Prior art keywords
layer
rock burst
hole section
rock
reinforced concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810658350.5A
Other languages
Chinese (zh)
Other versions
CN108590711B (en
Inventor
刘昌桂
王增武
赵路
胡玉植
刘吟琪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Zhongnan Engineering Corp Ltd
Original Assignee
PowerChina Zhongnan Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Zhongnan Engineering Corp Ltd filed Critical PowerChina Zhongnan Engineering Corp Ltd
Priority to CN201810658350.5A priority Critical patent/CN108590711B/en
Publication of CN108590711A publication Critical patent/CN108590711A/en
Application granted granted Critical
Publication of CN108590711B publication Critical patent/CN108590711B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/107Reinforcing elements therefor; Holders for the reinforcing elements
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a kind of liner structures of tunnel rock burst hole section, include around the preliminary bracing layer of rock burst hole section inner wall setting, around the reinforced concrete lining layer layer of preliminary bracing layer inner wall setting, the grout hole that preliminary bracing layer is penetrated from reinforced concrete lining layer layer is disposed with along rock burst hole section tunneling boring, it is formed with concretion marginsing rock layer along grout hole grouting, concretion marginsing rock layer is penetrated from reinforced concrete lining layer layer and is equipped with stress relief hole, and elastic insert is equipped between reinforced concrete lining layer layer and preliminary bracing layer.The present invention, which is formed by overall flexibility supporting construction, improves surrouding rock deformation constraints, both had and actively weaken rock burst intensity, have the function of passively undertaking rock burst force model load and rock pressure again, it can avoid the cracking destruction that later stage rock burst causes Wall Rock of Tunnel unstability and lining cutting, with preferable later stage rock-burst prevention effect, it is ensured that tunnel long-term safety is run.

Description

A kind of liner structure of tunnel rock burst hole section
Technical field
The invention belongs to hydroelectric project fields, and in particular to a kind of liner structure of tunnel rock burst hole section.
Background technology
With the continuous development of hydroelectric project and underground engineering, tunnel construction is towards large span, the direction of great burying Development, especially in the deep-lying tunnel of high-mountain gorge areas, geological structure is complicated, and crustal stress level is higher, High-geotemperature, water burst The risk of equal geological disasters further increases, wherein especially prominent with rock burst hazard.It is hard that rock burst generally refers to great burying tunnel Country rock is discharged by crustal stress and excavation disturbance is influenced and generates stresses re-distribution, radial constraint removal, and tangential stress is rapid So increase, the elastic strain energy of internal reservoir drastically discharges, and generates explosion and loosens, peels off, launching phenomenon, in the construction process rock Quick-fried generation it is difficult to predict.Rock burst typically occurs in face and neighbouring country rock, seriously threatens operating personnel and construction equipment Safety restricts construction speed, and rock burst is global underground engineering problem.
Currently used rock-burst prevention measure includes active measures and passive measure.Active measures include advanced hole, stress Release aperture, spray high pressure water, empty eye water filling etc.;Passive protecting measure has gunite concrete, sets prestressed anchor and installation grid Steel arch-shelf.In conjunction with tunnel functional requirement, the secondary lining of tunnel is carried out again after using the passive protecting measure when necessary, reduce The harm of rock burst and risk, but still there are following defects:
1., disaster loss grade higher rock burst larger for crustal stress, secondary lining bearing capacity is limited, can not directly take on.
2. feelings smaller for construction period crustal stress releasing ratio, that crustal stress will further discharge during tunnel is run Condition, during operation can gradually apply lining cutting crustal stress load, and when local stress load magnitude is larger, secondary lining carrying Ability is limited, can not directly take on, and there are the risks that liner structure destroys.
3., can be larger to surrouding rock deformation constraint because structural member rigidity is relatively large in traditional structure, rock can be improved instead The magnitude of energy accumulation before death is broken out, rock burst degree is aggravated.
Therefore, currently used tunnel rock-burst prevention measure scheme is transported for a long time without thoroughly solving high stress rock burst tunnel Capable structure safety problem.
Invention content
In view of the above-mentioned problems, the present invention is intended to provide a kind of generation effectively inhibiting rock burst, improves surrouding rock deformation about Beam condition ensures the liner structure of the tunnel rock burst hole section of tunnel long-term safety operation.
The technical solution that the present invention solves the problems, such as is:A kind of liner structure of tunnel rock burst hole section, including around rock burst hole The preliminary bracing layer of section inner wall setting, the reinforced concrete lining layer layer being arranged around preliminary bracing layer inner wall are complete along rock burst hole section Section is disposed with the grout hole that preliminary bracing layer is penetrated from reinforced concrete lining layer layer, and concretion marginsing rock is formed with along grout hole grouting Layer penetrates concretion marginsing rock layer from reinforced concrete lining layer layer and is equipped with stress relief hole, in reinforced concrete lining layer layer and initial stage branch Elastic insert is equipped between sheath.
Due to the setting of elastic insert so that whole liner structure has larger yield characteristic, can absorb larger Kinetic energy, especially so that the crown region with high-ground stress is provided with certain deformability, rigidity becomes without mutation in ladder Change.Elastic insert combination stress relief hole actively provides the deformation space of different directions to rock mass, and the high stress for keeping it internal obtains To effective release, to weaken rock burst degree.
Preliminary bracing layer, elastic insert, reinforced concrete lining layer layer, triplicity can absorb country rock as flexible support Portion of energy, reduces the movement tendency of sillar, and country rock is made to be in three-dimensional stress state, reduces the danger of rockburst risk and rock burst Evil.
Further, the elastic insert is set to crown region.Since high-ground stress concentration zones are distributed mainly on crown Region, therefore the elastic insert for being capable of providing flexible support is mainly set to the region.
Preferably, the elastic insert is distributed in crown central angle θ and is(0 °, 180 °)Crown region in.
It is furthermore preferred that the elastic insert is distributed in crown central angle θ is(0 °, 120 °)Crown region in.
Further, on section, elastic insert is continuously arranged around crown region or arranged for interval;Along rock burst hole section axis Line direction, elastic insert are continuously arranged or intermittently-arranged.
Specifically, the elastic insert material is polyurethane cork.
Preferably, the stress relief hole is set to crown central angle θ and is(0 °, 180 °)Crown region in, Huo Zheding Encircleing central angle θ is(0 °, 120 °)Crown region in.
Further, the region that the distributed areas of the stress relief hole are overlapped with elastic insert distributed areas, stress are released Discharge hole density of setting is big;The distributed areas of stress relief hole and the misaligned region in elastic insert distributed areas, stress relief hole Density of setting is small.
Further, it penetrates preliminary bracing layer from reinforced concrete lining layer layer and is equipped with osculum, the osculum is around steel Reinforced concrete lining cutting layer inner wall tunneling boring is arranged.
Osculum has both the function of certain stress relief hole, and osculum is connected to stress relief hole, and the infiltration of pressure water is enclosed Rock gap changes the clear-cut characteristic of rock, discharges part stress.
Specifically, the preliminary bracing layer includes the linked network reinforcing bar being arranged along rock burst hole section inner wall, breaks entirely along rock burst hole section The prestressed anchor of face arrangement surround concrete layer and surround rock burst hole section inner wall setting that rock burst hole section inner wall sprays Shape of a hoof grid steel arch-shelf.
The way of preliminary bracing layer is identical as the supporting construction of the prior art.
The present invention remarkable result be:During tunnel is run, elastic insert and the participation of reinforced concrete lining layer layer undertake portion Divide crustal stress released load, reinforced concrete lining layer layer, osculum, stress relief hole etc. inhibit the development of rock burst.It is formed Overall flexibility supporting construction improve surrouding rock deformation constraints, not only have and actively weaken rock burst intensity, but also with driven bearing The effect of rock burst force model load and rock pressure is carried on a shoulder pole, later stage rock burst is can avoid and causes Wall Rock of Tunnel unstability and the cracking of lining cutting broken It is bad, there is preferable later stage rock-burst prevention effect, it is ensured that tunnel long-term safety is run.
Description of the drawings
The invention will be further described below in conjunction with the accompanying drawings.
Fig. 1 is liner structure sectional schematic diagram of the present invention.
In figure:1- rock burst hole sections, 2- massifs, 3- high-ground stress concentration zones, 4- concretion marginsing rock layers, 5- grout holes, 6- stress Release aperture, 7- osculums, 8- preliminary bracing layers, 9- elastic inserts, 10- reinforced concrete lining layer layers.
Specific implementation mode
As shown in Figure 1, a kind of liner structure of tunnel rock burst hole section, includes the initial stage around rock burst hole section 1 inner wall setting Branch sheath 8, the reinforced concrete lining layer layer 10 being arranged around 8 inner wall of preliminary bracing layer.
The preliminary bracing layer 8 includes the linked network reinforcing bar being arranged along 1 inner wall of rock burst hole section, along 1 tunneling boring cloth of rock burst hole section Prestressed anchor, the concrete layer around rock burst hole section 1 inner wall injection and the horse around rock burst hole section 1 inner wall setting set Ungulate grid steel arch-shelf.
The grout hole 5 that preliminary bracing layer 8 is penetrated from reinforced concrete lining layer layer 10 is disposed with along 1 tunneling boring of rock burst hole section. It is formed with concretion marginsing rock layer 4 along the grouting of grout hole 5.
Concretion marginsing rock layer 4, which is penetrated, from reinforced concrete lining layer layer 10 is equipped with stress relief hole 6.The stress relief hole 6 is set Being placed in crown central angle θ is(0 °, 180 °)Crown region in or crown central angle θ be(0 °, 120 °] crown region It is interior.
Elastic insert 9 is equipped between reinforced concrete lining layer layer 10 and preliminary bracing layer 8.9 material of the elastic insert For polyurethane cork.The elasticity modulus of flexible polyurethane wood material is 2.0MPa or so.On section, elastic insert 9 is around crown Region is continuously arranged or arranged for interval.Along 1 axis direction of rock burst hole section, the continuous arrangement or intermittently-arranged of elastic insert 9.
Since high-ground stress concentration zones 3 are distributed mainly on crown region, the elastic insert 9 is distributed in the crown center of circle Angle θ is(0 °, 180 °)Crown region in.It is furthermore preferred that the elastic insert 9 is distributed in crown central angle θ is(0 °, 120 °] Crown region in.The region that the distributed areas of the stress relief hole 6 are overlapped with 9 distributed areas of elastic insert, stress release 6 density of setting of hole is big.The distributed areas of stress relief hole 6 and the misaligned region in 9 distributed areas of elastic insert, stress relief hole 6 density of setting are small.
Preliminary bracing layer 8, which is penetrated, from reinforced concrete lining layer layer 10 is equipped with osculum 7.The osculum 7 is mixed around reinforcing bar 10 inner wall tunneling boring arrangement of solidifying soil lining cutting layer.
When construction, underground chamber is excavated in massif 2, preliminary bracing is carried out after encountering rock burst hole section 1, using including setting Linked network reinforcing bar, gunite concrete set the measures such as prestressed anchor and installation grid steel frame, form preliminary bracing layer 8.Then into Row elastic insert 9 positions and constructs and the construction of reinforced concrete lining layer layer 10, while the positioning needs of pre-buried grout hole 5 Pvc pipe(Or steel pipe), the pvc pipe that the positioning of pre-buried stress relief hole 6 needs, the pvc pipe that the positioning of pre-buried osculum 7 needs, this Several pipes need to penetrate reinforced concrete lining layer layer 10.5 cleaning bottom of hole post-grouting of grout hole is constructed, and consolidation grouting intensity reaches requirement Concretion marginsing rock layer 4 is formed afterwards.The finally rock mass internal drilling construction at the osculum of pre-determined bit 7,6 position of stress relief hole.

Claims (10)

1. a kind of liner structure of tunnel rock burst hole section, it is characterised in that:Including around rock burst hole section(1)The initial stage of inner wall setting Branch sheath(8), around preliminary bracing layer(8)The reinforced concrete lining layer layer of inner wall setting(10), along rock burst hole section(1)Tunneling boring It is disposed with from reinforced concrete lining layer layer(10)Penetrate preliminary bracing layer(8)Grout hole(5), along grout hole(5)Grouting is formed There is concretion marginsing rock layer(4), from reinforced concrete lining layer layer(10)Penetrate concretion marginsing rock layer(4)Equipped with stress relief hole(6), in steel Reinforced concrete lining cutting layer(10)With preliminary bracing layer(8)Between be equipped with elastic insert(9).
2. the liner structure of tunnel rock burst hole section according to claim 1, it is characterised in that:The elastic insert(9)If It is placed in crown region.
3. the liner structure of tunnel rock burst hole section according to claim 2, it is characterised in that:The elastic insert(9)Point Being distributed in crown central angle θ is(0 °, 180 °)Crown region in.
4. the liner structure of tunnel rock burst hole section according to claim 3, it is characterised in that:The elastic insert(9)Point Being distributed in crown central angle θ is(0 °, 120 °)Crown region in.
5. according to the liner structure of claim 1-4 any one of them tunnel rock burst hole sections, it is characterised in that:On section, Elastic insert(9)Around the continuous arrangement in crown region or arranged for interval;Along rock burst hole section(1)Axis direction, elastic insert(9)Even Continuous arrangement or intermittently-arranged.
6. the liner structure of tunnel rock burst hole section according to claim 5, it is characterised in that:The elastic insert(9)Material Material is polyurethane cork.
7. according to the liner structure of claim 1-4 any one of them tunnel rock burst hole sections, it is characterised in that:The stress is released Discharge hole(6)Being set to crown central angle θ is(0 °, 180 °)Crown region in or crown central angle θ be(0 °, 120 °)'s In crown region.
8. the liner structure of tunnel rock burst hole section according to claim 7, it is characterised in that:The stress relief hole(6) Distributed areas and elastic insert(9)The region that distributed areas overlap, stress relief hole(6)Density of setting is big;Stress relief hole (6)Distributed areas and elastic insert(9)The misaligned region in distributed areas, stress relief hole(6)Density of setting is small.
9. the liner structure of tunnel rock burst hole section according to claim 1, it is characterised in that:From reinforced concrete lining layer layer (10)Penetrate preliminary bracing layer(8)Equipped with osculum(7), the osculum(7)Around reinforced concrete lining layer layer(10)Inner wall Tunneling boring is arranged.
10. the liner structure of tunnel rock burst hole section according to claim 1, it is characterised in that:The preliminary bracing layer(8) Including along rock burst hole section(1)Inner wall setting linked network reinforcing bar, along rock burst hole section(1)The prestressed anchor of tunneling boring arrangement is surround Rock burst hole section(1)The concrete layer and surround rock burst hole section that inner wall sprays(1)The shape of a hoof grid steel arch-shelf of inner wall setting.
CN201810658350.5A 2018-06-25 2018-06-25 Lining structure of tunnel rock explosion section Active CN108590711B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810658350.5A CN108590711B (en) 2018-06-25 2018-06-25 Lining structure of tunnel rock explosion section

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810658350.5A CN108590711B (en) 2018-06-25 2018-06-25 Lining structure of tunnel rock explosion section

Publications (2)

Publication Number Publication Date
CN108590711A true CN108590711A (en) 2018-09-28
CN108590711B CN108590711B (en) 2024-04-30

Family

ID=63634148

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810658350.5A Active CN108590711B (en) 2018-06-25 2018-06-25 Lining structure of tunnel rock explosion section

Country Status (1)

Country Link
CN (1) CN108590711B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109973115A (en) * 2019-04-04 2019-07-05 中国十七冶集团有限公司 A kind of construction method of karst area tunnel vault draining
CN110118102A (en) * 2019-05-05 2019-08-13 陕西理工大学 A kind of device and method of deformation of tunnel monitoring and supporting
CN110130929A (en) * 2019-06-14 2019-08-16 贵州省水利水电勘测设计研究院 A kind of protective device of rock burst geology hole section safe construction
CN111119948A (en) * 2019-11-26 2020-05-08 中铁第一勘察设计院集团有限公司 Rock burst prevention supporting structure of high-ground-stress hard rock tunnel and construction method of rock burst prevention supporting structure
CN111764940A (en) * 2020-07-03 2020-10-13 浙江省衢州市交通建设集团有限公司 Double-layer primary supporting structure of weak surrounding rock tunnel and construction method thereof
CN113360994A (en) * 2021-06-30 2021-09-07 中铁二院工程集团有限责任公司 Checking calculation method for extruded deformation tunnel supporting structure

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0673997A (en) * 1992-08-25 1994-03-15 Shimizu Corp Construction of waterway tunnel
CN202140103U (en) * 2011-07-22 2012-02-08 中铁十一局集团有限公司 Rock burst tunnel supporting structure
CN103279606A (en) * 2013-05-24 2013-09-04 中国水电顾问集团北京勘测设计研究院 Computing method of unfavorable geological section hydraulic round pressure tunnel lining
CN203515604U (en) * 2013-10-18 2014-04-02 四川省交通运输厅公路规划勘察设计研究院 Tunnel Support structure for schist layer in deformation
CN203809010U (en) * 2014-03-20 2014-09-03 中国水电顾问集团贵阳勘测设计研究院有限公司 Cavern stability improving structure
CN104695980A (en) * 2015-03-11 2015-06-10 中水北方勘测设计研究有限责任公司 Hydropower diversion tunnel lining structure applied to rock burst regions with high burial depth, high ground temperature and high ground stress
CN204386617U (en) * 2014-12-30 2015-06-10 中国电建集团贵阳勘测设计研究院有限公司 Consolidation grouting structure of low waterhead diversion tunnel
CN105114098A (en) * 2015-06-08 2015-12-02 中国电建集团贵阳勘测设计研究院有限公司 Method for treating unfavorable geological tunnel section of diversion tunnel and large-diameter diversion tunnel structure
CN106320296A (en) * 2016-11-02 2017-01-11 广西大学 Basalt fiber grid reinforced lining structure for high ground temperature high-pressure hydraulic tunnel
CN106499405A (en) * 2016-11-02 2017-03-15 中国电建集团成都勘测设计研究院有限公司 Tunnel lining structure
CN106761790A (en) * 2017-01-12 2017-05-31 中铁隧道集团有限公司 A kind of open type TBM crosses tunneling boring carbonaceous slate driving and method for protecting support
CN206319886U (en) * 2016-11-02 2017-07-11 中国电建集团成都勘测设计研究院有限公司 Tunnel lining structure
CN207176686U (en) * 2017-07-13 2018-04-03 中国电建集团华东勘测设计研究院有限公司 Full closure underground chamber backfill, consolidation grouting pipeline arranging structure
CN207348879U (en) * 2017-10-27 2018-05-11 中国电建集团成都勘测设计研究院有限公司 Tailwater tunnel structure
CN208441868U (en) * 2018-06-25 2019-01-29 中国电建集团中南勘测设计研究院有限公司 A kind of liner structure of tunnel rock burst hole section

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0673997A (en) * 1992-08-25 1994-03-15 Shimizu Corp Construction of waterway tunnel
CN202140103U (en) * 2011-07-22 2012-02-08 中铁十一局集团有限公司 Rock burst tunnel supporting structure
CN103279606A (en) * 2013-05-24 2013-09-04 中国水电顾问集团北京勘测设计研究院 Computing method of unfavorable geological section hydraulic round pressure tunnel lining
CN203515604U (en) * 2013-10-18 2014-04-02 四川省交通运输厅公路规划勘察设计研究院 Tunnel Support structure for schist layer in deformation
CN203809010U (en) * 2014-03-20 2014-09-03 中国水电顾问集团贵阳勘测设计研究院有限公司 Cavern stability improving structure
CN204386617U (en) * 2014-12-30 2015-06-10 中国电建集团贵阳勘测设计研究院有限公司 Consolidation grouting structure of low waterhead diversion tunnel
CN104695980A (en) * 2015-03-11 2015-06-10 中水北方勘测设计研究有限责任公司 Hydropower diversion tunnel lining structure applied to rock burst regions with high burial depth, high ground temperature and high ground stress
CN105114098A (en) * 2015-06-08 2015-12-02 中国电建集团贵阳勘测设计研究院有限公司 Method for treating unfavorable geological tunnel section of diversion tunnel and large-diameter diversion tunnel structure
CN106320296A (en) * 2016-11-02 2017-01-11 广西大学 Basalt fiber grid reinforced lining structure for high ground temperature high-pressure hydraulic tunnel
CN106499405A (en) * 2016-11-02 2017-03-15 中国电建集团成都勘测设计研究院有限公司 Tunnel lining structure
CN206319886U (en) * 2016-11-02 2017-07-11 中国电建集团成都勘测设计研究院有限公司 Tunnel lining structure
CN106761790A (en) * 2017-01-12 2017-05-31 中铁隧道集团有限公司 A kind of open type TBM crosses tunneling boring carbonaceous slate driving and method for protecting support
CN207176686U (en) * 2017-07-13 2018-04-03 中国电建集团华东勘测设计研究院有限公司 Full closure underground chamber backfill, consolidation grouting pipeline arranging structure
CN207348879U (en) * 2017-10-27 2018-05-11 中国电建集团成都勘测设计研究院有限公司 Tailwater tunnel structure
CN208441868U (en) * 2018-06-25 2019-01-29 中国电建集团中南勘测设计研究院有限公司 A kind of liner structure of tunnel rock burst hole section

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨立新主编: "《航标》", 31 October 2016, 大连:大连海事大学出版社, pages: 70 - 73 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109973115A (en) * 2019-04-04 2019-07-05 中国十七冶集团有限公司 A kind of construction method of karst area tunnel vault draining
CN109973115B (en) * 2019-04-04 2020-06-05 中国十七冶集团有限公司 Construction method for drainage of vault of tunnel in karst area
CN110118102A (en) * 2019-05-05 2019-08-13 陕西理工大学 A kind of device and method of deformation of tunnel monitoring and supporting
CN110130929A (en) * 2019-06-14 2019-08-16 贵州省水利水电勘测设计研究院 A kind of protective device of rock burst geology hole section safe construction
CN111119948A (en) * 2019-11-26 2020-05-08 中铁第一勘察设计院集团有限公司 Rock burst prevention supporting structure of high-ground-stress hard rock tunnel and construction method of rock burst prevention supporting structure
CN111764940A (en) * 2020-07-03 2020-10-13 浙江省衢州市交通建设集团有限公司 Double-layer primary supporting structure of weak surrounding rock tunnel and construction method thereof
CN113360994A (en) * 2021-06-30 2021-09-07 中铁二院工程集团有限责任公司 Checking calculation method for extruded deformation tunnel supporting structure
CN113360994B (en) * 2021-06-30 2022-07-22 中铁二院工程集团有限责任公司 Checking calculation method for extruded deformation tunnel supporting structure

Also Published As

Publication number Publication date
CN108590711B (en) 2024-04-30

Similar Documents

Publication Publication Date Title
CN108590711A (en) A kind of liner structure of tunnel rock burst hole section
JP7125550B2 (en) SUPPORT STRUCTURE AND CONSTRUCTION METHOD FOR TWO-STAGE HIGH-SPEED CLOSING TUNNEL WITH INVERTED ARCH
CN103195441B (en) A kind of supporting and reinforcing structure of coal mine tunnel and construction technology thereof
CN103410161B (en) Oblique control slip casting steel anchor tube framework and construction method thereof
CN107060774B (en) A kind of anti-tunnel portal wall damage device and construction method
CN105781571A (en) Construction method for soft rock deformation tunnel lining support dismantling-replacing arch
CN102493821B (en) Support method for high stress roadway coal-rock mass
CN103711507B (en) A kind of many steel strand wires combination supporting device controls the method for big relaxation zone roadway deformation
CN104818991A (en) Construction method of residual slope wash tunnel with shallow cover and unsymmetrical pressure
CN103527219A (en) Tunnel supporting structure used for large deformation stratum and construction method of tunnel supporting structure
CN107143338B (en) A kind of coal mine roadway driving and method for protecting support
CN104790959B (en) A kind of Shallow-buried Tunnels with Small Spacing ground method for tunnel construction
CN106869969A (en) A kind of excavation supporting construction method of soft rock large section tunnel
CN108678772A (en) A kind of multilevel hierarchy suspension device and its construction method for rich water sandy gravel stratum tunnel
CN108518229A (en) Large deformation weak broken wall rock outsized section tunnel excavation supporting structure and construction method
CN101899837A (en) Active anti-shear concrete supporting structure for reinforcing deep sliding surfaces of rock slopes
CN110230497A (en) A kind of positive barrel double -side approach construction method in threaded list road
CN110284885A (en) Shield inspection-pit construction method
CN208441868U (en) A kind of liner structure of tunnel rock burst hole section
CN110552723B (en) Treatment construction method for continuous collapse roof fall of small-section steep slope tunnel
CN209115122U (en) A kind of strong rock burst section tunnel support structure
CN114562289A (en) Rapid treatment method for large-scale cavity collapse of soft broken surrounding rock tunnel vault
CN104790971B (en) A kind of advanced pre-add solid method of steel tube shed of the small spacing ground constructing tunnel of shallow embedding
CN116537784B (en) Stabilization method for small coal pillar gob-side entry driving
CN107034905A (en) Control the combination retaining structure and its construction method of biased deformation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant