09K8/467Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells containing inorganic binders, e.g. Portland cement containing additives for specific purposes
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices, or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Chemical & Material Sciences (AREA)
  • Inorganic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Soil Conditioners And Soil-Stabilizing Materials (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention belongs to the oilwell water shutoffs and fracturing yield increasing technical field used in oil exploitation, and in particular to a kind of highly aqueous well control water method for increasing of hyposmosis bottom water reservoir takes nano combined high-strength blocking agent and clear water in mass ratio 47:5 mixing;Stratum is injected the mixture under the conditions of 0 90 DEG C, water outlet position and cracking initiation are blocked;Nano combined high-strength blocking agent is replaced into oil reservoir with fresh water balance;Closing well is waited solidifying;Drifting is to shaft bottom;With cementing truck pressure testing;To carrying out radial hydraulic jetting fracturing at the top of sandstone reservoir;The suction that drives a well is gone into operation.Present method solves blocking agent intensity in conventional water-plugging technique it is low or solidification after easily shrink, it is low with formation cementation intensity, cause high water-cut well is stifled incessantly or after blocking to increase production the big problem of difficulty, a new way is opened for the highly aqueous well control water yield-increasing technology of hyposmosis bottom water reservoir.

Description

A kind of highly aqueous well control water method for increasing of hyposmosis bottom water reservoir
Technical field
The invention belongs to the oilwell water shutoffs and fracturing yield increasing technical field used in oil exploitation, and in particular to a kind of low Permeate the highly aqueous well control water method for increasing of bottom water reservoir.
Background technology
In hyposmosis bottom water reservoir development process, due to being influenced by formation fracture and anisotropism, pressure break changes in addition Operation is made, links up bottom water after easily causing oil well measure, aqueous ascensional range is big, High water cut, and the presence of these wells seriously affects The performance of oil well productivity and oil field long term stable production.Conventional control water-plugging technique cannot be satisfied the volume increase of such oil reservoir control water at present Demand.The phase starts exploratory development to bottom water reservoir control water-plugging technique both at home and abroad in the early 1990s, undergoes the development and progress of more than ten years, There is the technology that bottom water reservoir early water block-off, bottom water watered-out well water blockoff etc. are directed to middle and high infiltration oil field.But in hyposmosis bottom water oil Technical bottleneck is always existed in terms of the control water blockoff of Tibetan:On the one hand, chemical water plugging of oil well conventional at present is mainly Polymer Plugging Agent, And to be often discharged intensity big for hyposmosis bottom water reservoir high water-cut well, and well head pressure is higher, Polymer Plugging Agent intensity is difficult to meet It blocks and requires;On the other hand, for hyposmosis bottom water reservoir, under existing technology, the high-strength blocking agent such as big cement class of intensity Injection difference easily causes near wellbore zone reservoir damage and is easily shunk after curing, low with formation cementation intensity, shows high water-cut well Go out to block up incessantly or increases production the problems such as difficulty is big after blocking.
Therefore, to solve the above problems, the present invention proposes a kind of highly aqueous well control water volume increase of hyposmosis bottom water reservoir Method develops nano combined high-strength blocking agent, improves the success rate of control water volume increase.
Invention content
The purpose of the present invention one is that overcome in hyposmosis bottom water reservoir conventional oil well chemical water shutoff be mainly Polymer Plugging Agent, And to be often discharged intensity big for hyposmosis bottom water reservoir high water-cut well, and well head pressure is higher, Polymer Plugging Agent intensity is difficult to meet The problem of closure requires;Purpose is second is that overcome hyposmosis bottom water reservoir, and under existing technology, big cement class of intensity etc. is high-strength Blocking agent injection difference easily causes near wellbore zone reservoir damage and is easily shunk after curing, low with formation cementation intensity, to high water-cut well Show to block up incessantly or increase production after blocking the big problem of difficulty.
For this purpose, the present invention provides a kind of highly aqueous well control water method for increasing of hyposmosis bottom water reservoir, including walk as follows Suddenly:
1)The nano combined high-strength blocking agent that mass parts are 40-70 parts and the clear water that mass parts are 50 parts are mixed to form suspension;
2)By step 1 under the conditions of 0-90 DEG C)Suspension inject stratum, to water outlet position and cracking initiation block;
3)With clear water, by the suspension in the pit shaft of stratum, all balance is replaced into oil reservoir;
4)It closes oil well and waits solidifying crack and the water stream channel for making the solid of suspension formation expansion block in oil reservoir;
5)Lead to oil well to shaft bottom;
6)With cementing truck pressure testing until pressure testing is qualified;
7)Reservoir is set to form diameter to carrying out radial hydraulic jetting fracturing at the top of oil reservoir sand body using hydraulic jetting fracturing tool To horizontal fracture;
8)Oil well suction is opened, by oil field pumping criteria program, suction operation is carried out to oil well.
The nano combined high-strength blocking agent is enhanced by the superfine cement of mass ratio 70%-90%, the nanometer of mass ratio 1%-30% The retarder mixture of agent and mass ratio 1%-20% form.
The grain size of the superfine cement is 0.2 μm -20 μm.
The nanometer strengthener is mixed by hydrophilic nano-silicon dioxide and lipophilic nano silicon dioxide, hydrophilic The mass ratio of nano silicon dioxide and lipophilic nano silicon dioxide is 3:1~1:3.
The mass ratio of the hydrophilic nano-silicon dioxide and lipophilic nano silicon dioxide is 1:1.
The retarder is larch sulfonation tannin extract, and larch sulfonation tannin extract is the sulfonated products of tannin and non-tannis.
The step 1)It is middle that nano combined high-strength blocking agent and clear water are mixed to form by suspension, step 2 using cementing truck)With Step 3)It is middle that suspension and clear water are injected by stratum using Frac unit or cementing truck, and injection pressure power is pumped when injection to be no more than ground Subject to the 80% of layer fracture pressure.
The step 4)Middle suspension need to react the solid that expansion is formed after 5-72h under the conditions of 0-90 DEG C of formation temperature.
The step 6)It is qualification that middle pressure testing is less than 0.5MPa with half an hour well mouth of oil well pressure drop, if pressure testing is unqualified, weight Multiple above-mentioned steps 1)To step 5)Until pressure testing is qualified.
Beneficial effects of the present invention:
1, the highly aqueous well control water method for increasing of this hyposmosis bottom water reservoir provided by the invention, by nano combined high-strength stifled The proprietary characteristic of agent, by eight steps, when solving existing water-plugging technique construction, Polymer Plugging Agent intensity is low or conventional water It is easily shunk after the solidification of mud class blocking agent, it is low with formation cementation intensity, the problem of follow-up well stimulation requirement cannot be met.This method is special Not Shi Yongyu hyposmosis bottom water reservoir high-water-cut oil-producing well, have a good application prospect.
2, the nano combined high-strength blocking agent configuration that the present invention uses is simple, and the thickening time is controllable, can adjust according to the design needs Control the thickening time;Microdilatancy after the addition of nano material makes the blocking agent cure, and substantially increase cementing strength and pressure resistance Degree.
3, the radial hydro-jet fracturing technology that the present invention uses is carried out being stitched to primary fissure using nano combined high-strength blocking agent After closure, radial level crack can be formed at the top of sandstone reservoir, improve oil stream direction, bottom water water logging is transformed into bottom water drive Oil greatly improves the success rate of control water volume increase.
Specific implementation mode
Embodiment 1:
A kind of highly aqueous well control water method for increasing of hyposmosis bottom water reservoir, includes the following steps:
1)The nano combined high-strength blocking agent that mass parts are 40-70 parts and the clear water that mass parts are 50 parts are mixed to form suspension; The nano combined high-strength blocking agent is by the superfine cement of mass ratio 70%-90%, the nanometer strengthener and quality of mass ratio 1%-30% Retarder mixture than 1%-20% forms;The grain size of the superfine cement is 0.2 μm -20 μm;The nanometer strengthener is by hydrophilic Type nano silicon dioxide and lipophilic nano silicon dioxide mix, hydrophilic nano-silicon dioxide and lipophilic nano-silica The mass ratio of SiClx is 3:1~1:3;The retarder is larch sulfonation tannin extract, and larch sulfonation tannin extract is tannin and non-tannis Sulfonated products;
2)By step 1 under the conditions of 0-90 DEG C)Suspension inject stratum, to water outlet position and cracking initiation block;
3)With clear water, by the suspension in the pit shaft of stratum, all balance is replaced into oil reservoir;
4)It closes oil well and waits solidifying crack and the water stream channel for making the solid of suspension formation expansion block in oil reservoir;The step 4)Middle suspension need to react the solid that expansion is formed after 5-72h under the conditions of 0-90 DEG C of formation temperature.
5)Lead to oil well to shaft bottom;
6)With cementing truck pressure testing until pressure testing is qualified;
7)Reservoir is set to form diameter to carrying out radial hydraulic jetting fracturing at the top of oil reservoir sand body using hydraulic jetting fracturing tool To horizontal fracture;
8)Oil well suction is opened, by oil field pumping criteria program, suction operation is carried out to oil well.
The step 1)It is middle that nano combined high-strength blocking agent and clear water are mixed to form by suspension, step 2 using cementing truck)With Step 3)It is middle that suspension and clear water are injected by stratum using Frac unit or cementing truck, and injection pressure power is pumped when injection to be no more than ground Subject to the 80% of layer fracture pressure.
The step 6)It is qualification that middle pressure testing is less than 0.5MPa with half an hour well mouth of oil well pressure drop, if pressure testing is unqualified, weight Multiple above-mentioned steps 1)To step 5)Until pressure testing is qualified.
Beneficial effects of the present invention:
1, the highly aqueous well control water method for increasing of this hyposmosis bottom water reservoir provided by the invention, by nano combined high-strength stifled The proprietary characteristic of agent, by eight steps, when solving existing water-plugging technique construction, Polymer Plugging Agent intensity is low or conventional water It is easily shunk after the solidification of mud class blocking agent, it is low with formation cementation intensity, the problem of follow-up well stimulation requirement cannot be met.This method is special Not Shi Yongyu hyposmosis bottom water reservoir high-water-cut oil-producing well, have a good application prospect.
2, the nano combined high-strength blocking agent configuration that the present invention uses is simple, and the thickening time is controllable, can adjust according to the design needs Control the thickening time;Microdilatancy after the addition of nano material makes the blocking agent cure, and substantially increase cementing strength and pressure resistance Degree.
3, the radial hydro-jet fracturing technology that the present invention uses is carried out being stitched to primary fissure using nano combined high-strength blocking agent After closure, radial level crack can be formed at the top of sandstone reservoir, improve oil stream direction, bottom water water logging is transformed into bottom water drive Oil greatly improves the success rate of control water volume increase.
Embodiment 2:
A kind of highly aqueous well control water method for increasing of hyposmosis bottom water reservoir, includes the following steps:
1)50 parts of 50 parts of nano combined high-strength blocking agent and clear water are mixed to form stable suspension;The nano combined high-strength blocking agent The retarder mixture of nanometer strengthener and mass ratio 10% that the superfine cement for being 70% by mass ratio, mass ratio are 20% forms institute It is existing product, 10 μm of grain size to state superfine cement;The nanometer strengthener is received by hydrophilic nano-silicon dioxide and lipophilic Rice silica in mass ratio 1:The mixture of 1 composition;The retarder refers to larch sulfonation tannin extract, and main component is single The sulfonated products of peace non-tannis.
2)By step 1 under the conditions of 80 DEG C)Nano combined high-strength blocking agent suspension inject stratum, to water outlet position and split Slit is at closure;
3)With clear water, by the nano combined high-strength blocking agent suspension in the pit shaft of stratum, all balance is replaced into oil reservoir;
4)It closes oil well and waits solidifying, under the conditions of 80 DEG C of formation temperature, reaction forms micro- swollen nano combined high-strength blocking agent suspension afterwards for 24 hours Swollen high intensity solid blocks the water stream channel of microcrack and matrix in reservoir, realizes effective closure to high-water-cut oil-producing well;
5)Logical oil well is such as hampered to shaft bottom, lower abrasive drilling tubing string abrasive drilling to shaft bottom;
6)With cementing truck pressure testing, it is qualification that half an hour well head pressure drop, which is less than 0.5MPa, if pressure testing is unqualified, repeats the above steps 1) To step 5), until pressure testing is qualified;
7)Reservoir is set to form diameter to carrying out radial hydraulic jetting fracturing at the top of oil reservoir sand body using hydraulic jetting fracturing tool To horizontal fracture;Using hydraulic jetting fracturing tool to carrying out radial hydraulic jetting fracturing at the top of sandstone reservoir, promote reservoir shape Radially horizontal fracture improves oil stream direction, and bottom water water logging is transformed into the bottom water displacement of reservoir oil as far as possible, improves volume increase success rate;
8)Oil well suction is opened, by oil field pumping criteria program, suction operation is carried out to oil well.
The step 1)It is middle that nano combined high-strength blocking agent and clear water are mixed to form by suspension, step 2 using cementing truck)With Step 3)It is middle that suspension and clear water are injected by stratum using Frac unit or cementing truck, and injection pressure power is pumped when injection to be no more than ground Subject to the 80% of layer fracture pressure.
The step 8)In, it directly goes into operation after verifying measure effect.
Embodiment 3:
A kind of highly aqueous well control water method for increasing of hyposmosis bottom water reservoir, includes the following steps:
1)50 parts of 70 parts of nano combined high-strength blocking agent and clear water are mixed to form stable suspension;The nano combined high-strength blocking agent It is formed by the retarder mixture of the superfine cement of mass ratio 80%, the nanometer strengthener of mass ratio 15% and mass ratio 5%;It is described super Thin cement is existing product, 20 μm of particle size range;The nanometer strengthener is received by hydrophilic nano-silicon dioxide and lipophilic Rice silica in mass ratio 1:The mixture of 1 composition;The retarder refers to larch sulfonation tannin extract, and main component is single The sulfonated products of peace non-tannis;
2)By step 1 under the conditions of 50 DEG C)Nano combined high-strength blocking agent suspension inject stratum, to water outlet position and crack shape At closure;
3)With clear water, by the nano combined high-strength blocking agent suspension in the pit shaft of stratum, all balance is replaced into oil reservoir;
4)Close oil well wait it is solidifying, nano combined high-strength blocking agent suspension under the conditions of 50 DEG C of formation temperature, react formed after 48h it is micro- swollen Swollen high intensity solid blocks the water stream channel of microcrack and matrix in reservoir, realizes effective closure to high-water-cut oil-producing well;
5)Logical oil well is such as hampered to shaft bottom, lower abrasive drilling tubing string abrasive drilling to shaft bottom;
6)With cementing truck pressure testing, it is qualification that half an hour well head pressure drop, which is less than 0.5MPa, if pressure testing is unqualified, repeats the above steps 1) To step 5), until pressure testing is qualified;
7)Reservoir is set to form diameter to carrying out radial hydraulic jetting fracturing at the top of oil reservoir sand body using hydraulic jetting fracturing tool To horizontal fracture;Using hydraulic jetting fracturing tool to carrying out radial hydraulic jetting fracturing at the top of sandstone reservoir, promote reservoir shape Radially horizontal fracture improves oil stream direction, and bottom water water logging is transformed into the bottom water displacement of reservoir oil as far as possible, improves volume increase success rate;
8)Oil well suction is opened, by oil field pumping criteria program, suction operation is carried out to oil well.
The step 1)It is middle that nano combined high-strength blocking agent and clear water are mixed to form by suspension, step 2 using cementing truck)With Step 3)It is middle that suspension and clear water are injected by stratum using Frac unit or cementing truck, and injection pressure power is pumped when injection to be no more than ground Subject to the 80% of layer fracture pressure.
The step 8)In, it directly goes into operation after verifying measure effect.
Embodiment 4:
A kind of highly aqueous well control water method for increasing of hyposmosis bottom water reservoir, includes the following steps:
1)50 parts of 50 parts of nano combined high-strength blocking agent and clear water are mixed to form stable suspension;The nano combined high-strength blocking agent It is formed by the retarder mixture of the superfine cement of mass ratio 70%, the nanometer strengthener of mass ratio 20% and mass ratio 10%, it is described super Thin cement is existing product, and 0.2 μm of particle size range, the nanometer strengthener is received by hydrophilic nano-silicon dioxide and lipophilic Rice silica in mass ratio 1:The mixture of 1 composition, the retarder refer to larch sulfonation tannin extract, and main component is single The sulfonated products of peace non-tannis;
2)By step 1 under the conditions of 60 DEG C)Nano combined high-strength blocking agent suspension inject stratum, to water outlet position and crack shape At closure;
3)With clear water, by the nano combined high-strength blocking agent suspension in the pit shaft of stratum, all balance is replaced into oil reservoir;
4)Close oil well wait it is solidifying, nano combined high-strength blocking agent suspension under the conditions of 60 DEG C of formation temperature, react formed after 48h it is micro- swollen Swollen high intensity solid blocks the water stream channel of microcrack and matrix in reservoir, realizes effective closure to high-water-cut oil-producing well;
5)Logical oil well is such as hampered to shaft bottom, lower abrasive drilling tubing string abrasive drilling to shaft bottom;
6)With cementing truck pressure testing, it is qualification that half an hour well head pressure drop, which is less than 0.5MPa, if pressure testing is unqualified, repeats the above steps 1) To step 5), until pressure testing is qualified;
7)Reservoir is set to form diameter to carrying out radial hydraulic jetting fracturing at the top of oil reservoir sand body using hydraulic jetting fracturing tool To horizontal fracture;Using hydraulic jetting fracturing tool to carrying out radial hydraulic jetting fracturing at the top of sandstone reservoir, promote reservoir shape Radially horizontal fracture improves oil stream direction, and bottom water water logging is transformed into the bottom water displacement of reservoir oil as far as possible, improves volume increase success rate;
8)Oil well suction is opened, by oil field pumping criteria program, suction operation is carried out to oil well.
The step 1)It is middle that nano combined high-strength blocking agent and clear water are mixed to form by suspension, step 2 using cementing truck)With Step 3)It is middle that suspension and clear water are injected by stratum using Frac unit or cementing truck, and injection pressure power is pumped when injection to be no more than ground Subject to the 80% of layer fracture pressure.
The step 8)In, it directly goes into operation after verifying measure effect.
Embodiment 5:
A kind of highly aqueous well control water method for increasing of hyposmosis bottom water reservoir, includes the following steps:
1)50 parts of 50 parts of nano combined high-strength blocking agent and clear water are mixed to form stable suspension;The nano combined high-strength blocking agent It is formed by the retarder mixture of the superfine cement of mass ratio 75%, the nanometer strengthener of mass ratio 1% and mass ratio 1%, it is described ultra-fine Cement is existing product, and 15 μm of particle size range, the nanometer strengthener is by hydrophilic nano-silicon dioxide and lipophilic nanometer Silica in mass ratio 1:The mixture of 1 composition, the retarder refers to larch sulfonation tannin extract, and main component is tannin With the sulfonated products of non-tannis;
2)By step 1 under the conditions of 40 DEG C)Nano combined high-strength blocking agent suspension inject stratum, to water outlet position and crack shape At closure;
3)With clear water, by the nano combined high-strength blocking agent suspension in the pit shaft of stratum, all balance is replaced into oil reservoir;
4)Close oil well wait it is solidifying, nano combined high-strength blocking agent suspension under the conditions of 40 DEG C of formation temperature, react formed after 48h it is micro- swollen Swollen high intensity solid blocks the water stream channel of microcrack and matrix in reservoir, realizes effective closure to high-water-cut oil-producing well;
5)Logical oil well is such as hampered to shaft bottom, lower abrasive drilling tubing string abrasive drilling to shaft bottom;
6)With cementing truck pressure testing, it is qualification that half an hour well head pressure drop, which is less than 0.5MPa, if pressure testing is unqualified, repeats the above steps 1) To step 5), until pressure testing is qualified;
7)Reservoir is set to form diameter to carrying out radial hydraulic jetting fracturing at the top of oil reservoir sand body using hydraulic jetting fracturing tool To horizontal fracture;Using hydraulic jetting fracturing tool to carrying out radial hydraulic jetting fracturing at the top of sandstone reservoir, promote reservoir shape Radially horizontal fracture improves oil stream direction, and bottom water water logging is transformed into the bottom water displacement of reservoir oil as far as possible, improves volume increase success rate;
8)Oil well suction is opened, by oil field pumping criteria program, suction operation is carried out to oil well.
The step 1)It is middle that nano combined high-strength blocking agent and clear water are mixed to form by suspension, step 2 using cementing truck)With Step 3)It is middle that suspension and clear water are injected by stratum using Frac unit or cementing truck, and injection pressure power is pumped when injection to be no more than ground Subject to the 80% of layer fracture pressure.
The step 8)In, it directly goes into operation after verifying measure effect.
The hydrophilic nano-silicon dioxide and lipophilic nano silicon dioxide of 1-5 of the embodiment of the present invention is existing product, It can be bought in market.
Specific implementation process of the present invention:
1, according to wellfracturing operation and refracturing transformation and geologic feature data and consider blocking agent block efficiency, calculate institute Need nano combined high-strength plug agent amount;
2, according to laboratory experiment as a result, determining the optium concentration of nano combined high-strength blocking agent each component;
3, according to the geologic feature for blocking reservoir, specific plug water construction scheme is formulated, it is main to determine discharge capacity and maximum pressure two The determination of a parameter, especially pressure should be subject to no more than the 80% of formation fracture pressure.
4, it is designed according to plug water construction and completes plug water construction, use when construction clear water formation testing to absorb water situation first, accordingly The injection discharge capacity and ground pump pressure for determining plug water construction, then note nano combined high-strength blocking agent, completion pair according to pump note scheme pump The plug water construction of service shaft;
5, drifting is such as hampered to shaft bottom, lower abrasive drilling tubing string abrasive drilling to shaft bottom;
6, with cementing truck pressure testing, it is qualification that half an hour well head pressure drop, which is less than 0.5MPa, if pressure testing is unqualified, repeats above-mentioned 1 ~ 5 step Suddenly, until pressure testing is qualified;
7, hydraulic jetting fracturing construction is completed according to hydraulic jetting fracturing detail design;
8, according to oil field pumping criteria program, suction operation is carried out to oil well, verifies effect of increasing production.
The foregoing examples are only illustrative of the present invention, does not constitute the limitation to protection scope of the present invention, all Be with the present invention it is same or analogous design all belong to the scope of protection of the present invention within.

Claims (9)

1. a kind of highly aqueous well control water method for increasing of hyposmosis bottom water reservoir, which is characterized in that include the following steps:
The nano combined high-strength blocking agent that mass parts are 40-70 parts and the clear water that mass parts are 50 parts are mixed to form suspension;
By step 1 under the conditions of 0-90 DEG C)Suspension inject stratum, to water outlet position and cracking initiation block;
With clear water, by the suspension in the pit shaft of stratum, all balance is replaced into oil reservoir;
It closes oil well and waits solidifying crack and the water stream channel for making the solid of suspension formation expansion block in oil reservoir;
5)Lead to oil well to shaft bottom;
6)With cementing truck pressure testing until pressure testing is qualified;
7)Reservoir is set to form diameter to carrying out radial hydraulic jetting fracturing at the top of oil reservoir sand body using hydraulic jetting fracturing tool To horizontal fracture;
8)Oil well suction is opened, by oil field pumping criteria program, suction operation is carried out to oil well.
2. the highly aqueous well control water method for increasing of hyposmosis bottom water reservoir as described in claim 1, it is characterised in that:It is described to receive Rice composite high-strength blocking agent is by the superfine cement of mass ratio 70%-90%, the nanometer strengthener of mass ratio 1%-30% and mass ratio 1%- 20% retarder mixture forms.
3. the highly aqueous well control water method for increasing of hyposmosis bottom water reservoir as claimed in claim 2, it is characterised in that:It is described super The grain size of thin cement is 0.2 μm -20 μm.
4. the highly aqueous well control water method for increasing of hyposmosis bottom water reservoir as claimed in claim 3, it is characterised in that:It is described to receive Rice reinforcing agent mixed by hydrophilic nano-silicon dioxide and lipophilic nano silicon dioxide, hydrophilic nano-silicon dioxide and The mass ratio of lipophilic nano silicon dioxide is 3:1~1:3.
5. the highly aqueous well control water method for increasing of hyposmosis bottom water reservoir as claimed in claim 4, it is characterised in that:The parent The mass ratio of water type nano silicon dioxide and lipophilic nano silicon dioxide is 1:1.
6. the highly aqueous well control water method for increasing of hyposmosis bottom water reservoir as claimed in claim 5, it is characterised in that:It is described slow Solidifying agent is larch sulfonation tannin extract, and larch sulfonation tannin extract is the sulfonated products of tannin and non-tannis.
7. the highly aqueous well control water method for increasing of hyposmosis bottom water reservoir as claimed in claim 6, it is characterised in that:The step Rapid 1)It is middle that nano combined high-strength blocking agent and clear water are mixed to form by suspension, step 2 using cementing truck)With step 3)It is middle to use pressure Pump injection pressure power is with no more than formation fracture pressure when splitting unit or cementing truck and suspension and clear water are injected stratum, and injecting Subject to 80%.
8. the highly aqueous well control water method for increasing of hyposmosis bottom water reservoir as claimed in claim 7, it is characterised in that:The step Rapid 4)Middle suspension need to react the solid that expansion is formed after 5-72h under the conditions of 0-90 DEG C of formation temperature.
9. the highly aqueous well control water method for increasing of hyposmosis bottom water reservoir as claimed in claim 8, it is characterised in that:The step Rapid 6)It is qualification that middle pressure testing is less than 0.5MPa with half an hour well mouth of oil well pressure drop, if pressure testing is unqualified, repeats the above steps 1)Extremely Step 5)Until pressure testing is qualified.
CN201810491995.4A 2018-05-22 2018-05-22 Water control and yield increase method for low-permeability bottom water reservoir high-water-content oil well Active CN108625836B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810491995.4A CN108625836B (en) 2018-05-22 2018-05-22 Water control and yield increase method for low-permeability bottom water reservoir high-water-content oil well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810491995.4A CN108625836B (en) 2018-05-22 2018-05-22 Water control and yield increase method for low-permeability bottom water reservoir high-water-content oil well

Publications (2)

Publication Number Publication Date
CN108625836A true CN108625836A (en) 2018-10-09
CN108625836B CN108625836B (en) 2021-01-29

Family

ID=63693824

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810491995.4A Active CN108625836B (en) 2018-05-22 2018-05-22 Water control and yield increase method for low-permeability bottom water reservoir high-water-content oil well

Country Status (1)

Country Link
CN (1) CN108625836B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110500080A (en) * 2019-09-20 2019-11-26 四川洁能锐思石油技术有限公司 A kind of high permeability zone bottom water coning shuts down stifled dredge of well and adopts control comprehensive processing method
CN111206902A (en) * 2020-01-22 2020-05-29 中国石油天然气股份有限公司 Water control synergistic transformation method for screen pipe well completion horizontal well
CN114562239A (en) * 2022-03-07 2022-05-31 吉林大学 Method and device for improving hydrate reservoir exploitation efficiency by adopting nanofluid

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1693377A (en) * 2004-05-09 2005-11-09 中国科学院化学研究所 Application of super hydrophilicity and/or super lipophilicity nano pore material
CN1704559A (en) * 2004-05-25 2005-12-07 中国石油化工股份有限公司河南油田分公司石油工程技术研究院 High strength and readily soluble nano water shutoff agent
US20080277116A1 (en) * 2007-05-10 2008-11-13 Halliburton Energy Services, Inc. Well Treatment Compositions and Methods Utilizing Nano-Particles
CN101787864A (en) * 2010-03-15 2010-07-28 中国石油集团川庆钻探工程有限公司 Method for plugging water from oil reservoir fractured water logging oil well developed by injecting water into low-permeable reservoir stratum
CN102134986A (en) * 2011-04-29 2011-07-27 中国石油集团川庆钻探工程有限公司 Production-increasing method by water-plugging and fracturing
CN102690639A (en) * 2012-06-15 2012-09-26 中国石油化工股份有限公司 Outside casing channeling-blocking agent
CN103321606A (en) * 2013-07-02 2013-09-25 中国石油集团川庆钻探工程有限公司 Low-permeability fractured reservoir oil well water-plugging and screening method
CN105295878A (en) * 2014-07-21 2016-02-03 中国石油化工股份有限公司 Nano-silica emulsifying water plugging agent and application thereof
CN107140650A (en) * 2017-04-07 2017-09-08 河南大学 A kind of silica nanometer surfactant and preparation method thereof
CN107235689A (en) * 2017-06-28 2017-10-10 常州文诺纺织品有限公司 A kind of early-strength superfine cement grouting material
US9890318B1 (en) * 2016-11-16 2018-02-13 China University Of Petroleum (Beijing) Drilling fluid additive composition and water-based drilling fluid suitable for high-pressure plugging

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1693377A (en) * 2004-05-09 2005-11-09 中国科学院化学研究所 Application of super hydrophilicity and/or super lipophilicity nano pore material
CN1704559A (en) * 2004-05-25 2005-12-07 中国石油化工股份有限公司河南油田分公司石油工程技术研究院 High strength and readily soluble nano water shutoff agent
US20080277116A1 (en) * 2007-05-10 2008-11-13 Halliburton Energy Services, Inc. Well Treatment Compositions and Methods Utilizing Nano-Particles
CN101787864A (en) * 2010-03-15 2010-07-28 中国石油集团川庆钻探工程有限公司 Method for plugging water from oil reservoir fractured water logging oil well developed by injecting water into low-permeable reservoir stratum
CN102134986A (en) * 2011-04-29 2011-07-27 中国石油集团川庆钻探工程有限公司 Production-increasing method by water-plugging and fracturing
CN102690639A (en) * 2012-06-15 2012-09-26 中国石油化工股份有限公司 Outside casing channeling-blocking agent
CN103321606A (en) * 2013-07-02 2013-09-25 中国石油集团川庆钻探工程有限公司 Low-permeability fractured reservoir oil well water-plugging and screening method
CN105295878A (en) * 2014-07-21 2016-02-03 中国石油化工股份有限公司 Nano-silica emulsifying water plugging agent and application thereof
US9890318B1 (en) * 2016-11-16 2018-02-13 China University Of Petroleum (Beijing) Drilling fluid additive composition and water-based drilling fluid suitable for high-pressure plugging
CN107140650A (en) * 2017-04-07 2017-09-08 河南大学 A kind of silica nanometer surfactant and preparation method thereof
CN107235689A (en) * 2017-06-28 2017-10-10 常州文诺纺织品有限公司 A kind of early-strength superfine cement grouting material

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110500080A (en) * 2019-09-20 2019-11-26 四川洁能锐思石油技术有限公司 A kind of high permeability zone bottom water coning shuts down stifled dredge of well and adopts control comprehensive processing method
CN111206902A (en) * 2020-01-22 2020-05-29 中国石油天然气股份有限公司 Water control synergistic transformation method for screen pipe well completion horizontal well
CN114562239A (en) * 2022-03-07 2022-05-31 吉林大学 Method and device for improving hydrate reservoir exploitation efficiency by adopting nanofluid

Also Published As

Publication number Publication date
CN108625836B (en) 2021-01-29

Similar Documents

Publication Publication Date Title
US8946131B2 (en) Methods and compositions for consolidating particulate matter in a subterranean formation
RU2692716C1 (en) Method of producing and using a substrate coated with cement
CN102485830A (en) Profile control oil-displacement agent for core-shell type inorganic/organic polymer composite microballoon
US20140290943A1 (en) Stabilized Fluids In Well Treatment
CN108625836A (en) A kind of highly aqueous well control water method for increasing of hyposmosis bottom water reservoir
CN109777387B (en) Repeated fracturing temporary plugging agent and preparation method and application thereof
AU2015390249B2 (en) Fracture having a bottom portion of reduced permeability and a top portion having a higher permeability
WO2005045186A1 (en) Method of completing poorly consolidated formations
CN109705827A (en) Oil drilling leak stopping pressure-bearing agent and preparation method thereof
US20220162935A1 (en) Methods of strengthening and consolidating subterranean formations with silicate-aluminum geopolymers
CN110159239B (en) Vertical well large-scale hydraulic fracturing oil jacket co-injection fracturing method
CN107558981A (en) A kind of more the scope of grain size grading temporarily block up the fracturing technology for realizing complex fracture
CN102926701B (en) A kind of mixed matching water-plugging technology method continuously
CN110229651B (en) Resin plugging agent for repairing cement annulus cracks and preparation method thereof
CN105754565A (en) Organic microsphere and inorganic silicate compounded type channeling sealing agent for thermal extraction of heavy oil and preparation method of channeling sealing agent
CN105888604A (en) Method applicable to repeatedly transforming stratum nearby shaft of low-pressure gas field old well to complete permanent blocking
CN105131922B (en) Workover treatment borehole wall resistance to compression stabilizer and its application process
CN103952130A (en) Temporary blocking gel for low-pressure oil-gas well and preparation method thereof
US10501681B2 (en) Inorganic clay particulate additive for consolidating treatments
CN108793865A (en) A kind of bottom water reservoir oilwell water shutoff agent
CA2999255C (en) Use of food grade particulates to form fractures having increased porosity and conductivity
CN103013479B (en) For sandstone coagulation slurry and the blocking method thereof of leak stopping
US10767101B2 (en) Methods of controlling fines migration in a well
CN114891492B (en) Low-temperature self-suspension curing sand and preparation method thereof
CN111944277B (en) Self-healing plugging material for regenerated top plate and preparation method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20201203

Address after: 100007 Dongcheng District, Dongzhimen, China, North Street, No. 9 Oil Mansion, No.

Applicant after: CHINA NATIONAL PETROLEUM Corp.

Applicant after: CNPC Chuanqing Drilling Engineering Co.,Ltd.

Address before: 710018 Shaanxi city of Xi'an province Weiyang District four road Fengcheng Changqing Technology Building

Applicant before: CNPC CHUANQING DRILLING ENGINEERING COMPANY LIMITED ENGINEERING TECHNOLOGY Research Institute

GR01 Patent grant
GR01 Patent grant