CN108595882A - A kind of city of battalion plans that pipeline BIM design Pipe Costs generate system - Google Patents

A kind of city of battalion plans that pipeline BIM design Pipe Costs generate system Download PDF

Info

Publication number
CN108595882A
CN108595882A CN201810439152.XA CN201810439152A CN108595882A CN 108595882 A CN108595882 A CN 108595882A CN 201810439152 A CN201810439152 A CN 201810439152A CN 108595882 A CN108595882 A CN 108595882A
Authority
CN
China
Prior art keywords
pipeline
bim
axis
coordinate
triple
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810439152.XA
Other languages
Chinese (zh)
Other versions
CN108595882B (en
Inventor
徐峥
徐文杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Camp City Planning Tsukito Design Inc
Original Assignee
Shanghai Camp City Planning Tsukito Design Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Camp City Planning Tsukito Design Inc filed Critical Shanghai Camp City Planning Tsukito Design Inc
Priority to CN201810439152.XA priority Critical patent/CN108595882B/en
Publication of CN108595882A publication Critical patent/CN108595882A/en
Application granted granted Critical
Publication of CN108595882B publication Critical patent/CN108595882B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/18Network design, e.g. design based on topological or interconnect aspects of utility systems, piping, heating ventilation air conditioning [HVAC] or cabling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0283Price estimation or determination
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Geometry (AREA)
  • General Business, Economics & Management (AREA)
  • Economics (AREA)
  • Finance (AREA)
  • Accounting & Taxation (AREA)
  • Game Theory and Decision Science (AREA)
  • Evolutionary Computation (AREA)
  • Mathematical Optimization (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Engineering & Computer Science (AREA)
  • Pure & Applied Mathematics (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Computer Hardware Design (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Primary Health Care (AREA)
  • Tourism & Hospitality (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of city of battalion planning pipeline BIM design Pipe Costs to generate system, including being defined to the system-operating environment, pipeline in range is defined, the parameter of the pipeline in the range is popped up on summary interface, this method can apply to each system, the calculating of Pipe Cost is carried out under two-dimensional design, the advantage of three dimensional design can be held a concurrent post again, pipeline is segmented and is positioned, category carries out a point group and stores, pipeline can be recalled from group, the parameter and price of pipeline that can not only be in indication range, and the unit price of pipeline can be changed, the total cost of final display pipeline.

Description

A kind of city of battalion plans that pipeline BIM design Pipe Costs generate system
Technical field
The present invention relates to Pipe Cost fields, are related to a kind of city of battalion planning pipeline BIM design Pipe Costs and generate system.
Background technology
In a BIM application systems of Ying Yi designing institutees orientation research and development, existing two-dimensional design thought is transformed into three Dimension design, while retaining the accumulative experience of two-dimensional design and custom as far as possible again, it provides and both retains conventional two-dimensional design The characteristics of, and the tool of three dimensional design advantage can be taken into account, become feasible program of the two-dimensional design to three dimensional design smooth transition.
But need to forge cost generation thought in application system, pipeline is meticulously analyzed, and energy Enough to its calculation of price, and unit price can be improved, therefore, it is necessary to be improved to method.
Invention content
In view of this, the present invention provides a kind of city of battalion planning pipeline BIM design pipes solved or part solves the above problems Line cost generates system.
To achieve the effect that above-mentioned technical proposal, the technical scheme is that:A kind of city of battalion plans pipeline BIM design pipes Line cost generates system, including:
City of battalion planning pipeline BIM design Pipe Costs generate system and are operated under BIM vertical view states;Wherein, BIM Vertical view is a type of view selected under BIM 3-D views, and BIM 3-D views are constituted based on x-axis, y-axis, z-axis Three-dimensional view, be divided into BIM front views, BIM left views, BIM vertical views;BIM front views are regarded by what x-axis, z-axis were constituted Figure, BIM left views are the views being made of y-axis, z-axis, and BIM vertical views are the views being made of x-axis, y-axis;It will be in BIM three-dimensionals Road in view is mapped in BIM vertical views, and the method for mapping is x-axis, y-axis, z-axis composition by road on 3-D view Coordinate extraction in coordinate system, becomes 0 by seat target value of the road in z-axis;In advance according to the type of pipeline by institute in road Having the parameter record of the starting point coordinate of pipeline, terminal point coordinate and pipeline, the sequence of record is walking along road in the table To noting down successively;X-axis, y-axis, z-axis can be arbitrarily designated in BIM 3-D views;
It includes pipeline and road locating module, line classification mould to seek city's planning pipeline BIM design Pipe Costs and generate system Block summarizes data module, user task distribution module;
Pipeline is used to position the relative position of road and pipeline with road locating module, first, pipeline and road positioning mould Block selects road in BIM vertical views, and a range is selected on road by mouse, is ranging from comprised in a rule Then or in irregular closed figure area finds the intersection point of pipeline and closed figure in road, and intersection point, which is more than, is equal to one It is a;Since intersection point, the trend of pipeline is simulated using mobile positioning point, mobile positioning point is moved along the trend of pipeline, with Starting point coordinate, the terminal point coordinate of all pipelines in table are compared, and are encountered intersection point pause, are encountered another intersection point and open again Begin, position of the different types of pipeline in range is indicated, triple is expressed as, triple table is shown as ((x1, y1), (x2, y2), θ), (x1, y1)、(x2, y2) and it is dynamic coordinate, as first two of triple, θ indicates the camber tilt of pipeline, makees For the Section 3 of triple, it is expressed asThe value of dynamic coordinate may be the seat of starting point coordinate, terminal point coordinate, intersection point Mark, x1With x2For starting point coordinate, terminal point coordinate, intersection point coordinate abscissa, y1With y2For starting point coordinate, terminal point coordinate, intersection point Coordinate ordinate, x and y are respectively the coordinate in x-axis, y-axis;
Line classification module divides the triple indicated in pipeline and road locating module to group according to the type of pipeline, and Establish being associated between triple and group;Line classification module determines three according to the sequencing of mobile positioning point moved through The value of tuple, using priority by starting point coordinate, terminal point coordinate, intersection point coordinate as first two of triple, further according toCalculate θ;Then line classification module carries out a point group to triple, and the ternary component that the pipeline of a type indicates is arrived One group, group are made of a series of triples;Bidirectional association rule is established between group and triple, bidirectional association rule indicates Between the two can mutual reasoning, be expressed as Q indicates that group, W indicate triple, Qi(s) one kind of group is indicated, WjIndicate that one kind of triple, s indicate the type of pipeline;I indicates that the number of group, j indicate the number of triple, is positive integer;
Thereafter, summarize the parameter of pipeline of the data module on summary interface in output area, the parameter of pipeline includes pipe The total price of the type of line, the internal diameter of pipeline or hole count or radical, the length of pipeline, the unit price of pipeline, pipeline;In output area The principle of the parameter of pipeline is as follows:
Summarize data module to pop up summary interface, by the parameter spread of pipeline to multi-level inference network, multilayer Secondary inference network is made of the neuron elements of many levels, represents the type of pipeline, is indicated using group, level Neural unit represents one kind of the parameter of all pipelines of the pipeline of a type, can not only be individually defeated on summarizing the page Go out, and the input of the neural unit as next level, triggers the output of the neural unit of next level;
User task distribution module is modified and is managed with two kinds of manager, user roles, and manager is responsible for table In all data record in advance, and be responsible for safeguarding the management of multi-level inference network, it is multi-level that user is responsible for modification The unit price of pipeline in inference network, the total price of modified pipeline are multiplied by the length of pipeline equal to the unit price of modified pipeline Degree, and modification report is sent to manager, the transmission existence time limitation of report is changed, time restriction refers to transmission modification report Time subtract time of modification no more than time T, modification report is comprising executing the user of modification, the time of modification, pipeline Monovalent, modified pipeline unit price;T is time restriction, and unit is the second, is set by the user, and value range is 0 to 30 seconds;
Wherein, the number of user is more than or equal to one, and manager selects vacant user to modify task, if carried out The user of modification task is more than that sending time T does not send modification report, is dormant user by user setting, and when suspend mode is arranged Between L, unit is hour, and value range is 0 to 1 hour, and modification task of not reallocating in dormancy time is to dormant user;
Modification task is to change the unit price of pipeline, and carry out the calculating of the total price of modified pipeline.
The present invention useful achievement be:A kind of city of battalion provided by the invention plans that pipeline BIM design Pipe Costs generate system System, this method can apply to each system, and the calculating of Pipe Cost is carried out under two-dimensional design, and can hold a concurrent post the excellent of three dimensional design Gesture is segmented pipeline and is positioned, and category carries out a point group and stores, and pipeline can be recalled from group, can not only show The parameter and price of interior pipeline are enclosed in demonstration, and can change the unit price of pipeline, the total cost of final display pipeline.
Specific implementation mode
In order to make technical problems, technical solutions and advantages to be solved be more clearly understood, tie below Embodiment is closed, the present invention will be described in detail.It should be noted that specific embodiment described herein is only explaining The present invention is not intended to limit the present invention, and can be realized that the product of said function belongs to equivalent replacement and improvement, is all contained in this hair Within bright protection domain.The specific method is as follows:
Embodiment 1:In recent years, the scientific and technological project cost industry that develops into brought three dimensional graphics.Cost engineer can To realize 3D modeling using related software according to construction drawing, and by some functions of software, such as automatic calculating and remittance Corresponding quantities can always be directly obtained.Pattern based on geometric operation and spatial topotaxy, cost operation realize intelligence Energyization, and it is convenient and efficient, accuracy rate is high.Nonetheless, still there is some defects for this pattern, though because threedimensional model The shape of building is so shown, but there is no including corresponding information, is specifically being constructed so can do nothing to help technical staff Correct analysis is made in the process.When there is design alteration or some are changed about the parameter of cost, just have no idea Realize the direct prediction to cost.Importantly, due to the cost of the model of building, engineering also have the information such as progress cannot and When it is shared, make troubles to the communication and coordination of each participant of project.
Nowadays, the incoming China of a new technology --- Building Information Model, full name in English Building The promotion and application of Information Modeling will be that revolutionary variation is brought in architecture information field.BIM technology generates Threedimensional model in include from initial decision to operation maintenance building life cycle management in engineering information, truly Ground realizes the digitlization and information system management of engineering project.The popularization and application of the technology, not only facilitate the design phase Coordinate design, collision detection, the Full procedure integrated building of construction stage, the intelligent management of operation stage and maintenance;And The resource-sharing between owner, unit in charge of construction and operator is facilitated, the Whole Course Management of construction project is truly realized. In the information database of BIM models, change in the work, project progress, material equipment and cost can be timely and accurately understood Etc. information, information can easily transmit, manage and can timely improve.For construction industry now, BIM technology is answered With and promote, be opportunity be also challenge, how to realize that higher level work collaboration, information sharing are that project administrators should Deep thinking.As the project cost industry of construction industry branch, control and Management Advisory Services task this engineering of project cost carry The core objective of construction project will catch the advantage of BIM technology to solve the problems in current cost industry, improve working efficiency, real The Cost Management of existing overall process helps the income for improving construction project.
Embodiment 2:The secondary development that the method for the present invention is carried out based on AutoCAD Civil 3D softwares, BIM (Building Information Model) is Building Information Model;
Under BIM vertical view states, the method for carrying out the present invention, BIM vertical views are one selected under BIM 3-D views The view of type;BIM 3-D views are the three-dimensional views constituted based on x-axis, y-axis, z-axis, and it is left to be divided into BIM front views, BIM View, BIM vertical views;
Wherein, BIM 3-D views are explained, BIM front views are the views being made of x-axis, z-axis, and BIM left views are The view being made of y-axis, z-axis, BIM vertical views are the views being made of x-axis, y-axis;X-axis, y-axis, z-axis can be regarded in BIM three-dimensionals It is arbitrarily designated in figure;Therefore, BIM vertical views are imitative two dimension views;
Road in BIM 3-D views is mapped in BIM vertical views, the method for mapping be by road on 3-D view X-axis, y-axis, z-axis constitute coordinate system in coordinate extraction, seat target value of the road in z-axis is become 0;BIM three-dimensionals are regarded Road in figure is mapped in BIM left views, and the method for mapping is sat to constitute x-axis, y-axis, z-axis of the road on 3-D view Coordinate extraction in mark system, becomes 0 by seat target value of the road in x-axis;Road in BIM 3-D views is mapped to BIM In left view, the method for mapping is that the coordinate that x-axis, y-axis, z-axis by road on 3-D view are constituted in coordinate system extracts, will Seat target value of the road in x-axis becomes 0;Road in BIM 3-D views is mapped in BIM front views, the method for mapping It is extracted for x-axis, y-axis, z-axis of the road on 3-D view are constituted the coordinate in coordinate system, by the coordinate of road on the y axis Value becomes 0;
The parameter of the starting point coordinate of all pipelines, terminal point coordinate and pipeline in road is recorded according to the type of pipeline in advance In the table, the sequence of record is noted down successively for the trend along road for record;The direction of the trend of road can be arbitrarily designated;
Road is selected in BIM vertical views, and a range is selected on road by mouse, is ranging from comprised in Area in one regular or irregular closed figure, finds the intersection point of pipeline and closed figure in road, and intersection point is more than Equal to one;Since intersection point, the trend of pipeline is simulated using mobile positioning point, mobile positioning point moves towards to move along pipeline It is dynamic, it is compared with starting point coordinate, the terminal point coordinate of all pipelines in table, encounters intersection point pause, encounter another intersection point Restart, to which pipeline is divided into a section sub- pipeline;The selected edge for ranging from pinning left mouse button delineation range, so After unclamp mouse, determine range;Mobile positioning point moves towards movement along pipeline, ceaselessly changes, and is the inside of closed figure Or the point on edge;
Position of the different types of pipeline in range is indicated, triple is expressed as, triple indicates sub- pipeline, Triple table is shown as ((x1, y1), (x2, y2), θ), (x1, y1)、(x2, y2) it is dynamic coordinate, as first two of triple, θ tables The camber tilt for showing pipeline is expressed as the Section 3 of tripleThe value of dynamic coordinate may be that starting point is sat The coordinate of mark, terminal point coordinate, intersection point, x1With x2For starting point coordinate, terminal point coordinate, intersection point coordinate abscissa, y1With y2To rise Point coordinates, terminal point coordinate, intersection point coordinate ordinate, x and y are respectively the coordinate in x-axis, y-axis;
Depending on the sequencing of mobile positioning point moved through, the position of sub- pipeline is noted down, successively passes through starting point First two as triple of coordinate of coordinate, terminal point coordinate, intersection point, further according to calculating θ;A point group is carried out to triple, by one To a group, group is made of the ternary component that the pipeline of a type indicates a series of triples;It is established between group and triple Bidirectional association rule, bidirectional association rule indicate between the two can mutual reasoning, be expressed asQ indicates group, W Indicate triple, Qi(s) one kind of group, W are indicatedjIndicate that one kind of triple, s indicate the type of pipeline;I indicates the number of group, J indicates the number of triple, is positive integer;
Thereafter, the parameter of the parameter of the pipeline on summary interface in ejection scope, pipeline includes the type of pipeline, pipeline Internal diameter or hole count or radical, the length of pipeline, the unit price of pipeline, pipeline total price;The parameter of pipeline in ejection scope Principle is as follows:
Pop up summary interface, by the parameter spread of pipeline to multi-level inference network, multi-level inference network by The neuron elements of many levels form, and represent the type of pipeline, are indicated using group, the neural unit of a level represents one One kind of the parameter of all pipelines of the pipeline of a type can not only be exported individually on summarizing the page, and as under The input of the neural unit of one level triggers the output of the neural unit of next level;Multi-level inference network is pipe A kind of reasoning of the parameter of line is type, the internal diameter of pipeline or the list of hole count or radical, the length of pipeline, pipeline of pipeline Valence, pipeline total price in an output, the sequence of output can be arbitrarily designated, and be continuous;In addition, triple also can Neural unit as a level is exported;
When management, the role of each censure is distinguished;It modifies and manages with two kinds of manager, user roles, manager It is responsible for the record in advance to all data in table, and is responsible for safeguarding that the management of multi-level inference network, user are responsible for repairing Change the unit price of the pipeline in multi-level inference network, the total price of modified pipeline is multiplied by equal to the unit price of modified pipeline The length of pipeline, and modification report is sent to manager, the transmission existence time limitation of report is changed, time restriction refers to transmission The time of modification report subtracts time of modification no more than time T, modification report comprising execute the user of modification, modification when Between, the unit price of monovalent, the modified pipeline of pipeline;T is time restriction, and unit is the second;Manager is the management of entire method Personnel, for the role that can be modified;
Also, the number of user is more than or equal to one, and manager selects vacant user to modify task, if carried out The user of modification task is more than that sending time T does not send modification report, is dormant user by user setting, and when suspend mode is arranged Between L, unit is hour, and modification task of not reallocating in dormancy time is to dormant user;When dormant user has spent suspend mode Between L, then dormant user switchs to user, can modify task;
Modification task is to change the unit price of pipeline, and carry out the calculating of the total price of modified pipeline.
The pipeline in certain pattern range is selected by the selection mode of AutoCAD, can change the parameter of pipeline, It may return on summary interface and modify to each pipeline, then click refresh button to refresh, click imports out button The pipeline of selection is saved as excel formats or txt formats, and the cost that display pipeline is total.
The present invention useful achievement be:A kind of city of battalion provided by the invention plans that pipeline BIM design Pipe Costs generate system System, this system can apply to each system, and the calculating of Pipe Cost is carried out under two-dimensional design, and can hold a concurrent post the excellent of three dimensional design Gesture is segmented pipeline and is positioned, and category carries out a point group and stores, and pipeline can be recalled from group, can not only show The parameter and price of interior pipeline are enclosed in demonstration, and can change the unit price of pipeline, the total cost of final display pipeline.
Although preferred embodiments of the present invention have been described, it is created once a person skilled in the art knows basic Property concept, then additional changes and modifications may be made to these embodiments.So it includes excellent that the following claims are intended to be interpreted as It selects embodiment and falls into all change and modification of the scope of the invention.
Obviously, those skilled in the art can carry out the embodiment of the present invention various modification and variations without departing from this hair The spirit and scope of bright embodiment.In this way, if these modifications and variations of the embodiment of the present invention belong to the claims in the present invention And its within the scope of equivalent technologies, then the present invention is also intended to include these modifications and variations.

Claims (1)

1. a kind of city of battalion plans that pipeline BIM design Pipe Costs generate system, which is characterized in that include the following contents:
City of battalion planning pipeline BIM design Pipe Costs generate system and are operated under BIM vertical view states;Wherein, institute It is a type of view selected under BIM 3-D views to state BIM vertical views, and the BIM 3-D views are based on x-axis, y The three-dimensional view that axis, z-axis are constituted, is divided into BIM front views, BIM left views, BIM vertical views;The BIM front views be by × The view that axis, z-axis are constituted, the BIM left views are the views being made of y-axis, z-axis, and the BIM vertical views are by x-axis, y-axis The view of composition;Road in the BIM 3-D views is mapped in the BIM vertical views, the method for mapping is by institute It states the coordinate that x-axis, y-axis, z-axis of the road on the 3-D view are constituted in coordinate system to extract, by the road in z-axis Sitting target value becomes 0;In advance according to the type of pipeline by the starting point coordinate of all pipelines, terminal point coordinate in the road with And the parameter record of the pipeline is in the table, the sequence of record is noted down successively for the trend along the road;X-axis, y-axis, z Axis can be arbitrarily designated in the BIM 3-D views;
It includes pipeline and road locating module, line classification mould that city of the battalion, which plans that pipeline BIM design Pipe Costs generate system, Block summarizes data module, user task distribution module;
The pipeline is used to position the relative position of the road and the pipeline, first, the pipeline with road locating module The road is selected in the BIM vertical views with road locating module, and one is selected on the road by mouse Range, the area being ranging from comprised in a regular or irregular closed figure find the road middle pipe The intersection point of line and the closed figure, the intersection point, which is more than, is equal to one;Since the intersection point, carry out mould using mobile positioning point Intend the trend of the pipeline, the mobile positioning point moves along the trend of the pipeline, and all described in the table Starting point coordinate, the terminal point coordinate of pipeline are compared, and are encountered the intersection point pause, are encountered another intersection point and restart, will not Position of the pipeline of same type in the range is indicated, and is expressed as triple, and the triple table is shown as ((x1, y1), (x2, y2), θ), (x1, y1)、(x2, y2) it is dynamic coordinate, as first two of the triple, θ indicates the inclination angle of the pipeline Gradient is expressed as the Section 3 of the tripleThe value of the dynamic coordinate may be that the starting point is sat The coordinate of mark, the terminal point coordinate, the intersection point, x1With x2For the starting point coordinate, the seat of the terminal point coordinate, the intersection point Target abscissa, y1With y2For the starting point coordinate, the terminal point coordinate, the intersection point coordinate ordinate, x is respectively with y Coordinate in x-axis, y-axis;
The line classification module divides the triple indicated in the pipeline and road locating module to group according to the type of pipeline, And establish being associated between triple and group;The line classification module is according to the elder generation moved through of the mobile positioning point Sequence determines the value of triple afterwards, and priority is passed through the coordinate of the starting point coordinate, the terminal point coordinate, the intersection point as institute State triple first two, further according toCalculate θ;Then the line classification module carries out a point group to the triple, By the ternary component of the pipeline expression of a type a to group, the group is made of a series of triples; Bidirectional association rule is established between the group and the triple, the bidirectional association rule expression between the two can be mutual Reasoning is expressed asQ indicates that the group, W indicate the triple, Qi(s) one kind of the group, W are indicatedjTable Show that one kind of the triple, s indicate the type of the pipeline;I indicates that the number of the group, j indicate the volume of the triple Number, it is positive integer;
Thereafter, the parameter for summarizing the pipeline that data module is exported on summary interface in the range, the ginseng of the pipeline Number includes type, the internal diameter of pipeline or the total price of hole count or radical, the length of pipeline, the unit price of pipeline, pipeline of pipeline;Output The principle of the parameter of pipeline in the range is as follows:
The data module that summarizes pops up summary interface, described by the parameter spread of pipeline to multi-level inference network Multi-level inference network is made of the neuron elements of many levels, represents the type of the pipeline, carrys out table using the group Show, the neural unit of a level represents one kind of the parameter of all pipelines of the pipeline of a type, can not only It is enough individually it is described summarize exported on the page, and the input of the neural unit as next level, triggering are described next The output of the neural unit of a level;
The user task distribution module is modified and is managed with two kinds of manager, user roles, responsible couple of the manager The record in advance of all data in the table, and be responsible for safeguarding the management of the multi-level inference network, the user It is responsible for the unit price of the pipeline in the modification multi-level inference network, the total price of the modified pipeline is equal to modification The unit price of the pipeline afterwards is multiplied by the length of the pipeline, and modification report is sent to the manager, the modification report The transmission existence time of announcement limits, and the time restriction, which refers to, to be sent time of the modification report and subtract time of modification and cannot surpass Time T is crossed, it is described to change the monovalent, described modified of the time, the pipeline for reporting the user, modification that are changed comprising execution The unit price of the pipeline;T is time restriction, and unit is the second, is set by the user, and value range is 0 to 30 seconds;
Wherein, the number of the user is more than or equal to one, and the manager selects the vacant user to modify task, If the user for task of modifying is more than to send the time T not sending the modification report, the user is set It is set to dormant user, and dormancy time L is set, unit is hour, and value range is 0 to 1 hour, in the dormancy time not The modification task of reallocating gives the dormant user;
The modification task is the calculating changed the unit price of the pipeline, and carry out the total price of the modified pipeline.
CN201810439152.XA 2018-05-09 2018-05-09 Yinyi planning pipeline BIM design pipeline cost generation system Active CN108595882B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810439152.XA CN108595882B (en) 2018-05-09 2018-05-09 Yinyi planning pipeline BIM design pipeline cost generation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810439152.XA CN108595882B (en) 2018-05-09 2018-05-09 Yinyi planning pipeline BIM design pipeline cost generation system

Publications (2)

Publication Number Publication Date
CN108595882A true CN108595882A (en) 2018-09-28
CN108595882B CN108595882B (en) 2020-09-29

Family

ID=63636658

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810439152.XA Active CN108595882B (en) 2018-05-09 2018-05-09 Yinyi planning pipeline BIM design pipeline cost generation system

Country Status (1)

Country Link
CN (1) CN108595882B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111680340A (en) * 2020-05-28 2020-09-18 上海上咨工程造价咨询有限公司 Building material price information pushing method, system and device and storage medium thereof
CN111693001A (en) * 2020-05-20 2020-09-22 合肥京亿盛精密科技有限公司 Three-coordinate detection tool
US11474673B1 (en) * 2018-10-01 2022-10-18 Splunk Inc. Handling modifications in programming of an iterative message processing system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204303029U (en) * 2013-08-13 2015-04-29 中铁上海工程局集团有限公司 For the BIM Database Systems of subway pipeline collision detection and later stage operation maintenance
KR20150089806A (en) * 2014-01-28 2015-08-05 동서대학교산학협력단 A Visual Reality system for city space management, inquiry, estimation and permission to be applied a City Information Model streaming technology, and a method of using a City Information Model
CN105888248A (en) * 2016-04-27 2016-08-24 河北建筑工程学院 Construction method of guiding informationization prefabricated member based on BIM (Building Information Modeling)) technology
CN106202831A (en) * 2016-08-10 2016-12-07 中国建筑第八工程局有限公司 A kind of pipeline layout optimization method based on BIM

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204303029U (en) * 2013-08-13 2015-04-29 中铁上海工程局集团有限公司 For the BIM Database Systems of subway pipeline collision detection and later stage operation maintenance
KR20150089806A (en) * 2014-01-28 2015-08-05 동서대학교산학협력단 A Visual Reality system for city space management, inquiry, estimation and permission to be applied a City Information Model streaming technology, and a method of using a City Information Model
CN105888248A (en) * 2016-04-27 2016-08-24 河北建筑工程学院 Construction method of guiding informationization prefabricated member based on BIM (Building Information Modeling)) technology
CN106202831A (en) * 2016-08-10 2016-12-07 中国建筑第八工程局有限公司 A kind of pipeline layout optimization method based on BIM

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11474673B1 (en) * 2018-10-01 2022-10-18 Splunk Inc. Handling modifications in programming of an iterative message processing system
CN111693001A (en) * 2020-05-20 2020-09-22 合肥京亿盛精密科技有限公司 Three-coordinate detection tool
CN111680340A (en) * 2020-05-28 2020-09-18 上海上咨工程造价咨询有限公司 Building material price information pushing method, system and device and storage medium thereof
CN111680340B (en) * 2020-05-28 2022-08-23 上海上咨工程造价咨询有限公司 Building material price information pushing method, system and device and storage medium thereof

Also Published As

Publication number Publication date
CN108595882B (en) 2020-09-29

Similar Documents

Publication Publication Date Title
Shen et al. Research on large-scale additive manufacturing based on multi-robot collaboration technology
ElNimr et al. Two-way integration of 3D visualization and discrete event simulation for modeling mobile crane movement under dynamically changing site layout
CN106407540B (en) A kind of underground utilities auxiliary programming checking method based on three-dimension GIS technology
CN107972034B (en) Complex workpiece trajectory planning simulation system based on ROS platform
CN104680588B (en) Event marker method and system based on BIM
Zolfagharian et al. Current trends in construction site layout planning
CN108595882A (en) A kind of city of battalion plans that pipeline BIM design Pipe Costs generate system
Chung et al. Smart facility management systems utilizing open BIM and augmented/virtual reality
CN103646154A (en) Three-dimensional digitization final assembly technology collaborative design system
CN105046432A (en) Building dimensional guide construction method
CN104063529A (en) Simulation method of layout planning of digital automobile plant
CN102063534B (en) High furnace overhaul project schedule three-dimensional simulation device and method
CN110941867A (en) Construction method of standardized site layout based on BIM
Luo et al. A sustainable BIM-based multidisciplinary framework for underground pipeline clash detection and analysis
CN103810310B (en) The parametrization equipped towards the asphalt foaming module of bituminous mixing plant determines method
CN110516387A (en) A kind of quick locating query method in position based on mobile phone B IM model
CN103955801A (en) Electric power system distributed parallel computing management method based on time-space dimension
Peng et al. The Application of Artificial Intelligence in Architectural Design and Planning
König et al. Levels of automation in urban design through arti ficial intelligence: A framework to characterize automation approaches
Samigulina et al. Analytical review of software for multi-agent systems and their applications
Shirowzhan et al. Spatial big data, BIM and advanced GIS for smart transformation: city, infrastructure and construction
Sun Design of Full Life-Cycle Management System for Construction Project Based on “BIM+ GIS”
Han et al. Analysis on the BIM application in the whole life cycle of railway engineering
Wang et al. Research and Design of Intelligent Manufacturing System Based on Internet of Things and Virtual Reality Technology
Wang Collision Detection Algorithm Based on Particle System in Virtual Simulation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A BIM Design Pipeline Cost Generation System for Yingyi Planning Pipeline

Effective date of registration: 20221213

Granted publication date: 20200929

Pledgee: Industrial Bank Co.,Ltd. Shanghai Huashan sub branch

Pledgor: SHANGHAI YINGYI URBAN PLANNING AND DESIGN CO.,LTD.

Registration number: Y2022310000371

CP02 Change in the address of a patent holder

Address after: 200233 3rd floor, building 19, 810 Yishan Road, Xuhui District, Shanghai

Patentee after: SHANGHAI YINGYI URBAN PLANNING AND DESIGN CO.,LTD.

Address before: Room 1802, Block K, No. 343 Huaihai West Road, Xuhui District, Shanghai, 200030

Patentee before: SHANGHAI YINGYI URBAN PLANNING AND DESIGN CO.,LTD.

CP02 Change in the address of a patent holder
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20200929

Pledgee: Industrial Bank Co.,Ltd. Shanghai Huashan sub branch

Pledgor: SHANGHAI YINGYI URBAN PLANNING AND DESIGN CO.,LTD.

Registration number: Y2022310000371

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A BIM Design Pipeline Cost Generation System for Business Planning Pipeline

Granted publication date: 20200929

Pledgee: Industrial Bank Co.,Ltd. Shanghai Huashan sub branch

Pledgor: SHANGHAI YINGYI URBAN PLANNING AND DESIGN CO.,LTD.

Registration number: Y2024310000098

PE01 Entry into force of the registration of the contract for pledge of patent right