CN108589709A - Hollow no stirrup friction pile and its construction method - Google Patents

Hollow no stirrup friction pile and its construction method Download PDF

Info

Publication number
CN108589709A
CN108589709A CN201810463031.9A CN201810463031A CN108589709A CN 108589709 A CN108589709 A CN 108589709A CN 201810463031 A CN201810463031 A CN 201810463031A CN 108589709 A CN108589709 A CN 108589709A
Authority
CN
China
Prior art keywords
casing
stirrup
hollow
reinforcing rib
friction pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810463031.9A
Other languages
Chinese (zh)
Other versions
CN108589709B (en
Inventor
陈亚志
林婵婵
李银刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201810463031.9A priority Critical patent/CN108589709B/en
Publication of CN108589709A publication Critical patent/CN108589709A/en
Application granted granted Critical
Publication of CN108589709B publication Critical patent/CN108589709B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of hollow no stirrup friction pile and its construction methods, hollow no stirrup friction pile includes the interior casing of concentric intussusception setting and outer casing, reinforcing rib is equipped between inside and outside casing, reinforcing rib is stretched out from outer casing surface, space casting concrete between inside and outside casing, filling concrete magma and earth mixtures, the interior casing are made of more piece cylinder inside interior casing, are connected by longitudinal main reinforcement between the more piece cylinder of casing in composition;Surveying setting-out goes out stake position first, and according to prior art Completion of Drilling Hole;Interior casing and outer casing are fixed together by reinforcing rib;The inside and outside casing being fixed together is sling in decentralization to the stake holes being drilled;The space casting concrete between interior casing and outer casing;After concrete curing, filling concrete magma and earth mixtures in interior casing;The present invention can increase friction pile and be accumulated with the earth soil contact, enhance frictional force and cohesive strength so that bored concrete pile friction coefficient is big, strength performance is protected.

Description

Hollow no stirrup friction pile and its construction method
Technical field
The invention belongs to build a field, be related to a kind of friction pile, and in particular to a kind of hollow no stirrup friction pile and its Construction method.
Background technology
With high-rise, super high rise building construction, pile foundation becomes preferred base form, and friction pile is currently generally transported In pile foundation.Friction pile undertakes the load from top mainly by the frictional force of pile body surface and original place matter soil, existing Friction pile because the center portion thereof divide concrete not with greatly contact, does not play its act on, do not have effect not only, cause instead The waste of material and the weight for increasing pile body.
Invention content
The object of the present invention is to provide a kind of hollow no stirrup friction piles, you can ensure pile body and around it soil property friction Power, and pile body weight can be reduced, material is saved, the original soil handled due to being generated in boring procedure can also be effectively backfilled, this Invention can realize that increasing friction pile pours the contact area with the earth soil afterwards, enhances frictional force and cohesive strength so that bored concrete pile Friction coefficient is big, strength performance is protected, and meets the requirement of specification and design.
A kind of hollow no stirrup friction pile, it is characterised in that:Interior casing including the setting of concentric intussusception and outer casing, it is inside and outside The reinforcing rib that the two is fixedly linked is equipped between casing, the reinforcing rib is stretched out from outer casing surface, empty between inside and outside casing Between casting concrete, filling concrete magma and earth mixtures inside interior casing.
As an improvement, the interior casing is made of more piece cylinder, pass through longitudinal direction in composition between the more piece cylinder of casing Main reinforcement is connected, and main reinforcement is welded with interior casing by edge.
As an improvement, the outer casing is also made of more piece cylinder, pass through cuff between the more piece cylinder of the outer casing of composition It is weldingly connected.
As an improvement, main ribs are uniformly distributed in interior casing surrounding, welded together by hoop of putting more energy between main reinforcement.
As an improvement, the reinforcing rib runs through inside and outside casing, and 5-10cm is stretched out in outer casing outer surface.
As an improvement, the interior casing and outer casing are equipped with the eyelet passed through for reinforcing rib, after reinforcing rib passes through eyelet, It is welded and fixed at eyelet.
As an improvement, the reinforcing rib is distributed on inside and outside casing cross section in well word.
As an improvement, the reinforcing rib is uniformly distributed along inside and outside casing axis direction interval.
A kind of hollow no stirrup friction pile construction method, which is characterized in that include the following steps:
Step 1: surveying setting-out goes out stake position, drill according to the prior art, and borehole cleaning extremely design or code requirement;
Step 2: interior casing and outer casing are fixed together by reinforcing rib;
Step 3: the inside and outside casing being fixed together is sling in decentralization to the stake holes being drilled;
Step 4: the space casting concrete between interior casing and outer casing;
Step 5: after concrete curing, filling concrete magma and earth mixtures in interior casing are completed empty after solidification The heart is without stirrup friction pile driving construction.
As an improvement, the interior casing and outer casing are made of more piece cylinder, first with reinforcing rib by inside and outside casing A pitch circle cylinder be welded and fixed together, sling transferred in stake holes with crane later, inside and outside the section casing cylinder decentralization after, Main reinforcement is welded on interior casing, and welds the cylinder of casing in another section using main reinforcement, utilizes cuff to weld outside another section later Then the cylinder of casing transfers a section cylinder heights again, so repeat, until inside and outside casing reaches projected depth.
Present invention has the advantages that:
The design of the invention carries inside and outside combination casing, and interior casing is centrally through reinforcing rib and cement mortar original soil knot Integrator, outer casing stretch out reinforcing rib end and increase the contact point with soil, further enhance entire pile body and soil Frictional force, pile body is without using stirrup, the problems such as avoiding common stirrup desoldering, saves material, rationally backfills original soil, save Transportation cost, while the problem of inside and outside casing avoids collapse hole after a pore-forming, adapting to construction condition variation, ensure that pile body Bearing capacity.
Description of the drawings
Fig. 1 is hollow no stirrup friction pile structural schematic diagram;
Fig. 2 is combination casing and bar connecting schematic diagram;
Fig. 3 is combination casing vertical view.
1- the earth soil, 2- concrete, 3- cement mortar original soils, the outer casings of 4-, casing in 5-, 6- main reinforcements, 7- reinforcing ribs, 8- Cuff.
Specific implementation mode
The present invention is illustrated below in conjunction with the accompanying drawings,
As shown in Figure 1 to Figure 3, a kind of hollow no stirrup friction pile, including combination casing, the combination casing is by concentric locking collar The interior casing 5 and outer casing 4 of folded setting form, and the reinforcing rib 7 that the two is fixedly linked, the reinforcement are equipped between inside and outside casing Muscle 7 is stretched out from 4 surface of outer casing, space casting concrete 2,5 inside filling concrete magma of interior casing and soil between inside and outside casing Mixture, i.e. cement mortar original soil 3, the interior casing 5 are made of the cylinder of more piece thin-walled, form in casing 5 more piece cylinder it Between be weldingly connected by longitudinal main reinforcement 6, main reinforcement 6 is welded with interior casing 5 by edge;The outer casing 4 is also by more piece thin-walled Cylinder composition, form and be weldingly connected by cuff 8 between the more piece cylinder of outer casing 4, main ribs 6 are in 5 circumferential direction of interior casing It is uniformly distributed, is welded together by hoop of putting more energy between main reinforcement 6, inside and outside casing is made of thin-wall steel pipe.
The reinforcing rib 7 is distributed on inside and outside casing cross section in well word, uniform along inside and outside casing axis direction interval Distribution.The interior casing 5 and outer casing 4 are equipped with the eyelet passed through for reinforcing rib 7, after reinforcing rib 7 passes through eyelet, at eyelet It is welded and fixed.The reinforcing rib 7 runs through inside and outside casing, and stretches out 5-10cm in 4 outer surface of outer casing.
Outer casing 4, interior casing 5 are processed:According to the size of design stake diameter, the making of casing is carried out in factory, outer casing 4 is same It is equal in magnitude to design stake diameter, interior casing 5 is stake diameter half, and inside and outside casing is all made of the processing of thin-walled light section, often section combination casing Both ends are opened there are two eyelet, are circumferentially evenly distributed with main reinforcement 6 along 5 outer wall of interior casing, 6 periphery winding welding of main reinforcement is put more energy into Hoop, inside and outside casing are provided with eyelet, are used for across reinforcing rib 7, and carry out welding at eyelet, reinforcing rib 7 stretches out outer casing 4 about 5- Corrosion prevention rust preventer is brushed on 10cm, 7 surface of reinforcing rib, 7 external protrusion of reinforcing rib point contact with the inner wall of stake holes increase friction pile and Stake holes frictional force, more preferably reinforcing rib 7 point be bent downwardly or tilt in the external protrusion of outer casing 4, further improve friction The frictional force of stake and stake holes, increases the stability of friction pile.
A kind of hollow no stirrup friction pile construction method, includes the following steps:
Step 1: surveying setting-out goes out stake position, drill according to the prior art, and borehole cleaning extremely design or code requirement;
Step 2: interior casing 5 and outer casing 4 are fixed together by reinforcing rib 7;
Step 3: the inside and outside casing being fixed together is sling in decentralization to the stake holes being drilled;
Step 4: the space casting concrete 2 between interior casing 5 and outer casing 4;
Step 5: after the solidification of concrete 2, filling concrete magma and earth mixtures in interior casing 5 are completed after solidification Hollow no stirrup friction pile driving construction.
In step 3, combination casing hoisting process is:The interior casing 5 and outer casing 4 are made of more piece cylinder, first A pitch circle cylinder of inside and outside casing is welded and fixed together using reinforcing rib 7, is sling transferred in stake holes with crane later, the section After the cylinder decentralization of inside and outside casing, main reinforcement 6 is welded on interior casing 5, and the cylinder of casing 5 in another section is welded using main reinforcement 6, It utilizes cuff 8 to weld the cylinder of casing 4 outside another section later, then transfers a section cylinder heights again, so repeat, until inside and outside Casing reaches projected depth.

Claims (10)

1. a kind of hollow no stirrup friction pile, it is characterised in that:Interior casing including the setting of concentric intussusception and outer casing, inside and outside shield The reinforcing rib that the two is fixedly linked is equipped between cylinder, the reinforcing rib is stretched out from outer casing surface, space between inside and outside casing Casting concrete, interior casing inside filling concrete magma and earth mixtures.
2. a kind of hollow no stirrup friction pile as described in claim 1, it is characterised in that:The interior casing is by more piece cylinder group At connected by longitudinal main reinforcement between the more piece cylinder of casing in composition, main reinforcement is welded with interior casing by edge.
3. a kind of hollow no stirrup friction pile as claimed in claim 2, it is characterised in that:The outer casing is also by more piece cylinder group At forming and be weldingly connected by cuff between the more piece cylinder of outer casing.
4. a kind of hollow no stirrup friction pile as claimed in claim 2, it is characterised in that:Main ribs are uniform in interior casing surrounding It is distributed, is welded together by hoop of putting more energy between main reinforcement.
5. a kind of hollow no stirrup friction pile as described in claim 1, it is characterised in that:The reinforcing rib runs through inside and outside casing, And stretch out 5-10cm in outer casing outer surface.
6. a kind of hollow no stirrup friction pile as described in claim 1, it is characterised in that:The interior casing and outer casing are equipped with It is welded and fixed at eyelet after reinforcing rib passes through eyelet for the eyelet that reinforcing rib passes through.
7. a kind of hollow no stirrup friction pile as claimed in claim 6, it is characterised in that:The reinforcing rib is transversal in inside and outside casing It is distributed in well word on face.
8. a kind of hollow no stirrup friction pile as claimed in claim 7, it is characterised in that:The reinforcing rib is along inside and outside casing axis Line direction interval is uniformly distributed.
The pile construction method 9. a kind of hollow no stirrup rubs, which is characterized in that include the following steps:
Step 1: surveying setting-out goes out stake position, drill according to the prior art, and borehole cleaning extremely design or code requirement;
Step 2: interior casing and outer casing are fixed together by reinforcing rib;
Step 3: the inside and outside casing being fixed together is sling in decentralization to the stake holes being drilled;
Step 4: the space casting concrete between interior casing and outer casing;
Step 5: after concrete curing, filling concrete magma and earth mixtures in interior casing complete hollow nothing after solidification Stirrup friction pile driving construction.
10. a kind of hollow no stirrup friction pile construction method as claimed in claim 9, it is characterised in that:The interior casing and outer Casing is made of more piece cylinder, is welded and fixed together a pitch circle cylinder of inside and outside casing first with reinforcing rib, Zhi Houyong Crane, which is sling, to be transferred in stake holes, inside and outside the section after the cylinder decentralization of casing, main reinforcement is welded on interior casing, and weld using main reinforcement The cylinder of casing in another section is connect, cuff is utilized to weld the cylinder of the outer casing of another section later, it is high then to transfer a pitch circle cylinder again Degree so repeats, until inside and outside casing reaches projected depth.
CN201810463031.9A 2018-05-15 2018-05-15 Hollow friction pile without stirrups and construction method thereof Active CN108589709B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810463031.9A CN108589709B (en) 2018-05-15 2018-05-15 Hollow friction pile without stirrups and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810463031.9A CN108589709B (en) 2018-05-15 2018-05-15 Hollow friction pile without stirrups and construction method thereof

Publications (2)

Publication Number Publication Date
CN108589709A true CN108589709A (en) 2018-09-28
CN108589709B CN108589709B (en) 2021-06-29

Family

ID=63631060

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810463031.9A Active CN108589709B (en) 2018-05-15 2018-05-15 Hollow friction pile without stirrups and construction method thereof

Country Status (1)

Country Link
CN (1) CN108589709B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537586A (en) * 2018-12-31 2019-03-29 江苏兴厦建设工程集团有限公司 A kind of pedestal pile
CN110106910A (en) * 2019-06-12 2019-08-09 中国电力工程顾问集团西南电力设计院有限公司 A kind of major diameter manually digging hole steel-pipe pile for mountain area overhead transmission line
CN110144888A (en) * 2019-06-12 2019-08-20 交通运输部公路科学研究所 Hollow pile foundation and production method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101892661A (en) * 2010-07-15 2010-11-24 南京工业大学 Double-pipe reinforced composite piles
CN103485333A (en) * 2013-07-18 2014-01-01 杭州博数土木工程技术有限公司 Corrugated hollow steel pipe friction pile and construction method thereof
CN205259174U (en) * 2015-12-11 2016-05-25 海南大学 Stake of sleeve pipe bamboo reinforcement soil cement

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101892661A (en) * 2010-07-15 2010-11-24 南京工业大学 Double-pipe reinforced composite piles
CN103485333A (en) * 2013-07-18 2014-01-01 杭州博数土木工程技术有限公司 Corrugated hollow steel pipe friction pile and construction method thereof
CN205259174U (en) * 2015-12-11 2016-05-25 海南大学 Stake of sleeve pipe bamboo reinforcement soil cement

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537586A (en) * 2018-12-31 2019-03-29 江苏兴厦建设工程集团有限公司 A kind of pedestal pile
CN109537586B (en) * 2018-12-31 2024-01-16 江苏兴厦建设工程集团有限公司 Pile with large head
CN110106910A (en) * 2019-06-12 2019-08-09 中国电力工程顾问集团西南电力设计院有限公司 A kind of major diameter manually digging hole steel-pipe pile for mountain area overhead transmission line
CN110144888A (en) * 2019-06-12 2019-08-20 交通运输部公路科学研究所 Hollow pile foundation and production method thereof

Also Published As

Publication number Publication date
CN108589709B (en) 2021-06-29

Similar Documents

Publication Publication Date Title
CN105780763B (en) Mesoporous vibrates the construction method of casing retaining wall long auger guncreting pile
CN108612109B (en) Bracket-free dismantling method for concrete support beam
CN108589709A (en) Hollow no stirrup friction pile and its construction method
CN105604001A (en) Stiffening core cement-soil tubular pile, construction method and cylindrical rotary stirring drilling tool
CN103541352A (en) Underground and overground continuous construction method for major-diameter high flat bed pile in sandy soil stratum
CN206616550U (en) A kind of small space construction bored concrete pile
CN111676967B (en) Construction method for pile-anchor support of spiral cage core anchor rod
JP2005146577A (en) Reinforcing cage for foundation pile, and method of reinforcement arrangement for enlarging enlarged bottom part
CN207211389U (en) A kind of assembled architecture is encorbelmented outrigger anchor hoop
CN108755663A (en) A kind of great diameter and long variable cross-section bored pile construction method
CN108222012A (en) A kind of foundation pit anchor cable excision and the construction method that supporting pile is carried out using anchor cable excision system
CN110820728A (en) Cast-in-situ bored pile construction method for penetrating underground deep-buried waste pipeline
CN219930978U (en) Prefabricated assembled grouting body
CN109763507B (en) A kind of double-wall corrugated pipe foundation foundation and its construction technology
CN209818080U (en) Segmental assembled pipe shed pouring construction structure
CN103132511A (en) Pile-forming method and pile-forming device for static pressure immersed tube expanded-base cast-in-place pile
CN109898505A (en) With the compound tubular pole of reinforced structure in soft stratum
CN215367223U (en) Pile head structure for post-grouting of rock-socketed pile
CN204199279U (en) Prefabricated reinforced concrete anchor pole
CN206844101U (en) A kind of suspention positioner of steel reinforcement cage
CN209384226U (en) A kind of Manual hole pile digging device in shifting sand layers
CN207244630U (en) Raked pile
CN218148318U (en) Curtain type pile casing structure for deep sludge cement mixing pile
CN207376622U (en) A kind of spiral carrier stake machine and spiral carrier stake
JP2603414B2 (en) True pipe large diameter cast-in-place pile method

Legal Events

Date Code Title Description