CN108612537A - A kind of shield machine people cabin heating system and control method - Google Patents

A kind of shield machine people cabin heating system and control method Download PDF

Info

Publication number
CN108612537A
CN108612537A CN201810647946.5A CN201810647946A CN108612537A CN 108612537 A CN108612537 A CN 108612537A CN 201810647946 A CN201810647946 A CN 201810647946A CN 108612537 A CN108612537 A CN 108612537A
Authority
CN
China
Prior art keywords
water
cabin
people cabin
temperature
heating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810647946.5A
Other languages
Chinese (zh)
Other versions
CN108612537B (en
Inventor
陈福涛
吕专真
郑伟
李峰
刘恒
韩兴超
王鸿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiamen XGMA CREC Heavy Machinery Co Ltd
Original Assignee
Xiamen XGMA CREC Heavy Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiamen XGMA CREC Heavy Machinery Co Ltd filed Critical Xiamen XGMA CREC Heavy Machinery Co Ltd
Priority to CN201810647946.5A priority Critical patent/CN108612537B/en
Publication of CN108612537A publication Critical patent/CN108612537A/en
Application granted granted Critical
Publication of CN108612537B publication Critical patent/CN108612537B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/10Arrangement or mounting of control or safety devices
    • F24D19/1006Arrangement or mounting of control or safety devices for water heating systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D3/00Hot-water central heating systems
    • F24D3/10Feed-line arrangements, e.g. providing for heat-accumulator tanks, expansion tanks ; Hydraulic components of a central heating system
    • F24D3/1058Feed-line arrangements, e.g. providing for heat-accumulator tanks, expansion tanks ; Hydraulic components of a central heating system disposition of pipes and pipe connections
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H1/00Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
    • F24H1/10Continuous-flow heaters, i.e. heaters in which heat is generated only while the water is flowing, e.g. with direct contact of the water with the heating medium
    • F24H1/101Continuous-flow heaters, i.e. heaters in which heat is generated only while the water is flowing, e.g. with direct contact of the water with the heating medium using electric energy supply
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/18Arrangement or mounting of grates or heating means
    • F24H9/1809Arrangement or mounting of grates or heating means for water heaters
    • F24H9/1818Arrangement or mounting of electric heating means
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/20Arrangement or mounting of control or safety devices
    • F24H9/2007Arrangement or mounting of control or safety devices for water heaters

Landscapes

  • Engineering & Computer Science (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Combustion & Propulsion (AREA)
  • Chemical & Material Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Geochemistry & Mineralogy (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Steam Or Hot-Water Central Heating Systems (AREA)

Abstract

A kind of shield machine people cabin heating system,Including people cabin,The first temperature sensor and the pressure sensor being arranged in people cabin,Interior circulation cooling water route,In people cabin water lines are crossed at least provided with one,This, which is crossed in water lines, is connected with radiator and first manual ball valve,And this crosses the external first heating water route of both ends difference and the second heating water route of water lines,The first heating water route and interior circulation cooling water route mutual conduction,Control ball valve and check valve are had additional on the first heating water route,The second heating external water heating system in water route,It further includes a control device,The control device is by receiving temperature signal that the first temperature sensor and second temperature sensor are transmitted and being compared,Then control instruction is sent out to control ball valve and water heating system,Opening/closing for realizing control ball valve,And water heating system is opened/is closed,To finally realize the conducting of water lines and the first heating water route or the second heating water route.

Description

A kind of shield machine people cabin heating system and control method
Technical field
The present invention relates to shield machine, espespecially a kind of improvement and its control method for shield machine people cabin heating system.
Background technology
Once shield machine cutterhead failure in tunneling process is needed repairing or replaced, staff is needed to pass through shield machine People cabin enters soil cabin and carries out band press operation, and people cabin can carry out the operation of buck as into the channel of soil cabin, as work people When member will come out from high pressure people cabin, need progress bleed that can just go out cabin, and during this bleed, people can be caused Temperature dramatic decrease in cabin(Normally declining an atmospheric pressure with 5 DEG C of temperature decline).It is demonstrated experimentally that human body is because of context Pressure can cause decompression sickness when rapidly reducing, and the generation of dysbarism is more easily caused in low temperature environment, because the heating of this person cabin is Reduce one of the important channel of generation of decompression sickness.
The heating device for commonly using shield machine people cabin is usually the electric heater that 220V is installed in people cabin(It is filled as oil heater heats It sets), the channel due to people cabin as company identical as soil cabin, composition of air is as soil cabin, and soil cabin composition of air is easy to be rich in Combustible gas, and people cabin is in high pressure conditions, once the electric heater of 220V due in tunneling process vibrations or external collision or Apparatus failure forms spark, easily leads to combustible gas in people cabin and generates blast accident, jeopardizes the life safety of member in people cabin.
In view of this, the present inventor furthers investigate in view of the above-mentioned drawbacks in the prior art, there is this case generation then.
Invention content
An object of the present disclosure be to provide it is a kind of have both it is energy saving with safe people cabin heating system.
The second object of the present invention is that provide one kind being formed by control method for above-mentioned people cabin heating system.
To realize the first purpose, the invention discloses a kind of shield machine people cabin heating systems, including:
People cabin is made of main cabin and secondary cabin;
First temperature sensor, for monitoring temperature level in people cabin;
Pressure sensor, for monitoring the pressure value in people cabin;
Interior circulation cooling water route, for radiating, shield owner drives speed reducer, air compressor machine, main driving gear oil system, knife of backbreaking The heat dissipation water route of system, and also have additional in the interior circulation cooling water route second temperature sensor for detecting the water route;
Water lines are crossed at least provided with one in people cabin, this, which is crossed in water lines, is connected with radiator and at least one first manual ball Valve, and this crosses the external first heating water route of both ends difference and the second heating water route of water lines, which follows with interior Ring radiates water route mutual conduction, and control ball valve and check valve is had additional on the first heating water route, and the is realized by controlling ball valve The on/off in one heating water route and interior circulation cooling water route, while interior circulation cooling water route and the first heating are ensured by check valve The forward conduction in water route between water route;The second heating external water heating system in water route, the water heating system includes water Heater and pump feeder;
Further include a control device, which is transmitted by receiving the first temperature sensor and second temperature sensor Temperature signal and be compared, then send out control instruction to control ball valve and water heating system, for realizing control ball valve Open/close and water heating system open/close, to finally realize water lines and the first heating water route or the second heating water route Conducting.
Further, the mistake water lines are through main cabin and secondary cabin, and this is crossed water lines and divides in the region positioned at main cabin Not She You at least one radiator and first manual ball valve, this is crossed water lines and is respectively equipped at least in the region positioned at secondary cabin One radiator and first manual ball valve.
Further, the described first heating water route is made of A section heating water routes and B section heating water routes, A sections heat water routes and Interior circulation cooling water route, B sections heating water routes, cross water lines be followed in series to form circulating water loop, at A section heating water route on and B Control ball valve is respectively provided on the water routes Duan Jiare, the check valve is arranged at A sections on heating water route or on B sections of heating water routes.
Further, A sections of heating water routes or B sections of heating water routes are additionally provided with flow switch.
Further, A sections of heating water routes and B sections of heating water routes further respectively have second manual ball valve.
Further, the interior circulation cooling water route is additionally provided with pressure-regulating valve.
Further, pressure heating control is additionally provided in the people cabin, pressure heating control issues control instruction extremely Control device, open/the closing and control opening for ball valve/for then controlling water heating system are closed.
The second purpose to realize the present invention, the invention also discloses it is a kind of do not increase force heating control be used for shield The control method of machine people cabin heating system, specifically:
As the pressure P > external atmosphere pressures P in people cabin:
Situation 1:The temperature t1 in the interior circulation cooling water route >=systemic presupposition temperature t, minimum temperature T1≤t in people cabin≤ Maximum temperature T2 in people cabin, and maximum temperature T2 in t1 >=people cabin, maximum temperature T2 in the temperature T < people cabin in people cabin at this time, The control device issues control instruction to ball valve is controlled, and is open state by control ball Vavle switching, first-hand in people cabin Dynamic ball valve default conditions are in open state, and the mistake water lines in people cabin are connected with the first heating water route at this time, and the heating of people cabin is adopted Carry out heat supply with interior circulation cooling water route, until people cabin in temperature T people cabin in maximum temperature T2, at this time control device issue control Control ball Vavle switching is in off state by system instruction to control ball valve;
Situation 2:Maximum temperature T2 in the temperature t1 < people cabin in the interior circulation cooling water route, at this time temperature T < in people cabin Maximum temperature T2 in people cabin, the control device issue control instruction to ball valve is controlled, and are to close shape by control ball Vavle switching State, the first manual ball valve default conditions in people cabin are in open state, at this time the mistake water lines in people cabin and the second heating water Road is connected, and control device issues control instruction to water heating system, opens water heater and pump feeder carries out pumping heat supply, until Maximum temperature in temperature T >=people cabin in people cabin, at this time control device issue control instruction to water heating system, close water heating Device, when the temperature T in people cabin is gradually reduced to T1, control device issues control instruction to water heating system, reopens water Heater, so that it is guaranteed that the temperature T in people cabin is in T1≤T≤T2 interval ranges always;
As pressure P=external atmosphere pressure P in people cabin:
The control device issues control instruction to ball valve is controlled, and is open state by control ball Vavle switching, water heats at this time System is closed, the personnel in people cabin by artificially control first manual ball valve open/close or people personnel out of my cabin By artificially controlling opening/closing for the second manual ball valve, to which the temperature realized in people cabin can heat as needed;
Meanwhile the personnel in various working conditions described above, people cabin can will write from memory when experiencing in people cabin when the temperature is excessively high Recognize situation first manual ball valve in the open state to close, water or the are heated to access first of mistake water lines people cabin in Two heating water routes heat sources cut-out, if accessed at this time water lines be second heating water route when, control device issues control Instruction closes water heater and pump feeder to water heating system.
The invention also discloses another controlling parties for shield machine people cabin heating system for increasing and forcing to heat control Method, specifically:
As the pressure P > external atmosphere pressures P in people cabin:
Situation 1:The temperature t1 > systemic presupposition temperature t in the interior circulation cooling water route, minimum temperature T1≤t in people cabin≤ Maximum temperature T2 in people cabin, and maximum temperature T2 in t1 >=people cabin, maximum temperature T2 in the temperature T < people cabin in people cabin at this time, The control device issues control instruction to ball valve is controlled, and is open state by control ball Vavle switching, first-hand in people cabin Dynamic ball valve default conditions are in open state, and the mistake water lines in people cabin are connected with the first heating water route at this time, and the heating of people cabin is adopted Carry out heat supply with interior circulation cooling water route, until people cabin in temperature T >=people cabin in maximum temperature T2, at this time control device issue Control ball Vavle switching is in off state by control instruction to ball valve is controlled;
Situation 2:The temperature t1 > systemic presupposition temperature t in the interior circulation cooling water route, minimum temperature T1≤t in people cabin≤ Maximum temperature T2 in people cabin, and maximum temperature T2, the control device issue in minimum temperature T1 < t1≤people cabin in people cabin Control ball Vavle switching is open state to ball valve is controlled by control instruction, and the first manual ball valve default conditions in people cabin are in Open state, at this time the mistake water lines in people cabin with first heating water route be connected, people cabin heating use interior circulation cooling water route into Row heat supply, the T in people cabin are stepped up, and are needed when interior circulation cooling water route heat supply speed cannot be satisfied people cabin internal staff and heat It asks, pressure heating control can be activated, control device issues control instruction to ball valve is controlled at this time, is to close by control ball Vavle switching State, the first manual ball valve default conditions in people cabin are in open state, at this time the mistake water lines in people cabin and the second heating Water route is connected, and control device issues control instruction to water heating system, opens water heater and pump feeder carries out pumping heat supply, directly Maximum temperature T2 in temperature T >=people cabin in people cabin, at this time control device issue control instruction to water heating system, close water Heater, when the temperature T in people cabin is gradually reduced to T1, control device issues control instruction to water heating system, opens again Water heater is opened, so that it is guaranteed that the temperature T in people cabin is in T1≤T≤T2 interval ranges always;
Situation 3:Minimum temperature T1 in temperature t1 < systemic presuppositions temperature t, t≤the people cabin in the interior circulation cooling water route, And maximum temperature T2 in the temperature T < people cabin in people cabin, the control device issue control instruction to ball valve is controlled, will control Ball valve switching is in off state, and the first manual ball valve default conditions in people cabin are in open state, crosses water in people cabin at this time Pipeline is connected with the second heating water route, and control device issues control instruction to water heating system, opens water heater and pump feeder Carry out pumping heat supply, until people cabin in temperature T >=people cabin in maximum temperature T2, at this time control device issue control instruction to water Heating system closes water heater, and when the temperature T in people cabin is gradually reduced to T1, control device issues control instruction to water Heating system reopens water heater, so that it is guaranteed that the temperature T in people cabin is in T1≤T≤T2 interval ranges always;
As pressure P=external atmosphere pressure P in people cabin:
The control device issues control instruction to ball valve is controlled, and is open state by control ball Vavle switching, water heats at this time System is closed, the personnel in people cabin by artificially control first manual ball valve open/close or people personnel out of my cabin By artificially controlling opening/closing for the second manual ball valve, to which the temperature realized in people cabin can heat as needed;
Meanwhile the personnel in various working conditions described above, people cabin can will write from memory when experiencing in people cabin when the temperature is excessively high Recognize situation first manual ball valve in the open state to close, water or the are heated to access first of mistake water lines people cabin in Two heating water routes heat sources cut-out, if accessed at this time water lines be second heating water route when, control device issues control Instruction closes water heater and pump feeder to water heating system.
Using above system and control method, when the temperature in circulation cooling water route in shield machine is enough, the mistake in people cabin Water lines can be by the first heating water route and interior circulation cooling water route mutual conduction, for being heated to people cabin;When interior cycle When the temperature in heat dissipation water route is not enough to heat people cabin, control device can add water lines and second according to preset condition Hot water road mutual conduction heats the water in water route by water heater pair second and heats, then realizes the heating to people cabin, Due to using water heater, prevent the security risk caused by electric spark caused by conventional electric heater, while can be effective The heat source that circulation cooling water route is provided in secondary use, effectively reduces energy consumption.
Description of the drawings
Preferably explain that and its present invention include and can be carried out as illustrating of providing of non-limitative example, In addition, this illustrates refer to the attached drawing, in the accompanying drawings:
Fig. 1 present invention does not increase the fundamental diagram for forcing heating control;
Fig. 2 present invention increases the fundamental diagram for forcing heating control;
Fig. 3 present invention does not increase the control strategy schematic diagram for forcing heating control;
Fig. 4 present invention increases the control strategy schematic diagram for forcing heating control.
Reference numeral:
People cabin, main cabin 11, secondary cabin 12, the first temperature sensor 2, pressure sensor 3, interior circulation cooling water route 4, second temperature pass Sensor 41, pressure-regulating valve, 42, cross water lines 5, manual ball valve 51, radiator 6, first heat water route 7, control ball valve 71, Check valve 72, A sections heating water routes 73, B section heating water routes 74, the second manual ball valve 75, flow switch 76, second heating water route 8, Water heater system 81, water heater 811, pump feeder 812, control device 9 force heating control 10
Specific implementation mode
The present invention is described in detail below in conjunction with drawings and the specific embodiments.
The invention discloses a kind of shield machine people cabin heating systems, including:People cabin 1 is made of main cabin 11 and secondary cabin 12;The One temperature sensor 2, for monitoring temperature level in people cabin 1;Pressure sensor 3, for monitoring the pressure value in people cabin 1;It is interior Circulation cooling water route 4, for main driving speed reducer or air compressor machine in the shield machine that radiates or main driving gear oil system or knife of backbreaking The heat dissipation water route of system, the interior circulation cooling water route can only radiate any one device wherein above-mentioned, can also radiate aforementioned All devices, and also have additional in the interior circulation cooling water route 4 second temperature sensor 41 for detecting the water route;
Water lines 5 are crossed at least provided with one in the people cabin 1, this, which is crossed in water lines 5, is connected with radiator 6 and at least one first-hand Dynamic ball valve 51, and water route 8 is heated in the both ends difference external first heating water route 7 and second for crossing water lines 5, the first heating water Road 7 and interior 4 mutual conduction of circulation cooling water route have additional control ball valve 71 and check valve 72 on the first heating water route 7, pass through The on/off that ball valve 71 realizes the first heating water route 7 and interior circulation cooling water route 4 is controlled, while interior follow is ensured by check valve 72 Heat the forward conduction in water route between water route 7 in ring heat dissipation water route 4 and first;Second heating, the 8 external water heating system of water route 81, the water heating system 81 includes water heater 811 and pump feeder 812;
It further includes a control device 9, and the control device 9 is by receiving the first temperature sensor 2 and second temperature sensor 41 temperature signals transmitted are simultaneously compared, and are then sent out control instruction to control ball valve 71 and water heating system 81, are used for Realizing that control ball valve 71 opens ,/close and water heating system 81 open/closes, to finally realize water lines 5 selectively with the Heat the conducting in water route 8 in one heating water route 7 or second.
The mistake water lines 5 are through main cabin 11 and secondary cabin 12, and this is crossed water lines 5 and divides in the region positioned at main cabin 11 Not She You at least one radiator 6 and first manual ball valve 51, this is crossed water lines 5 and is set respectively in the region positioned at secondary cabin 12 There are at least one radiator 6 and first manual ball valve 51, it is ensured that personnel can be first-hand by controlling in main cabin 11 or secondary cabin 12 Dynamic ball valve 51 heats the conducting that water route 8 is heated in water route 7 or second to open/close water lines 5 and first, to avoid people cabin 1 Interior temperature is excessively high and causes accident.
The described first heating water route 7 is made of A section heating water routes 73 and B section heating water routes 74, A sections heat water routes 73 and Interior circulation cooling water route 4, B sections of heating water routes 74, water lines 5 excessively are followed in series to form circulating water loop, and water route 73 is heated at A sections It is respectively provided with control ball valve 71 on upper and B section heating water routes 74, the check valve 72 setting is at A sections on heating water route 73 or B sections It heats on water route 74, the setting of check valve 72 can ensure that when being flowed out from interior circulation cooling water route 4 of flow, it can be ensured that flow is the It is flowed back with direction clockwise or counterclockwise in one heating water route 7.
The A sections heating water route 73 or B sections of heating water routes 74 is additionally provided with flow switch 76, when control device 9 will control When ball valve 71 is opened, flow flows into the first heating water route 7, and alarm is will produce when flow switch 76 does not monitor flow.
The A sections heating water route 73 and B sections of heating water routes 74 further respectively has second manual ball valve 75, is convenient for people Connection of the member in people's heating of manual on/off first out of my cabin water route 7 and interior circulation cooling water route 4.
The interior circulation cooling water route 4 is additionally provided with pressure-regulating valve 42, for controlling the interior outflow of circulation cooling water route 4 Hydraulic pressure value.
Pressure heating control 10 is additionally provided in the people cabin 1, pressure heating control 10 issues control instruction to control Device 9 processed, then control water heating system 81 open/closing and control opening for ball valve 71/close, it is ensured that when the temperature in people cabin 1 without When method meets the requirement of personnel in people cabin 1, heating control 10 can be forced to be cut come the mistake water lines 5 made one in cabin 1 by starting The second heating water route 8 is shifted to be heated.
The invention also discloses a kind of in people cabin for the control method of shield machine people cabin heating system, uses the control Method installs additional not in people cabin and forces heating control 10,
As the pressure P > external atmosphere pressure P in people cabin 1,
Situation 1:The temperature t1 in the interior circulation cooling water route 4 >=systemic presupposition temperature t, minimum temperature T1≤t in people cabin 1 Maximum temperature T2 in≤people cabin 1, and maximum temperature T2 in t1 >=people cabin 1, the at this time highest temperature in the temperature T < people cabin 1 in people cabin 1 T2 is spent, the control device 9 issues control instruction to control ball valve 71, control ball valve 71 is switched to open state, people cabin 1 Interior 51 default situations of first manual ball valve are in open state, and the mistake water lines 5 and first in people cabin 1 heat water route 7 at this time Conducting, the heating of people cabin 1 carries out heat supply using interior circulation cooling water route 4, until maximum temperature in temperature T >=people cabin 1 in people cabin 1 T2, at this time control device 9 issue control instruction to control ball valve 71, will control ball valve 71 switching be in off state;
Situation 2:Maximum temperature T2 in the temperature t1 < people cabin 1 in the interior circulation cooling water route 4, at this time the temperature T in people cabin 1 Maximum temperature T2 in < people cabin 1, the control device 9 issue control instruction to control ball valve 71, control ball valve 71 are switched It is in off state, 51 default situations of first manual ball valve in people cabin 1 are in open state, at this time the mistake water lines 5 in people cabin 1 It is connected with the second heating water route 8, control device 9 issues control instruction to water heating system 81, opens water heater 811 and pumping Device 812 carries out pumping heat supply, until people cabin 1 in temperature T >=people cabin 1 in maximum temperature T2, at this time control device 9 issue control Instruction closes water heater 811, when the temperature T in people cabin 1 is gradually reduced to T1, under control device 9 to water heating system 81 Control instruction is sent out to water heating system 81, reopens water heater 811, so that it is guaranteed that the temperature T in people cabin 1 is in T1 always In≤T≤T2 interval ranges;
As pressure P=external atmosphere pressure P in people cabin 1, the control device 9 issues control instruction to control ball valve 71, will control Ball valve 71 processed is switched to open state, and water heating system 81 is closed at this time, and the personnel in people cabin 1 are by artificially controlling First manual ball valve 51 opens/close or people cabin 1 outside personnel by artificially controlling opening for the second manual ball valve 75/close, to Realize that the temperature in people cabin 1 can heat as needed;
Certainly in these cases, when setting first manual ball valve 51 in people cabin 1, the personnel in people cabin 1, which work as, experiences people cabin Inside when the temperature is excessively high, default situations first manual ball valve 51 in the open state can be closed, to which interior mistake is accessed in people cabin 1 First heating water 7 or second of water lines 5 heats the heat source cut-out in water route 8, if it is the second heating to access water lines 5 at this time When water route 8, then control device 9 issues control instruction to water heating system 81, closes water heater 811 and pump feeder 812.
The invention also discloses another kinds to install the control that the shield machine people cabin heating system of control is heated in pressure additional in people cabin Method processed,
As the pressure P > external atmosphere pressure P in people cabin 1,
Situation 1:The temperature t1 > systemic presupposition temperature t in the interior circulation cooling water route 4, minimum temperature T1≤t in people cabin 1 Maximum temperature T2 in≤people cabin 1, and maximum temperature T2 in t1 >=people cabin 1, the at this time highest temperature in the temperature T < people cabin 1 in people cabin 1 T2 is spent, the control device 9 issues control instruction to control ball valve 71, control ball valve 71 is switched to open state, people cabin 1 Interior 51 default situations of first manual ball valve are in open state, and the mistake water lines 5 and first in people cabin 1 heat water route 7 at this time Conducting, the heating of people cabin 1 carries out heat supply using interior circulation cooling water route 4, until maximum temperature in temperature T >=people cabin 1 in people cabin 1 T2, at this time control device 9 issue control instruction to control ball valve 71, will control ball valve 71 switching be in off state;
Situation 2:The temperature t1 > systemic presupposition temperature t in the interior circulation cooling water route 4, minimum temperature T1≤t in people cabin 1 Maximum temperature T2 in≤people cabin 1, and maximum temperature T2, the control device in minimum temperature T1 < t1≤people cabin 1 in people cabin 1 9 issue control instruction to control ball valve 71, control ball valve 71 are switched to open state, the first manual ball valve 51 in people cabin 1 Default situations are in open state, and the mistake water lines 5 and first in people cabin 1 heat water route 7 and are connected at this time, and the heating of people cabin 1 uses Interior circulation cooling water route 4 carries out heat supply, and the T in people cabin 1 is stepped up, when interior circulation cooling water route 4 cannot be satisfied for thermal velocity 1 internal staff's demand for heat of people cabin can activate pressure heating control 10, and control device 9 issues control instruction to control ball at this time The control switching of ball valve 71 is in off state by valve 71, and 51 default situations of first manual ball valve in people cabin 1 are in open state, The mistake water lines 5 and second in people cabin 1 heat water route 8 and are connected at this time, and control device 9 issues control instruction to water heating system 81, it opens water heater 811 and pump feeder 812 carries out pumping heat supply, until maximum temperature in temperature T >=people cabin 1 in people cabin 1 T2, at this time control device 9 issue control instruction to water heating system 81, close water heater 811, when the temperature T in people cabin 1 by When step is reduced to T1, control device 9 issues control instruction to water heating system 81, reopens water heater 811, so that it is guaranteed that Temperature T in people cabin 1 is in T1≤T≤T2 interval ranges always;
Situation 3:Minimum temperature T1 in temperature t1 < systemic presuppositions temperature t, t≤the people cabin in the interior circulation cooling water route 4, And maximum temperature T2 in the temperature T < people cabin 1 in people cabin 1, the control device 9 issue control instruction extremely control ball valve 71, The control switching of ball valve 71 is in off state, 51 default situations of first manual ball valve in people cabin 1 are in open state, at this time people Mistake water lines 5 and second in cabin 1 heat water route 8 and are connected, and control device 9 issues control instruction to water heating system 81, opens Water heater 811 and pump feeder 812 carry out pumping heat supply, until maximum temperature T2 in temperature T >=people cabin 1 in people cabin 1, at this time Control device 9 issues control instruction to water heating system 81, water heater 811 is closed, when the temperature T in people cabin 1 is gradually reduced When to T1, control device 9 issues control instruction to water heating system 81, reopens water heater 811, so that it is guaranteed that people cabin 1 Interior temperature T is in T1≤T≤T2 interval ranges always;
As pressure P=external atmosphere pressure P in people cabin 1, the control device 9 issues control instruction to control ball valve 71, will control Ball valve 71 processed is switched to open state, and water heating system 81 is closed at this time, and the personnel in people cabin 1 are by artificially controlling First manual ball valve 51 opens/close or people cabin 1 outside personnel by artificially controlling opening for the second manual ball valve 75/close, to Realize that the temperature in people cabin 1 can heat as needed;
Certainly in these cases, when setting first manual ball valve 51 in people cabin 1, the personnel in people cabin 1, which work as, experiences people cabin Inside when the temperature is excessively high, default situations first manual ball valve 51 in the open state can be closed, to which interior mistake is accessed in people cabin 1 First heating water 7 or second of water lines 5 heats the heat source cut-out in water route 8, if it is the second heating to access water lines 5 at this time When water route 8, then control device 9 issues control instruction to water heating system 81, closes water heater 811 and pump feeder 812.
The product form and style of above-described embodiment and diagram and the non-limiting present invention, any technical field it is common The appropriate variation and modification that technical staff does it, all should be regarded as the patent category for not departing from the present invention.

Claims (9)

1. a kind of shield machine people cabin heating system, including:
People cabin is made of main cabin and secondary cabin;
First temperature sensor, for monitoring temperature level in people cabin;
Pressure sensor, for monitoring the pressure value in people cabin;
Interior circulation cooling water route, the equipment for radiating in shield machine radiate, and also increase in the interior circulation cooling water route Equipped with the second temperature sensor for detecting the water route;
It is characterized in that,
Water lines are crossed at least provided with one in people cabin, this, which is crossed in water lines, is connected with radiator and at least one first manual ball Valve, and this crosses the external first heating water route of both ends difference and the second heating water route of water lines, which follows with interior Ring radiates water route mutual conduction, and control ball valve and check valve is had additional on the first heating water route, and the is realized by controlling ball valve The on/off in one heating water route and interior circulation cooling water route, while interior circulation cooling water route and the first heating are ensured by check valve The forward conduction in water route between water route;The second heating external water heating system in water route, the water heating system includes water Heater and pump feeder;
Further include a control device, which is transmitted by receiving the first temperature sensor and second temperature sensor Temperature signal and be compared, then send out control instruction to control ball valve and water heating system, for realizing control ball valve Open/close and water heating system open/close, to finally realize water lines and the first heating water route or the second heating water route Conducting.
2. a kind of shield machine people cabin as described in claim 1 heating system, which is characterized in that the mistake water lines are through master Cabin and secondary cabin, and this is crossed water lines and is respectively equipped at least one radiator and first manual ball in the region positioned at main cabin Valve, this is crossed water lines and is respectively equipped at least one radiator and first manual ball valve in the region positioned at secondary cabin.
3. a kind of shield machine people cabin heating system as described in claim 1, which is characterized in that the first heating water route by A sections of heating water routes and B sections of heating water routes are constituted, and water lines, are crossed at B sections of heating water routes in A sections of heating water routes and interior circulation cooling water route It is followed in series to form circulating water loop, heated at A sections on water route and is respectively provided with control ball valve, the list on B sections of heating water routes It is arranged to valve at A sections on heating water route or on B sections of heating water routes.
4. a kind of shield machine people cabin as claimed in claim 3 heating system, which is characterized in that A sections of heating water routes or B sections of heating Water route is additionally provided with flow switch.
5. a kind of shield machine people cabin as claimed in claim 3 heating system, which is characterized in that A sections of heating water routes and B sections of heating Water route further respectively has second manual ball valve.
6. a kind of shield machine people cabin as described in claim 1 heating system, which is characterized in that the interior circulation cooling water route It is additionally provided with pressure-regulating valve.
7. shield machine people as claimed in any one of claims 1 to 6 cabin heating system, which is characterized in that also set in the people cabin There is a pressure to heat control, pressure heating control issues control instruction to control device, then control the opening of water heating system/ Close and control opening/closing for ball valve.
8. a kind of such as claim 1-4, the control method of 5-6 any one of them shield machine people cabin heating systems, feature It is,
As the pressure P > external atmosphere pressures P in people cabin:
Situation 1:The temperature t1 in the interior circulation cooling water route >=systemic presupposition temperature t, minimum temperature T1≤t in people cabin≤ Maximum temperature T2 in people cabin, and maximum temperature T2 in t1 >=people cabin, maximum temperature T2 in the temperature T < people cabin in people cabin at this time, The control device issues control instruction to ball valve is controlled, and is open state by control ball Vavle switching, first-hand in people cabin Dynamic ball valve default conditions are in open state, and the mistake water lines in people cabin are connected with the first heating water route at this time, and the heating of people cabin is adopted Carry out heat supply with interior circulation cooling water route, until people cabin in temperature T people cabin in maximum temperature T2, at this time control device issue control Control ball Vavle switching is in off state by system instruction to control ball valve;
Situation 2:Maximum temperature T2 in the temperature t1 < people cabin in the interior circulation cooling water route, at this time temperature T < in people cabin Maximum temperature T2 in people cabin, the control device issue control instruction to ball valve is controlled, and are to close shape by control ball Vavle switching State, the first manual ball valve default conditions in people cabin are in open state, at this time the mistake water lines in people cabin and the second heating water Road is connected, and control device issues control instruction to water heating system, opens water heater and pump feeder carries out pumping heat supply, until Maximum temperature in temperature T >=people cabin in people cabin, at this time control device issue control instruction to water heating system, close water heating Device, when the temperature T in people cabin is gradually reduced to T1, control device issues control instruction to water heating system, reopens water Heater, so that it is guaranteed that the temperature T in people cabin is in T1≤T≤T2 interval ranges always;
As pressure P=external atmosphere pressure P in people cabin:
The control device issues control instruction to ball valve is controlled, and is open state by control ball Vavle switching, water heats at this time System is closed, the personnel in people cabin by artificially control first manual ball valve open/close or people personnel out of my cabin By artificially controlling opening/closing for the second manual ball valve, to which the temperature realized in people cabin can heat as needed;
Meanwhile the personnel in various working conditions described above, people cabin can will write from memory when experiencing in people cabin when the temperature is excessively high Recognize situation first manual ball valve in the open state to close, water or the are heated to access first of mistake water lines people cabin in Two heating water routes heat sources cut-out, if accessed at this time water lines be second heating water route when, control device issues control Instruction closes water heater and pump feeder to water heating system.
9. a kind of control method of shield machine people as claimed in claim 7 cabin heating system, which is characterized in that
As the pressure P > external atmosphere pressures P in people cabin:
Situation 1:The temperature t1 > systemic presupposition temperature t in the interior circulation cooling water route, minimum temperature T1≤t in people cabin≤ Maximum temperature T2 in people cabin, and maximum temperature T2 in t1 >=people cabin, maximum temperature T2 in the temperature T < people cabin in people cabin at this time, The control device issues control instruction to ball valve is controlled, and is open state by control ball Vavle switching, first-hand in people cabin Dynamic ball valve default conditions are in open state, and the mistake water lines in people cabin are connected with the first heating water route at this time, and the heating of people cabin is adopted Carry out heat supply with interior circulation cooling water route, until people cabin in temperature T >=people cabin in maximum temperature T2, at this time control device issue Control ball Vavle switching is in off state by control instruction to ball valve is controlled;
Situation 2:The temperature t1 > systemic presupposition temperature t in the interior circulation cooling water route, minimum temperature T1≤t in people cabin≤ Maximum temperature T2 in people cabin, and maximum temperature T2, the control device issue in minimum temperature T1 < t1≤people cabin in people cabin Control ball Vavle switching is open state to ball valve is controlled by control instruction, and the first manual ball valve default conditions in people cabin are in Open state, at this time the mistake water lines in people cabin with first heating water route be connected, people cabin heating use interior circulation cooling water route into Row heat supply, the T in people cabin are stepped up, and are needed when interior circulation cooling water route heat supply speed cannot be satisfied people cabin internal staff and heat It asks, pressure heating control can be activated, control device issues control instruction to ball valve is controlled at this time, is to close by control ball Vavle switching State, the first manual ball valve default conditions in people cabin are in open state, at this time the mistake water lines in people cabin and the second heating Water route is connected, and control device issues control instruction to water heating system, opens water heater and pump feeder carries out pumping heat supply, directly Maximum temperature T2 in temperature T >=people cabin in people cabin, at this time control device issue control instruction to water heating system, close water Heater, when the temperature T in people cabin is gradually reduced to T1, control device issues control instruction to water heating system, opens again Water heater is opened, so that it is guaranteed that the temperature T in people cabin is in T1≤T≤T2 interval ranges always;
Situation 3:Minimum temperature T1 in temperature t1 < systemic presuppositions temperature t, t≤the people cabin in the interior circulation cooling water route, And maximum temperature T2 in the temperature T < people cabin in people cabin, the control device issue control instruction to ball valve is controlled, will control Ball valve switching is in off state, and the first manual ball valve default conditions in people cabin are in open state, crosses water in people cabin at this time Pipeline is connected with the second heating water route, and control device issues control instruction to water heating system, opens water heater and pump feeder Carry out pumping heat supply, until people cabin in temperature T >=people cabin in maximum temperature T2, at this time control device issue control instruction to water Heating system closes water heater, and when the temperature T in people cabin is gradually reduced to T1, control device issues control instruction to water Heating system reopens water heater, so that it is guaranteed that the temperature T in people cabin is in T1≤T≤T2 interval ranges always;
As pressure P=external atmosphere pressure P in people cabin:
The control device issues control instruction to ball valve is controlled, and is open state by control ball Vavle switching, water heats at this time System is closed, the personnel in people cabin by artificially control first manual ball valve open/close or people personnel out of my cabin By artificially controlling opening/closing for the second manual ball valve, to which the temperature realized in people cabin can heat as needed;
Meanwhile the personnel in various working conditions described above, people cabin can will write from memory when experiencing in people cabin when the temperature is excessively high Recognize situation first manual ball valve in the open state to close, water or the are heated to access first of mistake water lines people cabin in Two heating water routes heat sources cut-out, if accessed at this time water lines be second heating water route when, control device issues control Instruction closes water heater and pump feeder to water heating system.
CN201810647946.5A 2018-06-22 2018-06-22 Shield tunneling machine cabin heating system and control method Active CN108612537B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810647946.5A CN108612537B (en) 2018-06-22 2018-06-22 Shield tunneling machine cabin heating system and control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810647946.5A CN108612537B (en) 2018-06-22 2018-06-22 Shield tunneling machine cabin heating system and control method

Publications (2)

Publication Number Publication Date
CN108612537A true CN108612537A (en) 2018-10-02
CN108612537B CN108612537B (en) 2023-11-21

Family

ID=63665403

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810647946.5A Active CN108612537B (en) 2018-06-22 2018-06-22 Shield tunneling machine cabin heating system and control method

Country Status (1)

Country Link
CN (1) CN108612537B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110206553A (en) * 2019-07-08 2019-09-06 厦门厦工中铁重型机械有限公司 A kind of shield machine shield body structure

Citations (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1221965A (en) * 1967-04-12 1971-02-10 Junkers & Co Improvements in or relating to circulating water heaters
US4795113A (en) * 1984-02-06 1989-01-03 Minovitch Michael Andrew Electromagnetic transportation system for manned space travel
JPH06213483A (en) * 1993-01-14 1994-08-02 Kajima Corp Water supplying system used both for cooling and heating
JP2001200688A (en) * 2000-01-18 2001-07-27 Komatsu Ltd Shield machine
JP2003129791A (en) * 2001-10-26 2003-05-08 Hokuetsu Kogyo Co Ltd Ventilating and cooling method and apparatus in shield driving machine
JP2005139733A (en) * 2003-11-06 2005-06-02 Kajima Corp Tunnel inside cooling system
JP2011052403A (en) * 2009-08-31 2011-03-17 Ohbayashi Corp Shield machine and excavation method using the same
CN202783741U (en) * 2012-09-26 2013-03-13 烟台宏远氧业有限公司 Diving suit heating system in man lock of shield structure type tunneling machine
CN202991718U (en) * 2012-12-06 2013-06-12 中铁十二局集团第二工程有限公司 Movable circulating cooling water pool device for multi-interval shield excavation
CN103628891A (en) * 2013-11-21 2014-03-12 上海市基础工程集团有限公司 Method for controlling shield tunneling machine water circulation cooling system
CN204060698U (en) * 2014-09-20 2014-12-31 辽宁三三工业有限公司 Shield machine water cooling system
DE102014007853B3 (en) * 2014-05-30 2015-10-22 Bernhard Harter Method and device for controlling the temperature of a heat exchanger
CN205654346U (en) * 2016-04-19 2016-10-19 中铁工程装备集团有限公司 Shield constructs machine area and presses operation cooling system
CN205895243U (en) * 2016-06-27 2017-01-18 中交一公局第三工程有限公司 Outer recirculating cooling water system of single shield TBM
CN206232415U (en) * 2016-12-03 2017-06-09 中国葛洲坝集团基础工程有限公司 A kind of shield machine outer circulation water installations for automatically switching
CN106894978A (en) * 2017-02-21 2017-06-27 厦门厦工中铁重型机械有限公司 The protection device and its control method of booster pump in a kind of shield machine purging system
CN206595840U (en) * 2017-03-17 2017-10-27 中车株洲电力机车有限公司 A kind of development machine circulating cooling system
JP2017198383A (en) * 2016-04-26 2017-11-02 株式会社コロナ Heat pump type water heater
CN107516837A (en) * 2017-09-15 2017-12-26 中铁工程装备集团盾构制造有限公司 Shield machine frequency conversion tank dehydrating unit and its method
CN107906791A (en) * 2017-11-29 2018-04-13 苏州奥天诚机械有限公司 A kind of special refrigerating plant of shield machine
CN207393303U (en) * 2017-11-14 2018-05-22 中交二公局第三工程有限公司 For the shield machine refrigeration cool-down structure during shield tunnel construction
CN207469352U (en) * 2017-11-13 2018-06-08 中国水利水电第八工程局有限公司 Circulation in TBM
CN108167202A (en) * 2017-12-25 2018-06-15 辽宁三三工业有限公司 One kind controls cooling water system based on frequency-variable controller
CN208441838U (en) * 2018-06-22 2019-01-29 厦门厦工中铁重型机械有限公司 A kind of shield machine people cabin heating system

Patent Citations (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1221965A (en) * 1967-04-12 1971-02-10 Junkers & Co Improvements in or relating to circulating water heaters
US4795113A (en) * 1984-02-06 1989-01-03 Minovitch Michael Andrew Electromagnetic transportation system for manned space travel
JPH06213483A (en) * 1993-01-14 1994-08-02 Kajima Corp Water supplying system used both for cooling and heating
JP2001200688A (en) * 2000-01-18 2001-07-27 Komatsu Ltd Shield machine
JP2003129791A (en) * 2001-10-26 2003-05-08 Hokuetsu Kogyo Co Ltd Ventilating and cooling method and apparatus in shield driving machine
JP2005139733A (en) * 2003-11-06 2005-06-02 Kajima Corp Tunnel inside cooling system
JP2011052403A (en) * 2009-08-31 2011-03-17 Ohbayashi Corp Shield machine and excavation method using the same
CN202783741U (en) * 2012-09-26 2013-03-13 烟台宏远氧业有限公司 Diving suit heating system in man lock of shield structure type tunneling machine
CN202991718U (en) * 2012-12-06 2013-06-12 中铁十二局集团第二工程有限公司 Movable circulating cooling water pool device for multi-interval shield excavation
CN103628891A (en) * 2013-11-21 2014-03-12 上海市基础工程集团有限公司 Method for controlling shield tunneling machine water circulation cooling system
DE102014007853B3 (en) * 2014-05-30 2015-10-22 Bernhard Harter Method and device for controlling the temperature of a heat exchanger
CN204060698U (en) * 2014-09-20 2014-12-31 辽宁三三工业有限公司 Shield machine water cooling system
CN205654346U (en) * 2016-04-19 2016-10-19 中铁工程装备集团有限公司 Shield constructs machine area and presses operation cooling system
JP2017198383A (en) * 2016-04-26 2017-11-02 株式会社コロナ Heat pump type water heater
CN205895243U (en) * 2016-06-27 2017-01-18 中交一公局第三工程有限公司 Outer recirculating cooling water system of single shield TBM
CN206232415U (en) * 2016-12-03 2017-06-09 中国葛洲坝集团基础工程有限公司 A kind of shield machine outer circulation water installations for automatically switching
CN106894978A (en) * 2017-02-21 2017-06-27 厦门厦工中铁重型机械有限公司 The protection device and its control method of booster pump in a kind of shield machine purging system
CN206595840U (en) * 2017-03-17 2017-10-27 中车株洲电力机车有限公司 A kind of development machine circulating cooling system
CN107516837A (en) * 2017-09-15 2017-12-26 中铁工程装备集团盾构制造有限公司 Shield machine frequency conversion tank dehydrating unit and its method
CN207469352U (en) * 2017-11-13 2018-06-08 中国水利水电第八工程局有限公司 Circulation in TBM
CN207393303U (en) * 2017-11-14 2018-05-22 中交二公局第三工程有限公司 For the shield machine refrigeration cool-down structure during shield tunnel construction
CN107906791A (en) * 2017-11-29 2018-04-13 苏州奥天诚机械有限公司 A kind of special refrigerating plant of shield machine
CN108167202A (en) * 2017-12-25 2018-06-15 辽宁三三工业有限公司 One kind controls cooling water system based on frequency-variable controller
CN208441838U (en) * 2018-06-22 2019-01-29 厦门厦工中铁重型机械有限公司 A kind of shield machine people cabin heating system

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
崔天麟;李建华;任磊;: "富水砂卵石地层大直径泥水盾构带压换刀技术", 都市快轨交通, no. 03, pages 112 - 115 *
毛继伟;: "掘进机温度自动控制系统设计", 工矿自动化, no. 05, pages 11 - 13 *
王柏松;: "盾构气压过渡舱及其应用", 建筑机械化, no. 06, pages 57 - 60 *
陈馈;: "盾构带压进舱安全系统的研制", 铁道工程学报, no. 03, pages 54 - 56 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110206553A (en) * 2019-07-08 2019-09-06 厦门厦工中铁重型机械有限公司 A kind of shield machine shield body structure

Also Published As

Publication number Publication date
CN108612537B (en) 2023-11-21

Similar Documents

Publication Publication Date Title
CN207106105U (en) Electrombile thermal management system and electric car
US9533545B2 (en) Thermal management system for an electric vehicle
US2912832A (en) Cooling apparatus for vehicle seats
CN208441838U (en) A kind of shield machine people cabin heating system
JP5336077B2 (en) System that generates process air
EP2500541A1 (en) Internal combustion engine cooling system and failure determination method for internal combustion engine cooling system
CN105607672A (en) System and method for air mattress temperature control
MX2016011339A (en) Vehicle hvac system with auxiliary coolant loop for heating and cooling vehicle interior.
US9682608B2 (en) Supplemental heating and cooling sources for a heating, ventilation and air conditioning system
IN2012DN02697A (en)
JP2007102350A (en) Constant temperature liquid circulation device with external piping protection function
ES2252072T3 (en) PROCEDURE AND DEVICE FOR CONTROLLING A CLIMATE CONTROL EQUIPMENT FOR A VEHICLE SEAT.
CN108612537A (en) A kind of shield machine people cabin heating system and control method
WO2019030733A3 (en) Heat exchange and temperature sensing device and method of use
CN207311040U (en) A kind of vehicle cab heating control system
CN106837652B (en) A kind of vehicle fuel auxiliary heating system and its control method
CN204172728U (en) The automotive seat of temperature-controllable
CN108060969A (en) Vehicle cooling system assembly with electromagnetism liquid-cooled retarder
CN207478603U (en) A kind of low temperature impact test box
EP3339177A1 (en) Multi-mode environmental control systems
CN203637510U (en) Coach heating pipeline system
JPH02310117A (en) Heating apparatus for vehicle
CN104002640A (en) Automatic adjustment type automobile exhaust heating device and control method thereof
BR112017000588A2 (en) device for filling vehicle air conditioning systems with cooling agent r744
CN206346249U (en) Sliding loader heating system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant