CN108611991A CN201611180972.9A CN201611180972A CN108611991A CN 108611991 A CN108611991 A CN 108611991A CN 201611180972 A CN201611180972 A CN 201611180972A CN 108611991 A CN108611991 A CN 108611991A
Authority
CN
China
Prior art keywords
arch
steel
bridge
steel plate
arch bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611180972.9A
Other languages
Chinese (zh)
Inventor
王添龙
陈颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong University of Technology
Original Assignee
Guangdong University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong University of Technology filed Critical Guangdong University of Technology
Priority to CN201611180972.9A priority Critical patent/CN108611991A/en
Publication of CN108611991A publication Critical patent/CN108611991A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D4/00Arch-type bridges

Abstract

The invention belongs to bridge strengthening fields, and in particular to a kind of novel reinforced Old arch bridge structure and its construction method, including pontic 1 are equipped with epoxy resin mortar filled layer 4, and lateral stiffening steelframe is equipped on epoxy resin mortar filled layer 4 below pontic 1.It is connected with prefabricated box splicing steel plate 8 between arch rib, and applies prestressing force using deformed bar 9 between arch rib.Then casting concrete forms it into overall structure at arch springing, arch rib steel plate connecting pin and stretch-draw anchor anchorage.Finally to H profile steel 7, box splicing steel plate 8 and weld seam 5 carry out the preservative treatment such as paint.The lateral stiffening steel frame construction includes anchorage screw 2, anchor bolt 3, ribbed stiffener 6, H profile steel 7, structure of the invention technology reinforce arch bridge, and construction is simple is convenient, reinforcing expense is relatively low, dead weight increases less, and consolidation effect is good, and analysis is a kind of method of relatively inexpensive safe reinforcing arch bridge from structure stress.

Description

A kind of novel reinforced Old arch bridge structure
Technical field
The present invention relates to a kind of reinforcing Old arch bridge structures, belong to bridge strengthening field.
Background technology
With the development of society, the growth of the arch bridge length of service, the volume of traffic and vehicle load speed increase, cause arch bridge main body knot There are different degrees of cracking diseases, followed by its bearing capacity to be gradually lowered for structure, is rebuild if old bridge all removed, this It needs to spend a large amount of manpower and materials, government that can not bear, and also has a great impact to transformation traffic, therefore old bridge is added Gu being just particularly important.In existing technology, the reinforcement means of arch bridge is mainly the following:
1. mitigating spandrel construction gravimetric method:The method is by using the arch fill of lightweight, longitudinal perforation, arch building on extrados It is changed to light-duty the methods of board-like spandrel construction.The method advantage is can to mitigate dead load, infrastructure is wanted with reducing It asks, while can also mitigate the burden of main arch ring.The disadvantage is that needs suspend traffic and cost is relatively high.
2. external prestressed strengthening method;The method is chiefly used in reinforcing beam bridge, and displacement is generated for arch ring cracking and abutment, The reinforcing of this method can also be used in the arch bridge of vault downwarp.Its practice is:To the arch bridge of main arch ring longitudinal cracking, direction across bridge is set Reinforcing pull rod applies prestressed reinforcement;To the arch bridge of main arch ring Transverse Cracks or abutment displacement, vault downwarp, then using along bridge to setting It sets reinforcing bar or reinforcing pull rod applies prestressing force and reinforced.
3. shotcrete method for strengthening:Shotcrete reinforce have caking property is good, early strength is high, construction is quick and easy, adaptable, it is right The features such as Coherent traffic noise is smaller.But anchor jet technology reinforces the concrete that the shortcomings that arch bridge is injection need to be by as load before solidification Original structure undertakes, and the bearing capacity of structure is made to be affected;And arch bridge that there are later strengths is low, is unfavorable for bridge permanently makes Defect.
4. other reinforcement means of Old arch bridge all exist as shortened across footpath method, set arch (Internal Lining Method), the methods of arched girder combination Different degrees of deficiency, it is long in time limit.Cost is high or to suspend traffic.Traditional ruggedized construction and reinforcement means cannot be satisfied Low cost, high quality, the requirement of efficient engineering project, are badly in need of a kind of convenient and quick construction, cost is relatively low, the reinforcing of high quality Structural approach.
5. the present invention proposes a kind of novel reinforced Old arch bridge structure, have easy for construction, securely and reliably, stress performance is good Feature.
Invention content
It is an object of the invention to overcome the defect of existing Arch Bridges Strengthening technology, a kind of construction convenient and efficient, cost are provided It is low, accelerate the structural approach to bridge strengthening, it is proposed that a kind of novel reinforced Old arch bridge structure.
The technical scheme is that:H profile steel is pasted below pontic using epoxy resin mortar, and both ends each extend to arch H profile steel pressurization hereinafter, be anchored on pontic by bridge spring line with pre-buried anchor bolt and anchorage screw, and by the H-type after anchoring Steel welding is integral.It is connected with precast box shape steel plate between arch rib, and is answered in advance using deformed bar application between arch rib Power.The holistic resistant behavior of arch bridge can be effectively raised, pontic local pressure situation is improved.This H profile steel has efficiently warp Help sanction face proximate matter, and cross sectional shape is reasonable, and steel can be made higher to play efficiency, is effectively improved in the case of dead weight is relatively light and holds sanction energy Power.
The beneficial effects of the invention are as follows;Effectively add with the good loading characteristic of lateral stiffening steelframe and arch bridge flexibility Admittedly the principle handled uses lateral stiffening steel and reinforced to arch bridge, there is dead weight to increase little, construction is simple is convenient, adds Gu it is at low cost, and the characteristics of do not influence traffic, with good economic efficiency and social benefit.It is spelled with box between arch rib It connects steel plate and connects and apply prestressing force, it is effective to increase arch bridge load resistant power, to analyze it is also safer height from structure stress A kind of Arch Bridges Strengthening method of effect.
Description of the drawings
Fig. 1 is novel reinforced Old arch bridge structural side view;
Fig. 2 is that lateral stiffening steelframe reinforces arch bridge structure cross-sectional view;
Fig. 3 is to reinforce connection structure cross-sectional view between Old arch bridge arch rib.
Wherein;Bridge 1 body, 2 anchorage screws, 3 anchor bolts, 4 epoxy resin mortar filled layers, 5 weld seams, 6 ribbed stiffeners, 7H shaped steel, 8 Precast box shape steel plate, 9 deformed bars, 10 steel plates, the stretch-draw anchor anchorage of 11 adjustable pretightning forces.
Specific implementation mode
The present invention is described in further details below in conjunction with the accompanying drawings:
For arch bridge as shown in Figure 1, using laterally plus between diameter steelframe and arch rib connecting, box splices steel plate and application is pre- Stress is reinforced.First to surface have crack cleared up, the cementation of fissures or Seal treatment, H profile steel 7 is pasted with epoxy resin mortar To former arch bridge bottom surface, and both ends extend to spring line or less.With the anchor bolt 3 and anchorage screw 2 being embedded on former pontic by H The pressurization of shaped steel 7 is anchored on former arch bridge, and the welding of H profile steel 7 after anchoring is linked to be entirety, and ribbed stiffener is then welded on anchoring In H profile steel 7 afterwards, lateral stiffening steelframe is formed.It is connected with prefabricated box splicing steel plate 8 between arch rib, and between arch rib Apply prestressing force using deformed bar 9.Then coagulation is poured at arch springing, arch rib steel plate connecting pin and stretch-draw anchor anchorage 11 Soil forms it into overall structure.Finally to H profile steel 7, box splicing steel plate 8 and weld seam 5 carry out the preservative treatment such as paint.
In above-described embodiment, pastes and use high-strength steel with H profile steel 7, assembling is cut in advance by producer, and drills.Anchor spiral shell Bolt 3 is all made of expansion bolt, and is embedded into pontic in advance.
In above-described embodiment, box splices steel plate 8 using high-strength steel, and can first be prefabricated in the factory assembly.It uses at both ends Want advance reservation drilling for across deformed bar in the steel plate 10 of stretch-draw fixing anchor device.
In above-described embodiment, deformed bar 9 can with FRP tendons etc. other can prestretching material replace.
In above-described embodiment, using the special fast hardening sulphoaluminate cement concrete of steel fibre, have early by force, high tenacity is durable The good feature of property, can reach working strength, can shorten the construction time, not interfere traffic in a short time.
As described above, the present invention can be realized.The present invention is not limited to the above embodiment, those skilled in the art are made It is any to the above embodiment conspicuously improved or change, all without departing from the present invention design and appended claims Protection domain.

Claims (3)

1. a kind of novel reinforced Old arch bridge structure, it is characterized in that:Epoxy resin mortar filled layer 4 is equipped with below the pontic, and Lateral stiffening steel frame construction is equipped on epoxy resin mortar filled layer 4.It is connected with prefabricated box splicing steel plate 8 between arch rib, and Apply prestressing force using deformed bar 9 between arch rib.Then at arch springing, arch rib steel plate connecting pin and stretch-draw anchor anchorage 11 Casting concrete forms it into overall structure.
2. lateral stiffening steel frame construction according to claim 1, characterized in that H profile steel is pasted to the ring below pontic On oxygen filled layer 4, it is used in combination anchorage screw 2 and anchor bolt 3 to pressurize and anchors, ribbed stiffener 6 is welded in H profile steel 7.
3. casting concrete according to claim 1, characterized in that the special fast hardening sulphoaluminate cement of steel fibre has early By force, high tenacity, the good feature of durability, the construction period is short, does not influence traffic.
CN201611180972.9A 2016-12-13 2016-12-13 A kind of novel reinforced Old arch bridge structure Pending CN108611991A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611180972.9A CN108611991A (en) 2016-12-13 2016-12-13 A kind of novel reinforced Old arch bridge structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611180972.9A CN108611991A (en) 2016-12-13 2016-12-13 A kind of novel reinforced Old arch bridge structure

Publications (1)

Publication Number Publication Date
CN108611991A true CN108611991A (en) 2018-10-02

Family

ID=63657703

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611180972.9A Pending CN108611991A (en) 2016-12-13 2016-12-13 A kind of novel reinforced Old arch bridge structure

Country Status (1)

Country Link
CN (1) CN108611991A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109487710A (en) * 2018-12-19 2019-03-19 长沙理工大学 A kind of Arch Bridges Strengthening method based on prefabrication and assembly construction principle
CN111560836A (en) * 2020-05-20 2020-08-21 河北工业大学 Construction method of arch bridge main arch and construction method of assembled arch bridge
CN111705622A (en) * 2020-04-09 2020-09-25 赵瑞芬 Self-resetting assembly type precast concrete arch bridge
CN111733685A (en) * 2020-04-09 2020-10-02 赵瑞芬 Prefabricated arched girder section at end part of self-resetting assembly type arched bridge and forming method thereof
CN111733684A (en) * 2020-04-09 2020-10-02 赵瑞芬 Self-resetting assembly type precast concrete arch bridge support
CN114016443A (en) * 2021-08-12 2022-02-08 深圳大学 Abdominal arch structure reinforced by frame type reinforcing structure
CN114086484A (en) * 2021-11-16 2022-02-25 武汉理工大学 Reinforcing method for additionally arranging prefabricated UHPC (ultra high performance polycarbonate) plate on back of arch leg of rigid frame arch bridge
CN115595901A (en) * 2022-11-11 2023-01-13 广西大学(Cn) Arch foot reinforcing method of deck type arch bridge based on cable structure

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109487710A (en) * 2018-12-19 2019-03-19 长沙理工大学 A kind of Arch Bridges Strengthening method based on prefabrication and assembly construction principle
CN109487710B (en) * 2018-12-19 2024-02-27 长沙理工大学 Arch bridge reinforcement method based on prefabricated assembly principle
CN111705622A (en) * 2020-04-09 2020-09-25 赵瑞芬 Self-resetting assembly type precast concrete arch bridge
CN111733685A (en) * 2020-04-09 2020-10-02 赵瑞芬 Prefabricated arched girder section at end part of self-resetting assembly type arched bridge and forming method thereof
CN111733684A (en) * 2020-04-09 2020-10-02 赵瑞芬 Self-resetting assembly type precast concrete arch bridge support
CN111560836A (en) * 2020-05-20 2020-08-21 河北工业大学 Construction method of arch bridge main arch and construction method of assembled arch bridge
CN111560836B (en) * 2020-05-20 2021-02-09 河北工业大学 Construction method of arch bridge main arch and construction method of assembled arch bridge
CN114016443A (en) * 2021-08-12 2022-02-08 深圳大学 Abdominal arch structure reinforced by frame type reinforcing structure
CN114016443B (en) * 2021-08-12 2023-12-01 深圳大学 Abdominal arch structure reinforced by frame type reinforcing structure
CN114086484A (en) * 2021-11-16 2022-02-25 武汉理工大学 Reinforcing method for additionally arranging prefabricated UHPC (ultra high performance polycarbonate) plate on back of arch leg of rigid frame arch bridge
CN115595901A (en) * 2022-11-11 2023-01-13 广西大学(Cn) Arch foot reinforcing method of deck type arch bridge based on cable structure
CN115595901B (en) * 2022-11-11 2023-10-17 广西大学 Method for reinforcing arch springing of upper bearing arch bridge based on cable structure

Similar Documents

Publication Publication Date Title
CN108611991A (en) A kind of novel reinforced Old arch bridge structure
CN105113389B (en) Assembled type bridge pier column member with steel-concrete composite structure
CN105386405B (en) Based on bolted Precast Concrete Segmental Bridges concrete pier of steel tube
CN105887702B (en) A kind of method of pre-stressed carbon fiber plate and steel concrete reinforced concrete beam
CN107165272A (en) Prestressing force assembly concrete frame joint attachment structure and its construction method
CN201972237U (en) Section prefabricated rectangular steel pipe concrete truss
CN108978434B (en) Bracket-free industrialized construction method of steel-concrete combined continuous box girder bridge
CN104790424A (en) Reinforcing system and reinforcing method of wind power generation tower foundation ring foundation
CN109183607A (en) Precast spliced UHPC pipe-concrete super-high pier and construction method
CN108867310A (en) The short rib T beam bridge of pretensioning prestressed concrete and its construction method
CN108660908A (en) A kind of prestressed concrete cable-stayed bridge of the beam prefabricated pin-connected panel of tower
CN113005926A (en) Construction method of mountain area abrupt slope pier reinforcing device
CN110847041A (en) Temporary anchoring structure and anchoring method for segmental prefabricated assembled concrete box girder
CN105672144A (en) Medium-small span old bridge reinforcement and jointing-widening structure and construction method thereof
CN209178793U (en) A kind of prestressed concrete cable-stayed bridge of the beam prefabricated pin-connected panel of tower
CN104652242A (en) Derrick connecting structure used for reinforcing PSC (Pre-stressed Concrete) continuous box girder bridge and construction method
CN110578287A (en) assembled earth covering corrugated steel plate-prestressed concrete combined arch bridge and construction method thereof
CN109972499A (en) Seamless stretching structure and construction method among a kind of medium and small span freely-supported highway bridge
CN103614975A (en) Shear connector reinforcing method for failed hinge joint of assembly-type hollow slab girder
CN211689844U (en) Corrugated steel reinforcing arch utilizing high-strength grouting material
CN108252222A (en) Steel-concrete combined structure formula simple supported-to-continuous girder bridge method
CN211973156U (en) Comprehensive reinforcing structure for top plate void of steel-concrete combined section of steel-concrete combined beam bridge
CN112252169B (en) Hollow box-rock anchor combined light ground anchor bridge abutment and construction process thereof
CN209602942U (en) A kind of compound seismic reinforcing structure of V-type bridge pier
CN211735010U (en) Assembled earthing corrugated steel plate-prestressed concrete combination arched bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181002