CN108612918A - A kind of sealing device and construction method of the double walls of Pipeline Crossing Program differential settlement - Google Patents
A kind of sealing device and construction method of the double walls of Pipeline Crossing Program differential settlement Download PDFInfo
- Publication number
- CN108612918A CN108612918A CN201810727885.3A CN201810727885A CN108612918A CN 108612918 A CN108612918 A CN 108612918A CN 201810727885 A CN201810727885 A CN 201810727885A CN 108612918 A CN108612918 A CN 108612918A
- Authority
- CN
- China
- Prior art keywords
- wall
- sealing
- cover board
- pipeline
- casing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000007789 sealing Methods 0.000 title claims abstract description 116
- 238000010276 construction Methods 0.000 title claims abstract description 13
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 36
- 238000003466 welding Methods 0.000 claims abstract description 27
- 230000000149 penetrating effect Effects 0.000 claims abstract description 7
- 230000001050 lubricating effect Effects 0.000 claims description 31
- 239000003566 sealing material Substances 0.000 claims description 16
- 229910000831 Steel Inorganic materials 0.000 claims description 13
- 239000010959 steel Substances 0.000 claims description 13
- 238000012856 packing Methods 0.000 claims description 7
- 230000015271 coagulation Effects 0.000 claims description 3
- 238000005345 coagulation Methods 0.000 claims description 3
- 230000002093 peripheral effect Effects 0.000 claims description 3
- 229910000679 solder Inorganic materials 0.000 claims description 3
- GQWNECFJGBQMBO-UHFFFAOYSA-N Molindone hydrochloride Chemical compound Cl.O=C1C=2C(CC)=C(C)NC=2CCC1CN1CCOCC1 GQWNECFJGBQMBO-UHFFFAOYSA-N 0.000 claims 1
- 239000007787 solid Substances 0.000 claims 1
- 238000000034 method Methods 0.000 abstract description 2
- 238000010521 absorption reaction Methods 0.000 description 6
- 238000004062 sedimentation Methods 0.000 description 6
- 239000000463 material Substances 0.000 description 5
- 229920001343 polytetrafluoroethylene Polymers 0.000 description 4
- 239000004810 polytetrafluoroethylene Substances 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 3
- 239000003673 groundwater Substances 0.000 description 2
- 230000008595 infiltration Effects 0.000 description 2
- 238000001764 infiltration Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- -1 polytetrafluoroethylene Polymers 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 230000032258 transport Effects 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L5/00—Devices for use where pipes, cables or protective tubing pass through walls or partitions
- F16L5/02—Sealing
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Sewage (AREA)
- Pipe Accessories (AREA)
Abstract
A kind of sealing device and construction method of the double walls of Pipeline Crossing Program differential settlement, penetrate two coaxial sealing casings of two wall pre-embeddeds, big two outer end face of sealing casing of radius fixes a circle and is vertically arranged curtain plate, the cover board with central through hole is arranged in parallel on the outside of curtain plate, cover plate central through-hole outer rim is the penetrating cylinder in both ends after extending outwardly, setting pipeline is pierced by after sequentially passing through coaxial sealing casing one, subsiding crack, sealing pipe sleeve two, cylinder, is sealed between one inner wall of pipeline outer wall and sealing casing, cylinder inner wall;Gap sealing between curtain plate and cover board is symmetrical arranged four welding screws on the curtain plate of annular retainer plate periphery, and there are the amounts of moving up and down after being locked successively with cover board, backing plate, nut.Its construction procedure is followed successively by:Prefabricated water-stop casing and curtain plate and the edge of a wing, cover board, embedded water stop casing, once sealing, fixed cover board, secondary seal.The present invention, which can solve the prior art, repeatedly to repair, technical problem long in time limit, hidden danger is big.
Description
Technical field
The present invention relates to water treatment building field of sealing technology, specially one kind can be applied in municipal field Pipeline Crossing Program not
The sealing device and construction method of the double walls of uniform settlement.
Background technology
In water treatment building design, to save land used, often by water storage structures and other structures close to construction.
Due to both sides structures function difference, structure construction has differences, and subsiding crack is arranged at two kinds of structures close neighbours and forms double walls.
In most cases, since both sides structure sedimentation amount difference causes double walls to occur differential settlements, whens Pipeline Crossing Program double walls, will
Face the failure by shear risk that differential settlement is brought.Meanwhile if at the double walls of Pipeline Crossing Program under water level located underground, due to
The packing material of subsiding crack is unable to reach airtight waterproof between double walls, and underground water enters both sides structures possibly through gap.
To solve this problem, design mostly uses following technical measures greatly at present:In Pipeline Crossing Program water storage structures side
Wall on the pre-buried sealing casing to match with crossing pipeline diameter, it is poor further according to the both sides structure sedimentation amount estimated,
The pre-buried sealing casing being relatively large in diameter on the side wall of non-water storage structures.After both sides walls concrete pours, first will
Pipeline is tamped with sealing casing and pipeline enclosure gap on water storage structures wall with rigid seal material, then pipeline is passed through non-storage
Sealing casing on water structures wall, the gap between casing and pipeline use flexible material temporary sealing, on the one hand avoid two
Side structure sedimentation difference can also play the work for preventing underground water from entering structures by gap of stretching to the failure by shear of pipeline
With.
Both sides structures are basically completed the 80% of final settlement through ballast or full load one month or so time of sedimentation
Left and right, need during this period the temporary sealing material between pipeline and sealing casing carry out repairing at any time it is perfect.Subsequent one
In the time in or so year, it need to continue to observe and repair sealing material, adapt to the sedimentation subsequently constantly occurred, until both sides wall reaches
To final settlement.
The technical measures of the double walls of existing Pipeline Crossing Program differential settlement, in both sides structures reach final settlement it
Before, it needs repeatedly to repair the sealing material at pipeline through-wall, follow-up management operation is more complicated, and it is hidden to also increase engineering
Suffer from.
Invention content
In order to overcome the above technical defects and insufficient, the present invention provides a kind of the close of double walls of Pipeline Crossing Program differential settlement
Seal apparatus and construction method, the technical measures that can solve the double walls of existing Pipeline Crossing Program differential settlement reach in both sides structures
It before final settlement, needs repeatedly to repair the sealing material at pipeline through-wall, follow-up management runs more complicated, work
The technical problem that phase is long, hidden dangers in project is big.
The present invention uses following technical scheme:
A kind of sealing device of the double walls of Pipeline Crossing Program differential settlement, including the wall one of water storage structures and non-water storage structure
The wall two of object is built, there are subsiding cracks between the wall one and wall two disposed in parallel, penetrate one He of the wall respectively
The sealing casing one and sealing casing two of the two penetrating transverse uniaxial in pre-buried both ends of wall, two internal diameter of sealing casing are more than only
One internal diameter of jacket pipe,
Two outer end face of sealing casing fixes the curtain plate that a circle is vertically arranged, and band center is arranged in parallel on the outside of the curtain plate
The cover board of through-hole, the central through hole outer rim of the cover board sequentially pass through after extending outwardly for the penetrating cylinder in both ends, setting pipeline
It is pierced by after the coaxial sealing pipe sleeve one, subsiding crack, sealing pipe sleeve two, cylinder, two internal diameter of sealing casing is more than pipeline
Outer diameter, the spacing of two inner wall of sealing casing and crossing pipeline outer wall are △ h, the pipeline outer wall in sealing casing one
Circle sealing material sealing is respectively set between wall, cylinder inner wall;
The annular retainer plate of one circle protrusion of the curtain plate lateral surface setting, the retainer plate are arranged along the recessed ring of central diameter
Shape fixing groove, the fixing groove are embedded in the gap between curtain plate and cover board described in ring packing seal with elastometic washer, the ring
Four welding screws are symmetrical arranged on the curtain plate of shape retainer plate periphery;
The cover board corresponds to each welding screw and vertical stay bolt hole is arranged, and the welding screw passes through the long spiral shell on cover board
Housing connection pad plate, nut are locked after keyhole.
It is poor that the spacing △ h of two inner wall of sealing casing and crossing pipeline outer wall should meet final settlement.
The length L in the stay bolt hole is equal to the two of two inner wall of sealing casing and the spacing △ h of crossing pipeline outer wall
Times, it is formulated as L=2 △ h.
The fixed gear of one circle protrusion of setting around each stay bolt hole on the cover board, the fixed embedded profit in gear inside
Skidding, the lubricating pad correspond to stay bolt hole and open up the identical slot hole of shape, size;The welding screw sequentially passes through on cover board
Stay bolt hole and lubricating pad on slot hole after housing connection pad plate, nut fix.
A circle edge of a wing of outwardly convex, the edge of a wing are respectively provided in the middle part of the side wall of the sealing casing one and sealing casing two
Wall is parallel to be embedded to respectively in wall one and wall two.
The annular retainer plate is the annulus that round bar surrounds, and is welded on the curtain plate lateral surface.
The fixed gear is the rectangle enclosing that round bar surrounds, and is welded on the cover board lateral surface, is internally embedded
Lubricating pad corresponds to rectangle.
The lubricating pad uses the polyfluortetraethylene plate of 5mm thickness.
The curtain plate and cover board are square steel plate, and the cylinder, gasket are steel.
A kind of construction method of the sealing device of the double walls of Pipeline Crossing Program differential settlement, includes the following steps:
1) prefabricated water-stop casing two and curtain plate and the edge of a wing:Four symmetrical welding spiral shells are welded in the curtain plate lateral surface
Column;The central through hole peripheral solder one of the curtain plate encloses the annular retainer plate of protrusion, and setting is recessed along central diameter on the retainer plate
Annular fixing groove;
2) prefabricated cover board:The prefabricated cover board and the outwardly extending cylinder of central through hole outer rim;The cover board corresponds to each weldering
Connect the prefabricated vertical stay bolt hole of stud;The fixed gear of one circle protrusion of setting, institute around each stay bolt hole on the cover board
The fixed embedded lubricating pad in gear inside is stated, the lubricating pad corresponds to stay bolt hole and opens up the identical slot hole of geomery;
3) embedded water stop casing:In the wall one and wall two in difference pre-buried coaxial sealing casing one and step 1)
Prefabricated sealing casing two, the curtain plate setting is in two outside of wall;
4) once sealing:It is embedded in the wall one at the sealing casing one and is embedded with sealing casing in the wall two
After local caburizing's concrete coagulation at two, worn after pipeline is sequentially passed through the sealing casing one, subsiding crack, sealing casing two
Go out;Gap between sealing casing one in the pipeline and wall one is tamped with sealing material, the fixation in step 2)
Slot is embedded in the ring packing rubber ring for being higher by the fixing groove;
5) fixed cover board:Lubricating pad is placed in fixed gear on the cover board, welding screw is made to sequentially pass through cover board, fixed gear
And the hole of lubricating pad, then steel gasket is inserted on welding screw, tightening nuts are fixed, and keep the sealing rubber ring in step 4) close
Seal the gap between the curtain plate and cover board;
6) secondary seal:Gap between pipeline and cover plate central cylinder is tamped with sealing material.
The present invention has following positive beneficial effect:
The sealing device for the double walls of a kind of Pipeline Crossing Program differential settlement that the present invention designs, it is intended to overcome traditional technology measure
When solving Pipeline Crossing Program differential settlement pair wall, existing deficiency, once mounting finish, and both can avoid pipeline and are passing through Shuan Qiang
Place can effectively prevent external Groundwater infiltration both sides structures by failure by shear caused by differential settlement, exempt follow-up
Maintenance work.Apparatus of the present invention use common used material in municipal works, make simply, construction is convenient, can have in Practical Project
Effect promotes and applies.
A kind of sealing device of the double walls of Pipeline Crossing Program differential settlement that the present invention designs, be both avoided that pipeline pass through it is double
By failure by shear caused by differential settlement at wall, and external Groundwater infiltration both sides structures can be prevented, be constructed in both sides
The sealing situation at place through walls need not be observed and be repaired in the long-term settlement stabilization process of object, management is easy, short time limit.
Description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is curtain plate and sealing rubber ring structural schematic diagram;
Fig. 3 is cover board and polytetrafluoroethylene (PTFE) lubricating pad scheme of installation;
The scheme of installation of Fig. 4 Application Examples of the present invention.
Accompanying drawing number:1- sealings casing two, 2- curtain plates, 3- welding screws, 4- retainer plates, 5- sealing rubber rings, 6- lids
Plate, 7- cylinders, 8- fix gear, 9- lubricating pads, 10- gaskets, 11- nuts, 12- walls one, 13- walls two, 14- subsiding cracks, 15-
Sealing casing one, 16- pipelines, 17- sealing materials, 18- pump houses, 19- absorbing well, absorption wells, 20- water pumps and adjustable seats.
Specific implementation mode
The following further describes the specific embodiments of the present invention with reference to the drawings.
Following embodiment is only examples made by the present invention to clearly illustrate, and not to the limit of embodiments of the present invention
It is fixed.For those of ordinary skill in the art, it is various forms of that other can also be made on the basis of the following description
Variation changes, and these belong to the protection of obvious changes or variations that spirit of that invention is drawn still in the present invention
Among range.
Each attached drawing is referred to, a kind of sealing device of the double walls of Pipeline Crossing Program differential settlement includes the wall of water storage structures
The wall 2 13 of body 1 and non-water storage structures, there are subsiding cracks between the wall 1 and wall 2 13 disposed in parallel
14, the sealing casing 1 and water-baffling sleeve of the 2 13 penetrating transverse uniaxial in pre-buried both ends of the wall 1 and wall are penetrated respectively
Pipe 21,21 internal diameter of sealing casing are more than one 15 internal diameter of sealing casing,
Referring to Fig. 1,21 outer end face of sealing casing fixes the curtain plate 2 that a circle is vertically arranged, and 2 outside of the curtain plate is flat
Cover board 6 of the row setting with central through hole, the central through hole outer rim of the cover board 6 extend outwardly after for the penetrating cylinder 7 in both ends, if
It sets after pipeline 16 sequentially passes through the coaxial sealing pipe sleeve 1, subsiding crack 14, sealing pipe sleeve 21, cylinder 7 and is pierced by, it is described
21 internal diameter of sealing casing is more than 16 outer diameter of pipeline, and the spacing of 21 inner wall of sealing casing and 16 outer wall of crossing pipeline is △ h,
A circle sealing material 17 sealing is respectively set between one 15 inner wall of 16 outer wall of the pipeline and sealing casing, 7 inner wall of cylinder;
Referring to Fig. 2, edge is arranged in the annular retainer plate 4 of 2 lateral surface of curtain plate setting, one circle protrusion, the retainer plate 4
The recessed annular fixing groove of central diameter, the fixing groove be embedded in ring packing rubber ring 5 seal the curtain plate 2 and cover board 6 it
Between gap, be symmetrical arranged four welding screws 3 on the curtain plate 2 of the annular retainer plate 4 periphery;
The cover board 6 corresponds to each welding screw 3 and vertical stay bolt hole is arranged, and the welding screw 3 passes through on cover board 6
Housing connection pad plate 10, nut 11 are locked behind stay bolt hole.
It is poor that the spacing △ h of 21 inner wall of sealing casing and 16 outer wall of crossing pipeline should meet final settlement.
The length L in the stay bolt hole is equal to 21 inner wall of sealing casing and the spacing △ h's of 16 outer wall of crossing pipeline
Two times, it is formulated as L=2 △ h.
The fixed gear 8 of one circle protrusion, the fixed gear are set referring to Fig. 3, around each stay bolt hole on the cover board 6
The embedded lubricating pad 9 in 8 insides, the lubricating pad 9 correspond to stay bolt hole and open up the identical slot hole of shape, size;The welding screw 3
Sequentially pass through housing connection pad plate 10 after the slot hole on the stay bolt hole and lubricating pad 9 on cover board 6, nut 11 is fixed.
A circle edge of a wing of outwardly convex is respectively provided in the middle part of the side wall of the sealing casing 1 and sealing casing 21, it is described
The edge of a wing is parallel to wall and is embedded to respectively in wall 1 and wall 2 13.
The annular retainer plate 4 is the annulus that round bar surrounds, and is welded on 2 lateral surface of the curtain plate.
The rectangle enclosing that the fixed gear 8 surrounds for round bar, is welded on 6 lateral surface of the cover board, is internally embedded
Lubricating pad 9 correspond to rectangle.
The lubricating pad 9 uses the polyfluortetraethylene plate of 5mm thickness.
The curtain plate 2 and cover board 6 are square steel plate, and the cylinder 7, gasket 10 are steel.
A kind of construction method of the sealing device of the double walls of Pipeline Crossing Program differential settlement, includes the following steps:
1) prefabricated water-stop casing 21 and curtain plate 2 and the edge of a wing:Four symmetrical welderings are welded in 2 lateral surface of the curtain plate
Connect stud 3;The central through hole peripheral solder one of the curtain plate 2 encloses the annular retainer plate 4 of protrusion, and edge is arranged on the retainer plate 4
The recessed annular fixing groove of central diameter;
2) prefabricated cover board 6:The prefabricated cover board 6 and the outwardly extending cylinder of central through hole outer rim 7;The cover board 6 corresponds to
The prefabricated vertical stay bolt hole of each welding screw 3;The fixation of one circle protrusion of setting around each stay bolt hole on the cover board 6
Gear 8, the embedded lubricating pad 9 in 8 inside of fixed gear, the lubricating pad 9 correspond to stay bolt hole and open up the identical slot hole of geomery;
3) embedded water stop casing:The pre-buried coaxial sealing casing 1 of difference and step in the wall 1 and wall 2 13
It is rapid 1) in prefabricated sealing casing 21, the setting of the curtain plate 2 is in 2 13 outside of wall;
4) once sealing:It is embedded in the wall 1 at the sealing casing 1 and is embedded with only in the wall 2 13
After local caburizing's concrete coagulation at jacket pipe 21, by pipeline 16 sequentially pass through the sealing casing 1, subsiding crack 14,
It is pierced by after sealing casing 21;By gap sealing material 17 between the sealing casing 1 in the pipeline 16 and wall 1
It tamps, the fixing groove in step 2) is embedded in the ring packing rubber ring 5 for being higher by the fixing groove;
5) fixed cover board 6:Place lubricating pads 9 in fixed gear 8 on cover board 6, make welding screw 3 sequentially pass through cover board 6,
The hole of fixed gear 8 and lubricating pad 9, then steel gasket 10 is inserted on welding screw 3, tightening nuts 11 are fixed, and are made in step 4)
Sealing rubber ring 5 seal the gap between the curtain plate 2 and cover board 6;
6) secondary seal:Gap sealing material 17 between 6 center drum 7 of pipeline 16 and cover board is tamped.
Pipeline 16 first passes through storage when passing through double walls of the water storage structures and other structures that are disposed proximate in pipeline 16
The pre-buried sealing casing 1 to match with 16 diameter of crossing pipeline on the wall 1 of water structures side.Further according to what is estimated
Both sides structure sedimentation is poor, and the pre-buried sealing casing 21 being relatively large in diameter, larger on the side wall 2 13 of non-water storage structures
21 inner wall of sealing casing and the spacing △ h of 16 outer wall of crossing pipeline should to meet final settlement poor.The sealing casing two
1 outer end is welded with a piece of steel square curtain plate 2, and 2 surrounding of curtain plate welds four welding screws 3, and 2 center of curtain plate opens one
A through-hole identical with 21 diameter of sealing casing, ring-like retainer plate 4 is arranged around the through-hole, and ring-like retainer plate 4 uses round bar
It is welded with curtain plate 2, ring-like retainer plate 4 concaves along central diameter is arranged annular fixing groove, and circular seal is arranged in annular fixing groove
Rubber ring 5.
Prefabricated a piece of steel square cover board 6,6 surrounding of cover board reserve four stay bolt holes, the length L in stay bolt hole, i.e.,
The distance between both ends center of circle is equal to two times of 21 inner wall of sealing casing and the spacing △ h of 16 outer wall of crossing pipeline, as 2 △
h.One circle of setting houses the fixed gear 8 of rectangle lubricating pad 9 around each stay bolt hole, and fixed gear 8 is welded using round bar and cover board 6
It connects, lubricating pad 9 uses 5mm thickness polyfluortetraethylene plates, and corresponding to the stay bolt hole in the middle part of polyfluortetraethylene plate opens slot hole;Cover board 6
A circular hole to match with 16 diameter of crossing pipeline is opened at center, and it is identical as Circularhole diameter, long that circular welds an internal diameter
Degree can meet the cylinder 7 that filling sealing material 17 requires.
When construction, after when both sides, walls concrete pours, by sealing on pipeline 16 and water storage structures wall 1
Gap is tamped by seal request rigid seal material 17 between casing 1 and pipeline 16, then pipeline 16 is constructed across non-water storage
Sealing casing 21 on object wall 2 13, the vacant blow-by in gap between sealing casing 21 and pipeline 16.
Sealing rubber ring 5 is placed in ring-like fixing groove 4 on curtain plate 2, then pipeline 16 is passed through with steel cover board 6, makes cover board 6
On stay bolt hole be aligned with four welding screws 3 on curtain plate 2.Polytetrafluoroethylene (PTFE) is placed in fixed gear 8 on cover board 6
Lubricating pad 9, then steel gasket 10 is inserted on welding screw 3, tightening nuts 11 make sealing rubber ring 5 be in suitable compression
Than in range.
Finally the gap sealing material 17 between 6 center drum 7 of pipeline 16 and cover board is tamped.
Referring to the application implementation figure of Fig. 4, absorbing well, absorption well is set before water factory's water distribution pump house, distribution pump absorbs water from absorbing well, absorption well.Distribution pump
Room is semi-underground type, and subsiding crack 14 is set between pump house wall and absorbing well, absorption well pool wall.
Water distribution water pump suction pipe crosses 18 wall of absorbing well, absorption well pool wall and water distribution pump house, for avoid water storage structures absorbing well, absorption well 19 and
The differential settlement of both non-water storage structures water distribution pump houses 18 causes the failure by shear of suction hose, while preventing in subsiding crack 14
Underground water penetrates into pump house 18 by the place of taking over, and apparatus of the present invention are installed on suction hose access point wall in water distribution pump house 18, transports
Row works well.
Claims (10)
1. a kind of sealing device of the double walls of Pipeline Crossing Program differential settlement, including the wall one (12) of water storage structures and non-water storage
The wall two (13) of structures, there are subsiding crack (14) between the wall one (12) disposed in parallel and wall two (13), divide
The sealing casing one (15) and sealing of the penetrating transverse uniaxial of the wall one (12) and the pre-buried both ends of wall two (13) are not penetrated
Casing two (1), two (1) internal diameter of the sealing casing are more than sealing casing one (15) internal diameter, which is characterized in that
Two (1) outer end face of the sealing casing fixes the curtain plate (2) that a circle is vertically arranged, and is arranged in parallel on the outside of the curtain plate (2)
Cover board (6) with central through hole, the central through hole outer rim of the cover board (6) extend outwardly after for the penetrating cylinder (7) in both ends, if
It sets after pipeline (16) sequentially passes through the coaxial sealing pipe sleeve one (15), subsiding crack (14), sealing pipe sleeve two (1), cylinder (7)
It is pierced by, two (1) internal diameter of the sealing casing is more than pipeline (16) outer diameter, two (1) inner wall of the sealing casing and crossing pipeline
(16) spacing of outer wall is △ h, between pipeline (16) outer wall and sealing casing one (15) inner wall, cylinder (7) inner wall respectively
One circle sealing material (17) of setting seals;
The annular retainer plate (4) of one circle protrusion of curtain plate (2) the lateral surface setting, the retainer plate (4) are arranged under central diameter
Recessed annular fixing groove, the fixing groove be embedded in ring packing rubber ring (5) seal the curtain plate (2) and cover board (6) it
Between gap, four welding screws (3) arranged symmetrically on the curtain plate (2) of described annular retainer plate (4) periphery;
Vertical stay bolt hole is arranged in the corresponding each welding screw (3) of the cover board (6), and the welding screw (3) passes through cover board (6)
On stay bolt hole after housing connection pad plate (10), nut (11) be locked.
2. a kind of sealing device of the double walls of Pipeline Crossing Program differential settlement as described in claim 1, which is characterized in that described to stop
It is poor that the spacing △ h of jacket pipe two (1) inner wall and crossing pipeline (16) outer wall should meet final settlement.
3. a kind of sealing device of the double walls of Pipeline Crossing Program differential settlement as described in claim 1, which is characterized in that the length
The length L of bolt hole is equal to two times of two (1) inner wall of the sealing casing and the spacing △ h of crossing pipeline (16) outer wall, with public affairs
Formula is expressed as L=2 △ h.
4. a kind of sealing device of the double walls of Pipeline Crossing Program differential settlement as described in claim 1, which is characterized in that the lid
One the fixed of circle protrusion of setting keeps off (8) around each stay bolt hole on plate (6), embedded lubricating pad on the inside of the fixed gear (8)
(9), the lubricating pad (9) corresponding stay bolt hole opens up the identical slot hole of shape, size;The welding screw (3) sequentially passes through
Housing connection pad plate (10), nut (11) are fixed after the slot hole on stay bolt hole and lubricating pad (9) on cover board (6).
5. a kind of sealing device of the double walls of Pipeline Crossing Program differential settlement as described in claim 1, which is characterized in that described to stop
A circle edge of a wing of outwardly convex is respectively provided in the middle part of the side wall of jacket pipe one (15) and sealing casing two (1), the edge of a wing is parallel to
Wall is embedded to respectively in wall one (12) and wall two (13).
6. a kind of sealing device of the double walls of Pipeline Crossing Program differential settlement as described in claim 1, which is characterized in that the ring
Shape retainer plate (4) is the annulus that round bar surrounds, and is welded on the curtain plate (2) lateral surface.
7. a kind of sealing device of the double walls of Pipeline Crossing Program differential settlement as described in claim 1, which is characterized in that described solid
Fixed gear (8) is the rectangle enclosing that round bar surrounds, and is welded on the cover board (6) lateral surface, the lubricating pad being internally embedded (9)
Correspond to rectangle.
8. a kind of sealing device of the double walls of Pipeline Crossing Program differential settlement as claimed in claim 1 or 7, which is characterized in that institute
State the polyfluortetraethylene plate that lubricating pad (9) uses 5mm thickness.
9. a kind of sealing device of the double walls of Pipeline Crossing Program differential settlement as described in claim 1, which is characterized in that described outer
Listrium (2) and cover board (6) are square steel plate, and the cylinder (7), gasket (10) are steel.
10. a kind of construction method of the sealing device of the double walls of Pipeline Crossing Program differential settlement, which is characterized in that including following step
Suddenly:
1) prefabricated water-stop casing two (1) and curtain plate (2) and the edge of a wing:Four are welded in the curtain plate (2) lateral surface symmetrically
Welding screw (3);The central through hole peripheral solder one of the curtain plate (2) encloses the annular retainer plate (4) of protrusion, the retainer plate
(4) it is arranged along the recessed annular fixing groove of central diameter on;
2) prefabricated cover board (6):The prefabricated cover board (6) and the outwardly extending cylinder of central through hole outer rim (7);The cover board (6)
Corresponding each prefabricated vertical stay bolt hole of welding screw (3);One circle of setting is convex around each stay bolt hole on the cover board (6)
The fixed gear (8) risen, the fixation keep off embedded lubricating pad (9) on the inside of (8), and the lubricating pad (9) corresponding stay bolt hole opens up shape
The identical slot hole of shape size;
3) embedded water stop casing:In the wall one (12) and wall two (13) respectively pre-buried coaxial sealing casing one (15) and
Prefabricated sealing casing two (1) in step 1), curtain plate (2) setting is on the outside of wall two (13);
4) once sealing:Be embedded at the sealing casing one (15) in the wall one (12) and the wall two (13) in be embedded with
After local caburizing's concrete coagulation at sealing casing two (1), pipeline (16) is sequentially passed through into the sealing casing one (15), is sunk
It is pierced by after drop seam (14), sealing casing two (1);It will be between the sealing casing one (15) in the pipeline (16) and wall one (12)
Gap is tamped with sealing material (17), and the fixing groove in step 2) is embedded in the ring packing rubber for being higher by the fixing groove
It encloses (5);
5) fixed cover board (6):Lubricating pad (9) is placed in fixed gear (8) on cover board (6), welding screw (3) is made to sequentially pass through
The hole of cover board (6), fixed gear (8) and lubricating pad (9), then steel gasket (10), tightening nuts are inserted on welding screw (3)
(11) fixed, so that the sealing rubber ring (5) in step 4) is sealed the gap between the curtain plate (2) and cover board (6);
6) secondary seal:Gap between pipeline (16) and cover board (6) center drum (7) is tamped with sealing material (17).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810727885.3A CN108612918B (en) | 2018-07-05 | 2018-07-05 | Sealing device for pipeline penetrating through differential settlement double walls and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810727885.3A CN108612918B (en) | 2018-07-05 | 2018-07-05 | Sealing device for pipeline penetrating through differential settlement double walls and construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108612918A true CN108612918A (en) | 2018-10-02 |
CN108612918B CN108612918B (en) | 2023-10-27 |
Family
ID=63666016
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810727885.3A Active CN108612918B (en) | 2018-07-05 | 2018-07-05 | Sealing device for pipeline penetrating through differential settlement double walls and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108612918B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111188948A (en) * | 2020-02-28 | 2020-05-22 | 广船国际有限公司 | Cargo oil pipe cabin penetrating method |
CN114006329A (en) * | 2021-11-02 | 2022-02-01 | 国网上海市电力公司 | Cable variable-diameter sealing piece water-blocking flange |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1514465A (en) * | 1975-05-15 | 1978-06-14 | Hudson D | Pipe assemblies |
JPH06249390A (en) * | 1993-02-26 | 1994-09-06 | Kyokuto Rubber Kk | Method and device for preventing water leakage in pit of piping system |
CN201126063Y (en) * | 2007-04-16 | 2008-10-01 | 符永利 | Flexible water string |
CN104455755A (en) * | 2014-12-03 | 2015-03-25 | 浙江省火电建设公司 | Waterproof sealing device of underground thrust wall feed-through sleeve |
CN105650381A (en) * | 2016-03-18 | 2016-06-08 | 昌邑海洋水业有限公司 | Sedimentation self-adaptive rectangular telescopic connecting device of civil engineering foundation structure |
CN105697887A (en) * | 2016-03-28 | 2016-06-22 | 北京市政建设集团有限责任公司 | Water proofing method for situation that pipeline penetrates hydraulic structure settlement joint |
CN207211667U (en) * | 2017-06-23 | 2018-04-10 | 中电建路桥集团有限公司 | A kind of mortar joint for building smears tool |
CN208579038U (en) * | 2018-07-05 | 2019-03-05 | 北京市市政工程设计研究总院有限公司 | A kind of sealing device of the double walls of Pipeline Crossing Program differential settlement |
-
2018
- 2018-07-05 CN CN201810727885.3A patent/CN108612918B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1514465A (en) * | 1975-05-15 | 1978-06-14 | Hudson D | Pipe assemblies |
JPH06249390A (en) * | 1993-02-26 | 1994-09-06 | Kyokuto Rubber Kk | Method and device for preventing water leakage in pit of piping system |
CN201126063Y (en) * | 2007-04-16 | 2008-10-01 | 符永利 | Flexible water string |
CN104455755A (en) * | 2014-12-03 | 2015-03-25 | 浙江省火电建设公司 | Waterproof sealing device of underground thrust wall feed-through sleeve |
CN105650381A (en) * | 2016-03-18 | 2016-06-08 | 昌邑海洋水业有限公司 | Sedimentation self-adaptive rectangular telescopic connecting device of civil engineering foundation structure |
CN105697887A (en) * | 2016-03-28 | 2016-06-22 | 北京市政建设集团有限责任公司 | Water proofing method for situation that pipeline penetrates hydraulic structure settlement joint |
CN207211667U (en) * | 2017-06-23 | 2018-04-10 | 中电建路桥集团有限公司 | A kind of mortar joint for building smears tool |
CN208579038U (en) * | 2018-07-05 | 2019-03-05 | 北京市市政工程设计研究总院有限公司 | A kind of sealing device of the double walls of Pipeline Crossing Program differential settlement |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111188948A (en) * | 2020-02-28 | 2020-05-22 | 广船国际有限公司 | Cargo oil pipe cabin penetrating method |
CN114006329A (en) * | 2021-11-02 | 2022-02-01 | 国网上海市电力公司 | Cable variable-diameter sealing piece water-blocking flange |
CN114006329B (en) * | 2021-11-02 | 2024-05-03 | 国网上海市电力公司 | Cable variable diameter sealing member flange that blocks water |
Also Published As
Publication number | Publication date |
---|---|
CN108612918B (en) | 2023-10-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108612918A (en) | A kind of sealing device and construction method of the double walls of Pipeline Crossing Program differential settlement | |
CN105064412A (en) | Air bag type sealing structure for deformation joint of open trench tunnel | |
CN110424458A (en) | Tunneling boring PC piping lane piece construction and its closed-water test method | |
CN208579038U (en) | A kind of sealing device of the double walls of Pipeline Crossing Program differential settlement | |
CN106049644A (en) | Detection boring rapid restoration support mould apparatus for concrete drain pipe culvert and restoration method thereof | |
CN209907415U (en) | Vertical jacking opening device for jacking pipe | |
CN112681535A (en) | Waterproof sealing assembly for vertical floor penetrating pipeline and leakage detection and construction method thereof | |
CN111585229A (en) | Flexible waterproof sealing structure for wall penetration of underground direct-buried cable or optical cable and construction method | |
CN213417868U (en) | Plugging device for water leakage point or water leakage zone of underground engineering enclosure structure | |
CN212801603U (en) | Foundation pit bottom plate reserved precipitation plugging device | |
CN212742598U (en) | Precipitation well block structure | |
CN107883113A (en) | A kind of adjustable type pipe inside frame hardened system and its reinforcement means | |
CN208965586U (en) | Integral type antiseep inspection shaft | |
CN212129395U (en) | Be used for prosthetic inside lining device of drainage pipe | |
CN210684746U (en) | Modified precipitation well plugging device | |
CN209324098U (en) | A kind of closed type pond steel linear device | |
CN210857249U (en) | Precipitation well plugging device and precipitation well structure | |
CN205804559U (en) | Erecting device is quickly repaired in a kind of concrete drain tile culvert detection boring | |
CN211951725U (en) | Wall and plate penetration prevention device for water supply and drainage pipe in building engineering | |
CN217925809U (en) | Anchor-grouting-drainage integrated water stop sleeve | |
RU2646915C2 (en) | Method for repairing sewage wells | |
CN220396772U (en) | Water stopping mechanism for house | |
KR20140010216A (en) | Sealing repair method of underground buried pipe joint and damaged part | |
CN218378149U (en) | Tongue-and-groove type flexible interface reinforced concrete drain pipe | |
CN214946973U (en) | Roof pre-buried sleeve device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |