CN108589848A - Secondary drainage masonry assures technique - Google Patents
Secondary drainage masonry assures technique Download PDFInfo
- Publication number
- CN108589848A CN108589848A CN201810421776.9A CN201810421776A CN108589848A CN 108589848 A CN108589848 A CN 108589848A CN 201810421776 A CN201810421776 A CN 201810421776A CN 108589848 A CN108589848 A CN 108589848A
- Authority
- CN
- China
- Prior art keywords
- caisson
- blow
- pipe
- layer
- masonry
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03C—DOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
- E03C1/00—Domestic plumbing installations for fresh water or waste water; Sinks
- E03C1/12—Plumbing installations for waste water; Basins or fountains connected thereto; Sinks
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F17/00—Vertical ducts; Channels, e.g. for drainage
- E04F17/08—Vertical ducts; Channels, e.g. for drainage for receiving utility lines, e.g. cables, pipes
Abstract
The present invention discloses secondary drainage masonry and assures technique, which is characterized in that includes the following steps, 1), caisson bottom cleaned out, at the top of brushing flexible water brushing to caisson;2) blow-off pipe (4), is arranged according to layout design, secondary drainage floor drain (2) is placed into caisson centre position, the place's of elevating above the soil installation ground floor drain (3) on blow-off pipe, ground is the screed (8) for being equipped with ceramic tile (7);3), caisson backfills cinder, steel wire lump is placed right over the grid floor drain of secondary drainage, hardening slope, which is done, with cement mortar forms hardened layer (5), waterproof coating layer (6) is coated on hardened layer, using secondary floor drain as minimum point, caisson ground surface forms nest shape, it is stiff after brushing water-repellent paint again;The main drainpipe (1) that last blow-off pipe connection is wrapped up with masonry.It can realize the puzzlement for reducing later period maintenance, be not easy to plug, removal stink does not return taste thoroughly.
Description
Technical field:
The invention belongs to construction drainage fields, and in particular to a kind of secondary drainage masonry assures technique.
Background technology:
The most popular explanation of secondary drainage is exactly to stay a floor drain using ceramic tile bottom in the middle part of caisson.This ground
Draining tube leakage inside leakage mainly cleaning caisson and floor infiltration.It is that have very much must that secondary drainage is done in the middle part of caisson of toilet
It wants, because if the drainpipe in caisson infiltration occurs if there is leak and ground, water can be accumulated constantly in caisson, be sunk
Ponding in case may crack floor tile, and ponding can leak cause that metope is mouldy, floor makes moist deformation, wire short-circuiting everywhere
The problems such as.It is noted that caisson bottom is cleaned out when installing secondary drainage floor drain additional, ensure that discharge outlet is unobstructed.
Invention content:
The present invention is directed to overcome the deficiencies of existing technologies, a kind of secondary drainage masonry is provided and assures technique, can realize reduction
The puzzlement of later period maintenance, is not easy to plug, and removal stink does not return taste thoroughly.
In order to solve the above technical problem, the present invention provides following technical schemes:
Secondary drainage masonry assures technique, which is characterized in that includes the following steps, 1), caisson bottom cleaned out, apply
At the top of brush flexible water brushing to caisson;2) blow-off pipe 4, is arranged according to layout design, secondary drainage floor drain 2 is placed in caisson
Between position, ground floor drain 3 is installed at the place of elevating above the soil on blow-off pipe, and ground is the screed 8 for being equipped with ceramic tile 7;3), caisson backfills
Cinder places steel wire lump right over the grid floor drain of secondary drainage, and doing hardening slope with cement mortar forms hardened layer 5, firmly
Change and be coated with waterproof coating layer 6 on layer, using secondary floor drain as minimum point, caisson ground surface forms nest shape, is brushed again after stiff
Water-repellent paint;The main drainpipe 1 that last blow-off pipe connection is wrapped up with masonry.
Preferably, main drainpipe, including blow-off pipe, sound-proof material, common brick layer, cement layer, waterproof layer, from top surface to caisson bottom
The effective sound-proof material wound clockwise package of portion's entirety blowdown, the gluing of sound-proof material interface cements, again with iron wire hoop on the outside of sound-proof material
Tightly;Common brick layer builds package blow-off pipe by laying bricks or stones, and the flat encirclement blow-off pipe of flour is crossed with cement mortar again on the outside of common brick layer;Wrap up blow-off pipe
Cement layer parch after, the blow-off pipe for wrapping up cement layer is enclosed with waterproof layer by bottom to tube top.
Preferably, at the negative and positive angle of cement mortar at an angle of 90.
Preferably, waterproof layer number is two layers.
Compared with prior art, the present invention has following advantageous effect:
It is different from common waterproof operation, more tightly, the puzzlement of later period maintenance is reduced, is not easy to plug, removal stink is thorough
Do not return taste in bottom.
Description of the drawings
Fig. 1 is the schematic diagram of secondary drainage technique of the present invention;
Fig. 2 is the brick package blow-off pipe schematic diagram that secondary drainage masonry of the present invention assures technique;
Specific implementation mode
Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings, it should be understood that preferred reality described herein
Apply example only for the purpose of illustrating and explaining the present invention and is not intended to limit the present invention.
As shown in Figs. 1-2, secondary drainage masonry assures technique, includes the following steps, 1), caisson bottom is cleaned out,
At the top of brushing flexible water brushing to caisson;2) blow-off pipe 4, is arranged according to layout design, secondary drainage floor drain 2 is placed into caisson
Centre position, ground floor drain 3 is installed at the place of elevating above the soil on blow-off pipe, and ground is the screed 8 for being equipped with ceramic tile 7;3), caisson returns
Cinder is filled out, steel wire lump is placed right over the grid floor drain of secondary drainage, doing hardening slope with cement mortar forms hardened layer 5,
Waterproof coating layer 6 is coated on hardened layer, using secondary floor drain as minimum point, caisson ground surface forms nest shape, is applied again after stiff
Brush water-repellent paint;The main drainpipe 1 that last blow-off pipe connection is wrapped up with masonry.
Above-mentioned main drainpipe 1, including blow-off pipe 11, sound-proof material 12, common brick layer 13, cement layer 14, waterproof layer 15, from top surface
To the effective sound-proof material wound clockwise package of caisson bottom entirety blowdown, the gluing of sound-proof material interface cements, on the outside of sound-proof material again
With iron wire banding;Common brick layer builds package blow-off pipe by laying bricks or stones, and the flat encirclement blow-off pipe of flour is crossed with cement mortar again on the outside of common brick layer;Packet
Wrap up in blow-off pipe cement layer parch after, the blow-off pipe for wrapping up cement layer is enclosed with waterproof layer, waterproof layer number by bottom to tube top
It is two layers.At the negative and positive angle of cement mortar at an angle of 90.
It the foregoing is merely embodiments of the present invention are illustrated, is not intended to restrict the invention, for the technology of this field
For personnel, all within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in
Within protection scope of the present invention.
Claims (4)
1. secondary drainage masonry assures technique, which is characterized in that include the following steps, 1), caisson bottom cleaned out, brush
At the top of flexible water brushing to caisson;2) blow-off pipe (4), is arranged according to layout design, secondary drainage floor drain (2) is placed into caisson
Centre position, the place's of elevating above the soil installation ground floor drain (3) on blow-off pipe, ground is the screed (8) for being equipped with ceramic tile (7);3)、
Caisson backfills cinder, and steel wire lump is placed right over the grid floor drain of secondary drainage, and doing hardening slope with cement mortar forms firmly
Change layer (5), waterproof coating layer (6) is coated on hardened layer, using secondary floor drain as minimum point, caisson ground surface forms nest shape, does
Brushing water-repellent paint again after hard;The main drainpipe (1) that last blow-off pipe connection is wrapped up with masonry.
2. secondary drainage masonry assures construction technology according to claim 1, it is characterised in that:Main drainpipe, including blowdown
(11), sound-proof material (12), common brick layer (13), cement layer (14), waterproof layer (15) are managed, from top surface to caisson bottom entirety blow-off pipe
(11) sound-proof material (12) wound clockwise is used to wrap up, the gluing of sound-proof material (12) interface cements, again with iron wire hoop on the outside of sound-proof material
Tightly;Common brick layer (13) builds package blow-off pipe by laying bricks or stones, and the flat encirclement blow-off pipe of flour is crossed with cement mortar again on the outside of common brick layer;Wrapped row
After the cement layer (14) of dirty pipe parches, the blow-off pipe for wrapping up cement layer is enclosed with waterproof layer (15) by bottom to tube top.
3. secondary drainage masonry assures construction technology according to claim 2, it is characterised in that:At the negative and positive angle of cement mortar
At an angle of 90.
4. secondary drainage masonry assures construction technology according to claim 2, it is characterised in that:Waterproof layer number is two layers.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810421776.9A CN108589848A (en) | 2018-05-04 | 2018-05-04 | Secondary drainage masonry assures technique |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810421776.9A CN108589848A (en) | 2018-05-04 | 2018-05-04 | Secondary drainage masonry assures technique |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108589848A true CN108589848A (en) | 2018-09-28 |
Family
ID=63620852
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810421776.9A Pending CN108589848A (en) | 2018-05-04 | 2018-05-04 | Secondary drainage masonry assures technique |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108589848A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114016579A (en) * | 2021-12-16 | 2022-02-08 | 沈阳盛世大宅装饰工程有限公司 | Secondary drainage system for drainage reconstruction construction of interior decoration |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08193393A (en) * | 1995-01-13 | 1996-07-30 | Mitsui Constr Co Ltd | Drainage equipment structure in balcony |
CN202745335U (en) * | 2012-08-21 | 2013-02-20 | 东莞市亚欧装饰设计工程有限公司 | Sunken type toilet water-resistant deodorization settling basin structure |
CN204510741U (en) * | 2015-02-06 | 2015-07-29 | 洛阳师范学院 | A kind of washroom bag vertical tube structure |
CN205907766U (en) * | 2016-08-04 | 2017-01-25 | 罗丽宝 | Whole waterproof construction of bathroom caisson |
-
2018
- 2018-05-04 CN CN201810421776.9A patent/CN108589848A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08193393A (en) * | 1995-01-13 | 1996-07-30 | Mitsui Constr Co Ltd | Drainage equipment structure in balcony |
CN202745335U (en) * | 2012-08-21 | 2013-02-20 | 东莞市亚欧装饰设计工程有限公司 | Sunken type toilet water-resistant deodorization settling basin structure |
CN204510741U (en) * | 2015-02-06 | 2015-07-29 | 洛阳师范学院 | A kind of washroom bag vertical tube structure |
CN205907766U (en) * | 2016-08-04 | 2017-01-25 | 罗丽宝 | Whole waterproof construction of bathroom caisson |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114016579A (en) * | 2021-12-16 | 2022-02-08 | 沈阳盛世大宅装饰工程有限公司 | Secondary drainage system for drainage reconstruction construction of interior decoration |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107816138A (en) | A kind of construction technology of subsided rest room | |
CN104153400B (en) | A kind of construction method of soft foundation pouring pile head waterproof | |
CN108589848A (en) | Secondary drainage masonry assures technique | |
CN104264700A (en) | Seepage prevention construction method for light-weight precipitation well point post-cast strip of underground construction | |
CN112376610A (en) | Waterproof construction method outside cross pipe gallery | |
CN210887906U (en) | Caisson formula bathroom floor antiseep structure | |
KR20120097091A (en) | Drainage device of leakage protection in floor of a building and method thereof | |
CN103912123B (en) | Caisson type washroom water leakage preventing-draining construction method | |
CN217352628U (en) | Basement waterproof structure | |
CN206521812U (en) | A kind of anti-leakage structure of toilet | |
KR200306106Y1 (en) | Air vent | |
CN207295944U (en) | A kind of hotel's floor drain leakage preventing structure | |
CN104264714A (en) | Waterproof construction joint structure of basement exterior wall | |
CN207453051U (en) | Toilet sleeper wall | |
CN204174629U (en) | A kind of light-duty precipitation well point ater-casting, underground building multi-way prevention plugging structure | |
CN209585309U (en) | Subsided rest room waterproof construction | |
CN206859231U (en) | A kind of grouting device of bored concrete pile | |
CN112609778A (en) | Construction method for tertiary drainage | |
CN202188236U (en) | Structure for preventing fire and stagnant water when pipeline passes through building storey | |
CN108149864A (en) | Exempt from exhaust hole roofing construction technique | |
CN112942432A (en) | Construction method of anti-leakage brick inspection well | |
CN207672955U (en) | A kind of bat sizing device for metope frosting treatment | |
CN111088830A (en) | Caisson type toilet secondary drainage pipeline | |
CN213115036U (en) | Water blocking structure of floor heating water distributor | |
CN220450912U (en) | Manhole structure of basement wall group sleeve |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180928 |