CN108595882A - A kind of city of battalion plans that pipeline BIM design Pipe Costs generate system - Google Patents
A kind of city of battalion plans that pipeline BIM design Pipe Costs generate system Download PDFInfo
- Publication number
- CN108595882A CN108595882A CN201810439152.XA CN201810439152A CN108595882A CN 108595882 A CN108595882 A CN 108595882A CN 201810439152 A CN201810439152 A CN 201810439152A CN 108595882 A CN108595882 A CN 108595882A
- Authority
- CN
- China
- Prior art keywords
- pipeline
- bim
- axis
- coordinate
- triple
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000013461 design Methods 0.000 title claims abstract description 29
- 238000000034 method Methods 0.000 claims abstract description 16
- 230000004048 modification Effects 0.000 claims description 36
- 238000012986 modification Methods 0.000 claims description 36
- 238000007726 management method Methods 0.000 claims description 11
- 230000001537 neural effect Effects 0.000 claims description 10
- 230000008859 change Effects 0.000 claims description 9
- 230000002457 bidirectional effect Effects 0.000 claims description 6
- 238000013507 mapping Methods 0.000 claims description 6
- 230000005540 biological transmission Effects 0.000 claims description 5
- 230000005059 dormancy Effects 0.000 claims description 4
- 230000001788 irregular Effects 0.000 claims description 3
- 210000002569 neuron Anatomy 0.000 claims description 3
- 239000000203 mixture Substances 0.000 claims description 2
- 241000208340 Araliaceae Species 0.000 claims 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 claims 1
- 235000003140 Panax quinquefolius Nutrition 0.000 claims 1
- 235000008434 ginseng Nutrition 0.000 claims 1
- 230000008901 benefit Effects 0.000 abstract description 4
- 238000010276 construction Methods 0.000 description 8
- 238000005516 engineering process Methods 0.000 description 7
- 238000000605 extraction Methods 0.000 description 3
- 238000012423 maintenance Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 238000012163 sequencing technique Methods 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000000284 extract Substances 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012827 research and development Methods 0.000 description 1
- 238000004919 topotaxy Methods 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/18—Network design, e.g. design based on topological or interconnect aspects of utility systems, piping, heating ventilation air conditioning [HVAC] or cabling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/02—Marketing; Price estimation or determination; Fundraising
- G06Q30/0283—Price estimation or determination
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Strategic Management (AREA)
- Development Economics (AREA)
- Marketing (AREA)
- Geometry (AREA)
- General Business, Economics & Management (AREA)
- Economics (AREA)
- Finance (AREA)
- Accounting & Taxation (AREA)
- Game Theory and Decision Science (AREA)
- Evolutionary Computation (AREA)
- Mathematical Optimization (AREA)
- Entrepreneurship & Innovation (AREA)
- General Engineering & Computer Science (AREA)
- Pure & Applied Mathematics (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Computer Networks & Wireless Communication (AREA)
- Computer Hardware Design (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Primary Health Care (AREA)
- Tourism & Hospitality (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810439152.XA CN108595882B (en) | 2018-05-09 | 2018-05-09 | Yinyi planning pipeline BIM design pipeline cost generation system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810439152.XA CN108595882B (en) | 2018-05-09 | 2018-05-09 | Yinyi planning pipeline BIM design pipeline cost generation system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108595882A true CN108595882A (en) | 2018-09-28 |
CN108595882B CN108595882B (en) | 2020-09-29 |
Family
ID=63636658
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810439152.XA Active CN108595882B (en) | 2018-05-09 | 2018-05-09 | Yinyi planning pipeline BIM design pipeline cost generation system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108595882B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111680340A (en) * | 2020-05-28 | 2020-09-18 | 上海上咨工程造价咨询有限公司 | Building material price information pushing method, system and device and storage medium thereof |
CN111693001A (en) * | 2020-05-20 | 2020-09-22 | 合肥京亿盛精密科技有限公司 | Three-coordinate detection tool |
US11474673B1 (en) * | 2018-10-01 | 2022-10-18 | Splunk Inc. | Handling modifications in programming of an iterative message processing system |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204303029U (en) * | 2013-08-13 | 2015-04-29 | 中铁上海工程局集团有限公司 | For the BIM Database Systems of subway pipeline collision detection and later stage operation maintenance |
KR20150089806A (en) * | 2014-01-28 | 2015-08-05 | 동서대학교산학협력단 | A Visual Reality system for city space management, inquiry, estimation and permission to be applied a City Information Model streaming technology, and a method of using a City Information Model |
CN105888248A (en) * | 2016-04-27 | 2016-08-24 | 河北建筑工程学院 | Construction method of guiding informationization prefabricated member based on BIM (Building Information Modeling)) technology |
CN106202831A (en) * | 2016-08-10 | 2016-12-07 | 中国建筑第八工程局有限公司 | A kind of pipeline layout optimization method based on BIM |
-
2018
- 2018-05-09 CN CN201810439152.XA patent/CN108595882B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204303029U (en) * | 2013-08-13 | 2015-04-29 | 中铁上海工程局集团有限公司 | For the BIM Database Systems of subway pipeline collision detection and later stage operation maintenance |
KR20150089806A (en) * | 2014-01-28 | 2015-08-05 | 동서대학교산학협력단 | A Visual Reality system for city space management, inquiry, estimation and permission to be applied a City Information Model streaming technology, and a method of using a City Information Model |
CN105888248A (en) * | 2016-04-27 | 2016-08-24 | 河北建筑工程学院 | Construction method of guiding informationization prefabricated member based on BIM (Building Information Modeling)) technology |
CN106202831A (en) * | 2016-08-10 | 2016-12-07 | 中国建筑第八工程局有限公司 | A kind of pipeline layout optimization method based on BIM |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11474673B1 (en) * | 2018-10-01 | 2022-10-18 | Splunk Inc. | Handling modifications in programming of an iterative message processing system |
CN111693001A (en) * | 2020-05-20 | 2020-09-22 | 合肥京亿盛精密科技有限公司 | Three-coordinate detection tool |
CN111680340A (en) * | 2020-05-28 | 2020-09-18 | 上海上咨工程造价咨询有限公司 | Building material price information pushing method, system and device and storage medium thereof |
CN111680340B (en) * | 2020-05-28 | 2022-08-23 | 上海上咨工程造价咨询有限公司 | Building material price information pushing method, system and device and storage medium thereof |
Also Published As
Publication number | Publication date |
---|---|
CN108595882B (en) | 2020-09-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Shen et al. | Research on large-scale additive manufacturing based on multi-robot collaboration technology | |
ElNimr et al. | Two-way integration of 3D visualization and discrete event simulation for modeling mobile crane movement under dynamically changing site layout | |
CN106407540B (en) | A kind of underground utilities auxiliary programming checking method based on three-dimension GIS technology | |
CN107972034B (en) | Complex workpiece trajectory planning simulation system based on ROS platform | |
CN104680588B (en) | Event marker method and system based on BIM | |
Zolfagharian et al. | Current trends in construction site layout planning | |
CN108595882A (en) | A kind of city of battalion plans that pipeline BIM design Pipe Costs generate system | |
Chung et al. | Smart facility management systems utilizing open BIM and augmented/virtual reality | |
CN103646154A (en) | Three-dimensional digitization final assembly technology collaborative design system | |
CN105046432A (en) | Building dimensional guide construction method | |
CN104063529A (en) | Simulation method of layout planning of digital automobile plant | |
CN102063534B (en) | High furnace overhaul project schedule three-dimensional simulation device and method | |
CN110941867A (en) | Construction method of standardized site layout based on BIM | |
Luo et al. | A sustainable BIM-based multidisciplinary framework for underground pipeline clash detection and analysis | |
CN103810310B (en) | The parametrization equipped towards the asphalt foaming module of bituminous mixing plant determines method | |
CN110516387A (en) | A kind of quick locating query method in position based on mobile phone B IM model | |
CN103955801A (en) | Electric power system distributed parallel computing management method based on time-space dimension | |
Peng et al. | The Application of Artificial Intelligence in Architectural Design and Planning | |
König et al. | Levels of automation in urban design through arti ficial intelligence: A framework to characterize automation approaches | |
Samigulina et al. | Analytical review of software for multi-agent systems and their applications | |
Shirowzhan et al. | Spatial big data, BIM and advanced GIS for smart transformation: city, infrastructure and construction | |
Sun | Design of Full Life-Cycle Management System for Construction Project Based on “BIM+ GIS” | |
Han et al. | Analysis on the BIM application in the whole life cycle of railway engineering | |
Wang et al. | Research and Design of Intelligent Manufacturing System Based on Internet of Things and Virtual Reality Technology | |
Wang | Collision Detection Algorithm Based on Particle System in Virtual Simulation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A BIM Design Pipeline Cost Generation System for Yingyi Planning Pipeline Effective date of registration: 20221213 Granted publication date: 20200929 Pledgee: Industrial Bank Co.,Ltd. Shanghai Huashan sub branch Pledgor: SHANGHAI YINGYI URBAN PLANNING AND DESIGN CO.,LTD. Registration number: Y2022310000371 |
|
CP02 | Change in the address of a patent holder |
Address after: 200233 3rd floor, building 19, 810 Yishan Road, Xuhui District, Shanghai Patentee after: SHANGHAI YINGYI URBAN PLANNING AND DESIGN CO.,LTD. Address before: Room 1802, Block K, No. 343 Huaihai West Road, Xuhui District, Shanghai, 200030 Patentee before: SHANGHAI YINGYI URBAN PLANNING AND DESIGN CO.,LTD. |
|
CP02 | Change in the address of a patent holder | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Granted publication date: 20200929 Pledgee: Industrial Bank Co.,Ltd. Shanghai Huashan sub branch Pledgor: SHANGHAI YINGYI URBAN PLANNING AND DESIGN CO.,LTD. Registration number: Y2022310000371 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A BIM Design Pipeline Cost Generation System for Business Planning Pipeline Granted publication date: 20200929 Pledgee: Industrial Bank Co.,Ltd. Shanghai Huashan sub branch Pledgor: SHANGHAI YINGYI URBAN PLANNING AND DESIGN CO.,LTD. Registration number: Y2024310000098 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |