CN209275349U - A kind of novel underground formula two-compartment oil tank - Google Patents
A kind of novel underground formula two-compartment oil tank Download PDFInfo
- Publication number
- CN209275349U CN209275349U CN201822123654.XU CN201822123654U CN209275349U CN 209275349 U CN209275349 U CN 209275349U CN 201822123654 U CN201822123654 U CN 201822123654U CN 209275349 U CN209275349 U CN 209275349U
- Authority
- CN
- China
- Prior art keywords
- steel
- tank body
- limited block
- tripod
- oil tank
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Foundations (AREA)
Abstract
The utility model relates to petroleum storage technical fields.It is designed to provide a kind of novel underground formula two-compartment oil tank for capableing of quick location and installation.The technical scheme adopted by the utility model is a kind of novel underground formula two-compartment oil tank, the I-steel at tank body both ends is located at including horizontal positioned cylindrical tank body and pad, the I-steel is vertical with the length direction of tank body;Length direction on the bottom edge of the I-steel along I-steel is evenly arranged with several rod aperture, and the I-steel is fixedly connected with the ground by the anchor pole being threaded through in rod aperture;Lower part at left and right sides of the tank body is provided with limited block, and the limited block is made of tripod and connecting plate;The rectangular triangle of tripod, and bevel edge is towards tank body;The connecting plate is located at tripod and is provided with the keyhole matched with stud on a side lower part of tank body, connecting plate.The utility model can be quick, stable completion to the location and installation of tank body, and it is versatile.
Description
Technical field
The utility model relates to petroleum storage technical fields, and in particular to a kind of novel underground formula two-compartment oil tank.
Background technique
Buried Oil Tank is a kind of equipment that the places such as gas station, oil depot are used to store petroleum, usual Buried Oil Tank packet
Single layer oil tank and two-compartment oil tank etc. are included, Buried Oil Tank used at present is based on two-compartment oil tank.Buried Oil Tank was being installed
Cheng Zhong usually first digs foundation pit, and concrete bolster is then built in foundation pit, and the positioning with tank body cooperation is provided on bolster
Groove.After the completion of concrete bolster is dry, then oil tank is lifted and completes to position in the positioning groove to bolster, last earthing
It tamps.But due to by the way of concrete monolith, causing construction period longer in the prior art, at the same need compact dimensions and
The suitable positioning groove of shape, is easy to cause tank body to shift during later period earthing, and then influences the installation quality of tank body.
Summary of the invention
The purpose of this utility model is to provide a kind of novel underground formula two-compartment oil tanks for capableing of quick location and installation.
For achieving the above object, the technical scheme adopted by the utility model is a kind of double-deck oil of novel underground formula
Tank is located at the I-steel at tank body both ends, the length of the I-steel and tank body including horizontal positioned cylindrical tank body and pad
Direction is vertical;Length direction on the bottom edge of the I-steel along I-steel is evenly arranged with several rod aperture, and the I-steel is logical
The anchor pole being threaded through in rod aperture is crossed to be fixedly connected with the ground;Lower part at left and right sides of the tank body is provided with limited block, the limited block
It is made of tripod and connecting plate;The rectangular triangle of tripod, and bevel edge is towards tank body;The connecting plate is located at triangle
Frame is provided with the keyhole matched with stud on connecting plate backwards to a side lower part of tank body;On the top margin of the I-steel
It is provided with the strip-shaped hole matched with stud;The stud is located in keyhole and strip-shaped hole, and by limited block and work
The locking of word steel.
Preferably, the surface of the I-steel and limited block is provided with rust preventive coating.
Preferably, the lower end of the anchor pole is provided with delavay raspberry herb.
Preferably, rubber antiskid layer is provided on the bevel edge of the tripod.
The beneficial effects of the utility model embody a concentrated reflection of, completion that can be quick, stable to the location and installation of tank body, and
It is versatile.Specifically, the utility model in use, first excavation pit on construction ground, then according to tank body
Length has good positioning two I-steel, and is fixed I-steel and ground using anchor pole.Then staff as needed will limit
Position block is slided along I-steel, after two limited blocks are adjusted to suitable location, using stud by I-steel and limited block
It is fixed, it is also formed positioning groove, then lifts tank body between two limited blocks.The utility model and traditional
Mode is compared, and under the premise of guaranteeing position stability, is not only shortened construction period, is accelerated installation speed, while can
Various different size of tank body installations are adapted to, versatility is extremely strong.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the left view of Fig. 1.
Specific embodiment
A kind of novel underground formula two-compartment oil tank as illustrated in fig. 1 and 2, including horizontal positioned cylindrical tank body 1 and pad
It is located at the I-steel 2 at 1 both ends of tank body, certainly, for the longer tank body 1 of span, middle part can also add I-steel 2,
The I-steel 2 is vertical with the length direction of tank body 1.Length direction on the bottom edge of the I-steel 2 along I-steel 2 is uniformly set
Several rod aperture are equipped with, the I-steel 2 is fixedly connected with the ground by the anchor pole 3 being threaded through in rod aperture.In order to further increase anchor pole 3
The lower end of the bonding strength on ground, the anchor pole 3 is provided with delavay raspberry herb 8.
As shown in Fig. 2, the lower part of 1 left and right sides of tank body is provided with limited block, the limited block is by tripod 4 and even
Fishplate bar 5 is constituted.The rectangular triangle of the tripod 4, and bevel edge is towards tank body 1.The connecting plate 5 is located at tripod 4 backwards
One side lower part of tank body 1 is provided with the keyhole matched with stud 7 on connecting plate 5.It is set on the top margin of the I-steel 2
It is equipped with the strip-shaped hole 6 matched with stud 7.The stud 7 is located in keyhole and strip-shaped hole 6, and by limited block with
I-steel 2 is locked.
The utility model in use, first excavation pit on construction ground, then according to the length of tank body 1 by two
I-steel 2 is had good positioning, and is fixed I-steel 2 with ground using anchor pole 3.Then staff as needed by limited block along
I-steel 2 slides, and after two limited blocks are adjusted to suitable location, is fixed I-steel 2 and limited block using stud 7,
Also it is formed positioning groove, then lifts tank body 1 between two limited blocks.The utility model and traditional mode
It compares, under the premise of guaranteeing position stability, not only shortens construction period, accelerates installation speed, can adapt to simultaneously
Various different size of tank bodies 1 are installed, and versatility is extremely strong.
Simultaneously as the surface of I-steel 2 and limited block described in the utility model is provided with anti-using buried installation
Become rusty paint layer, to prevent from corroding.Predictably rust preventive coating has also can be set in the surface of tank body 1.In addition, in order to place three
Abrasion between corner bracket 4 and tank body 1 is provided with rubber antiskid layer on the bevel edge of the tripod 4.
Claims (4)
1. a kind of novel underground formula two-compartment oil tank, it is characterised in that: be located at including horizontal positioned cylindrical tank body (1) and pad
The I-steel (2) at tank body (1) both ends, the I-steel (2) are vertical with the length direction of tank body (1);The bottom of the I-steel (2)
Length direction on side along I-steel (2) is evenly arranged with several rod aperture, and the I-steel (2) passes through the anchor that is threaded through in rod aperture
Bar (3) is fixedly connected with the ground;Lower part at left and right sides of the tank body (1) is provided with limited block, the limited block by tripod (4) and
Connecting plate (5) is constituted;The rectangular triangle of the tripod (4), and bevel edge is towards tank body (1);The connecting plate (5) is located at three
Corner bracket (4) is provided with the keyhole matched with stud (7) on connecting plate (5) backwards to a side lower part of tank body (1);It is described
The strip-shaped hole (6) matched with stud (7) is provided on the top margin of I-steel (2);The stud (7) is located at keyhole
It is interior with strip-shaped hole (6), and limited block and I-steel (2) are locked.
2. novel underground formula two-compartment oil tank according to claim 1, it is characterised in that: the I-steel (2) and limited block
Surface be provided with rust preventive coating.
3. novel underground formula two-compartment oil tank according to claim 2, it is characterised in that: the lower end of the anchor pole (3) is arranged
There are delavay raspberry herb (8).
4. novel underground formula two-compartment oil tank according to claim 3, it is characterised in that: on the bevel edge of the tripod (4)
It is provided with rubber antiskid layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822123654.XU CN209275349U (en) | 2018-12-17 | 2018-12-17 | A kind of novel underground formula two-compartment oil tank |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822123654.XU CN209275349U (en) | 2018-12-17 | 2018-12-17 | A kind of novel underground formula two-compartment oil tank |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209275349U true CN209275349U (en) | 2019-08-20 |
Family
ID=67611512
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822123654.XU Active CN209275349U (en) | 2018-12-17 | 2018-12-17 | A kind of novel underground formula two-compartment oil tank |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209275349U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113479499A (en) * | 2021-06-11 | 2021-10-08 | 深圳市佳运通电子有限公司 | Intelligent skid-mounted airtight oil storage device |
-
2018
- 2018-12-17 CN CN201822123654.XU patent/CN209275349U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113479499A (en) * | 2021-06-11 | 2021-10-08 | 深圳市佳运通电子有限公司 | Intelligent skid-mounted airtight oil storage device |
CN113479499B (en) * | 2021-06-11 | 2022-08-12 | 深圳市佳运通电子有限公司 | Intelligent skid-mounted airtight oil storage device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110562840B (en) | Construction method for turning large-scale equipment by using crane and pulley block | |
CN209275349U (en) | A kind of novel underground formula two-compartment oil tank | |
CN206438413U (en) | Bridge pier pinner preformed hole alignment system | |
CN101838970B (en) | Construction method for transversely strengthening railway bridge by utilizing prestressing steel structure | |
CN203782670U (en) | Floating box platform for over-water construction | |
CN207331720U (en) | A kind of cofferdam with Combined steel tube sheet pile | |
CN211172124U (en) | Floating platform device for pile foundation construction | |
CN210049241U (en) | Subway civil engineering is with pulling out stake device | |
CN206233252U (en) | For the steel cofferdam device that bridge pier is reinforced under water | |
CN206555568U (en) | A kind of device of the fixation oil pipeline with cushioning effect | |
CN205024588U (en) | Telescoping device is easily changed to iron road bridge roof beam | |
CN205804178U (en) | Scalable without holder device for the liftable of bridge coping construction | |
CN210658043U (en) | Novel leveling device for mounting assembly type pier | |
CN201512809U (en) | Bolt connecting box-shaped prefabricated assembly type concrete tower crane foundation | |
CN115030745A (en) | Inclined shaft steep slope thin-wall mid-partition wall construction trolley and construction method thereof | |
CN208649870U (en) | A kind of prefabricated steel and concrete combination beam trestle | |
CN208072651U (en) | A kind of steel plate for sealing water fixing device | |
CN207314179U (en) | A kind of sound barrier monoblock type rim of a cup mounting structure | |
CN207047681U (en) | Bridge assembly | |
JPH10331427A (en) | Vibration isolation device installation jig and vibration isolation device installation method using the same | |
CN207160050U (en) | A kind of 1000kV transforming plant main transformers basis | |
CN206784354U (en) | A kind of U-shaped casing seal installation | |
CN217079139U (en) | Device convenient to research and fixed of building steel structure installation | |
CN106545014B (en) | A kind of more pile-type, assembled pile sinking verticality control device | |
CN219056100U (en) | Pipeline transportation device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |