CN213742184U - Building engineering is with die carrier that has structure of being convenient for dismouting - Google Patents

Building engineering is with die carrier that has structure of being convenient for dismouting Download PDF

Info

Publication number
CN213742184U
CN213742184U CN202022603797.8U CN202022603797U CN213742184U CN 213742184 U CN213742184 U CN 213742184U CN 202022603797 U CN202022603797 U CN 202022603797U CN 213742184 U CN213742184 U CN 213742184U
Authority
CN
China
Prior art keywords
rod
pole setting
piece
main
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022603797.8U
Other languages
Chinese (zh)
Inventor
关萌
魏玲玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Hongzheng Construction Co.,Ltd.
Liang Yinghong
Zhongshan Hongfeng Environmental Sanitation and Cleaning Co.,Ltd.
Original Assignee
Beijing Jianqi Power Technology Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jianqi Power Technology Engineering Co Ltd filed Critical Beijing Jianqi Power Technology Engineering Co Ltd
Priority to CN202022603797.8U priority Critical patent/CN213742184U/en
Application granted granted Critical
Publication of CN213742184U publication Critical patent/CN213742184U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a building engineering is with die carrier that has dismouting structure of being convenient for, including main pole setting and vice pole setting, the upper end of main pole setting is provided with the regulation pole, and the lower extreme of main pole setting is provided with and fills up the foot, and the department's upper end placed in the middle of filling up the foot is provided with the fixture block, vice pole setting sets up in the outside of adjusting the pole, and the outside lower extreme of vice pole setting is provided with the threaded sleeve, the threaded sleeve inboard is provided with the lead screw, and the one end of lead screw is provided with first regulation handle, outside one side of main pole setting and vice pole setting is provided with the horizontal pole. This building engineering is with being provided with die carrier and is provided with first regulation handle, and the lead screw of first regulation handle one end passes through to constitute threaded connection between threaded sleeve and the vice pole setting, because the interval has some differences from top to bottom in the floor, and ordinary scaffold pipe fitting can not adjust its length in a flexible way, therefore the effect of adjusting the pole lies in that it can carry out the flexible adjustment of stretching out and drawing back to the linking length between main pole setting and the vice pole setting.

Description

Building engineering is with die carrier that has structure of being convenient for dismouting
Technical Field
The utility model relates to a building engineering die carrier technical field specifically is a building engineering is with die carrier that has dismouting structure of being convenient for.
Background
The formwork for the construction engineering is a formwork support frame group for the production of the construction engineering, and at present, along with the acceleration of the progress of modern cities, the high-rise mansion is quickly built, the construction progress requirement of the engineering is more and more tight, so that the requirements on the use convenience, the dismounting convenience and the environment protection of the formwork for the construction engineering are all provided.
Most of the common formwork for building engineering in the market at present are the same, but the formwork structure consumes a large amount of manpower and material resources due to complex and complicated operation processes in actual operation, and is unfavorable for a construction period with time being urgent, and the formwork is convenient for solving the inconvenient and complex operation processes of the disassembly and the assembly of the formwork, so that the formwork with the structure convenient for the disassembly and the assembly of the formwork for building engineering is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building engineering is with die carrier that has dismouting structure of being convenient for to the current generally used die carrier for building engineering who proposes in solving above-mentioned background is the most the same, but such die carrier structure is in the middle of the actual operation because the complex and complicated of operation flow, consequently consumed a large amount of manpower and material resources, and also caused unfavorable to the time limit for a project that the time is urgent, and this die carrier is just in order to solve the inconvenient and complex operation flow's of building die carrier dismouting problem.
In order to achieve the above object, the utility model provides a following technical scheme: a formwork with a structure convenient to disassemble and assemble for construction engineering comprises a main vertical rod and an auxiliary vertical rod, wherein an adjusting rod is arranged at the upper end of the main vertical rod, a pad foot is arranged at the lower end of the main vertical rod, a clamping block is arranged at the upper end of the middle part of the pad foot, the auxiliary vertical rod is arranged on the outer side of the adjusting rod, a threaded sleeve is arranged at the outer lower end of the auxiliary vertical rod, a lead screw is arranged on the inner side of the threaded sleeve, a first adjusting handle is arranged at one end of the lead screw, a cross rod is arranged on one side of the outer part of the main vertical rod and the auxiliary vertical rod, scaffold fasteners are arranged at the connecting parts of the main vertical rod, the auxiliary vertical rod and the cross rod, sliding grooves are formed in the upper side and the lower side of the cross rod, a loop rod stabilizing piece is arranged at the lower end of the loop rod stabilizing piece, a sliding rod stabilizing piece is arranged at the tail end of the loop rod, a second adjusting handle is arranged on one side of the outer lower end of the loop rod stabilizing piece, and an inclined strut supporting rod is arranged on one side of the outside of the sleeve rod stabilizing piece and the outside of the slide rod stabilizing piece.
Preferably, the screw rod at one end of the first adjusting handle is in threaded connection with the auxiliary vertical rod through a threaded sleeve, and one end of the screw rod is attached to the outer wall of the adjusting rod.
Preferably, the main upright rod forms a telescopic structure through the adjusting rod and the auxiliary upright rod, and the pad foot forms a clamping structure through the clamping block and the main upright rod.
Preferably, the sleeve rod stabilizing piece and the sliding rod stabilizing piece are distributed in a jogged mode through the sliding block and the sliding groove, and the sleeve rod stabilizing piece and the sliding rod stabilizing piece are distributed in two modes.
Preferably, the sleeve rod stabilizing piece and the slide rod stabilizing piece form a detachable structure through the second adjusting handle, and the sleeve rod stabilizing piece and the inclined strut supporting rod on the inner side of the slide rod stabilizing piece are distributed in a crossed mode.
Preferably, main pole setting and vice pole setting pass through and constitute detachable construction between scaffold fastener and the horizontal pole, and the horizontal distribution is presented to the horizontal pole.
Compared with the prior art, the beneficial effects of the utility model are that: this building engineering is with being provided with die carrier and is provided with first regulation handle, the lead screw of first regulation handle one end passes through to constitute threaded connection between threaded sleeve and the vice pole setting, because the interval has difference from top to bottom on the floor, and ordinary scaffold pipe fitting can not adjust its length in a flexible way, consequently, the effect of adjusting the pole lies in that it can carry out the nimble adjustment of stretching out and drawing back to the linking length between main pole setting and the vice pole setting, it is also convenient that the dismouting operation between main pole setting and the vice pole setting is also made to the mode of establishing through this cover simultaneously, and the effect of first regulation handle lies in making things convenient for the operator to rotate the lead screw, thereby make the one end of lead screw to support the laminating to the regulating stem, and make and adjust reciprocal anchorage between pole and the vice pole setting, threaded sleeve mainly plays the effect of stabilizing the lead screw simultaneously.
The utility model discloses a fixed mode can enough stabilize each other between the member through the gomphosis of slider and spout, the loaded down with trivial details flow that needs carry out repeated fastening through a large amount of scaffold fasteners has been avoided simultaneously again to the firm piece of loop bar and the firm piece of slide bar through constituting the gomphosis form between slider and the spout and distribute, because the horizontal pole mainly plays and carries out the effect that the bay is connected main pole setting and vice pole setting, but can not avoid main pole setting and vice pole setting to take place the phenomenon of rolling about, therefore the effect of loop bar firm piece and the firm piece of slide bar lies in can supporting between the horizontal pole from top to bottom and stabilizes, thereby the main pole setting of having avoided being connected with the horizontal pole takes place to sway the phenomenon of rocking with vice pole setting, and the gomphosis fixed mode through slider and spout can enough stabilize each other between the member.
The loop bar steadier forms detachable construction through between second regulation handle and the slide bar steadier, because upper and lower layer horizontal pole can not guarantee its interval size is unanimous completely when carrying out artifical installation, and loop bar steadier and slide bar steadier can not carry out synchronous installation with the horizontal pole, consequently loop bar steadier and slide bar steadier can imbed in the spout of horizontal pole under the flexible effect of each other, and finally through second regulation handle reciprocal anchorage between loop bar steadier and the slide bar steadier, second regulation handle also makes the dismouting between loop bar steadier and the slide bar steadier more convenient simultaneously, and bracing branch mainly plays and strengthens firm effect between loop bar steadier and the slide bar steadier.
Drawings
Fig. 1 is a schematic front view of the external structure of the present invention;
FIG. 2 is a schematic view of the front view of the internal structure of the present invention;
FIG. 3 is a cross-sectional structure of the cross bar of the present invention;
fig. 4 is a schematic view of a part of an enlarged structure at a in fig. 2 according to the present invention.
In the figure: 1. a main upright stanchion; 2. adjusting a rod; 3. a foot pad; 4. a clamping block; 5. an auxiliary upright rod; 6. a threaded sleeve; 7. a screw rod; 8. a first adjustment handle; 9. a cross bar; 10. scaffold fasteners; 11. a chute; 12. the loop bar fixing piece; 13. a slide bar stabilizing member; 14. a slider; 15. a second adjustment handle; 16. bracing strut.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a formwork with a structure convenient to disassemble and assemble for construction engineering comprises a main upright stanchion 1, an adjusting rod 2, a pad 3, a fixture block 4, an auxiliary upright stanchion 5, a threaded sleeve 6, a lead screw 7, a first adjusting handle 8, a cross rod 9, a scaffold fastener 10, a chute 11, a loop bar fixing piece 12, a slide bar fixing piece 13, a slider 14, a second adjusting handle 15 and a diagonal strut 16, wherein the upper end of the main upright stanchion 1 is provided with the adjusting rod 2, the lower end of the main upright stanchion 1 is provided with the pad 3, the upper end of the middle part of the pad 3 is provided with the fixture block 4, the auxiliary upright stanchion 5 is arranged at the outer side of the adjusting rod 2, the outer lower end of the auxiliary upright stanchion 5 is provided with the threaded sleeve 6, the inner side of the threaded sleeve 6 is provided with the lead screw 7, one end of the lead screw 7 is provided with the first adjusting handle 8, one side of the outer parts of the main upright stanchion 1 and the auxiliary upright stanchion 5 is provided with the cross rod 9, and the scaffold fastener 10 is arranged at the joint of the main upright stanchion 1, the auxiliary upright stanchion 5 and the cross rod 9, the upper side and the lower side of the cross rod 9 are provided with sliding grooves 11, the lower end of the cross rod 9 is provided with a sleeve rod stabilizing piece 12, the inner side of the lower end of the sleeve rod stabilizing piece 12 is provided with a sliding rod stabilizing piece 13, the tail ends of the sliding rod stabilizing piece 13 and the sleeve rod stabilizing piece 12 are provided with a sliding block 14, one side of the outer lower end of the sleeve rod stabilizing piece 12 is provided with a second adjusting handle 15, and one side of the outer part of the sleeve rod stabilizing piece 12 and the outer part of the sliding rod stabilizing piece 13 is provided with an inclined strut supporting rod 16;
the screw 7 at one end of the first adjusting handle 8 is in threaded connection with the auxiliary upright stanchion 5 through the threaded sleeve 6, one end of the screw 7 is attached to the outer wall of the adjusting rod 2, the distance between the upper and lower floors is different, and the length of the common scaffold pipe fitting cannot be flexibly adjusted, so that the adjusting rod 2 has the function of flexibly adjusting the connection length between the main upright stanchion 1 and the auxiliary upright stanchion 5 in a telescopic manner, and meanwhile, the main upright stanchion 1 and the auxiliary upright stanchion 5 are more convenient to disassemble and assemble through the sleeving manner, and the first adjusting handle 8 is convenient for an operator to rotate the screw 7, so that one end of the screw 7 abuts against the adjusting rod 2 to be attached, the adjusting rod 2 and the auxiliary upright stanchion 5 are fixed with each other, and the threaded sleeve 6 mainly plays a role in stabilizing the screw 7;
the main upright rod 1 and the auxiliary upright rod 5 form a telescopic structure through the adjusting rod 2, the foot pad 3 and the main upright rod 1 form a clamping structure through the clamping block 4, the main upright rod 1 and the auxiliary upright rod 5 have the main effects that the main upright rod 1 and the auxiliary upright rod 5 can support and fix a building template, and meanwhile, the main upright rod 1 and the auxiliary upright rod 5 can be telescopically adjusted through the adjusting rod 2, so that the main upright rod 1 and the auxiliary upright rod 5 are stretched and adjusted according to different space sizes of the template, the foot pad 3 has the effect that the contact area between the main upright rod 1 and the ground can be increased, the main upright rod 1 is more stable, and meanwhile, the clamping block 4 mainly plays a role in clamping and fixing the main upright rod 1 and the foot pad 3;
the sleeve rod stabilizing piece 12 and the slide rod stabilizing piece 13 are in embedded distribution through the sliding block 14 and the sliding groove 11, the sleeve rod stabilizing piece 12 and the slide rod stabilizing piece 13 are in two distribution, and the cross rod 9 mainly plays a role in connecting the main upright rod 1 and the auxiliary upright rod 5 in a partition section manner, but the phenomenon that the main upright rod 1 and the auxiliary upright rod 5 shake left and right cannot be avoided, so that the sleeve rod stabilizing piece 12 and the slide rod stabilizing piece 13 can be used for stably supporting the upper cross rod 9 and the lower cross rod 9, the phenomenon that the main upright rod 1 and the auxiliary upright rod 5 connected with the cross rod 9 swing and shake is avoided, the rod pieces can be mutually stabilized through the embedded fixing mode of the sliding block 14 and the sliding groove 11, and meanwhile, the complex flow that repeated fastening is needed through a large number of scaffold fasteners 10 is avoided;
the loop bar steady 12 forms a detachable structure with the slide bar steady 13 through the second adjusting handle 15, and the sleeve rod steady piece 12 and the bracing strut 16 at the inner side of the slide rod steady piece 13 are distributed in a cross way, because the upper and lower layers of cross bars 9 can not ensure the distance and the size are completely consistent when being manually installed, and the sleeve rod steady piece 12 and the sliding rod steady piece 13 can not be installed with the cross bars 9 synchronously, the sleeve steady 12 and the slide rod steady 13 can thus engage in the slide groove 11 of the transverse bar 9 under the effect of mutual telescoping, and finally the sleeve steady 12 and the slide steady 13 are fixed to each other by means of a second adjusting handle 15, at the same time the second adjusting handle 15 also facilitates the assembly and disassembly between the sleeve steady 12 and the slide steady 13, the bracing strut 16 mainly plays a role in reinforcing and stabilizing the space between the sleeve rod steady piece 12 and the slide rod steady piece 13;
main pole setting 1 and vice pole setting 5 pass through and constitute detachable construction between scaffold fastener 10 and the horizontal pole 9, and the horizontal pole 9 is the horizontal distribution, because main pole setting 1 and vice pole setting 5 only play the effect of carrying out the vertical braces to the building templates, but can not guarantee the possibility that the template takes place lateral displacement, consequently horizontal pole 9 mainly plays and overlaps pole stabilizing member 12 and slide bar stabilizing member 13 and mutually supports firmly between all main pole setting 1 and vice pole setting 5 under scaffold fastener 10's connection.
The working principle is as follows: for the die carrier with the structure convenient for dismounting and mounting for the building engineering, firstly, the pad foot 3 is placed on the ground, then the auxiliary upright stanchion 5 is sleeved on the adjusting rod 2 at the upper end of the main upright stanchion 1, then the lower end of the main upright stanchion 1 is mutually clamped and fixed with the clamping block 4 at the upper end of the pad foot 3, and finally the auxiliary upright stanchion 5 is stretched according to the height size of the template, wherein, because the length of the common scaffold pipe fitting can not be flexibly adjusted, the adjusting rod 2 has the function of flexibly adjusting the connection length between the main upright stanchion 1 and the auxiliary upright stanchion 5, and simultaneously, the dismounting and mounting operation between the main upright stanchion 1 and the auxiliary upright stanchion 5 is more convenient by the sleeving mode, and the first adjusting handle 8 has the function of facilitating an operator to rotate the screw rod 7, thereby enabling one end of the screw rod 7 to abut against and attach the adjusting rod 2, and make adjusting pole 2 and vice pole setting 5 fixed each other to finally confirm the whole height between main pole setting 1 and the vice pole setting 5, next fasten the outside one side at main pole setting 1 and vice pole setting 5 respectively with horizontal pole 9 through the fixed mode of scaffold fastener 10, then insert the spout 11 of horizontal pole 9 side respectively with loop bar steadiness spare 12 and the slider 14 of slide bar steadiness spare 13 one end, then carry out the screw-thread fastening between loop bar steadiness spare 12 and the slide bar steadiness spare 13 by second regulation handle 15, thereby accomplish the installation operation of die carrier.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a building engineering is with die carrier that has dismouting structure of being convenient for, includes main pole setting (1) and vice pole setting (5), its characterized in that: the upper end of the main upright stanchion (1) is provided with an adjusting rod (2), the lower end of the main upright stanchion (1) is provided with a pad foot (3), the upper end of the middle part of the pad foot (3) is provided with a clamping block (4), the auxiliary upright stanchion (5) is arranged on the outer side of the adjusting rod (2), the outer lower end of the auxiliary upright stanchion (5) is provided with a threaded sleeve (6), the inner side of the threaded sleeve (6) is provided with a lead screw (7), one end of the lead screw (7) is provided with a first adjusting handle (8), one side of the outer parts of the main upright stanchion (1) and the auxiliary upright stanchion (5) is provided with a cross rod (9), the joint of the main upright stanchion (1) and the auxiliary upright stanchion (5) and the cross rod (9) is provided with a scaffold fastener (10), the upper and lower sides of the cross rod (9) are provided with sliding chutes (11), the lower end of the cross rod (9) is provided with a loop rod stabilizing piece (12), the inner side of the lower end of the loop rod stabilizing piece (12) is provided with a stabilizing slide rod (13), and the tail ends of the sliding rod steady piece (13) and the sleeve rod steady piece (12) are provided with sliding blocks (14), one side of the outer lower end of the sleeve rod steady piece (12) is provided with a second adjusting handle (15), and one side of the outer part of the sleeve rod steady piece (12) and the outer part of the sliding rod steady piece (13) is provided with an inclined strut supporting rod (16).
2. The formwork with the structure convenient for disassembly and assembly for constructional engineering as claimed in claim 1, wherein: and a screw rod (7) at one end of the first adjusting handle (8) is in threaded connection with the auxiliary upright rod (5) through a threaded sleeve (6), and one end of the screw rod (7) is attached to the outer wall of the adjusting rod (2).
3. The formwork with the structure convenient for disassembly and assembly for constructional engineering as claimed in claim 1, wherein: the main upright rod (1) forms a telescopic structure through the adjusting rod (2) and the auxiliary upright rod (5), and the pad foot (3) forms a clamping structure through the clamping block (4) and the main upright rod (1).
4. The formwork with the structure convenient for disassembly and assembly for constructional engineering as claimed in claim 1, wherein: the sleeve rod stabilizing piece (12) and the sliding rod stabilizing piece (13) are distributed in an embedded manner through the sliding block (14) and the sliding groove (11), and the sleeve rod stabilizing piece (12) and the sliding rod stabilizing piece (13) are distributed in two ways.
5. The formwork with the structure convenient for disassembly and assembly for constructional engineering as claimed in claim 1, wherein: the sleeve rod stabilizing piece (12) and the sliding rod stabilizing piece (13) form a detachable structure through the second adjusting handle (15), and the sleeve rod stabilizing piece (12) and the inclined strut supporting rod (16) on the inner side of the sliding rod stabilizing piece (13) are distributed in a crossed mode.
6. The formwork with the structure convenient for disassembly and assembly for constructional engineering as claimed in claim 1, wherein: main pole setting (1) and vice pole setting (5) pass through and constitute detachable construction between scaffold fastener (10) and horizontal pole (9), and horizontal pole (9) are the horizontal distribution.
CN202022603797.8U 2020-11-12 2020-11-12 Building engineering is with die carrier that has structure of being convenient for dismouting Active CN213742184U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022603797.8U CN213742184U (en) 2020-11-12 2020-11-12 Building engineering is with die carrier that has structure of being convenient for dismouting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022603797.8U CN213742184U (en) 2020-11-12 2020-11-12 Building engineering is with die carrier that has structure of being convenient for dismouting

Publications (1)

Publication Number Publication Date
CN213742184U true CN213742184U (en) 2021-07-20

Family

ID=76823398

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022603797.8U Active CN213742184U (en) 2020-11-12 2020-11-12 Building engineering is with die carrier that has structure of being convenient for dismouting

Country Status (1)

Country Link
CN (1) CN213742184U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114033144A (en) * 2021-12-07 2022-02-11 江苏省苏中建设集团股份有限公司 Splicing type steel structure frame convenient to mount and used for building support

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114033144A (en) * 2021-12-07 2022-02-11 江苏省苏中建设集团股份有限公司 Splicing type steel structure frame convenient to mount and used for building support

Similar Documents

Publication Publication Date Title
CN213742184U (en) Building engineering is with die carrier that has structure of being convenient for dismouting
CN207553652U (en) A kind of assembled architecture wallboard combines support device
CN209053425U (en) A kind of Double-strut cantilever template suitable for concreting
CN210622322U (en) Detachable temporary support for constructional engineering construction
CN212002250U (en) Support frame for steel structure engineering construction
CN210336391U (en) Portable adjustable prefabricated T-beam diaphragm beam supporting bottom support device
CN204738536U (en) Subway station side wall concrete form support frame
CN111502069A (en) Convenient positioning structure and installation method for building assembly type prefabricated wall
CN207609011U (en) Assembled architecture agent structure
CN207469717U (en) A kind of architectural engineering scaffold bracing means
CN205577402U (en) Adjustable arched beam formwork reinforcing apparatus that can used repeatedly
CN104389415A (en) Scaffold
CN214272509U (en) Assembled energy-conserving building wall component
CN213927305U (en) Shock-proof type interior decoration floor is with prefabricated bearing structure
CN213953046U (en) First section steel column location bearing structure
CN208168147U (en) A kind of prefabrication type building structure column
CN2531035Y (en) Telescopic steel pipe strut
CN209261215U (en) A kind of narrow Zhongting concrete top plate supporting frame system of building
CN209413302U (en) Movable side wall form support system with operation platform
CN208473153U (en) A kind of precasting steel frame stair
CN214423600U (en) Combined cambered surface inflatable plastic film arched shed structure
CN204252504U (en) Scaffold
CN212867127U (en) A warning rail guard for mining engineering
CN110792277A (en) Guardrail for building construction
CN216201123U (en) Warm grillage that rolls over that leads to of building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230914

Address after: 528441 Second Floor, No. 30 Minmin Avenue, Minmin Town, Zhongshan City, Guangdong Province

Patentee after: Guangdong Hongzheng Construction Co.,Ltd.

Address before: One of the fifth floors, No. 30 Minmin Avenue, Minmin Town, Zhongshan City, Guangdong Province, 528441

Patentee before: Zhongshan Hongfeng Environmental Sanitation and Cleaning Co.,Ltd.

Patentee before: Liang Yinghong

Effective date of registration: 20230914

Address after: One of the fifth floors, No. 30 Minmin Avenue, Minmin Town, Zhongshan City, Guangdong Province, 528441

Patentee after: Zhongshan Hongfeng Environmental Sanitation and Cleaning Co.,Ltd.

Patentee after: Liang Yinghong

Address before: 101149 room 01-3769, 3rd floor, 99 Shuixian West Road, Tongzhou District, Beijing

Patentee before: Beijing Jianqi Power Technology Engineering Co.,Ltd.

TR01 Transfer of patent right