CN108612385A - A kind of quick assembling design method of steel construction steel tower - Google Patents

A kind of quick assembling design method of steel construction steel tower Download PDF

Info

Publication number
CN108612385A
CN108612385A CN201810599010.XA CN201810599010A CN108612385A CN 108612385 A CN108612385 A CN 108612385A CN 201810599010 A CN201810599010 A CN 201810599010A CN 108612385 A CN108612385 A CN 108612385A
Authority
CN
China
Prior art keywords
steel
tower
steel tower
construction
design method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810599010.XA
Other languages
Chinese (zh)
Inventor
尹宝平
常思维
于亮
胡金梅
梁文彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Ke Hua Steel Construction Co Ltd
Original Assignee
Qingdao Ke Hua Steel Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Ke Hua Steel Construction Co Ltd filed Critical Qingdao Ke Hua Steel Construction Co Ltd
Priority to CN201810599010.XA priority Critical patent/CN108612385A/en
Publication of CN108612385A publication Critical patent/CN108612385A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • E04H12/08Structures made of specified materials of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Wood Science & Technology (AREA)
  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The invention discloses a kind of quick assembling design methods of steel construction steel tower, specifically comprise the steps of:S1. the preparation before steel tower assembling, S2. the piecemeal assembling of iron tower structure, S3. the assembled iron tower structure of piecemeal is carried out horizontal pre-assembled and examines correction, S4. steel tower installation base is cleared up, arrangement scene simultaneously prepares column foot, S5. steel tower is set up in lifting successively from bottom to top on the column foot built well, and S6. installs anti-climbing frame, lightning arrester, scarer and burglar alarm;S3 wherein in step composition synchronous can be carried out with S4.The quick assembling design method of steel construction steel tower provided by the invention improves construction efficiency, shortens the construction-time of steel construction steel tower, makes full use of human resources, has saved construction cost;The appearance for reducing installation error by horizontal pre-assembled and inspection correction, the possible risk implemented in installation process is minimized, the safety coefficient of working at height is improved.

Description

A kind of quick assembling design method of steel construction steel tower
Technical field
The present invention relates to steel construction package technique field, especially a kind of quick assembling design method of steel construction steel tower.
Background technology
At this stage, the assemble method of steel structure member mostly uses greatly following several method:(1) sample method:With 1:1 ratio Component reality sample is released on mounting plate, then the position according to part on real sample, assembles respectively as component, this side Method is suitable for truss, the isostructural assembling of framework;(2) profiling replicates assembling method:First land used sample method is assembled into the structure of single side, so Spot welding is secured afterwards, is turned over, and as fetal membrane is replicated, assembles the structure of another single side in the above, and twice, this is filled for round-trip assembling Method of completing the square is suitable for the assembling of the mutually symmetrical truss structure in cross section;(3) dress is found:According to the characteristics of component and the stabilization of part Position, the assembly of selection from top to bottom or from bottom to top;The method is suitable for the structure that anti-horizontalization is steady, height is moderate or big The cylinder-shaped steel structure of diameter;(4) crouch dress:It is little suitable for section by the assembly of the horizontally-arranged progress of component, but length is longer thin Long component;(5) loose tool assembling method:The assemble method part of component being located in loose tool on its rigging position.In steel construction Assembling process in, the stability and installation speed and quality of the assembling technique of steel construction to Steel Structure Installation, and show There are still some shortcomings in the assembling of some steel construction steel towers and mounting technique development, such as assemble installation procedure and design unreasonable make It is slower at job schedule, influence the integral construction speed of steel construction steel tower.
Invention content
It is slow in order to solve assembling speed present in steel construction steel tower assembling process, assembling and installation procedure are unreasonable etc. Problem, the present invention provide a kind of quick assembling design method of steel construction steel tower.
The technical solution adopted by the present invention to solve the technical problems is:A kind of quick assembling design side of steel construction steel tower Method specifically comprises the steps of:
S1. the preparation before steel tower assembling:Specifically include action S11. assemblings utensil, the equipment material of two modules The preparation and inspection of material, the preparation and quality examination of S12. iron tower construction members, the work of two modules can reasonable distribution personnel it is same Shi Jinhang saves the construction time;
S2. the piecemeal assembling of iron tower structure, passes through weldering by substrate frame, truss internal structure beam and the horizontal bracing piece in column foot The mode connect is attached fixation, and when welding takes both ends behind first centre, longitudinal, external sequence behind first inside after first transverse direction;
S3. the assembled iron tower structure of piecemeal is carried out horizontal pre-assembled and examines correction;
S4. steel tower installation base is cleared up, arrangement scene simultaneously prepares column foot, by foundation bolt and the nut to match to tower Supporting leg in base is fixed;
S5. using the method for vertical dress, steel tower is set up in lifting successively from bottom to top on the column foot built well;
S6., anti-climbing frame, lightning arrester, scarer and burglar alarm are installed;S3 wherein in above-mentioned steps composition It synchronous can be carried out with S4.
The above-mentioned a kind of quick assembling design method of steel construction steel tower, installation base is with load-bearing capacity in the S4 Platform ground, roof or hillside.
A kind of above-mentioned steel construction steel tower quick assembling design method is set up in the S5 around steel tower and is equipped with protection Frame, the height of protective frame are identical as the height for the steel towers that installation is complete.
A kind of above-mentioned steel construction steel tower quick assembling design method during steel tower is set up in lifting in the S5, is completed After one layer or several layers of steel constructions, in time using lifting means by the lift up of steel structure to be installed being completed to pre-installing position It sets, to save the set-up time.
The above-mentioned a kind of quick assembling design method of steel construction steel tower, lift in the S5 it is horizontal it is smooth after the completion of need installation load-bearing Frame is horizontal smooth to reinforce, it is ensured that its stability installed.
The above-mentioned a kind of quick assembling design method of steel construction steel tower, the iron tower construction member of the steel construction steel tower is by high-strength Degree stainless steel material is made, and the surface of the iron tower construction member is coated with anticorrosion and antistatic layer.
The above-mentioned a kind of quick assembling design method of steel construction steel tower, the burglar alarm are equipped with 2~4, bird repellent dress 1~3 is installed.
A kind of above-mentioned steel construction steel tower quick assembling design method is welded with tilting substrate frame on the column foot.
Compared with prior art, the present invention has the characteristics that property and advantageous effect following prominent:
The invention has the advantages that the quick assembling design method of steel construction steel tower provided by the invention improves construction Efficiency shortens the construction-time of steel construction steel tower, makes full use of human resources, saved construction cost;By horizontal pre- Assembling and inspection correction reduce the appearance of installation error, the possible risk implemented in installation process are minimized, raising The safety coefficient of working at height.
Description of the drawings
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is the quick assembling design method flow schematic diagram of steel construction steel tower in the present invention;
Fig. 2 is the structural schematic diagram of steel construction steel tower in the present invention.
1. column foot in figure, 2. substrate framves, 3. truss, 4. horizontal bracing pieces, 5. bearing frames, 6. is horizontal smooth, and 7. scarers, 8. keep away Thunder device, 9. burglar alarms.
Specific implementation mode
To make those skilled in the art be better understood from technical scheme of the present invention, below in conjunction with the accompanying drawings and specific embodiment party Formula elaborates to the present invention.
A kind of quick assembling design method of steel construction steel tower, specifically comprises the steps of:
S1. the preparation before steel tower assembling, including two aspects:S11. the preparation and inspection of utensil, equipment and materials are assembled It looks into, the preparation and quality examination of S12. iron tower construction members;
S2. the piecemeal assembling of iron tower structure, substrate frame 2,3 internal structure beam of truss and the horizontal bracing piece 4 in column foot 1 are led to The mode for crossing welding is attached fixation, and when welding takes both ends behind first centre, longitudinal after first transverse direction, external suitable behind first inside Sequence;
S3. the assembled iron tower structure of piecemeal is carried out horizontal pre-assembled and examines correction;
S4. steel tower installation base is cleared up, arrangement scene simultaneously prepares column foot 1, passes through foundation bolt and the nut pair to match Supporting leg in column foot 1 is fixed;
S5. using the method for vertical dress, steel tower is set up in lifting successively from bottom to top on the column foot 1 built well;
S6., anti-climbing frame, lightning arrester 8, scarer 7 and burglar alarm 9 are installed;Wherein in above-mentioned steps composition S3 synchronous can be carried out with S4.
Further, installation base includes having on platform ground, roof or the hillside of load-bearing capacity in the S4;Institute It states to set up in S5 and protective frame is installed around steel tower, the height of protective frame is identical as the height for the steel towers that installation is complete, During steel tower is set up in lifting in the S5, after completing one layer or several layers of steel constructions, it will be assembled using lifting means in time The lift up of steel structure to be installed completed is to pre-installed position, to save the set-up time;Cross smooth 6 is lifted in the S5 to be needed after the completion Bearing frame 5 is installed to reinforce cross smooth 6, it is ensured that its stability installed;The iron tower construction member of the steel construction steel tower is by high intensity Stainless steel material is made, and the surface of the iron tower construction member is coated with anticorrosion and antistatic layer;The burglar alarm 9 is equipped with 2, drives Bird device 7 is equipped with 3.
Above example is only exemplary embodiment of the present invention, is not used in the limitation present invention, protection scope of the present invention It is defined by the claims.Those skilled in the art can within the spirit and scope of the present invention make respectively the present invention Kind modification or equivalent replacement, this modification or equivalent replacement also should be regarded as being within the scope of the present invention.

Claims (6)

1. a kind of quick assembling design method of steel construction steel tower, which is characterized in that specifically comprise the steps of:
S1. the preparation before steel tower assembling, specifically includes the action of two modules:S11. utensil, equipment and materials are assembled Preparation and inspection, the preparation and quality examination of S12. iron tower construction members;
S2. the piecemeal assembling of iron tower structure, by the structural beams and horizontal bracing piece (4) of substrate frame (2), truss (3) in column foot (1) It is attached fixation by welding;
S3. the assembled iron tower structure of piecemeal is carried out horizontal pre-assembled and examines correction;
S4. steel tower installation base is cleared up, arrangement scene simultaneously prepares column foot (1), by foundation bolt and the nut to match to tower Supporting leg in base (1) is fixed;
S5. using the method for vertical dress, steel tower is set up in lifting successively from bottom to top on the column foot (1) built well;
S6., anti-climbing frame, lightning arrester (8), scarer (7) and burglar alarm (9) are installed;Wherein in above-mentioned steps composition S3 and S4 synchronous can carry out.
2. a kind of quick assembling design method of steel construction steel tower according to claim 1, which is characterized in that pacify in the S4 It is platform ground, roof or the hillside for having load-bearing capacity to fill base.
3. a kind of quick assembling design method of steel construction steel tower according to claim 1, which is characterized in that group in the S5 It builds and protective frame is installed around steel tower, the height of protective frame is identical as the height for the steel towers that installation is complete.
4. a kind of quick assembling design method of steel construction steel tower according to claim 1, which is characterized in that the S5 liftings During setting up steel tower, after completing one layer or several layers of steel constructions, the timely steel to be installed that will be completed using lifting means Structure is promoted to pre-installed position.
5. a kind of quick assembling design method of steel construction steel tower according to claim 1, which is characterized in that the steel construction The iron tower construction member of steel tower is made of high-strength stainless steel material.
6. a kind of quick assembling design method of steel construction steel tower according to claim 1, which is characterized in that the bird repellent dress It sets (7) and is equipped with 1~3, burglar alarm (9) is equipped with 2~4.
CN201810599010.XA 2018-06-12 2018-06-12 A kind of quick assembling design method of steel construction steel tower Pending CN108612385A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810599010.XA CN108612385A (en) 2018-06-12 2018-06-12 A kind of quick assembling design method of steel construction steel tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810599010.XA CN108612385A (en) 2018-06-12 2018-06-12 A kind of quick assembling design method of steel construction steel tower

Publications (1)

Publication Number Publication Date
CN108612385A true CN108612385A (en) 2018-10-02

Family

ID=63664979

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810599010.XA Pending CN108612385A (en) 2018-06-12 2018-06-12 A kind of quick assembling design method of steel construction steel tower

Country Status (1)

Country Link
CN (1) CN108612385A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109555301A (en) * 2018-12-17 2019-04-02 嘉兴市恒光电力建设有限责任公司 A kind of multi-functional mounting platform of high voltage power cable
CN111173347A (en) * 2020-01-10 2020-05-19 程笔云 Construction method for power communication steel structure iron tower
CN111319063A (en) * 2018-12-13 2020-06-23 日本电产三协(浙江)有限公司 Method for manufacturing robot
CN111927187A (en) * 2020-07-01 2020-11-13 江苏润凯电力设备有限公司 Rapid assembly process for structural support of power transmission tower

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130212963A1 (en) * 2012-02-21 2013-08-22 Fabcon, Inc. Wind Turbine Tower
CN106285177A (en) * 2016-08-12 2017-01-04 上海电力设计院有限公司 The assemble method of aerial line steel tower
CN107345455A (en) * 2017-07-27 2017-11-14 江苏中瀚通讯技术有限公司 A kind of city high voltage power transmission line bar
CN107939141A (en) * 2017-11-16 2018-04-20 中国建筑局(集团)有限公司 Steel structure tower and construction method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130212963A1 (en) * 2012-02-21 2013-08-22 Fabcon, Inc. Wind Turbine Tower
CN106285177A (en) * 2016-08-12 2017-01-04 上海电力设计院有限公司 The assemble method of aerial line steel tower
CN107345455A (en) * 2017-07-27 2017-11-14 江苏中瀚通讯技术有限公司 A kind of city high voltage power transmission line bar
CN107939141A (en) * 2017-11-16 2018-04-20 中国建筑局(集团)有限公司 Steel structure tower and construction method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111319063A (en) * 2018-12-13 2020-06-23 日本电产三协(浙江)有限公司 Method for manufacturing robot
CN111319063B (en) * 2018-12-13 2021-11-12 日本电产三协(浙江)有限公司 Method for manufacturing robot
CN109555301A (en) * 2018-12-17 2019-04-02 嘉兴市恒光电力建设有限责任公司 A kind of multi-functional mounting platform of high voltage power cable
CN111173347A (en) * 2020-01-10 2020-05-19 程笔云 Construction method for power communication steel structure iron tower
CN111173347B (en) * 2020-01-10 2021-06-29 江苏大盛铁塔制造有限公司 Construction method for power communication steel structure iron tower
CN111927187A (en) * 2020-07-01 2020-11-13 江苏润凯电力设备有限公司 Rapid assembly process for structural support of power transmission tower

Similar Documents

Publication Publication Date Title
CN108612385A (en) A kind of quick assembling design method of steel construction steel tower
CN109235902A (en) Positive quadrangular pyramid bolt-ball net frame multi-point support high-altitude dissipates splicing method
CN109138454A (en) A kind of installation method of super high-rise building outline border bandy truss
CN111021779A (en) Integral descending and dismantling construction method for space net rack and auxiliary supporting mechanism
WO2022253310A1 (en) High-altitude rotating construction method for large venue steel canopy
CN201460242U (en) Assembly jig frame with net rack structure
CN113404281A (en) Climbing type scaffold, climbing and mounting method thereof and construction method of fabricated building
CN102134833A (en) Construction method for hoisting and disassembling bailey truss
CN110565801B (en) Novel support steel construction
CN110344332A (en) Support is used in bridge king-tower entablature construction
CN108147311A (en) A kind of material lifting platform and its method for improving
CN102022003A (en) Suspended ceiling keel sheet assembling and hoisting method
CN211998568U (en) Standard knot and tower crane
CN113770623A (en) Construction method for welding portable suspension cage
CN210917011U (en) Cable tower structure and bridge
CN201952103U (en) Steel-bar lifting frame
CN207905333U (en) Saddle combines Construction of Supporting hoistable platform
CN207276133U (en) A kind of jacking apparatus
CN218933797U (en) High-altitude operation platform device for tower platform beam of steelmaking main plant
CN211286560U (en) Spherical node suspension adjustable operation platform
CN109778897A (en) The connection type and assembly method of assembled elevator steel construction and pedestal
CN219759329U (en) Oil immersed power transformer
CN220487057U (en) Basket type operation platform for butt joint of steel giant columns
CN217175645U (en) Cable hanging flower basket device suitable for construction of building curtain wall with inner inverted inclined plane
CN211572669U (en) Steel structure supporting mechanism for assembly type building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181002

RJ01 Rejection of invention patent application after publication