CN108608363A - The flat uniaxial photovoltaic bracket mounting tool of one kind and installation method - Google Patents

The flat uniaxial photovoltaic bracket mounting tool of one kind and installation method Download PDF

Info

Publication number
CN108608363A
CN108608363A CN201810384812.9A CN201810384812A CN108608363A CN 108608363 A CN108608363 A CN 108608363A CN 201810384812 A CN201810384812 A CN 201810384812A CN 108608363 A CN108608363 A CN 108608363A
Authority
CN
China
Prior art keywords
photovoltaic bracket
column
uniaxial photovoltaic
flat uniaxial
mounting tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810384812.9A
Other languages
Chinese (zh)
Inventor
杜积春
蔡昆
刘红涛
吴佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201810384812.9A priority Critical patent/CN108608363A/en
Publication of CN108608363A publication Critical patent/CN108608363A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25BTOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
    • B25B27/00Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for

Abstract

The invention discloses the flat uniaxial photovoltaic bracket mounting tool of one kind and installation methods, and it includes column and lifting lug to put down single shaft photovoltaic bracket mounting tool;Wherein, pile foundation mutually fixed lock ring of the column equipped with being used for, with uniaxial photovoltaic bracket is put down;Lifting lug is arranged on column, for lifting flat uniaxial photovoltaic bracket to be installed.In actual installation, because flat uniaxial photovoltaic bracket subelement is heavier, and type is cumbersome, is not easy to operating personnel and lifts, increases assembly difficulty;But under the auxiliary of flat uniaxial photovoltaic bracket mounting tool, flat uniaxial photovoltaic bracket to be installed can be lifted on mounting tool lifting lug, to simplify installation process.Therefore, flat uniaxial photovoltaic bracket mounting tool proposed by the present invention can simplify the link of flat uniaxial photovoltaic bracket installation, reduce operation difficulty, solve the problems, such as the field at this stage.

Description

The flat uniaxial photovoltaic bracket mounting tool of one kind and installation method
Technical field
The present invention relates to photovoltaic bracket installing areas, more specifically to the flat uniaxial photovoltaic bracket mounting tool of one kind And installation method.
Background technology
Solar photovoltaic bracket is to be designed in solar photovoltaic generation system in order to put, install, fix solar panel Special frame body;Include mainly:Pile foundation, column, adjusting post, cant beam, crossbeam, rolling bearing etc..
The parts of flat uniaxiality tracking formula solar photovoltaic bracket are more, cumbersome for installation in the construction process;And part member Part belongs to large scale structure, heavier mass, be not easy to it is artificial lift, increase installation difficulty, increase the work of operating personnel Amount, reduces working efficiency.
Therefore, how to simplify the fixing link of flat uniaxial photovoltaic bracket, reduce operation difficulty, be that the field is urgently at this stage The problem of solution.
Invention content
In view of this, the purpose of the present invention is to provide the flat uniaxial photovoltaic bracket mounting tool of one kind, which being capable of letter The link for changing flat uniaxial photovoltaic bracket installation, reduces operation difficulty, solves the problems, such as the field at this stage.The purpose of the present invention A kind of flat uniaxial photovoltaic bracket installation method of offer is also resided in, this method is suitable for above-mentioned flat uniaxial photovoltaic bracket erector Dress reduces operation difficulty therefore, it is possible to simplify the link of flat uniaxial photovoltaic bracket installation.
The flat uniaxial photovoltaic bracket mounting tool of one kind, including:
Column, the column be equipped be used for, with it is described it is flat single shaft photovoltaic bracket the mutually fixed lock ring of pile foundation;
Lifting lug, the lifting lug are arranged on the column, for lifting flat uniaxial photovoltaic bracket to be installed.
Preferably, the flat uniaxial photovoltaic bracket mounting tool, the end of the column is equipped with bending segment, the lifting lug It is set to the bending segment.
Preferably, the flat uniaxial photovoltaic bracket mounting tool, the lock ring is two.
Preferably, the described flat uniaxial photovoltaic bracket mounting tool, the lock ring by bolt by the column with it is described Pile foundation is mutually fixed.
The flat uniaxial photovoltaic bracket installation method of one kind, including step:
First, column is fixed in the pile foundation of flat uniaxial photovoltaic bracket by lock ring;
Secondly, flat uniaxial photovoltaic bracket to be installed is lifted on the lifting lug of the column;
Finally, the installation of the flat uniaxial photovoltaic bracket is completed under the auxiliary of the column.
Flat uniaxial photovoltaic bracket mounting tool proposed by the present invention, including column and lifting lug;Wherein, column, which is equipped with, uses In, the mutually fixed lock ring of pile foundation with flat uniaxial photovoltaic bracket;Lifting lug is arranged on column, for lifting flat single shaft to be installed Photovoltaic bracket.In actual installation, because flat uniaxial photovoltaic bracket subelement is heavier, and type is cumbersome, is not easy to operating personnel It lifts, increases assembly difficulty;It, can be by flat uniaxial light to be installed but under the auxiliary of flat uniaxial photovoltaic bracket mounting tool Volt holder is lifted on mounting tool lifting lug, to simplify installation process.Therefore, flat uniaxial photovoltaic bracket installation proposed by the present invention Tooling can simplify the link of flat uniaxial photovoltaic bracket installation, reduce operation difficulty, solve the problems, such as the field at this stage.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with Obtain other attached drawings according to these attached drawings.
Fig. 1 is the front view that uniaxial photovoltaic bracket mounting tool is put down in the specific embodiment of the invention;
Fig. 2 is the side view that uniaxial photovoltaic bracket mounting tool is put down in the specific embodiment of the invention;
Fig. 3 is the schematic diagram of lock ring in the specific embodiment of the invention.
In Fig. 1-Fig. 3:
Column -1, lock ring -2, lifting lug -3, bending segment -4.
Specific implementation mode
The core of present embodiment is that providing one kind putting down uniaxial photovoltaic bracket mounting tool, which can simplify The link of flat single shaft photovoltaic bracket installation, reduces operation difficulty, solves the problems, such as the field at this stage.
Hereinafter, being illustrated to embodiment with reference to attached drawing.In addition, embodiments illustrated below is not to recorded in claim Invention content rise any restriction effect.In addition, the full content of the composition represented by following example is not limited to as right It is required that necessary to the solution of recorded invention.
The flat uniaxial photovoltaic bracket mounting tool that present embodiment provides, refers to Fig. 1-Fig. 3;Including 1 He of column Lifting lug 3;Wherein, column 1 be equipped be used for, with the mutually fixed lock ring of the pile foundation of flat single shaft photovoltaic bracket 2;The setting of lifting lug 3 is vertical On column 1, for lifting flat uniaxial photovoltaic bracket to be installed.In actual installation, because flat uniaxial photovoltaic bracket subelement compared with Weight, and type is cumbersome, is not easy to operating personnel and lifts, increases assembly difficulty;But in flat uniaxial photovoltaic bracket mounting tool Under auxiliary, flat uniaxial photovoltaic bracket to be installed can be lifted on mounting tool lifting lug 3, to simplify installation process.Therefore, Flat uniaxial photovoltaic bracket mounting tool proposed by the present invention can simplify the link of flat uniaxial photovoltaic bracket installation, reduce operation Difficulty solves the problems, such as the field at this stage.
It should be noted that the height of column 1 can be depending on actual conditions, such as it can be designed as two meters or so.
The flat uniaxial photovoltaic bracket mounting tool that present embodiment provides, the end of column 1 can be equipped with bending segment 4, and lifting lug 3 is set on the bending segment 4;The setting can further in angle, facilitate the lifting of holder to be installed, so as to Operating personnel treat the control of mounting bracket.
The flat uniaxial photovoltaic bracket mounting tool that present embodiment provides, it is fixed with pile foundation in order to improve column 1 Firmness can be arranged two lock rings 2 and column 1 is fixed in pile foundation;It, can and for the ease of the dismounting of follow-up column 1 Column 1 to be fixed in pile foundation by bolt.
Present embodiment also provides a kind of flat uniaxial photovoltaic bracket installation method, includes mainly step:
First, column 1 is fixed in the pile foundation of flat uniaxial photovoltaic bracket by lock ring 2;
Secondly, flat uniaxial photovoltaic bracket to be installed is lifted on the lifting lug 3 of column 1;
Finally, the installation of flat uniaxial photovoltaic bracket is completed under the auxiliary of column 1.
The installation method of flat uniaxial photovoltaic bracket is described further below:
Measurement before installation and positioning:
1) it is installed as unit of array, starting point is installed as with C row motors before installation, measures it respectively to the 1st row and the 8th row Two it is diagonally opposed between spacing, theoretical value is 41.77 meters, according to measurement data adjust two angle upper pillar stands 1 placement Position, if both sides length difference away from larger, can take the mode of center respectively round about to carry out, it is ensured that two angles it is vertical The range error of 1 distance center position column 1 of column controls within 40mm;
2) on the basis of center, the spacing of itself and C row both ends pile foundation is measured, center point is adjusted according to measurement data Set two heel posts 1 put and deviation post, distance it is smaller is displaced outwardly on one side, moved inward on one side apart from larger, move Dynamic distance is the 1/2 of the difference of two measured values;Ensure two adjacent upright posts 1 of adjacent each column spacing be 4m ± 20mm in, from from The closer point of central point is radiated to both sides and is installed, to reduce the influence of cumulative errors;
3) method described above determines the installation site of 5 root post 1 of the 4th row or the 5th row, often arranges between two neighboring column 1 Away from for 7.75m ± 30mm;
4) placement location of all columns 1 in an array is determined according to the above method and marked, according to top Method confirms the relative position of 1 bottom plate of column and pile foundation pile crown built-in fitting, ensures that contact area is abundant, bottom plate exceeds built-in fitting most Big distance ensures within 15mm.
Drilling:
On the basis of the column 1 of two, each column both ends a logical line is drawn with wire;1 depth of parallelism of column by each column and often arranged Control is in 5mm, according to the spacing of institute's bracing wire repetition measurement vertically and horizontally adjacent upright posts 1, it is ensured that in claimed range;
The relative elevation of column 1 is measured using spirit level, spirit level antenna height is less than 1 overhead height of motor position column At 6cm, the height of all columns 1 in array is measured, is the benchmark in this array from greatest measure and the average value of minimum value Spirit level is inserted into the benchmark point by point again, and the height and position of each column 1 is measured in same level, and It is marked using thin pen, this label as needs the parallel position to drill;It is subject to that this marks and finds out centerline in column 1 Position, as needs the upper position punched;The position in second hole can be positioned by measuring 150mm downwards;It is needed well with sample punch mark Punch unknown central point;It is required that the control of upper surface hole centre distance cradle top position is within 4--8mm;
It is drilled in specified location using magnetic drill, selects the drill bit of φ 12mm or φ 12.5mm, bored in boring procedure Empty position watering cooling, it is ensured that drilling quality;
Column 1 welds:
1) column of drilling 1 is placed in fixed stake top facial planes before this, is welded, in column 1 before welding The verticality that horizontal ulnar side measures column 1 is vertically and horizontally placed respectively, it is ensured that 1 verticality of column;
2) welding job is carried out after verticality is adjusted, first by the angle point weldering of four, floor when welding, it is ensured that securely, wait for Top adjusting post 1 and cant beam installation, crossbeam is after installation is complete, then carries out final full weld;Four cincture streams are paid attention to when full weld Welding, forbids to weld lower a line after a line is welded completely again, avoids the deformation for causing 1 bottom plate of column.
Height adjusting post 1 and installation:
1) height adjusting post 1 is attached fastening in place by the bolt of M12*60 with column 1;
Cant beam, crossbeam splicing and installation:
1) triangle bearing block is mounted on the outside of cant beam;It is separated with a bearing spacer ring per side;
2) crossbeam is put on the ground, every two crossbeams 1 and crossbeam 2 is spliced into one by crossbeam connector, spelled Ground even is ensured when connecing;
3) on the same side of two crossbeams, according to drawing requirement data, every cant beam and crossbeam extension position are identified Mark;Ensure that crossbeam cantilever span is consistent when installation, the distance of cant beam both sides is equal;After installing crossbeam, check again for splicing Whether place's bolt is tightened;
4) the distance between every two root posts 1 are measured, it is cant beam installation position that corresponding position is marked on crossbeam position It sets;Cant beam is connect fastening with crossbeam in place using U-bolt;
5) flat uniaxial photovoltaic bracket mounting tool proposed by the present invention is mounted in holder pile foundation, and is hanged at lifting lug 3 Hang up properly chain block;The crossbeam spliced and cant beam frame are sling using suspender belt and chain block, height of lift position is with oblique Beam triangle bearing hole stops when concordant with 1 bolt hole of adjusting post, is pacified cant beam and adjusting post 1 using the bolt of M20*160 Dress is fixed, that is, completes the integral installation of holder.
Advantageous effect:
Using conventional mounting arrangements, each parts in flat single-shaft support system must be installed respectively, installation effect Rate is relatively low, simultaneously as weight support frame is larger and mounting height reaches 3 meters or so, need during the installation process more manpower and There are security risks, increase workload and cost input.
After the technology of the present invention, installation effectiveness and quality are improved, while assisting using special tooling and chain block Operation reduces security risk, reduces workload and cost input.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest range caused.

Claims (5)

1. the flat uniaxial photovoltaic bracket mounting tool of one kind, which is characterized in that including:
Column (1), the column (1) be equipped be used for, with it is described it is flat single shaft photovoltaic bracket the mutually fixed lock ring of pile foundation (2);
Lifting lug (3), the lifting lug (3) are arranged on the column (1), for lifting flat uniaxial photovoltaic bracket to be installed.
2. flat uniaxial photovoltaic bracket mounting tool according to claim 1, which is characterized in that the end of the column (1) Equipped with bending segment (4), the lifting lug (3) is set to the bending segment (4).
3. flat uniaxial photovoltaic bracket mounting tool according to claim 1, which is characterized in that the lock ring (2) is two.
4. flat uniaxial photovoltaic bracket mounting tool according to claim 1, which is characterized in that the lock ring (2) passes through spiral shell Bolt mutually fixes the column (1) with the pile foundation.
5. the flat uniaxial photovoltaic bracket installation method of one kind, which is characterized in that including step:
First, column (1) is fixed in the pile foundation of flat uniaxial photovoltaic bracket by lock ring (2);
Secondly, flat uniaxial photovoltaic bracket to be installed is lifted on the lifting lug (3) of the column (1);
Finally, the installation of the flat uniaxial photovoltaic bracket is completed under the auxiliary of the column (1).
CN201810384812.9A 2018-04-26 2018-04-26 The flat uniaxial photovoltaic bracket mounting tool of one kind and installation method Pending CN108608363A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810384812.9A CN108608363A (en) 2018-04-26 2018-04-26 The flat uniaxial photovoltaic bracket mounting tool of one kind and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810384812.9A CN108608363A (en) 2018-04-26 2018-04-26 The flat uniaxial photovoltaic bracket mounting tool of one kind and installation method

Publications (1)

Publication Number Publication Date
CN108608363A true CN108608363A (en) 2018-10-02

Family

ID=63661306

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810384812.9A Pending CN108608363A (en) 2018-04-26 2018-04-26 The flat uniaxial photovoltaic bracket mounting tool of one kind and installation method

Country Status (1)

Country Link
CN (1) CN108608363A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7225515B1 (en) * 2004-02-10 2007-06-05 Larry Truett Hicks Steel joining tool
US20100170072A1 (en) * 2009-01-07 2010-07-08 Jay Price Elzey Universal sprinkler nozzle tool
CN202079565U (en) * 2011-05-24 2011-12-21 中铁十二局集团第三工程有限公司 Auxiliary tool for installing steel arch center
CN203317316U (en) * 2012-12-07 2013-12-04 平湖核奇重型机械有限公司 Assembly fixture for supporting plate brackets of heater
CN206335513U (en) * 2016-08-31 2017-07-18 北京万源工业有限公司 One kind is used for pitch control cabinet assembly tooling in wind power equipment
CN206786135U (en) * 2017-04-01 2017-12-22 中国十七冶集团有限公司 A kind of pipeline waterborne and π type compensator hoisting bracket

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7225515B1 (en) * 2004-02-10 2007-06-05 Larry Truett Hicks Steel joining tool
US20100170072A1 (en) * 2009-01-07 2010-07-08 Jay Price Elzey Universal sprinkler nozzle tool
CN202079565U (en) * 2011-05-24 2011-12-21 中铁十二局集团第三工程有限公司 Auxiliary tool for installing steel arch center
CN203317316U (en) * 2012-12-07 2013-12-04 平湖核奇重型机械有限公司 Assembly fixture for supporting plate brackets of heater
CN206335513U (en) * 2016-08-31 2017-07-18 北京万源工业有限公司 One kind is used for pitch control cabinet assembly tooling in wind power equipment
CN206786135U (en) * 2017-04-01 2017-12-22 中国十七冶集团有限公司 A kind of pipeline waterborne and π type compensator hoisting bracket

Similar Documents

Publication Publication Date Title
CN110219326B (en) Reverse construction method one-column one-pile underwater verticality adjusting construction process
CN111451764B (en) Staggered installation method for lower furnace shell of hot blast stove and equipment in stove
CN210238595U (en) One-column one-pile underwater verticality adjusting construction device by reverse construction method
CN107090775A (en) A kind of full framing space beam-ends cable guide pipe construction localization method
CN113668881B (en) Curved-surface beam combined jig frame and assembling method
CN110295761B (en) Steel upright post sagging adjustment monitoring device and sagging adjustment monitoring method
CN107303941B (en) Derrick of marine drilling ship and centering installation method thereof
CN108033342B (en) A kind of step rail assembly method of public transport ladder
CN109629449A (en) A kind of steel case arch bridge arch springing toughened internal stress installation locating support and alignment method
CN108608363A (en) The flat uniaxial photovoltaic bracket mounting tool of one kind and installation method
CN205999789U (en) Cable-stayed bridge beams of concrete cable guide pipe supporting and positioning device
CN210483097U (en) Steel stand transfers monitoring device that hangs down
CN108179749B (en) Lattice column positioner and positioning method thereof
CN108100841B (en) A kind of step rail assembly technology of public transport ladder
CN102392099B (en) Hanger plate connecting, adjusting and centering device for backing ring and furnace shell of large converter
CN113585079B (en) Method for quickly installing steel structure stand column
CN109110638A (en) Blast furnace overhaul lifting furnace shells tool
CN115288036A (en) Installation device and construction method for swivel steel structure bridge support
CN213267538U (en) Leading hole platform for U-shaped sandstone riverbed steel trestle on shoal
CN103303789A (en) Adjustable buttress for supporting running rail of tunnel track laying gantry crane
CN209704012U (en) The formwork erection device of steel column cornerite
CN109332430B (en) Mast lifting and straightening device
CN206930460U (en) A kind of Block movement car for cutting rate test
CN218970017U (en) Flexible connection device for reverse construction steel pipe column and reinforcement cage
CN220503899U (en) Adjustable pile foundation construction steel reinforcement cage mounting platform device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181002

RJ01 Rejection of invention patent application after publication