CN108612197A - A kind of building construction is integrated to assemble wall and assemble method - Google Patents
A kind of building construction is integrated to assemble wall and assemble method Download PDFInfo
- Publication number
- CN108612197A CN108612197A CN201810455509.3A CN201810455509A CN108612197A CN 108612197 A CN108612197 A CN 108612197A CN 201810455509 A CN201810455509 A CN 201810455509A CN 108612197 A CN108612197 A CN 108612197A
- Authority
- CN
- China
- Prior art keywords
- support
- wall
- threaded rod
- far
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 25
- 238000009435 building construction Methods 0.000 title claims abstract description 20
- 238000009434 installation Methods 0.000 claims description 8
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 4
- 239000007787 solid Substances 0.000 claims description 2
- 238000005516 engineering process Methods 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 6
- 238000010276 construction Methods 0.000 description 5
- 239000004568 cement Substances 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000011381 foam concrete Substances 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000032258 transport Effects 0.000 description 2
- 230000003139 buffering effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 230000002262 irrigation Effects 0.000 description 1
- 238000003973 irrigation Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000003319 supportive effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/343—Structures characterised by movable, separable, or collapsible parts, e.g. for transport
- E04B1/34315—Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
- E04B1/34321—Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts mainly constituted by panels
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/61—Connections for building structures in general of slab-shaped building elements with each other
- E04B1/6108—Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/61—Connections for building structures in general of slab-shaped building elements with each other
- E04B1/6108—Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together
- E04B2001/6191—Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means on the corners of the slabs
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
The invention discloses a kind of integrated assembling wall of building construction and assemble methods, including firm banking, the firm banking top face and back side intermediate symmetrical position are rotatably connected to threaded rod, side of the braced frame far from threaded rod slidably connects telescopic fixed bracket, the telescopic fixed bracket inner surface slidably connects assembling wall, screw thread rod outer surface centre position is threaded with lifting slider, the lifting slider front and back symmetric position is rotatably connected to support fixed link, the support fixed link, which is located between lifting slider and support riser, is connected with cushioning and supporting device, the side of the second drum sliding block far from braced frame is fixedly connected with fixed footstock, the present invention relates to building construction technology fields.The device overall structure is detachable, is readily transported, simple in structure, is hardly damaged, easy to assembly quick, and flexible performance of constructing is high, and has frame structure, lighter in weight, is conducive to protect human body and wall safety.
Description
Technical field
The present invention relates to building construction technology field, the integrated assembling wall of specially a kind of building construction and assemble method.
Background technology
Wall block after the construction wall construction generally used at present is constituted using frame is assembled, long construction period.And
Existing integrated wall has template cast-in-place foamed concrete wall and zinc-plated keel shoe cement panel cast-in-place foamed concrete wall.Mould
Plate cast-in-situ wall is due to being poured with polylith template molding, and surface smoothness is not easy to control, and wall unit weight is up to very much
Less than the requirement of lightweight;Zinc-plated keel shoe cement panel wall body keel frame assembling is cumbersome to be not easy to site operation, due to keel shoe
It is that iron sheet is suppressed, so easily deformable in irrigation process be unfavorable for bonding with wall plate face, wall cost height
Be unfavorable for promote and it is energy saving.It is equally faced using integrated assembling wall and to improve construction flexibility, transport facility how to greatest extent
The requirement of property and convenient and efficient property.
Invention content
(One)The technical issues of solution
In view of the deficiencies of the prior art, it the present invention provides a kind of integrated assembling wall of building construction and assemble method, solves
Existing zinc-plated keel shoe cement panel wall is yielding and wall panel bonding is bad, and cost is high, integrates assembling
Wall construction flexibility is not high, and transports inconvenient problem.
(Two)Technical solution
In order to achieve the above object, the present invention is achieved by the following technical programs:A kind of integrated assembling wall of building construction and
Assemble method, including firm banking, the firm banking top face and back side intermediate symmetrical position are rotatably connected to screw thread
Bar, firm banking top both sides slidably connect the first drum sliding block, and the first drum sliding block is far from firm banking
Side be fixedly connected with braced frame, side of the braced frame far from threaded rod slidably connects telescopic fixed bracket, institute
It states telescopic fixed bracket inner surface and slidably connects assembling wall, the braced frame is located at threaded rod phase close to the side of threaded rod
The position answered offers fixed chute, and screw thread rod outer surface centre position is threaded with lifting slider, the lifting
Sliding block front and back symmetric position is rotatably connected to support fixed link, the described support one end of fixed link far from lifting slider
It is rotatably connected to support riser, the support fixed link, which is located between lifting slider and support riser, is connected with cushioning supportive
Device, side of the braced frame far from firm banking are fixedly connected with the second drum sliding block, and the second drum sliding block is remote
It is fixedly connected with fixed footstock from the side of braced frame.
Preferably, the firm banking is identical with fixed footstock structure, and the firm banking includes base body, the bottom
Seat body top front and back centre position offers threaded rod fixing groove, consolidates positioned at threaded rod at the top of the base body
Determine slot both sides symmetric position and offer fixed hole, fixed hole is located at the top of the base body far from threaded rod fixing groove
Side offer drum sliding slot.
Preferably, the threaded rod fixing groove inner surface and threaded rod are rotatablely connected, the drum sliding slot inner surface and the
One drum sliding block is slidably connected.
Preferably, the braced frame includes chassis body, and side of the chassis body far from threaded rod offers recessed
Slot, the groove inner surface front and back offer installation sliding slot, and the installation sliding slot inner surface is slided with telescopic fixed bracket
Dynamic connection.
Preferably, the telescopic fixed bracket includes support transverse slat, and the support transverse slat turns close to the side of fixed chute
Dynamic to be connected with collapsible bar, the support top and bottom of the transverse slat far from fixed chute side offer wall and fix
Slot, the wall fixing groove inner surface are slidably connected with assembling wall, and the support transverse slat front and back has been fixedly connected with
Block is covered, the set block inner surface slidably connects interior self-locking telescoping rod.
Preferably, the assembling wall includes wall block, and wall block side centre position close to each other offers tightly
Gu sliding slot, the fastening sliding slot inner surface slidably connects fastening sliding block.
Preferably, the support fixed link includes main rod body, and the side centre position that the main rod body is located remotely from each other is fixed
A plurality of fixing bolts are connected with, the fixing bolt outer surface is fixedly connected with nut.
Preferably, the cushioning and supporting device includes the first support column, and first support column both ends have been fixedly connected with
Buffer spring, side of the buffer spring far from the first support column are fixedly connected with the second support column, second support column
Side far from buffer spring is fixedly connected with annulus fixing piece.
Preferably, the annulus fixing piece inner surface is slidably connected with fixing bolt.
Preferably, the fixed chute inner surface is slidably connected with support riser, and the threaded rod is far from firm banking
One end is rotatablely connected with fixed footstock.
(Three)Advantageous effect
The present invention provides a kind of integrated assembling wall of building construction and assemble methods, have following advantageous effect:
(1)The present invention is rotatably connected to threaded rod, fixed bottom by firm banking top face and back side intermediate symmetrical position
Seat top both sides slidably connect the first drum sliding block, and the first side of the drum sliding block far from firm banking is fixedly connected with branch
Support frame frame, side of the braced frame far from firm banking are fixedly connected with the second drum sliding block, and the second drum sliding block is far from support
The side of frame is fixedly connected with fixed footstock so that and the device overall structure is detachable, is readily transported, and simple in structure,
It is hardly damaged.
(2)The present invention slidably connects telescopic fixed bracket, telescopic fixed bracket by side of the braced frame far from threaded rod
Inner surface slidably connects assembling wall, and braced frame is located at the corresponding position of threaded rod close to the side of threaded rod and offers
Fixed chute, screw thread rod outer surface centre position are threaded with lifting slider, and lifting slider front and back symmetric position is equal
It is rotatably connected to support fixed link, the one end of support fixed link far from lifting slider is rotatably connected to support riser, and support is fixed
Bar, which is located between lifting slider and support riser, is connected with cushioning and supporting device so that the device is easy to assembly quick, applies
The flexible performance of work is high, and has frame structure, lighter in weight, is conducive to protect human body and wall safety.
Description of the drawings
Fig. 1 is overall structure of the present invention;
Fig. 2 is firm banking structural schematic diagram of the present invention;
Fig. 3 is support frame structure schematic diagram of the present invention;
Fig. 4 is telescopic fixed bracket structural schematic diagram of the present invention;
Fig. 5 is present invention assembling wall body structure schematic diagram;
Fig. 6 is present invention support fixed rod structure schematic diagram;
Fig. 7 is cushioning and supporting device structural schematic diagram of the present invention.
In figure:1- firm bankings, 101- base bodies, 102- threaded rods fixing groove, 103- fixed holes, 104- drum are slided
Slot, 2- threaded rods, the first drum of 3- sliding block, 4- braced frames, 41- chassis bodies, 42- grooves, 43- installations sliding slot, 5- are flexible
Fixed frame, 51- supports transverse slat, 52- collapsibles bar, 53- walls fixing groove, 54- sets block, self-locking telescoping rod, 6- groups in 55-
Fill wall, 61- walls block, 62- fastenings sliding slot, 63- fastenings sliding block, 7- fixed chutes, 8- lifting sliders, 9- supports fixed link, 91-
Main rod body, 92- fixing bolts, 93- nuts, 10- supports riser, 11- cushioning and supporting devices, the first support columns of 111-, 112- are slow
It rushes spring, the second support columns of 113-, 114- annulus fixing piece, the second drum of 12- sliding block, 13- and fixes footstock.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
- 7 are please referred to Fig.1, the present invention provides a kind of technical solution:A kind of building construction is integrated to assemble wall and assembling side
Method, including firm banking 1,1 top face of firm banking and back side intermediate symmetrical position are rotatably connected to threaded rod 2, fixed
1 top both sides of pedestal slidably connect the first drum sliding block 3, and side of the first drum sliding block 3 far from firm banking 1, which is fixed, to be connected
It is connected to braced frame 4, braced frame 4 includes chassis body 41, and side of the chassis body 41 far from threaded rod 2 opens up fluted
42,42 inner surface front and back of groove offers installation sliding slot 43, and installation 43 inner surface of sliding slot is slided with telescopic fixed bracket 5
Connection.Side of the braced frame 4 far from threaded rod 2 slidably connects telescopic fixed bracket 5, and telescopic fixed bracket 5 includes support transverse slat
51, support transverse slat 51 is rotatably connected to collapsible bar 52 close to the side of fixed chute 7, and support transverse slat 51 is far from fixed
The top and bottom of 7 side of sliding slot offer wall fixing groove 53, and 53 inner surface of wall fixing groove connects with the assembling sliding of wall 6
It connects, support 51 front and back of transverse slat has been fixedly connected with set block 54, and set 54 inner surface of block slidably connects interior self-locking telescoping rod
55.5 inner surface of telescopic fixed bracket slidably connects assembling wall 6, and assembling wall 6 includes wall block 61, and wall block 61 is close to each other
Side centre position offers fastening sliding slot 62, and fastening 62 inner surface of sliding slot slidably connects fastening sliding block 63.Braced frame 4
It is located at 2 corresponding position of threaded rod close to the side of threaded rod 2 and offers fixed chute 7,2 outer surface centre position of threaded rod
It is threaded with lifting slider 8,8 front and back symmetric position of lifting slider is rotatably connected to support fixed link 9, and support is solid
Fixed pole 9 includes main rod body 91, and the side centre position that main rod body 91 is located remotely from each other is fixedly connected with a plurality of fixing bolts 92, Gu
Determine 92 outer surface of bolt and is fixedly connected with nut 93.It is perpendicular that the one end of support fixed link 9 far from lifting slider 8 is rotatably connected to support
Plate 10, support fixed link 9, which is located between lifting slider 8 and support riser 10, is connected with cushioning and supporting device 11, buffering branch
Support arrangement 11 includes the first support column 111, and 111 both ends of the first support column have been fixedly connected with buffer spring 112, buffer spring
112 sides far from the first support column 111 are fixedly connected with the second support column 113, and the second support column 113 is far from buffer spring
112 side is fixedly connected with annulus fixing piece 114.So that the device is easy to assembly quick, flexible performance of constructing is high, and has
Frame structure, lighter in weight are conducive to protect human body and wall safety.114 inner surface of annulus fixing piece is slided with fixing bolt 92
Dynamic connection.Side of the braced frame 4 far from firm banking 1 is fixedly connected with the second drum sliding block 12, and the second drum sliding block 12 is remote
Side from braced frame 4 is fixedly connected with fixed footstock 13.7 inner surface of fixed chute is slidably connected with support riser 10, spiral shell
The one end of rasp bar 2 far from firm banking 1 is rotatablely connected with fixed footstock 13.Firm banking 1 is identical with fixed 13 structure of footstock, Gu
It includes base body 101 to determine pedestal 1, and 101 top face of base body and back side centre position offer threaded rod fixing groove
102,102 inner surface of threaded rod fixing groove is rotatablely connected with threaded rod 2, and 101 top of base body is located at threaded rod fixing groove 102
Both sides symmetric position offers fixed hole 103, and 101 top of base body is fixed positioned at fixed hole 103 far from threaded rod
The side of slot 102 offers drum sliding slot 104, and 104 inner surface of drum sliding slot is slidably connected with the first drum sliding block 3.So that should
Device overall structure is detachable, is readily transported, and simple in structure, is hardly damaged.
In use, so that firm banking 1 is positioned and fixed by the fixed hole 103 in firm banking 1, pass through spiral shell
Rasp bar fixing groove 102 installs threaded rod 2, passes through mutually agreeing with for drum sliding slot 104 and the first drum sliding block 3 so that
Braced frame 4 and firm banking 1 are attached, and lifting slider 8 and threaded rod 2 are assembled, and support fixed link 9 is carried out
Installation so that support riser 10 and fixed chute 7 are mutually agreed with, and by annulus fixing piece 114 and fixing bolt 92 into
Row is adjusted so that support fixed link 9 can be supported braced frame 4, and be fastened by nut 93, be supported, will
Telescopic fixed bracket 5 by install sliding slot 43 be mounted on chassis body 41 groove 42 in, by wall block 61 by fasten sliding block 63 into
Row assembling, and in wall fixing groove 53, mutually agreed with by interior self-locking telescoping rod 55 and collapsible bar 52,
So that wall is sealed fastening, fixed footstock 13 is assembled by the second drum sliding block 12 and braced frame 4 later, and
It is attached with threaded rod 2, completes assembling.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also include other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.In the absence of more restrictions.By sentence " an including element limited, it is not excluded that including
There is also other identical elements in the process, method, article or equipment of element ".
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of variations, modification, replace
And modification, the scope of the present invention is defined by the appended.
Claims (10)
1. a kind of integrated assembling wall of building construction and assemble method, including firm banking(1), it is characterised in that:The fixation
Pedestal(1)Top face and back side intermediate symmetrical position are rotatably connected to threaded rod(2), the firm banking(1)Top two
Side slidably connects the first drum sliding block(3), the first drum sliding block(3)Far from firm banking(1)Side fix connect
It is connected to braced frame(4), the braced frame(4)Far from threaded rod(2)Side slidably connect telescopic fixed bracket(5), institute
State telescopic fixed bracket(5)Inner surface slidably connects assembling wall(6), the braced frame(4)Close to threaded rod(2)Side
Positioned at threaded rod(2)Corresponding position offers fixed chute(7), the threaded rod(2)Outer surface centre position screw thread connects
It is connected to lifting slider(8), the lifting slider(8)Front and back symmetric position is rotatably connected to support fixed link(9), institute
State support fixed link(9)Far from lifting slider(8)One end be rotatably connected to support riser(10), the support fixed link(9)
Positioned at lifting slider(8)With support riser(10)Between be connected with cushioning and supporting device(11), the braced frame(4)Far
From firm banking(1)Side be fixedly connected with the second drum sliding block(12), the second drum sliding block(12)Far from support frame
Frame(4)Side be fixedly connected with fixed footstock(13).
2. a kind of integrated assembling wall of building construction according to claim 1 and assemble method, it is characterised in that:It is described solid
Determine pedestal(1)With fixed footstock(13)Structure is identical, the firm banking(1)Including base body(101), the base body
(101)Top face and back side centre position offer threaded rod fixing groove(102), the base body(101)Top position
In threaded rod fixing groove(102)Both sides symmetric position offers fixed hole(103), the base body(101)Top position
In fixed hole(103)Far from threaded rod fixing groove(102)Side offer drum sliding slot(104).
3. a kind of integrated assembling wall of building construction according to claim 2 and assemble method, it is characterised in that:The spiral shell
Rasp bar fixing groove(102)Inner surface and threaded rod(2)Rotation connection, the drum sliding slot(104)Inner surface and the first drum are slided
Block(3)It is slidably connected.
4. a kind of integrated assembling wall of building construction according to claim 1 and assemble method, it is characterised in that:The branch
Support frame frame(4)Including chassis body(41), the chassis body(41)Far from threaded rod(2)Side open up it is fluted(42),
The groove(42)Inner surface front and back offers installation sliding slot(43), the installation sliding slot(43)Inner surface with it is flexible
Fixed frame(5)It is slidably connected.
5. a kind of integrated assembling wall of building construction according to claim 1 and assemble method, it is characterised in that:It is described to stretch
Contracting fixed frame(5)Including supporting transverse slat(51), the support transverse slat(51)Close to fixed chute(7)Side be rotatably connected to
Collapsible bar(52), the support transverse slat(51)Far from fixed chute(7)The top and bottom of side offer wall
Fixing groove(53), the wall fixing groove(53)Inner surface and assembling wall(6)It is slidably connected, the support transverse slat(51)Front
It is fixedly connected with set block with the back side(54), the set block(54)Inner surface slidably connects interior self-locking telescoping rod(55).
6. a kind of integrated assembling wall of building construction according to claim 1 and assemble method, it is characterised in that:Described group
Fill wall(6)Including wall block(61), the wall block(61)Side centre position close to each other offers fastening sliding slot(62),
The fastening sliding slot(62)Inner surface slidably connects fastening sliding block(63).
7. a kind of integrated assembling wall of building construction according to claim 1 and assemble method, it is characterised in that:The branch
Support fixed link(9)Including main rod body(91), the main rod body(91)The side centre position being located remotely from each other is fixedly connected with plural number
A fixing bolt(92), the fixing bolt(92)Outer surface is fixedly connected with nut(93).
8. a kind of integrated assembling wall of building construction according to claim 7 and assemble method, it is characterised in that:It is described slow
Rush support device(11)Including the first support column(111), first support column(111)Both ends have been fixedly connected with buffer spring
(112), the buffer spring(112)Far from the first support column(111)Side be fixedly connected with the second support column(113), institute
State the second support column(113)Far from buffer spring(112)Side be fixedly connected with annulus fixing piece(114).
9. a kind of integrated assembling wall of building construction according to claim 8 and assemble method, it is characterised in that:The circle
Ring fixing piece(114)Inner surface and fixing bolt(92)It is slidably connected.
10. a kind of integrated assembling wall of building construction according to claim 1 and assemble method, it is characterised in that:It is described
Fixed chute(7)Inner surface and support riser(10)It is slidably connected, the threaded rod(2)Far from firm banking(1)One end with
Fixed footstock(13)Rotation connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810455509.3A CN108612197B (en) | 2018-05-14 | 2018-05-14 | Integrated assembly wall of housing construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810455509.3A CN108612197B (en) | 2018-05-14 | 2018-05-14 | Integrated assembly wall of housing construction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108612197A true CN108612197A (en) | 2018-10-02 |
CN108612197B CN108612197B (en) | 2021-02-02 |
Family
ID=63663098
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810455509.3A Expired - Fee Related CN108612197B (en) | 2018-05-14 | 2018-05-14 | Integrated assembly wall of housing construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108612197B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112499054A (en) * | 2020-11-20 | 2021-03-16 | 潍坊科技学院 | Simple mask recovery equipment |
CN113026955A (en) * | 2021-03-22 | 2021-06-25 | 安宜建设集团有限公司 | Assembly type building structure with stable structure and construction method thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07207678A (en) * | 1994-01-19 | 1995-08-08 | Sumitomo Constr Co Ltd | Structure portion using concrete block |
US6041566A (en) * | 1996-09-19 | 2000-03-28 | Bale Built, Inc. | Composite wall system |
JP2006057257A (en) * | 2004-08-17 | 2006-03-02 | Ise Eizen Komuten:Kk | Anchor nut and reinforcing structure in wooden building using the anchor nut |
JP2009256970A (en) * | 2008-04-17 | 2009-11-05 | Sekisui Chem Co Ltd | Foundation inspection port cover structure in heat-insulating foundation |
CN104805931A (en) * | 2015-05-04 | 2015-07-29 | 李�学 | Integrated assembled house building wall body and assembling method |
CN205840455U (en) * | 2016-08-02 | 2016-12-28 | 罗晓飞 | Shock absorption house building structure that is a kind of readily accessible and that assemble |
CN206987044U (en) * | 2017-08-08 | 2018-02-09 | 青岛义和钢构有限公司 | A kind of steel construction unit structure beneficial to Modular assembled |
-
2018
- 2018-05-14 CN CN201810455509.3A patent/CN108612197B/en not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07207678A (en) * | 1994-01-19 | 1995-08-08 | Sumitomo Constr Co Ltd | Structure portion using concrete block |
US6041566A (en) * | 1996-09-19 | 2000-03-28 | Bale Built, Inc. | Composite wall system |
JP2006057257A (en) * | 2004-08-17 | 2006-03-02 | Ise Eizen Komuten:Kk | Anchor nut and reinforcing structure in wooden building using the anchor nut |
JP2009256970A (en) * | 2008-04-17 | 2009-11-05 | Sekisui Chem Co Ltd | Foundation inspection port cover structure in heat-insulating foundation |
CN104805931A (en) * | 2015-05-04 | 2015-07-29 | 李�学 | Integrated assembled house building wall body and assembling method |
CN205840455U (en) * | 2016-08-02 | 2016-12-28 | 罗晓飞 | Shock absorption house building structure that is a kind of readily accessible and that assemble |
CN206987044U (en) * | 2017-08-08 | 2018-02-09 | 青岛义和钢构有限公司 | A kind of steel construction unit structure beneficial to Modular assembled |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112499054A (en) * | 2020-11-20 | 2021-03-16 | 潍坊科技学院 | Simple mask recovery equipment |
CN113026955A (en) * | 2021-03-22 | 2021-06-25 | 安宜建设集团有限公司 | Assembly type building structure with stable structure and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN108612197B (en) | 2021-02-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108612197A (en) | A kind of building construction is integrated to assemble wall and assemble method | |
CN108214840A (en) | A kind of vertical adjustable precast stair mold | |
PL225014B1 (en) | Steam generator and fitting thereof | |
CN210006884U (en) | multifunctional roof antenna supporting device with self-counterweight and anti-overturning functions | |
CN203729440U (en) | Stay bar lower joint of rigid supporting dome structure | |
CN213710299U (en) | Modular two-layer elevartor shaft integral lifting bracing operation platform | |
CN218264431U (en) | Light steel wall body of fabricated building | |
CN206530077U (en) | A kind of support frame | |
CN215595068U (en) | Can have enough to meet need regularization precast concrete post bracing device | |
CN215254852U (en) | A consolidate strutting arrangement for building engineering | |
CN213742184U (en) | Building engineering is with die carrier that has structure of being convenient for dismouting | |
CN205577402U (en) | Adjustable arched beam formwork reinforcing apparatus that can used repeatedly | |
CN211775780U (en) | Novel template link | |
CN111946087A (en) | Fabricated building reinforcing member and construction method thereof | |
CN114232780A (en) | Steel structure unit for integrated house and steel structure mobile integrated house | |
CN201756808U (en) | Elevation regulator for installing steel members | |
CN207296474U (en) | A kind of building template supporting rack | |
CN209703793U (en) | Hanging device is used in stone curtain wall installation | |
CN208415685U (en) | A kind of adjustable assembled supporting frame structure | |
CN205626959U (en) | Portable badminton court ground net post | |
CN202018974U (en) | Bracket for solar PV biaxial system | |
CN203071217U (en) | An antenna support | |
CN214942635U (en) | Novel PC wallboard bearing diagonal | |
CN214575124U (en) | Assembled truss with adjustable span | |
CN112746746A (en) | Accurate assembly device and method for prefabricated components of assembly type building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210202 |
|
CF01 | Termination of patent right due to non-payment of annual fee |