CN108600840A - set-top box power consumption control method and system - Google Patents

set-top box power consumption control method and system Download PDF

Info

Publication number
CN108600840A
CN108600840A CN201810270129.2A CN201810270129A CN108600840A CN 108600840 A CN108600840 A CN 108600840A CN 201810270129 A CN201810270129 A CN 201810270129A CN 108600840 A CN108600840 A CN 108600840A
Authority
CN
China
Prior art keywords
time
recovery time
application
default
power consumption
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810270129.2A
Other languages
Chinese (zh)
Other versions
CN108600840B (en
Inventor
张亚利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Jiuzhou Electric Appliance Co Ltd
Original Assignee
Shenzhen Jiuzhou Electric Appliance Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Jiuzhou Electric Appliance Co Ltd filed Critical Shenzhen Jiuzhou Electric Appliance Co Ltd
Priority to CN201810270129.2A priority Critical patent/CN108600840B/en
Publication of CN108600840A publication Critical patent/CN108600840A/en
Priority to PCT/CN2018/125751 priority patent/WO2019184526A1/en
Application granted granted Critical
Publication of CN108600840B publication Critical patent/CN108600840B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N21/00Selective content distribution, e.g. interactive television or video on demand [VOD]
    • H04N21/40Client devices specifically adapted for the reception of or interaction with content, e.g. set-top-box [STB]; Operations thereof
    • H04N21/43Processing of content or additional data, e.g. demultiplexing additional data from a digital video stream; Elementary client operations, e.g. monitoring of home network or synchronising decoder's clock; Client middleware
    • H04N21/443OS processes, e.g. booting an STB, implementing a Java virtual machine in an STB or power management in an STB
    • H04N21/4436Power management, e.g. shutting down unused components of the receiver
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F1/00Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
    • G06F1/26Power supply means, e.g. regulation thereof
    • G06F1/32Means for saving power
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/48Program initiating; Program switching, e.g. by interrupt
    • G06F9/4806Task transfer initiation or dispatching
    • G06F9/4843Task transfer initiation or dispatching by program, e.g. task dispatcher, supervisor, operating system
    • G06F9/4881Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues
    • G06F9/4893Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues taking into account power or heat criteria
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N21/00Selective content distribution, e.g. interactive television or video on demand [VOD]
    • H04N21/40Client devices specifically adapted for the reception of or interaction with content, e.g. set-top-box [STB]; Operations thereof
    • H04N21/43Processing of content or additional data, e.g. demultiplexing additional data from a digital video stream; Elementary client operations, e.g. monitoring of home network or synchronising decoder's clock; Client middleware
    • H04N21/442Monitoring of processes or resources, e.g. detecting the failure of a recording device, monitoring the downstream bandwidth, the number of times a movie has been viewed, the storage space available from the internal hard disk
    • H04N21/4424Monitoring of the internal components or processes of the client device, e.g. CPU or memory load, processing speed, timer, counter or percentage of the hard disk space used
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N21/00Selective content distribution, e.g. interactive television or video on demand [VOD]
    • H04N21/40Client devices specifically adapted for the reception of or interaction with content, e.g. set-top-box [STB]; Operations thereof
    • H04N21/43Processing of content or additional data, e.g. demultiplexing additional data from a digital video stream; Elementary client operations, e.g. monitoring of home network or synchronising decoder's clock; Client middleware
    • H04N21/443OS processes, e.g. booting an STB, implementing a Java virtual machine in an STB or power management in an STB
    • H04N21/4435Memory management
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D10/00Energy efficient computing, e.g. low power processors, power management or thermal management

Landscapes

  • Engineering & Computer Science (AREA)
  • Software Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Multimedia (AREA)
  • Signal Processing (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Databases & Information Systems (AREA)
  • Power Sources (AREA)

Abstract

The present invention relates to a kind of set-top box power consumption control method and systems, set-top box memory is avoided seriously to be occupied by default recovery time, by adjusting the recovery time of application to the statistics of application commonly used degree and averagely start time interval, common application can be avoided preferably to be recovered the power consumption increase and wait for that the when of causing to be again started up brings, for being of little use power consumption is reduced using recycling in advance, control is optimized hence for set-top box power consumption, set-top-box system is avoided to be under severe running environment, ensure that foreground application timely responds to, reduce fever and power consumption, ensure the performance of set-top box.

Description

Set-top box power consumption control method and system
Technical field
The present invention relates to digital TV field more particularly to a kind of set-top box power consumption control methods and system.
Background technology
With the application of intelligence system on the set-top box, the scene mode of multitask is increasingly liked by user.Companion With the continuous promotion of user demand, the application of set-top box carrying is more and more, and content is also more and more abundant, the time of operation It is required that it is increasingly longer, it applies starting up now, be normal method using running background.
But set-top box power consumption can be caused to seriously affect using the behavior of running background.It is frequent on backstage due to applying Operation, preempting resources, the application response for leading to foreground not in time, the bad illusion of system performance are caused to user.After Platform operation needs wake-up system and other auxiliaries, this just needs to provide more power consumptions to ensure system just Often operation.With continuing to increase for operation application, set-top-box system will be finally caused to be in the environment of severe operation, before causing Platform application can not timely respond to, also due to continuous service, power consumption persistently consumes, and fever continues to increase, and power consumption persistently increases, this is all Greatly burden and adverse effect are brought to the performance of set-top box.
Set-top-box system has primary mechanism of control and background application management and control at present, wherein:
Primary mechanism of control
Mechanism of control of the set-top-box system with acquiescence, in Installed System Memory wretched insufficiency to the backstage of long-time not running Using being recycled and (terminating to apply), the behavior in running background is applied in management to a certain extent.But Memory recycle Standard is very high, until triggering low Memory recycle, widely applies in backstage long-play, and system has been in Heavy-duty service state can not solve to apply power problems caused by running background, at this time set-top-box system and foreground well Using operation that cannot be smooth, user experience is very poor.
Background application management and control
The mechanism of background program management and control is after application enters running background for a period of time, by force by the application of running background All terminate, prevents it in the operation on backstage.This mode can effective management and control apply the behavior in running background, but by In the management and control of severe, user needs to restart application when needing to reuse application, is done using restarting procedure needs big The action of initialization is measured, frequent cold start-up application also results in the increase of power consumption and power consumption is additional increased more.Meanwhile Since user frequently starts application, each user is required for reinitializing, and causes the startup speed of application very slow, user Stand-by period is longer, and experience is bad.
The power consumption of set-top box cannot being all managed well using mechanism of control for the above set-top-box system, can lead to machine The high load capacity of set-top box system or not only cannot management and control power consumption well, can also bring the increase of extra power consumption and influence user Usage experience.
Invention content
In view of this, it is necessary to set-top box power consumption be caused greatly to bear for above application running background, influence foreground The problem of using response, provide a kind of set-top box power consumption control method and system.
A kind of set-top box power consumption control method provided by the invention, includes the following steps:
The recovery time of default application running background;
It obtains each application and starts primary Mean Time Between Replacement;
Mean Time Between Replacement is compared with default recovery time;
If the Mean Time Between Replacement of application is less than default recovery time, and the two difference is more than the first difference, then answers this Recovery time is extended for being more than the first recovery time of default recovery time;
If the Mean Time Between Replacement of application is more than default recovery time, and difference is more than the second difference, then by the application Recovery time shorten to be less than the second recovery time of default recovery time.
In further mode, the method for default recovery time is specially:Multiple set-top box EMS memory occupation is counted to reach Time when setting ratio simultaneously calculates average value, and average value is set as default recovery time.
In further mode, when obtaining Mean Time Between Replacement, also obtains and apply opening within period seclected time Dynamic number, if the number of starts is less than setting number the application be not identified as commonly using application.
In further mode, if the Mean Time Between Replacement of the application is less than default recovery time, and the two difference More than the first difference, then the recovery time of the application is extended for going back more than the step of the first recovery time for presetting recovery time Including:
The number of starts applied in default recovery time is obtained, the returning the application if the number of starts is greater than the set value The first recovery time is extended between time receiving.
A kind of set-top box power consumption control system provided by the invention, including:
Recovery time setup module presets the recovery time of an application running background;
Interval time acquisition module obtains each application and starts primary Mean Time Between Replacement;
Mean Time Between Replacement is compared by time comparison module with default recovery time;
Recovery time adjusts module, if the Mean Time Between Replacement of application is less than default recycling, and the two difference is more than the The recovery time of the application is then extended for being more than the first recovery time of default recovery time by one difference;If application is averaged Interval time is more than default recovery time, and difference is more than the second difference, then shorten to be less than by the recovery time of the application pre- If the second recovery time of recovery time.
In further mode, the recovery time setup module counts multiple set-top box EMS memory occupation and reaches setting ratio Time when example simultaneously calculates average value, and average value is set as default recovery time.
In further mode, the interval time acquisition module also obtains application when obtaining Mean Time Between Replacement The number of starts within period seclected time, if the number of starts less than setting number if the application be not identified as commonly use application.
In further mode, the recovery time adjustment module obtains the startup time applied in default recovery time Number, the first recovery time is extended for if the number of starts is greater than the set value by the recovery time of the application.
Set-top box power consumption control method and system of the present invention avoid set-top box memory serious by default recovery time It occupies, by adjusting the recovery time of application to the statistics of application commonly used degree and averagely start time interval, for normal It can preferably be avoided being recovered the power consumption increase and wait for that the when of causing to be again started up brings with application, be carried for being of little use to apply Preceding recycling reduces power consumption, optimizes control hence for set-top box power consumption, set-top-box system is avoided to be in severe running environment Under, ensure that foreground application timely responds to, reduces fever and power consumption, ensure the performance of set-top box.
Description of the drawings
One or more embodiments are illustrated by the picture in corresponding attached drawing, these exemplary theorys The bright restriction not constituted to embodiment, the element with same reference numbers label is expressed as similar element in attached drawing, removes Non- to have special statement, composition does not limit the figure in attached drawing.
Fig. 1 is a kind of flow diagram for set-top box power consumption control method that a wherein embodiment of the invention provides;
Fig. 2 is a kind of structural schematic diagram for set-top box power consumption control system that a wherein embodiment of the invention provides.
Specific implementation mode
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art The every other embodiment obtained without creative efforts, shall fall within the protection scope of the present invention.
In addition, as long as technical characteristic involved in the various embodiments of the present invention described below is each other not Conflict is constituted to can be combined with each other.
To solve that power problems caused by running background, present invention combination set-top-box system is applied to carry mechanism, to application Running background is managed, and provides a kind of set-top box power consumption control method, specifically, this method such as Fig. 1 in one embodiment It is shown, include the following steps:
Step S10:The recovery time T of default application running background.
What consideration set-top-box system was had by oneself applies running background mechanism of control, and the step is in set-top-box system property retention stream The time that application is recycled and (terminates to apply) when presetting an application running background under the premise of smooth, i.e., in the present embodiment Recovery time T.If using, without individually changing or being arranged the recovery time individually applied, being recycled reaching when running background The application will be recovered (application is moved to end) when time T.
Wherein, it is the setting recovery time T of reasonably optimizing, the method for step setting recovery time T is specially:Statistics is more Time when secondary set-top box EMS memory occupation reaches setting ratio simultaneously calculates average value, and average value is set as recovery time T.Memory Setting ratio is occupied preferably to keep set-top-box system is smooth, foreground application is unaffected to be advisable.Setting can be to avoid machine in this way Top box memory is occupied and leads to wretched insufficiency, can also avoid not considering directly direct that background application is complete in the case of memory Terminate in portion.
Step S20:It obtains each application and starts primary Mean Time Between Replacement M.
For all applications, the service condition each applied is different, application be the common application of user, use Frequently, the number that foreground and backstage switching start in the short time is more, and some applications are the applications that user is not frequently used, and are answered It will not be again started up in the long period with entering after running background.Wish quickly to be made by backstage startup using user for common With, and the application for that will not be again started up in the long period then can be recycled, and reduce power consumption.For that can answer each Usage degree is understood, and the time interval started with the last time when which starts application every time is counted and counted Average value is calculated, is applied and starts primary Mean Time Between Replacement M, application is understood by the size of Mean Time Between Replacement M Usage degree.Illustrate to be again started up using interval very short time if M values are smaller, belong to common application, M values on the contrary compared with It is big then be of little use.
To be more accurate, which also obtains when obtaining Mean Time Between Replacement M and applies the startup within period seclected time Number, if the number of starts is less than setting number the application be not identified as common application, pass through the limitation of further number It can preferably determine whether apply is common.
Step S30:Mean Time Between Replacement M is compared with default recovery time T.
For management and control that can be according to the usage degree each applied to carry out personalized, get using Mean Time Between Replacement M Afterwards, the step by it carry out personal settings compared with preset recovery time T.
Step S40:If the Mean Time Between Replacement M of application is less than default recovery time T, and the two difference is poor more than first The recovery time of the application is then extended for being more than the first recovery time T1 of default recovery time T by value.
By comparing, if Mean Time Between Replacement M is less than recovery time T, to avoid common apply when reaching recycling Between T when be recovered, then extend the application recovery time be the first recovery time T1.
The step can will further be applied and be limited to common application.Wherein, the judgement of application has been commonly used in step s 30 Through providing, repeat no more.
Further, also application further can be limited in this step, then the step further includes:Acquisition is answered The recovery time of the application is extended for first by the number of starts in recovery time T if the number of starts is greater than the set value Recovery time T1 can carry out management and control to application to the service condition of application according to active user in this way, can more meet user Demand.
Step S50:If the Mean Time Between Replacement M of application is more than default recovery time T, and difference is more than the second difference, then The recovery time of the application is shorten to be less than the second recovery time T2 of default recovery time T.
Likewise, by comparing, if Mean Time Between Replacement M is more than recovery time T, the startup time of the application can be explained The number less and running background time is longer, can in advance terminate the application, then the recovery time of the application be shorten to second Recovery time T2, i.e. application can terminate the application after entering the running background short period, to reduce power consumption and to memory Occupancy.
Compared with prior art, the set-top box power consumption control method of the embodiment avoids machine by default recovery time Top box memory is seriously occupied, by adjusting returning for application to the statistics of application commonly used degree and averagely start time interval Between time receiving, common application can be avoided preferably to be recovered the power consumption increase and wait for that the when of causing to be again started up brings, it is right Power consumption is reduced using recycling in advance in being of little use, control is optimized hence for set-top box power consumption, avoids at set-top-box system Under severe running environment, ensure that foreground application timely responds to, reduces fever and power consumption, ensure the performance of set-top box.
To solve to apply power problems caused by running background, the present invention also provides a kind of set-top box power consumption control system, The system is as shown in Fig. 2, include in one embodiment:
Recovery time setup module 100 presets the recovery time T of an application running background.
What consideration set-top-box system was had by oneself applies running background mechanism of control, the recovery time setup module 100 of the system Application is recycled when presetting an application running background under the premise of set-top-box system property retention smoothness and (terminates to answer With) time, i.e., the recovery time T in the present embodiment.If individually answered using when running background without individually changing or being arranged Recovery time, then when reaching recovery time T, the application will be recovered (application is moved to end).
Wherein, it is the setting recovery time T of reasonably optimizing, it is specific that recovery time setup module 100 sets recovery time T For:Recovery time setup module 100 counts time when multiple set-top box EMS memory occupation reaches setting ratio and calculates average value, Average value is set as recovery time T.EMS memory occupation setting ratio preferably with keep set-top-box system is smooth, foreground application not by Influence is advisable.In this way setting can be occupied to avoid set-top box memory and lead to wretched insufficiency, can also avoid not considering directly Direct in the case of memory all terminates background application.
Interval time acquisition module 200 obtains each application and starts primary Mean Time Between Replacement M.
For all applications, the service condition each applied is different, application be the common application of user, use Frequently, the number that foreground and backstage switching start in the short time is more, and some applications are the applications that user is not frequently used, and are answered It will not be again started up in the long period with entering after running background.Wish quickly to be made by backstage startup using user for common With, and the application for that will not be again started up in the long period then can be recycled, and reduce power consumption.For that can answer each Usage degree is understood, when interval time acquisition module 200 starts application every time between the last time started Every being counted and being calculated average value, it is applied and starts primary Mean Time Between Replacement M, pass through the big of Mean Time Between Replacement M It is small to understand the usage degree of application.Illustrate to be again started up using interval very short time if M values are smaller, belongs to common Using, otherwise M values are larger, are of little use.
To be more accurate, interval time acquisition module 200 is also obtained and is applied when selected when obtaining Mean Time Between Replacement M Between the number of starts in the period, if the number of starts is less than setting number the application be not identified as commonly using application, by into one The number limitation of step then can preferably determine whether apply is common.
Mean Time Between Replacement M is compared by time comparison module 300 with default recovery time T.
For management and control that can be according to the usage degree each applied to carry out personalized, get using Mean Time Between Replacement M Afterwards, time comparison module 300 by it carry out personal settings compared with preset recovery time T.
Recovery time adjusts module 400, if the Mean Time Between Replacement M of application is less than default recovery time T, and the two difference More than the first difference, then the recovery time of the application is extended for being more than the first recovery time T1 of default recovery time T;If answering Mean Time Between Replacement M is more than default recovery time T, and difference is more than the second difference, then the recovery time of the application contracts Short the second recovery time T2 for less than default recovery time T.
By comparing, if Mean Time Between Replacement M is less than recovery time T, to avoid common apply when reaching recycling Between T when be recovered, then recovery time adjustment module 400 extend the application recovery time be the first recovery time T1.
It can will further apply and be limited to common application.Wherein, the judgement for commonly using application has been given, and repeats no more.
Further, the number of starts in recovery time T is applied in recovery time adjustment module 400 acquisition, if starting Number is greater than the set value, and the recovery time of the application is extended for the first recovery time T1, in this way can be according to active user couple The service condition of application to carry out management and control to application, can more meet the needs of users.
Likewise, by comparing, if Mean Time Between Replacement M is more than recovery time T, the startup time of the application can be explained The number less and running background time is longer, can in advance terminate the application, then recovery time adjusts module 400 by the application Recovery time shorten to the second recovery time T2, i.e. application can terminate the application after entering the running background short period, from And reduce power consumption and the occupancy to memory.
Compared with prior art, the set-top box power consumption control system of the embodiment avoids machine by default recovery time Top box memory is seriously occupied, by adjusting returning for application to the statistics of application commonly used degree and averagely start time interval Between time receiving, common application can be avoided preferably to be recovered the power consumption increase and wait for that the when of causing to be again started up brings, it is right Power consumption is reduced using recycling in advance in being of little use, control is optimized hence for set-top box power consumption, avoids at set-top-box system Under severe running environment, ensure that foreground application timely responds to, reduces fever and power consumption, ensure the performance of set-top box.
It should be noted that system embodiment described above is only schematical, wherein described be used as separation unit The unit that part illustrates may or may not be physically separated, and the component shown as unit can be or also may be used Not to be physical unit, you can be located at a place, or may be distributed over multiple network units.It can be according to reality Need select some or all of module therein to achieve the purpose of the solution of this embodiment.
By the description of above embodiment, those of ordinary skill in the art can be understood that each embodiment can borrow Help software that the mode of general hardware platform is added to realize, naturally it is also possible to pass through hardware.Those of ordinary skill in the art can manage All or part of flow in the solution realization embodiment method is can be by the relevant hardware of computer program instructions come complete At the program can be stored in computer read/write memory medium, and the program is when being executed, it may include such as each method Embodiment flow.Wherein, the storage medium can be magnetic disc, CD, read-only memory (Read-Only Memory, ROM) or random access memory (Random Access Memory, RAM) etc..
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;At this It under the thinking of invention, can also be combined between the technical characteristic in above example or different embodiment, step can be with It is realized with random order, and there are many other variations of different aspect present invention as described above, for simplicity, they do not have Have and is provided in details;Although the present invention is described in detail referring to the foregoing embodiments, the ordinary skill people of this field Member should understand that:It still can be with technical scheme described in the above embodiments is modified, or to which part skill Art feature carries out equivalent replacement;And these modifications or replacements, each reality of the present invention that it does not separate the essence of the corresponding technical solution Apply the range of a technical solution.

Claims (8)

1. a kind of set-top box power consumption control method, which is characterized in that include the following steps:
The recovery time of default application running background;
It obtains each application and starts primary Mean Time Between Replacement;
Mean Time Between Replacement is compared with default recovery time;
If the Mean Time Between Replacement of application is less than default recovery time, and the two difference is more than the first difference, then by the application Recovery time is extended for being more than the first recovery time of default recovery time;
If the Mean Time Between Replacement of application is more than default recovery time, and difference is more than the second difference, then by the recycling of the application Time shorten to be less than the second recovery time of default recovery time.
2. set-top box power consumption control method according to claim 1, which is characterized in that the method for default recovery time is specific For:It counts time when multiple set-top box EMS memory occupation reaches setting ratio and calculates average value, average value is set as default Recovery time.
3. set-top box power consumption control method according to claim 1, which is characterized in that when obtaining Mean Time Between Replacement, Also obtain apply the number of starts within period seclected time, if the number of starts less than setting number if the application be not identified as Common application.
4. set-top box power consumption control method according to claim 1, which is characterized in that if when the equispaced of the application Between be less than default recovery time, and the two difference is more than the first difference, then is extended for being more than by the recovery time of the application default The step of first recovery time of recovery time further includes:
The number of starts applied in default recovery time is obtained, when if the number of starts being greater than the set value by the recycling of the application Between be extended for the first recovery time.
5. a kind of set-top box power consumption control system, which is characterized in that including:
Recovery time setup module presets the recovery time of an application running background;
Interval time acquisition module obtains each application and starts primary Mean Time Between Replacement;
Mean Time Between Replacement is compared by time comparison module with default recovery time;
Recovery time adjustment module, if the Mean Time Between Replacement of application is less than default recycling, and the two difference is poor more than first The recovery time of the application is then extended for being more than the first recovery time of default recovery time by value;If the equispaced of application Time is more than default recovery time, and difference is more than the second difference, then shorten to be less than by the recovery time of the application and preset back The second recovery time between time receiving.
6. set-top box power consumption control system according to claim 5, which is characterized in that the recovery time setup module system It counts time when multiple set-top box EMS memory occupation reaches setting ratio and calculates average value, when average value is set as default recycling Between.
7. set-top box power consumption control system according to claim 5, which is characterized in that the interval time acquisition module exists It when obtaining Mean Time Between Replacement, also obtains and applies the number of starts within period seclected time, if the number of starts is less than setting time Several, which is not identified as common application.
8. set-top box power consumption control system according to claim 5, which is characterized in that the recovery time adjustment module obtains The number of starts applied in default recovery time is taken, extends the recovery time of the application if the number of starts is greater than the set value For the first recovery time.
CN201810270129.2A 2018-03-29 2018-03-29 Set top box power consumption control method and system Expired - Fee Related CN108600840B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201810270129.2A CN108600840B (en) 2018-03-29 2018-03-29 Set top box power consumption control method and system
PCT/CN2018/125751 WO2019184526A1 (en) 2018-03-29 2018-12-29 Set top box power consumption control method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810270129.2A CN108600840B (en) 2018-03-29 2018-03-29 Set top box power consumption control method and system

Publications (2)

Publication Number Publication Date
CN108600840A true CN108600840A (en) 2018-09-28
CN108600840B CN108600840B (en) 2020-07-10

Family

ID=63624919

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810270129.2A Expired - Fee Related CN108600840B (en) 2018-03-29 2018-03-29 Set top box power consumption control method and system

Country Status (2)

Country Link
CN (1) CN108600840B (en)
WO (1) WO2019184526A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019184526A1 (en) * 2018-03-29 2019-10-03 深圳市九洲电器有限公司 Set top box power consumption control method and system
CN110795239A (en) * 2019-10-15 2020-02-14 浙江口碑网络技术有限公司 Application memory leakage detection method and device
CN113608868A (en) * 2021-07-20 2021-11-05 深圳市天威视讯股份有限公司 Background application management execution method and system suitable for set top box

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102981825A (en) * 2012-10-31 2013-03-20 广东欧珀移动通信有限公司 Method and system of managing background data of mobile terminal
CN104298613A (en) * 2014-09-29 2015-01-21 广州金山网络科技有限公司 Method for cleaning up system memory and terminal device
CN104866366A (en) * 2015-06-15 2015-08-26 广东欧珀移动通信有限公司 Application clearing method and application clearing device
CN105701025A (en) * 2015-12-31 2016-06-22 华为技术有限公司 Memory recovery method and device
CN106843450A (en) * 2017-01-23 2017-06-13 努比亚技术有限公司 The storage processing method and device of a kind of terminal applies

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102521041B (en) * 2011-12-14 2014-10-08 华为终端有限公司 Method for processing application program and wireless handheld device
CN105676987A (en) * 2014-11-19 2016-06-15 中兴通讯股份有限公司 Method for shutting down background application of mobile terminal, device and mobile terminal
CN106855826B (en) * 2015-12-08 2021-02-23 斑马智行网络(香港)有限公司 Background application program control method and device
US10133601B2 (en) * 2016-03-31 2018-11-20 Intel Corporation Memory management
CN106292998A (en) * 2016-07-28 2017-01-04 宇龙计算机通信科技(深圳)有限公司 The management method of a kind of running background program and terminal
CN107402626A (en) * 2017-07-31 2017-11-28 广东欧珀移动通信有限公司 Using cycle synchronisation management method, device, storage medium and electronic equipment
CN108600840B (en) * 2018-03-29 2020-07-10 深圳市九洲电器有限公司 Set top box power consumption control method and system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102981825A (en) * 2012-10-31 2013-03-20 广东欧珀移动通信有限公司 Method and system of managing background data of mobile terminal
CN104298613A (en) * 2014-09-29 2015-01-21 广州金山网络科技有限公司 Method for cleaning up system memory and terminal device
CN104866366A (en) * 2015-06-15 2015-08-26 广东欧珀移动通信有限公司 Application clearing method and application clearing device
CN105701025A (en) * 2015-12-31 2016-06-22 华为技术有限公司 Memory recovery method and device
CN106843450A (en) * 2017-01-23 2017-06-13 努比亚技术有限公司 The storage processing method and device of a kind of terminal applies

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019184526A1 (en) * 2018-03-29 2019-10-03 深圳市九洲电器有限公司 Set top box power consumption control method and system
CN110795239A (en) * 2019-10-15 2020-02-14 浙江口碑网络技术有限公司 Application memory leakage detection method and device
CN113608868A (en) * 2021-07-20 2021-11-05 深圳市天威视讯股份有限公司 Background application management execution method and system suitable for set top box

Also Published As

Publication number Publication date
WO2019184526A1 (en) 2019-10-03
CN108600840B (en) 2020-07-10

Similar Documents

Publication Publication Date Title
CN108600840A (en) set-top box power consumption control method and system
CN108965485B (en) Container resource management method and device and cloud platform
US10310757B2 (en) Systems and methods for memory power saving via kernel steering to memory balloons
US7933230B2 (en) Dynamic bandwidth sharing
US8589936B2 (en) Method and apparatus for managing reallocation of system resources
US10331195B2 (en) Power and performance aware memory-controller voting mechanism
KR970012201A (en) On-demand video system and video scheduling method of the system, physical resource scheduling method of on-demand customer service system, computer readable memory
CN109684090A (en) A kind of resource allocation methods and device
CN103078933A (en) Method and device for determining data migration time
CN107357392A (en) Mobile terminal temperature rise control method, mobile terminal and readable storage medium storing program for executing
US20040205217A1 (en) Method of running a media application and a media system with job control
WO2023071282A1 (en) Method and system for controlling post-stage display module, and related assembly
CN114207571A (en) Computing device and method of operating the same
US20220291735A1 (en) Data scanning method, mobile terminal, and non-volatile computer-readable storage medium
CN111078398A (en) GPU (graphics processing Unit) distribution method, equipment and storage medium
CN113032142B (en) Resource adjusting method and device, electronic equipment and computer readable storage medium
US8527565B2 (en) Selecting and reassigning a blade for a logical partition for service scheduling of a blade server
CN105100505A (en) Method and system for assigning battery level to terminal applications
CN102143206A (en) Storage pool regulation method, device and system for cluster storage system
KR20230132398A (en) Device For Managing QoS Of Storage System And Method Thereof
CN102811154B (en) Resource acquisition method and network server system
CN113099509B (en) Service selection method, device, terminal and storage medium
CN112416570B (en) Picture stream access method and device, picture processing system and electronic equipment
CN109408233B (en) Cache resource allocation method and device
WO2021077747A1 (en) Method and device for implementing application loading, computer storage medium and terminal

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200710

Termination date: 20210329

CF01 Termination of patent right due to non-payment of annual fee