CN108591618A - Environmentally friendly bogey - Google Patents

Environmentally friendly bogey Download PDF

Info

Publication number
CN108591618A
CN108591618A CN201810721713.5A CN201810721713A CN108591618A CN 108591618 A CN108591618 A CN 108591618A CN 201810721713 A CN201810721713 A CN 201810721713A CN 108591618 A CN108591618 A CN 108591618A
Authority
CN
China
Prior art keywords
babinet
bottom plate
installation part
sliding slot
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810721713.5A
Other languages
Chinese (zh)
Inventor
林吉庆
赖旭东
任全军
马中兴
张世文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Jianghan Lida Petroleum Material And Equipment Co Ltd
Original Assignee
Hubei Jianghan Lida Petroleum Material And Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Jianghan Lida Petroleum Material And Equipment Co Ltd filed Critical Hubei Jianghan Lida Petroleum Material And Equipment Co Ltd
Priority to CN201810721713.5A priority Critical patent/CN108591618A/en
Publication of CN108591618A publication Critical patent/CN108591618A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/02Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets partly surrounding the pipes, cables or protective tubing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/16Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe
    • F16L3/20Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in transverse direction
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/22Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals
    • F16L3/223Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals each support having one transverse base for supporting the pipes
    • F16L3/2235Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals each support having one transverse base for supporting the pipes each pipe being supported by a common element fastened to the base

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a kind of environmentally friendly bogeys,Solve traditional cost height and defect not environmentally,It includes supporting body,Installation part and clamping piece,The supporting body includes babinet,The installation part is slidably connected on babinet,The locating part of locking installation part is provided on the babinet,The babinet includes main body,Head cover and bottom plate,The head cover,Bottom plate is detachably connected with main body,After only bottom plate and main body need to be fixed during forming supporting body,It is packed into after the ballast materials such as sandstone soil in main body from top and fixes upper top cover again,The adjustment of clamping piece position may be implemented to adapt to the needs of different occasions in the installation part being slidably connected,And dress soil pressure carries on the spot in this way,Plug and play avoids the Hou Ning times,It avoids damaging reclaiming for farmland and environment,I.e. removable babinet is reused after removing bottom plate after use,It is convenient and efficient,Efficiency had not only been improved in this way but also reduced cost,Nor farm environment can be impacted and be damaged.

Description

Environmentally friendly bogey
Technical field
The present invention relates to oil drilling and extracting equipment fields, more specifically, it relates to a kind of environmental protection bogey.
Background technology
Currently, the fixation of public petroleum drilling and mining pipe fitting, is all to use scene and cement mortar in corresponding pipeline Foundation bolt is fixed at position, and Plain will first dig the hole of standard side's amount under suitable position, and mountain area will then pacify at corresponding position Decking be well placed fixed foundation bolt, then pour into sandstone cement mortar etc. it is to be solidified into forming supporting body, then by fixation On foundation bolt using clamping piece come clamp pipe fitting realize fix, a well site usual so just need tens up to a hundred tons of sandstones and Cement material, modern petroleum drilling environmental requirement of constructing is very stringent, also needs to make an overall screening cement foundation pier after the completion of construction and reclaim, The soil in mountain area is more golden expensive, and broken disintegration returning to the field process is more troublesome, dangerous, heavy, thus occupies a large amount of fortune Defeated and artificial terminal charges, it is of high cost and not environmentally.
Invention content
In view of the deficiencies of the prior art, the present invention intends to provide a kind of environmentally friendly bogey, there is cost Low and more environmentally friendly advantage.
To achieve the above object, the present invention provides following technical solutions:
A kind of environmental protection bogey, including supporting body, installation part and clamping piece, the supporting body include babinet, the installation Part is slidably connected on babinet, be provided on the babinet locking installation part locating part, the babinet include main body, head cover and Bottom plate, the head cover, bottom plate and main body are detachably connected.
It is arranged in this way, after need to only being fixed bottom plate and main body during forming supporting body, from top toward main body Upper top cover is fixed after the interior loading ballast materials such as sandstone soil again, clamping piece is then loaded onto and clamps pipe by clamping piece The adjustment of clamping piece position may be implemented to adapt to the needs of different occasions, and so on the spot in part, the installation part being slidably connected It fills soil pressure to carry, plug and play avoids the Hou Ning times, avoids damaging reclaiming for farmland and environment, removes after use after bottom plate i.e. Removable babinet is reused, convenient and efficient, had not only been improved efficiency in this way but also had been reduced cost, nor can be to farm environment It impacts and damages.
The present invention is further arranged:The sliding slot slided for installation part is provided on the babinet, at the notch of the sliding slot It is provided with the rib of blocking installation part abjection, the end of the sliding slot forms the loading port slid into for installation part.
Installation part can be slid by loading port in sliding slot in this way, and can play good limit by the setting of rib makees With so that installation part can stablize the case where moved along track length direction, it avoided surprisingly to deviate from.
The present invention is further arranged:The locating part includes the rack being arranged in rib towards sliding slot bottom wall side, described Installation part is band tooth bolt, and described with tooth bolt includes sliding the head in sliding slot and being pierced by sliding slot and for across clamping The end thread of the screw rod of part, the screw rod is connected with nut, is provided on the head towards rack and is used for and rack card The tooth block connect, when the head is contacted with sliding slot bottom wall, the tooth block is detached with rack.
In this way when needing to adjust the position of installation part, installation part bottom is contacted with sliding slot bottom wall, and installation part can slide Position is adjusted to adapt to the needs of different occasions, after installation part is slid into specified position, installation part is above carried so that tooth Block is clamped with rack, then loads onto clamping piece, wherein band tooth bolt is loaded onto nut after passing through clamping piece and tightened, so that peace Piece installing can not move down holding lock-out state, realize the limit to installation part, simple in structure and easy to operate.
The present invention is further arranged:The main body is tapered and includes the side plate being fixed to each other, the length at the top of the side plate Length of the degree less than bottom.
Main body is arranged to cone structure, on the one hand its center of gravity is partial to bottom when main body is placed in this way, and then places Stability be significantly less prone to and topple over, in addition babinet when not in use, after removing head cover and bottom plate, wherein each main body It can be stacked together, occupied space is placed to save.
The present invention is further arranged:The securing plate of both connections is provided between the adjacent side plate.
Adjacent side plates can be connected by securing plate and all side plates is made to form an entirety, so that main body Overall construction intensity higher, soil is applied to the active force of side plate not it is easier that fission occurs in side plate after soil is packed into main body The case where falling.
The present invention is further arranged:Corresponding through-hole is offered in the securing plate and bottom plate, is set in the babinet It is equipped with carrying screw, described carrying screw one end is pierced by bottom base plate, and the other end passes through the through-hole of securing plate, and the carrying spiral shell The both ends of silk are both provided with the nut being threadedly coupled with it.
Due in main body be packed into soil after gravity be mainly applied on bottom plate, by will carry screw pass through bottom plate and After securing plate, both ends screw on nut and realize that limit is fixed, it is established that connection between bottom plate and main body simultaneously forms entirety, further The bearing capacity of bottom plate is improved, lifting avoids bottom plate from occurring loosening the case where falling when adjusting position.
The present invention is further arranged:The bottom wall periphery of the bottom plate is provided with convex edge, and the height of the convex edge is more than carrying Screw is pierced by the length of bottom plate.
Since carrying screw end sections can be pierced by bottom plate, it can be formed and be accommodated in the bottom surface of bottom plate by the setting of convex edge The groove of screw end is carried, so that the screw end for being pierced by bottom plate does not interfere with the horizontal positioned of babinet, babinet can be with The placement of horizontal stable.
The present invention is further arranged:The clamping piece includes arc pressuring plate, and the both sides of the arc pressuring plate are provided with ribbon supply The mounting portion that tooth bolt passes through.
The cambered surface of arc pressuring plate can be bonded with tube surface, and band tooth bolt refills top nut by arc after passing through mounting portion Shape pressing plate clamps fixation of the pipe fitting realization to pipe fitting, and fixed stability is more notable.
The present invention is further arranged:The clamping piece includes extension rod and U-shaped inserted link, and confession is provided on the extension rod With the mounting hole that tooth bolt passes through, multigroup perforation passed through for U-shaped plunger end is offered on the extension rod, the U-shaped is inserted The end thread of bar is connected with nut.
Due to being needed in some occasions while fixing multiple pipe fittings, extension rod can be mounted on band tooth bolt carry out in this way It is fixed, then by being packed into multiple U-shaped inserted links and tightening nut realization in perforation to being fixed while multiple pipe fittings, more in fact With property, and it is simple in structure easy to operate.
The present invention is further arranged:The side plate of the babinet offers the mounting groove installed for sliding slot, the mounting groove one End seal is closed, and the other end runs through side plate roof.
Sliding slot is mounted in mounting groove first, and mounting groove bottom end closure, in this way can be to playing limit with tooth bolt Effect, band tooth bolt can be blocked after being snapped down to extreme position, and the mounting groove other end is in order to enable sliding slot through side plate roof Loading port it is unaffected, be packed into from loading port convenient for band tooth bolt, and loading port can be by head cover institute after loading onto head cover Blocking, so that the both ends of sliding slot are closed, can only slide in the limited travel in track length direction with tooth bolt, subtracts The case where few band tooth bolt accidentally slips out.
In conclusion the invention has the advantages that:
1, tradition has been abandoned by way of pouring sandstone cement slurry sets and forming supporting body, now by being packed into soil in babinet Supporting body is formed, bottom plate is removed after the completion and leaks out soil, realizes that the repeatability of babinet is practical, it is convenient and efficient, improve efficiency While reduce cost and avoid damage farmland;
2, band tooth bolt, which is slidably connected in sliding slot, realizes position adjustment, can be suitable for different size according to actual needs and be clamped The fixation of part, while the clamping piece with extension rod can be selected to realize the case where simultaneously clamping on multiple tubing element in specific occasion, To more applicability;
3, the body structure of taper not only increases the stability of placement, but also when it is not in use after removing head cover and bottom plate, Main body can be stacked together save occupied space be readily transported and store.
Description of the drawings
Fig. 1 is the overall structure figure of embodiment 1;
Fig. 2 is the explosive view of embodiment 1;
Fig. 3 is the internal structure chart of main body in embodiment 1;
Fig. 4 is the bottom view of embodiment 1;
Fig. 5 is the overall structure figure of embodiment 2;
Fig. 6 is the explosive view of embodiment 3.
Reference numeral:1, babinet;11, main body;111, side plate;112, mounting groove;113, securing plate;114, through-hole;12, it pushes up Lid;13, bottom plate;131, convex edge;2, mounting hole;21, screw;3, sliding slot;31, rib;32, rack;33, loading port;4, band tooth Bolt;41, head;42, screw rod;43, tooth block;5, nut;6, arc pressuring plate;61, mounting portion;7, screw is carried;8, extension rod; 81, mounting hole;82, it perforates;9, U-shaped inserted link;10, electromagnet;101, it switchs.
Specific implementation mode
Below in conjunction with attached drawing, invention is further described in detail.
As depicted in figs. 1 and 2, a kind of environmentally friendly bogey, including supporting body, installation part and clamping piece, wherein carrying Body includes the babinet 1 of inner hollow, which includes main body 11, head cover 12 and bottom plate 13, main body 11, head cover 12 and Corresponding mounting hole 2 is offered on four sides on bottom plate 13, is realized 12 He of head cover by being packed into screw 21 in mounting hole 2 Bottom plate 13 is detachably mounted in main body 11.It is wherein respectively and fixedly provided on 11 side wall of 12 roof of head cover and main body and is slided for installation part Dynamic sliding slot 3, and the both ends of sliding slot 3 are formed through loading port 33, the notch both sides of sliding slot 3 are symmetrically arranged with rib 31, installation Part is band tooth bolt 4, with tooth bolt 4 includes head 41 of the sliding in sliding slot 3 and is pierced by sliding slot 3 and for across clamping piece Screw rod 42, be connected with nut 5 in the end thread of screw rod 42, wherein clamping piece is arc pressuring plate 6, the both sides of arc pressuring plate 6 Equipped with the mounting portion 61 that ribbon supply tooth bolt 4 passes through, the locating part of locking strip tooth bolt 4 is provided in sliding slot 3, to adjust It is locked behind position with tooth bolt 4, then arc pressuring plate 6 is loaded onto into clamping pipe fitting, realize the fixation to pipe fitting;In main body 11 The mounting groove 112 installed for sliding slot 3 is offered on side wall, 11 roof of main body is run through on 112 bottom end closure of mounting groove, top, this Belt transect tooth bolt 4 can be blocked after being snapped down to extreme position, and after loading onto head cover 12, and loading port 33 can be hindered by head cover 12 Gear, so that the both ends of sliding slot 3 are closed, can only be slided with tooth bolt 4 in the limited travel of 3 length direction of sliding slot, Reduce the case where band tooth bolt 4 accidentally slips out.
Tradition has been abandoned in this way in a manner of pouring sandstone cement slurry sets and form supporting body, by being packed into babinet 1 Soil supporting body, then fix upper top cover 12 and clamp pipe fitting, you can the fixation to petroleum drilling and mining pipe fitting is realized, after completing drilling It removes bottom plate 13 and leaks out soil, realize that the repeatability of babinet 1 is practical, it is convenient and efficient, reduce cost while improving efficiency And avoid damaging farmland, it is more environmentally-friendly.
Wherein locating part includes the rack 32 being arranged in rib 31 towards 3 bottom wall side of sliding slot, and with the head of tooth bolt 4 It is provided on 41 towards rack 32 and for the tooth block 43 that be clamped with rack 32, when head 41 is contacted with 3 bottom wall of sliding slot, tooth block 43 are in discrete state with rack 32, and band tooth bolt 4 is not locked at this time can be freely in the interior sliding of sliding slot 3, in band tooth Bolt 4 is across arc pressuring plate 6 and tightens nut 5 come when clamping pipe fitting, the head 41 with tooth bolt 4 and 3 bottom wall of sliding slot are de- at this time From, and tooth block 43 is in clamped condition with rack 32, realizes to the limit with tooth bolt 4, can come according to actual needs in this way The position with tooth bolt 4 is adjusted to adapt to the needs of different occasions, more practicability, and simple to operate quick.
As shown in Figure 3 and Figure 4, the shape of main body 11 is the tetragonous bench-type of taper, so that the center of gravity of main body 11 is on the lower side, Increase the stability that main body 11 is placed, and simultaneously when without using babinet 1, removing the babinet 1 after bottom plate 13 can be folded It puts, save occupied space and is readily transported.Wherein main body 11 includes the side plate 111 being fixed to each other, and is arranged between adjacent side plates 111 There is both fixed securing plate 113, securing plate 113 is located at the top and bottom of side plate 111, so that each side plate 111 form an entirety so that the overall construction intensity higher of main body 11, soil is applied to side after being packed into soil in main body 11 The active force of plate 111 is not it is easier that the case where fission is fallen occurs in side plate 111.
Vertically arranged carrying screw 7 is installed in main body 11, confession is offered in bottom plate 13 and securing plate 113 The through-hole 114 that carrying screw 7 passes through, 7 one end of carrying screw are pierced by 13 bottom of bottom plate, and the other end passes through securing plate 113, and carries The both ends of screw 7 are both provided with the nut 5 being threadedly coupled with it, the connection being built such that between bottom plate 13 and main body 11 and shape It is integral, the bearing capacity of bottom plate 13 is further increased, lifting avoids bottom plate 13 from occurring loosening the case where falling when adjusting position. The placement of stablizing of babinet 1 can be influenced by being pierced by bottom plate 13 additionally, due to carrying 7 end sections of screw, therefore is arranged on the periphery of bottom plate 13 There is convex edge 131, and the height of convex edge 131 is more than the length that carrying screw 7 is pierced by bottom plate 13, so that carrying screw 7 is pierced by The part of bottom plate 13 does not interfere with stablizing for babinet 1 and places, and babinet 1 can be placed smoothly.
Specific work process:First by bottom plate 13 fix on the main body 11, then will carrying screw 7 worn from bottom plate 13 to It across securing plate 113, and realizes and fixes in the both ends tightening nut 5 of carrying screw 7, then be packed into soil in main body 11, in side When needing fixed pipe fitting on plate 111, it will be packed into sliding slot 3 from loading port 33 with tooth bolt 4, and regulate the position with tooth bolt 4 It postpones, pipe fitting is loaded onto arc pressuring plate 6 and screwed with 4 end of tooth bolt between side plate 111 is located at two band tooth bolts 4 Nut 5 clamps pipe fitting, and band tooth bolt 4 is no longer abutted with 3 bottom wall of sliding slot and tooth block 43 and the clamping realization of rack 32 position at this time Limit, be finally packed into head cover 12 and fixed, such as need to fix pipe fitting on head cover 12, pipe fitting is clamped according to above-mentioned same operation , head cover 12, bottom plate 13 are dismantled again after completing oil drilling, soil is deviate from from main body 11, and babinet 1 can repeatability Progress use next time, need by babinet 1 be overlapped store when only need to by side plate 111 band tooth bolt 4 and arc pressuring plate 6 remove .
Embodiment 2:A kind of environmental protection bogey, difference lies in the difference of clamping piece structure, this implementations with embodiment 1 Clamping piece in example includes extension rod 8 and U-shaped inserted link 9, ribbon supply tooth bolt 4 is provided on extension rod 8, installation is passed through to fix Mounting hole 81, offer multigroup perforation 82 passed through for 9 end of U-shaped inserted link at the top of extension rod 8, while in U-shaped inserted link 9 Both ends be threaded with nut 5.In this way when some occasions need while fixing multiple pipe fittings, extension rod 8 can be filled It is fixed on band tooth bolt 4, then by being packed into multiple U-shaped inserted links 9 and the realization of tightening nut 5 in perforation 82 to multiple It is fixed while pipe fitting, more practicability, and simple in structure easy to operate.
Embodiment 3:A kind of environmental protection bogey, difference lies in the difference of locating part structure, this implementations with embodiment 1 Locating part includes the electromagnet 10 for being fixed at sliding slot 3 backwards to side in example, and is provided with accumulator on babinet 1(In figure It is not shown)And the switch 101 of control 10 power on/off of electromagnet, at adjustment band tooth 4 position in sliding slot 3 of bolt, electromagnet 10 are in off-position, behind the mobile position with tooth bolt 4 to needs, turn on the switch 101 and are powered and generate to electromagnet 10 Band tooth bolt 4, which is sucked, in magnetic force makes it fix, simple in structure, and operation is also convenient for fast, equally may be implemented to exist to band tooth bolt 4 Limit in sliding slot 3.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, people in the art Member can as needed make the present embodiment the modification of not creative contribution after reading this specification, but as long as at this It is all protected by Patent Law in the right of invention.

Claims (10)

1. a kind of environmental protection bogey, including supporting body, installation part and clamping piece, it is characterized in that:The supporting body includes case Body (1), the installation part are slidably connected on babinet (1), and the locating part of locking installation part, institute are provided on the babinet (1) It includes main body (11), head cover (12) and bottom plate (13) to state babinet (1), and the head cover (12), bottom plate (13) and main body (11) are removable Unload connection.
2. environmental protection bogey according to claim 1, it is characterized in that:It is provided on the babinet (1) and is slided for installation part Dynamic sliding slot (3) is provided with the rib (31) of blocking installation part abjection, the end of the sliding slot (3) at the notch of the sliding slot (3) Portion forms the loading port (33) slid into for installation part.
3. environmental protection bogey according to claim 2, it is characterized in that:The locating part includes being arranged in rib (31) court To the rack (32) of sliding slot (3) bottom wall side, the installation part is band tooth bolt (4), and the band tooth bolt (4) includes that sliding exists Head (41) in sliding slot (3) and it is pierced by sliding slot (3) and for the screw rod (42) across clamping piece, the end of the screw rod (42) Portion is threaded with nut (5), is provided on the head (41) towards rack (32) and for the tooth that is clamped with rack (32) Block (43), when the head (41) contacts with sliding slot (3) bottom wall, the tooth block (43) detaches with rack (32).
4. environmental protection bogey according to claim 1, it is characterized in that:The main body (11) is tapered and includes mutually solid Fixed side plate (111), the length at the top of the side plate (111) are less than the length of bottom.
5. environmental protection bogey according to claim 4, it is characterized in that:The company of being provided between the adjacent side plate (111) Connect the securing plate (113) of the two.
6. environmental protection bogey according to claim 5, it is characterized in that:On the securing plate (113) and bottom plate (13) Corresponding through-hole (114) is offered, carrying screw (7) is provided in the babinet (1), described carrying screw (7) one end is worn Go out bottom plate (13) bottom, the other end passes through the through-hole (114) of securing plate (113), and the both ends of the carrying screw (7) are respectively provided with There is the nut (5) being threadedly coupled with it.
7. environmental protection bogey according to claim 6, it is characterized in that:The bottom wall periphery of the bottom plate (13) is provided with convex Along (131), the height of the convex edge (131) is more than the length that carrying screw (7) is pierced by bottom plate (13).
8. environmental protection bogey according to claim 3, it is characterized in that:The clamping piece includes arc pressuring plate (6), described The both sides of arc pressuring plate (6) are provided with the mounting portion (61) that ribbon supply tooth bolt (4) passes through.
9. environmental protection bogey according to claim 3, it is characterized in that:The clamping piece includes extension rod (8) and U-shaped Inserted link (9) is provided with the mounting hole (81) that ribbon supply tooth bolt (4) passes through on the extension rod (8), is opened on the extension rod (8) Equipped with multigroup perforation (82) passed through for U-shaped inserted link (9) end, the end thread of the U-shaped inserted link (9) is connected with nut (5).
10. environmental protection bogey according to claim 4, it is characterized in that:The side plate (111) of the babinet (1) offers For the mounting groove (112) of sliding slot (3) installation, mounting groove (112) one end closing, the other end runs through side plate (111) roof.
CN201810721713.5A 2018-07-04 2018-07-04 Environmentally friendly bogey Pending CN108591618A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810721713.5A CN108591618A (en) 2018-07-04 2018-07-04 Environmentally friendly bogey

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810721713.5A CN108591618A (en) 2018-07-04 2018-07-04 Environmentally friendly bogey

Publications (1)

Publication Number Publication Date
CN108591618A true CN108591618A (en) 2018-09-28

Family

ID=63633769

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810721713.5A Pending CN108591618A (en) 2018-07-04 2018-07-04 Environmentally friendly bogey

Country Status (1)

Country Link
CN (1) CN108591618A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006283814A (en) * 2005-03-31 2006-10-19 Hitachi Kokusai Electric Inc Fixing structure of pipe
CN202532021U (en) * 2012-03-22 2012-11-14 中国石油天然气股份有限公司 Movable pipeline rest pier
CN104344086A (en) * 2013-07-25 2015-02-11 中国石油天然气股份有限公司 Pipeline buttress device and use method
CN204942764U (en) * 2015-08-13 2016-01-06 中国石油天然气股份有限公司 Pipeline buttress
CN206023153U (en) * 2016-08-04 2017-03-15 文波 Hot-rolled strip tooth sliding groove type bracket and component assembled high voltage electric transmission cable fixture
CN107947068A (en) * 2017-12-30 2018-04-20 绍兴市卓元电气科技有限公司 A kind of horizontal vertical direction and around the axial adjustable cable bearer of trailing arm
CN208579030U (en) * 2018-07-04 2019-03-05 湖北江汉利达石油物资装备有限公司 Environmentally friendly bogey

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006283814A (en) * 2005-03-31 2006-10-19 Hitachi Kokusai Electric Inc Fixing structure of pipe
CN202532021U (en) * 2012-03-22 2012-11-14 中国石油天然气股份有限公司 Movable pipeline rest pier
CN104344086A (en) * 2013-07-25 2015-02-11 中国石油天然气股份有限公司 Pipeline buttress device and use method
CN204942764U (en) * 2015-08-13 2016-01-06 中国石油天然气股份有限公司 Pipeline buttress
CN206023153U (en) * 2016-08-04 2017-03-15 文波 Hot-rolled strip tooth sliding groove type bracket and component assembled high voltage electric transmission cable fixture
CN107947068A (en) * 2017-12-30 2018-04-20 绍兴市卓元电气科技有限公司 A kind of horizontal vertical direction and around the axial adjustable cable bearer of trailing arm
CN208579030U (en) * 2018-07-04 2019-03-05 湖北江汉利达石油物资装备有限公司 Environmentally friendly bogey

Similar Documents

Publication Publication Date Title
CN208579030U (en) Environmentally friendly bogey
CN109763642A (en) Skyscraper expansion joint wall construction structure and construction method
CN108591618A (en) Environmentally friendly bogey
CN202532021U (en) Movable pipeline rest pier
CN206956735U (en) A kind of combined type shaped steel PHC pile tube bearing diagonal foundation pit enclosure structures
CN205836005U (en) PE sealing of tube lifting type tool
CN216289932U (en) Cable fixing device for hydraulic engineering
CN207339182U (en) One kind adjusts rod-type cable bearer
CN213116348U (en) Tunnel arch support device for tunnel construction
CN108871122A (en) A kind of engineering explosion mounting device for facilitating detonator fixed point to place
CN107165660A (en) A kind of new type mining point post Liftable type post footwear apparatus
CN207484186U (en) A kind of road structure close to highway bridge pier
CN210919229U (en) Engine water outlet pipe of loader
CN210334848U (en) Welding set is used in stock production
CN207530410U (en) Become platform on 10KV integration columns
CN209275349U (en) A kind of novel underground formula two-compartment oil tank
CN207215163U (en) A kind of anti-surface subsidence support experimental provision
CN105442829B (en) A kind of anti-skidding universal wall-connecting piece of the hoop formula with non-slipping block
CN209308524U (en) A kind of sandstone stacking pond convenient for discharging
CN106988530B (en) Waterstop pours device
CN206513047U (en) The outer protector of high-supported formwork support body
CN213773380U (en) A detachable magazine attachment for super large diameter pile foundation concrete fills
CN206267148U (en) A kind of Static pressure pile driver being automatically positioned
CN208700565U (en) A kind of gas station's lining can system
CN211368743U (en) Foundation strutting arrangement for building engineering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Lin Jiqing

Inventor after: Lai Xudong

Inventor after: Ren Quanjun

Inventor after: Ma Zhongxin

Inventor after: Zhang Shiwen

Inventor before: Lin Jiqing

Inventor before: Lai Xudong

Inventor before: Ren Quanjun

Inventor before: Ma Zhongxing

Inventor before: Zhang Shiwen

CB03 Change of inventor or designer information
RJ01 Rejection of invention patent application after publication

Application publication date: 20180928