CN108590242A - Assembling type steel structure one-shot job canopy and its installation method - Google Patents
Assembling type steel structure one-shot job canopy and its installation method Download PDFInfo
- Publication number
- CN108590242A CN108590242A CN201810766620.4A CN201810766620A CN108590242A CN 108590242 A CN108590242 A CN 108590242A CN 201810766620 A CN201810766620 A CN 201810766620A CN 108590242 A CN108590242 A CN 108590242A
- Authority
- CN
- China
- Prior art keywords
- purlin
- open web
- oeuveres
- bors
- type steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/12—Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
- E04H1/1205—Small buildings erected in the open air
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/32—Safety or protective measures for persons during the construction of buildings
Abstract
Assembling type steel structure one-shot job canopy and its installation method of the present invention, including longitudinal open web type truss, lateral open web type truss, purlin and at least two assembled rigid units;The assembled rigid unit is arranged in parallel, it is linked together by purlin between each assembled rigid unit, purlin is several, is set in qually spaced on Two bors d's oeuveres c-type steel I-beam, and it is perpendicular with Two bors d's oeuveres c-type steel I-beam, longitudinal open web type truss is connected at the top flange of Two bors d's oeuveres c-type steel I-beam both ends.Lateral open web type truss is to be set in qually spaced on purlin, and perpendicular with purlin, the both ends of lateral open web type truss are connected on longitudinal open web type truss.Component needed for the present invention can be prefabricated in advance in factory, is all bolted at the scene, and without welding, assembling and dissembling speed is quick;And column is located at surrounding, and intermediate working region is open, facilitates worker's operation.
Description
Technical field
The present invention relates to a kind of operation canopies, more particularly, to a kind of assembling type steel structure one-shot job canopy and its installation side
Method.
Background technology
Operation canopy is the provisional facility that construction site provides safety guarantee for worker's operation.Current most of constructions
The operation canopy of onsite application is the steel structure frame set up or be made up of welding by fastener, steel pipe, and the form is not only
Component is more, and design is complicated, and assembling and dissembling speed is slower, and security performance is not high, cannot fully meet the anti-requirement pounded of rain-proof.Cause
This will not only consider that structure is safe and reliable, while wanting to be recycled for multiple times when building such one-shot job canopy, installation
Fast, energy conservation and environmental protection, and being capable of multifunctional use.
Invention content
The object of the present invention is to provide a kind of assembling type steel structure one-shot job canopy and its installation method, the operation canopy it is complete
Portion's component is assembled at the construction field (site) by prefabrication, and there is safety of structure height, construction to dismantle, and speed is fast, can repeatedly weigh
The characteristics of using again.
Of the existing technology in order to solve the problems, such as, the technical solution adopted by the present invention is as follows:
Assembling type steel structure one-shot job canopy, including longitudinal open web type truss, lateral open web type truss, purlin and at least two are spelled
Fill unit;
The assembled rigid unit includes two square steel tube columns, a Two bors d's oeuveres c-type steel I-beam and bolt, two square steel tubes
Column is mounted on the both ends of Two bors d's oeuveres c-type steel I-beam, and square steel tube column both ends are welded with end plate, the top of square steel tube column
It is connected with Two bors d's oeuveres c-type steel I-beam by bolt, the bottom end of square steel tube column is connect by expansion bolt with concrete foundation,
The assembled rigid unit is arranged in parallel, and is linked together by purlin between each assembled rigid unit, and purlin is several, equidistantly
It is arranged on Two bors d's oeuveres c-type steel I-beam, and perpendicular with Two bors d's oeuveres c-type steel I-beam,
The longitudinal direction open web type truss is two, is connected at the top flange of Two bors d's oeuveres c-type steel I-beam both ends.
The transverse direction open web type truss is several, is set in qually spaced on purlin, and perpendicular with purlin, laterally on an empty stomach
The both ends of formula truss are connected on longitudinal open web type truss.
The Two bors d's oeuveres c-type steel I-beam is knockdown.
The top of the every square steel tube column is symmetrically arranged with two beam column diagonal braces, and beam column diagonal brace lower part passes through to drawing spiral shell
Bolt is fixed on square steel tube column, and top is fixed on Two bors d's oeuveres c-type steel I-beam lower flange by plain bolt.
The purlin is connected with Two bors d's oeuveres c-type steel I-beam top flange.
The top of the every square steel tube column is provided with diagonal brace between a root post and purlin, diagonal brace between column and purlin
Lower part is fixed on by split bolt on square steel tube column, and top is by plain bolt, end plate connection on purlin.
Setting is anti-above the transverse direction open web type truss pounds structure, and anti-pound places scaffold board, plank sheathing in structure.
Color steel is bolted above the purlin.
There are space between the transverse direction open web type truss bottom end and purlin, lateral open web type truss top is empty less than longitudinal
The top of abdomen formula truss.
The installation method of the assembling type steel structure one-shot job canopy, includes the following steps:
1. installing two square steel tube columns;
2. installing Two bors d's oeuveres c-type steel I-beam;
3. beam column diagonal brace is connected to by split bolt on quadrate steel pipe column side wall;
4. longitudinal open web type truss is connected to 5. top flange that Two bors d's oeuveres c-type steel I-beam two is held by plain bolt;
6. lateral open web type truss is connected to by plain bolt, connecting plate on longitudinal open web type truss;
7. after at least two parallel assembled rigid units are arranged, at the bolt hole position that Two bors d's oeuveres c-type steel I-beam is reserved, a row is arranged
Purlin;
8. above purlin by tapping screw fix rain insensitive device-color steel, tapping screw arranged beneath waterproof rubber gasket,
Surrounding smears water-repellent paint;
Scaffold board or plank sheathing are completely spread above lateral open web type truss, is fixed by iron wire or hawser.
Advantage for present invention is with advantageous effect:
The assembled rigid unit of assembling type steel structure one-shot job canopy of the present invention is by Two bors d's oeuveres c-type steel I-beam, square steel tube column, diagonal brace group
At two Pin frames, the setting that purlin is used for color steel plate on lower is set thereafter above beam, while being arranged two at the both ends of beam
The paving that lateral open web type truss is used for upper layer scaffold board is finally arranged in a longitudinal direction open web type truss between longitudinal open web type truss
If the Double-protection form can meet simultaneously, rain-proof is anti-to pound requirements, upper layer meet it is anti-pound requirement, lower layer meets rain-proof and requires.And
The superiority of truss structure and section steel beam is taken full advantage of, rain-proof is arranged below, and anti-pound is disposed over, for dropped object
With comfort cushioning effect.It is respectively provided with diagonal brace between beam column, between column and purlin, increases the stability of operation canopy, assembly and disassembly side
Just.Safety guarantee can not only be provided for worker, and can be recycled for multiple times.
The required component of the present invention can be prefabricated in advance in factory, is all bolted at the scene, without welding,
Assembling and dissembling speed is quick;And column is located at surrounding, and intermediate working region is open, facilitates worker's operation.Enterprise can be according to practical feelings
Assembled rigid unit quantity is freely arranged in condition, increases operation canopy area to meet requirement of engineering.
The all steel of component used in the present invention repeat and recycle, meet the green construction theory advocated in China,
Agree with the strategy of sustainable development of country.
The present invention has wide range of applications, and can be applied not only to carpenter's machining shed of construction site, it may also be used for reinforcing bar adds
Builder's temporary shed, escape way etc..
Description of the drawings
The present invention will be further described in detail below in conjunction with the accompanying drawings.
Fig. 1 is assembling type steel structure one-shot job canopy of the present invention;
Fig. 2 is the structure chart of assembled rigid unit;
Fig. 3 is the positions A foot joint detail drawing in Fig. 1;
Fig. 4 is beam column diagonal brace connection detail in the positions B in Fig. 1;
Fig. 5 is the positions C bean column node detail drawing in Fig. 1;
Fig. 6 is the positions D longitudinal direction open web type truss and coupled beam connection detail in Fig. 1;
Fig. 7 is vertical, horizontal open web type panel point detail drawing in the positions E in Fig. 1;
Fig. 8 is the positions F coupled beam and purlin connection detail in Fig. 1.
In figure:1- square steel tube columns, 2- purlins, the longitudinal directions 3- open web type truss, diagonal brace between 4- columns and purlin, 5- beam columns
Diagonal brace, 6- Two bors d's oeuveres c-type steel I-beams, 7- transverse direction open web type truss, 8- end plates, 9- split bolts, 10- plain bolts, 11- put more energy into
Rib, 12- expansion bolts, 13- concrete foundations, 14- connecting plates.
Specific implementation mode
With reference to specific embodiment, the present invention will be described in further detail, but protection scope of the present invention is not had
The embodiment of body is limited, and is subject to claims.In addition, with without prejudice under the premise of technical solution of the present invention, to this hair
Any modifications or changes easy to implement of those of ordinary skill in the art made by bright fall within the claim model of the present invention
Within enclosing.
As shown in Figure 1, assembling type steel structure one-shot job canopy of the present invention, including longitudinal open web type truss 3, lateral open web type
Truss 7, purlin 2 and at least two assembled rigid units.
As shown in Fig. 2, the assembled rigid unit includes two square steel tube columns, 1, Two bors d's oeuveres c-type steel I-beam 6 and general
Logical bolt, two square steel tube columns are mounted on the both ends of Two bors d's oeuveres c-type steel I-beam.
As shown in figure 5, square steel tube column both ends are welded with end plate 8, top end plate 8, the common spiral shell of square steel tube column
Bolt 10 is connected with Two bors d's oeuveres c-type steel I-beam 6.Pass through ribbed stiffener 11 and square steel positioned at the both ends of the end plate 8 of square steel tube column top
Tube column 1 is connected.
As shown in figure 3, square steel tube column bottom end is connect by end plate 8, expansion bolt 12 with concrete foundation 13, it is described double
It is knockdown to spell c-type steel I-beam, is put together by self tapping self-drilling screw.End plate 8 positioned at square steel tube column bottom end
Both ends are connected by ribbed stiffener 11 with square steel tube column 1.
As shown in Figure 1, the assembled rigid unit is arranged in parallel, linked together by purlin 2 between each assembled rigid unit, purlin
2 be several, is set in qually spaced on Two bors d's oeuveres c-type steel I-beam 6, and perpendicular with Two bors d's oeuveres c-type steel I-beam 6.
As shown in Fig. 1,8, the purlin 2 is connected by plain bolt 10, end plate 8 with Two bors d's oeuveres c-type steel I-beam top flange,
For being laid with color steel rain-proof.
As a shown in Figure 6, longitudinal open web type truss 3 is two, and Two bors d's oeuveres C is connected to by plain bolt 10, end plate 8
At 6 both ends top flange of type steel I-beam, it can be actually needed according to scene and concatenation unit quantity is set.As shown in Figure 1, described is vertical
Structure to open web type truss 3 is rectangular frame structure, and spaced set has several supporting rods in frame.
The end plate, ribbed stiffener are welded in factory.
As shown in Fig. 1,7, the transverse direction open web type truss 7 is several, is set in qually spaced on purlin 2, and with purlin 2
Perpendicular, lateral open web type truss is identical as longitudinal structure of open web type truss, and the both ends of lateral open web type truss pass through common
Bolt 10, connecting plate 14 are connected on the supporting rod of longitudinal open web type truss, and scaffold board is laid with above lateral open web type truss and is used
It pounds in anti-, and is fixed on lateral open web type truss by tied silk or hawser.The setting quantity of lateral open web type truss and longitudinal direction
The quantity of supporting rod on open web type truss is identical.
As shown in Fig. 1,2,4,6, the top of the every square steel tube column is symmetrically arranged with two beam column diagonal braces 5, beam column
Diagonal brace lower part is fixed on by split bolt 9 on square steel tube column, and top is fixed on Two bors d's oeuveres c-type steel I-beam by plain bolt
Lower flange.
As shown in Figure 1, the top of the every square steel tube column is provided with diagonal brace 4 between a root post and purlin, column with
The lower part of diagonal brace 4 is fixed on by split bolt on square steel tube column between purlin, and top is by plain bolt, end plate connection in purlin
On item.
Setting is anti-above the transverse direction open web type truss pounds structure, and anti-pound places scaffold board, plank sheathing in structure, conveniently set
It sets rain-proof to prevent pounding measure, meets the anti-buffer requirements pounded.And enterprise's later stage is facilitated to hang catch-phrase.
Color steel is connected by plain bolt above the purlin and is used for rain-proof.
As shown in Figure 1, between the transverse direction open web type truss bottom end and purlin 2, there are space, lateral open web type truss tops
Less than the top of longitudinal open web type truss, there are segment spaces between lateral open web type truss bottom end and purlin 2, can be coloured silk at end
Steel plate, which is laid with, to be provided convenient, and the top that lateral open web type truss top is less than longitudinal open web type truss makes top there are spaces, can
Constraint is provided to the laying of scaffold board or plank.
The installation method of assembling type steel structure one-shot job canopy of the present invention includes the following steps:
1. installing two square steel tube columns 1;
2. installing Two bors d's oeuveres c-type steel I-beam 6;
3. beam column diagonal brace 5 is connected to by split bolt 9 on 1 side wall of quadrate steel pipe column;
4. longitudinal open web type truss 3 to be connected to the top flange at 6 both ends of Two bors d's oeuveres c-type steel I-beam by plain bolt;
5. lateral open web type truss 7 is connected to by plain bolt 10, connecting plate 14 on longitudinal open web type truss 3.
After 6. at least two parallel assembled rigid units are set, at the bolt hole position that Two bors d's oeuveres c-type steel I-beam 6 is reserved, if
Set row's purlin 2;
7. fixing rain insensitive device-color steel, tapping screw arranged beneath water proof rubber pad by tapping screw above purlin 2
Circle, surrounding smears water-repellent paint, to meet waterproof requirement;
8. completely spreading scaffold board or plank sheathing above lateral open web type truss 7, fixed by iron wire or hawser, it is anti-to meet
Pound requirement.
As shown in Figure 1, for better design of expression form and intention, two assembled rigid units are provided with, the later stage can basis
More assembled rigid units are arranged in actual needs.Specific connection type repeats above step.
The above is only presently preferred embodiments of the present invention, not does any type of limitation to the present invention, for
For those skilled in the art, do not depart from technical solution of the present invention in the range of, when using the disclosure above
Technology contents make it is a little be modified to the equivalent embodiment of equivalent variations, as long as being the content without departing from technical solution of the present invention,
Any simple modification, equivalent change and modification made to the above embodiment also should be regarded as this hair according to the technical essence of the invention
Bright protection domain.All undefined components in this embodiment can be implemented in the prior art.
Claims (9)
1. assembling type steel structure one-shot job canopy, it is characterised in that:Including longitudinal open web type truss, lateral open web type truss, purlin
Item and at least two assembled rigid units;
The assembled rigid unit includes two square steel tube columns, a Two bors d's oeuveres c-type steel I-beam and bolt, two square steel tubes
Column is mounted on the both ends of Two bors d's oeuveres c-type steel I-beam, and square steel tube column both ends are welded with end plate, the top of square steel tube column
It is connected with Two bors d's oeuveres c-type steel I-beam by bolt, the bottom end of square steel tube column is connect by expansion bolt with concrete foundation,
The assembled rigid unit is arranged in parallel, and is linked together by purlin between each assembled rigid unit, and purlin is several, equidistantly
It is arranged on Two bors d's oeuveres c-type steel I-beam, and perpendicular with Two bors d's oeuveres c-type steel I-beam,
The longitudinal direction open web type truss is two, is connected at the top flange of Two bors d's oeuveres c-type steel I-beam both ends;
The transverse direction open web type truss is several, is set in qually spaced on purlin, and perpendicular with purlin, lateral open web type purlin
The both ends of frame are connected on longitudinal open web type truss.
2. assembling type steel structure one-shot job canopy according to claim 1, it is characterised in that:The Two bors d's oeuveres c-type I-steel
Beam is knockdown.
3. assembling type steel structure one-shot job canopy according to claim 1, it is characterised in that:The square steel tube column it is upper
Portion is symmetrically arranged with two beam column diagonal braces, and beam column diagonal brace lower part is fixed on by split bolt on square steel tube column, and top passes through
Plain bolt is fixed on Two bors d's oeuveres c-type steel I-beam lower flange.
4. assembling type steel structure one-shot job canopy according to claim 1 or 2, it is characterised in that:The purlin and Two bors d's oeuveres C
Type steel I-beam top flange is connected.
5. assembling type steel structure one-shot job canopy according to claim 1, it is characterised in that:The square steel tube column it is upper
Portion is provided with diagonal brace between a root post and purlin, and the lower part of diagonal brace is fixed on square steel tube by split bolt and stands between column and purlin
On column, top is by plain bolt, end plate connection on purlin.
6. assembling type steel structure one-shot job canopy according to claim 1, it is characterised in that:The transverse direction open web type truss
Top setting is anti-to pound structure, and anti-pound places scaffold board, plank sheathing in structure.
7. assembling type steel structure one-shot job canopy according to claim 1, it is characterised in that:Pass through spiral shell above the purlin
It tethers and connects color steel.
8. assembling type steel structure one-shot job canopy according to claim 1, it is characterised in that:The transverse direction open web type truss
There are space between bottom end and purlin, lateral open web type truss top is less than the top of longitudinal open web type truss.
9. the installation method of assembling type steel structure one-shot job canopy according to claim 1, it is characterised in that including following
Step:
1. installing two square steel tube columns;
2. installing Two bors d's oeuveres c-type steel I-beam;
3. beam column diagonal brace is connected to by split bolt on quadrate steel pipe column side wall;
4. longitudinal open web type truss is connected to 5. top flange that Two bors d's oeuveres c-type steel I-beam two is held by plain bolt;
6. lateral open web type truss is connected to by plain bolt, connecting plate on longitudinal open web type truss;
7. after at least two parallel assembled rigid units are arranged, at the bolt hole position that Two bors d's oeuveres c-type steel I-beam is reserved, a row is arranged
Purlin;
8. above purlin by tapping screw fix rain insensitive device-color steel, tapping screw arranged beneath waterproof rubber gasket,
Surrounding smears water-repellent paint;
Scaffold board or plank sheathing are completely spread above lateral open web type truss, is fixed by iron wire or hawser.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810766620.4A CN108590242A (en) | 2018-07-13 | 2018-07-13 | Assembling type steel structure one-shot job canopy and its installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810766620.4A CN108590242A (en) | 2018-07-13 | 2018-07-13 | Assembling type steel structure one-shot job canopy and its installation method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108590242A true CN108590242A (en) | 2018-09-28 |
Family
ID=63618253
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810766620.4A Pending CN108590242A (en) | 2018-07-13 | 2018-07-13 | Assembling type steel structure one-shot job canopy and its installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108590242A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109537737A (en) * | 2019-01-14 | 2019-03-29 | 浙江新盛建设集团有限公司 | A kind of the totally detachable type machining shed and its assemble method of waterproof layer partition |
CN110080568A (en) * | 2019-05-20 | 2019-08-02 | 湖北省水利水电规划勘测设计院 | Assembled resource collects corridor |
CN110219478A (en) * | 2019-05-08 | 2019-09-10 | 中铁建工集团有限公司 | Assembled protection canopy |
CN110374197A (en) * | 2019-07-23 | 2019-10-25 | 丹阳市乐工钢结构有限公司 | A kind of assembling type steel structure construction set and assembly method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201184058Y (en) * | 2008-04-08 | 2009-01-21 | 魏延涛 | Protection shed for construction work site |
CN202370253U (en) * | 2011-12-09 | 2012-08-08 | 中建四局第六建筑工程有限公司 | Assembly type single-row vertical rod machining shed for building construction site |
CN203559594U (en) * | 2013-08-09 | 2014-04-23 | 中建四局第六建筑工程有限公司 | Combined type protection shed |
CN204081538U (en) * | 2014-09-10 | 2015-01-07 | 中建四局第六建筑工程有限公司 | A kind of assembling turnover processing protection canopy |
DE202014106083U1 (en) * | 2014-12-16 | 2015-01-14 | B+P Gerüstbau Gmbh | Rapid installation canopy |
CN205476545U (en) * | 2016-01-11 | 2016-08-17 | 四川省第十五建筑有限公司 | Multipurpose combined strength construction ground protection shed structure support frame |
CN208534105U (en) * | 2018-07-13 | 2019-02-22 | 沈阳建筑大学 | Assembling type steel structure one-shot job canopy |
-
2018
- 2018-07-13 CN CN201810766620.4A patent/CN108590242A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201184058Y (en) * | 2008-04-08 | 2009-01-21 | 魏延涛 | Protection shed for construction work site |
CN202370253U (en) * | 2011-12-09 | 2012-08-08 | 中建四局第六建筑工程有限公司 | Assembly type single-row vertical rod machining shed for building construction site |
CN203559594U (en) * | 2013-08-09 | 2014-04-23 | 中建四局第六建筑工程有限公司 | Combined type protection shed |
CN204081538U (en) * | 2014-09-10 | 2015-01-07 | 中建四局第六建筑工程有限公司 | A kind of assembling turnover processing protection canopy |
DE202014106083U1 (en) * | 2014-12-16 | 2015-01-14 | B+P Gerüstbau Gmbh | Rapid installation canopy |
CN205476545U (en) * | 2016-01-11 | 2016-08-17 | 四川省第十五建筑有限公司 | Multipurpose combined strength construction ground protection shed structure support frame |
CN208534105U (en) * | 2018-07-13 | 2019-02-22 | 沈阳建筑大学 | Assembling type steel structure one-shot job canopy |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109537737A (en) * | 2019-01-14 | 2019-03-29 | 浙江新盛建设集团有限公司 | A kind of the totally detachable type machining shed and its assemble method of waterproof layer partition |
CN110219478A (en) * | 2019-05-08 | 2019-09-10 | 中铁建工集团有限公司 | Assembled protection canopy |
CN110080568A (en) * | 2019-05-20 | 2019-08-02 | 湖北省水利水电规划勘测设计院 | Assembled resource collects corridor |
CN110374197A (en) * | 2019-07-23 | 2019-10-25 | 丹阳市乐工钢结构有限公司 | A kind of assembling type steel structure construction set and assembly method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108590242A (en) | Assembling type steel structure one-shot job canopy and its installation method | |
CN205637106U (en) | Building structure system of completely assembling formula steel construction | |
CN102733606A (en) | Construction method of high large cantilever structure | |
CN108412128A (en) | A kind of connection structure of steel core concrete column | |
CN107905251A (en) | A kind of module prestressing force Retaining Wall and its assembly method | |
CN105203398A (en) | Experiment loading device and method considering stress amplitude of web member joint and applied to truss arch bridge | |
CN104818772A (en) | Large-span long-cantilever connection structure and construction technique | |
CN107905385A (en) | The assembled arthitecutral structure and method of construction that steel construction is combined with concrete structure | |
CN107191000A (en) | The temporary support of telescopic in height regulation reinforces combination steel construction | |
CN208202657U (en) | Assembled is bolted carpenter's machining shed entirely | |
CN108560895A (en) | A kind of adjustable type elevator shaft operating platform and its erection method | |
CN108412231A (en) | Assembled is bolted reinforcing steel processing shed and its assemble method entirely | |
CN208534105U (en) | Assembling type steel structure one-shot job canopy | |
CN207363024U (en) | A kind of portal frame structure | |
CN207905389U (en) | Assembled is bolted reinforcing steel processing shed entirely | |
CN210420862U (en) | Stay cable tower end anchoring device | |
CN112227688A (en) | Stiffening plate bearing type outer frame-free construction platform for residential building and construction method | |
CN109914614A (en) | A kind of connection structure of assembling frame structural construction side column or center pillar and beam | |
CN214659044U (en) | Novel node construction is consolidated to curtain wall boots type column base | |
CN104831928A (en) | Construction method for high-altitude large-span concrete connected structure formwork supporting steel platform | |
CN108149794A (en) | The multi-functional sizing protection canopy of assembled and its assemble method | |
CN205003027U (en) | Experiment loading device of web member node stress amplitude is considered to purlin formula arched bridge | |
CN207314664U (en) | A kind of assembling prefabricated reinforced concrete column and assembled combination frame building system | |
CN114215179B (en) | Wet construction method for center pillar joint of steel beam floor system and steel frame wallboard system | |
CN109914616A (en) | A kind of dry construction connection structure of assembling frame structural construction corner post and beam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |