CN108584335A - Across the assembly line multiple spot jettison system of one kind and method - Google Patents

Across the assembly line multiple spot jettison system of one kind and method Download PDF

Info

Publication number
CN108584335A
CN108584335A CN201810420653.3A CN201810420653A CN108584335A CN 108584335 A CN108584335 A CN 108584335A CN 201810420653 A CN201810420653 A CN 201810420653A CN 108584335 A CN108584335 A CN 108584335A
Authority
CN
China
Prior art keywords
assembly line
workpiece
delivery track
track
multiple spot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810420653.3A
Other languages
Chinese (zh)
Other versions
CN108584335B (en
Inventor
翁端文
褚如昶
吕新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
INA Intelligent Technology Zhejiang Co Ltd
Original Assignee
Zhejiang Yi - Na Intelligent Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=63619820&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN108584335(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Zhejiang Yi - Na Intelligent Technology Co Ltd filed Critical Zhejiang Yi - Na Intelligent Technology Co Ltd
Priority to CN201810420653.3A priority Critical patent/CN108584335B/en
Publication of CN108584335A publication Critical patent/CN108584335A/en
Application granted granted Critical
Publication of CN108584335B publication Critical patent/CN108584335B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G35/00Mechanical conveyors not otherwise provided for
    • B65G35/06Mechanical conveyors not otherwise provided for comprising a load-carrier moving along a path, e.g. a closed path, and adapted to be engaged by any one of a series of traction elements spaced along the path
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G2201/00Indexing codes relating to handling devices, e.g. conveyors, characterised by the type of product or load being conveyed or handled
    • B65G2201/02Articles
    • B65G2201/0229Clothes, clothes hangers

Abstract

The present invention relates to a kind of production line system, specially a kind of across assembly line multiple spot jettison system, including a plurality of assembly line, and aiming station across the centre for workpiece to be directly transported to the assembly line of assembly line setting multiple spot putting module.Workpiece directly can be launched the aiming station to required dispensing by the present invention by the multiple spot putting module of across assembly line setting position, saved the circulation time by unnecessary station, improved working efficiency.

Description

Across the assembly line multiple spot jettison system of one kind and method
Technical field
The present invention relates to a kind of production line systems, and in particular to across the assembly line multiple spot jettison system of one kind and method.
Background technology
Garment hanging system is for realizing the preparation to ready-made clothes, and existing garment hanging system is often deposited for monomer Without the contact in structure or flow direction between each garment hanging system.And larger clothes making is for enterprise, workshop sometimes Interior that multiple garment hanging systems can be arranged, in the existing control mode to hanging clothes, these garment hanging systems are each other Between it is general not will produce contact, each garment hanging system is respectively with an independent interior circulation form realization clothing function.Root It, generally can be in a garment hanging system when building garment hanging system according to the preparation section for the clothes usually to be produced Tens work stations of upper setting, the process that these work stations can correspond to clothes are usually sewing one at a work station Procedure will complete entire process and be subjected to one completely to prepare flowing water process.But present human cost, time cost by Gradually promoted, it would be desirable to it is a set of to break the whole up into parts, and energy poly- zero is whole Production line process, each work is sequentially undergone in change The line production system of sequence improves working efficiency.
Application No. is the patents of invention of CN201210098981.9 to disclose a kind of intelligence hanging pipeline system, specific Disclose the system and read the card reader of clothes hanger information and be mounted on the exit of work station, clothes rack incoming and it is outbound using branch rail and The mode of ring road guiding passes in and out work station, and when clothes hanger is out of the station, main orbit not will disconnect, and entering the station for clothes hanger is not with outbound It is controlled by card reader, but by system computerized comprehensive overall arrangement, station controller voluntarily judges and controls, and sends out to greatest extent The effect for waving assembly line, greatly promotes production efficiency.But whole flow process is still and needs gradually to carry out, and needs by longer Cycle, still cannot significantly improve production efficiency in one independence.
It is thrown so we need to design a set of across the assembly line multiple spot that can be launched with diameter to aiming station on assembly line Place system.
Invention content
The present invention is in order to solve the above technical problems, provide across the assembly line multiple spot jettison system of one kind and method.
Across the assembly line multiple spot jettison system of one kind, including a plurality of assembly line, and be used for workpiece across assembly line setting Directly it is transported to the multiple spot putting module of the aiming station of the centre of the assembly line.
The technical program has the beneficial effect that:It can be by the multiple spot putting module of across assembly line setting position directly by workpiece The aiming station for launching required dispensing saves the circulation time by unnecessary station, improves working efficiency.
As the preferred of the technical program, the multiple spot putting module include for input the workpiece input track of workpiece, The first delivery track for shifting the workpiece between different assembly lines, for by workpiece same assembly line difference The second delivery track shifted between station,
The workpiece input track is connected with each assembly line workpiece is delivered to target pipeline from the workpiece input track;
The workpiece input track is connected with second delivery track workpiece is delivered to institute from second delivery track State workpiece input track;
Second delivery track and first delivery track linking from first delivery track by workpiece to be delivered to institute State the second delivery track.It is by the workpiece input track, first delivery track, second delivery track that workpiece is fast Speed is launched into assembly line, and the time cost initially launched is reduced, and improves working efficiency.
As the preferred of the technical program, the workpiece input track is arranged in a second direction in a plurality of elementary stream Side;
First delivery track is arranged across a plurality of assembly line in a second direction;
Second delivery track is connected along first direction with first delivery track;
The first direction intersects with the second direction.The workpiece input track, first delivery track and a plurality of stream Waterline intersection setting, realizes across assembly line dispensing workpiece;The further preferably described first direction is vertical with the second direction, Convenient for mechanical erection and use.
As the preferred of the technical program, first delivery track is arranged above the assembly line, and described second is defeated Track is sent to be arranged in the top or side of the assembly line.Dispensing function can more be quickly finished.
As the preferred of the technical program, first delivery track includes being set to first delivery track and the stream Unit is launched in lifting at waterline crossover location;The lifting is launched unit and is connect with assembly line, and across assembly line carry out work is used for The scheduling of part is shifted.Unit, which is launched, by lifting realizes transfer of the workpiece between assembly line and first delivery track.
As the preferred of the technical program, workpiece input track is connected with second delivery track by mounting unit;
Second delivery track is connected with first delivery track by mounting unit.There is provided employee's by mounting unit Workpiece.
Across the assembly line multiple spot put-on method of one kind being suitable for across assembly line multiple spot jettison system, including step:
S1, workpiece input the multiple spot putting module through the workpiece input track;
S2, workpiece are delivered to aiming station through the multiple spot putting module.
The technical program has the beneficial effect that:It can be by changing method directly by the mesh of workpiece dispensing to required dispensing Station is marked, the circulation time by unnecessary station is saved, improves working efficiency.
As the preferred of the technical program, the step S2 includes:
S2-1, workpiece enter second delivery track through the workpiece input track;
S2-2, workpiece are delivered to corresponding first delivery track of the aiming station through second delivery track;
S2-3, workpiece are delivered to aiming station through first delivery track.
As the preferred of the technical program, the workpiece input track is with second delivery track by mounting unit rank It connects;
Second delivery track is connected with first delivery track by mounting unit;
In the step S2-1, the workpiece enters second conveyor track through the mounting unit from the workpiece input track Road;
In the step S2-2, the workpiece enters first conveyor track through the mounting unit from second delivery track Road.
As the preferred of the technical program, first delivery track includes being set to first delivery track and the stream Unit is launched in lifting at waterline crossover location;The lifting is launched unit and is connect with assembly line, and across assembly line carry out work is used for The scheduling of part is shifted;
In the step S2-3, workpiece launches unit by the lifting, enters aiming station institute from first delivery track Assembly line.
Description of the drawings
Fig. 1 is a kind of schematic diagram of across assembly line multiple spot jettison system of the present invention;
Fig. 2 is a kind of flow chart of across assembly line multiple spot put-on method of the present invention;
Fig. 3 is the particular flow sheet of step S2 in a kind of across assembly line multiple spot put-on method of the present invention;
Fig. 4 is the schematic diagram of embodiment three.
Specific implementation mode
This specific embodiment is only explanation of the invention, is not the limitation to invention, those skilled in the art The modification that not creative contribution can be made to the present embodiment as needed after reading this specification, but as long as in this hair The protection of Patent Law is all received in bright right.
Embodiment one
It is as shown in Figure 1 a kind of across assembly line multiple spot jettison system, including a plurality of assembly line 1, and the use being arranged across assembly line 1 In the multiple spot putting module 2 of the aiming station for the centre that workpiece is directly transported to the assembly line 1.Assembly line 1 includes annular Backbone, the processing stations being arranged symmetrically in annular backbone both sides along annular active direction.Workpiece to be processed can pass through clothing The pendants such as frame are articulated on annular backbone and are moved along annular backbone, pass through each station on annular backbone path successively, reach To when needing to be processed station, it is articulated to processing stations from annular backbone and is processed.The workpiece processed can be from station It mounts again into annular backbone, into being recycled to next station in assembly line.Workpiece in a pipeline can only be with flowing water The operation beat of line, with fixed movement speed along fixed direction(Such as clockwise or counter-clockwise), successively by edge The multiple stations arranged around annular backbone.In general, the one end for being fixed on assembly line in the prior art is arranged for launching Workpiece to be processed(Such as dress material cut-parts)Station, the starting point of the process as assembly line, workpiece from the station mount enter The annular backbone of assembly line is processed into expected semi-finished product or finished product by each station on annular backbone successively.So And assembly line is after arrangement installs, the equipment of each station can change easily, and according to the difference of converted products, it needs The manufacturing procedure and processing content wanted are different.For specific converted products, not necessarily it is required for from assembly line starting point Station start to process, however, there remains entering assembly line through the starting point, pass through each station successively then along assembly line, arrive Up to aiming station, the processing stand-by period of workpiece is longer, affects production efficiency.
In the technical solution of the present embodiment, directly workpiece can be thrown by the multiple spot putting module 2 being arranged across assembly line The aiming station launched required for being put into.Such as in process of production, different workpiece need to be suitable by whole flow process by traditional process Sequence is transported to corresponding station, is transported to after the labor and materials of relatively rear process just have to pass through the process links of front corresponding Station, wastes the time, and required workpiece directly can be transported to corresponding station, saved by across assembly line multiple spot jettison system By the circulation time of unnecessary station, working efficiency is improved.
The multiple spot putting module 2 includes for inputting the workpiece input track 21 of workpiece, being used for the workpiece not With the first delivery track 22 shifted between assembly line, for shifting workpiece between the different station of same assembly line Two delivery tracks 23.Assembly line 1 is the circular orbit being arranged along straight line in Fig. 1;The workpiece input track 21 is to be arranged more The circular orbit of side where the process starting point of assembly line;First delivery track 22 is arranged in a second direction in assembly line The top of plane where annular backbone, and cross over all assembly lines;Second delivery track 23 is to be arranged along first direction Circular orbit.First direction intersects with second direction(It is preferred that substantially vertical setting)So that the first delivery track and second defeated Send track interlaced arrangement.The top of plane where the main orbit in assembly line can be arranged in second delivery track, can also be arranged In the side of assembly line.The workpiece input track 21 is connect with a plurality of assembly line 1, assembly line 1 and the workpiece input track 21 connection is the same side, workpiece(Such as cut-parts to be processed), if necessary to the station where the initial position from assembly line Start to process, then workpiece is inputted in mounting into after the workpiece input track 21, and mesh is delivered to through the workpiece input track 21 The assembly line 1 where station is marked, into the fabrication cycles of the assembly line.
Further, the end for the workpiece input track 21 that second delivery track 23 is arranged, and in a second direction The side or top of assembly line are arranged in parallel in a plurality of assembly line.Second delivery track 23 and workpiece input track 21 It is connected by mounting unit 200.Preferably, the second delivery track 23 can also have it is a plurality of, it is parallel respectively to be set with each assembly line It sets.First delivery track 22 is arranged across a plurality of assembly line in a second direction, one end of the first delivery track 22 and the Two delivery tracks 23 are connected by mounting unit 200.First delivery track 22 can have a plurality of, be in respectively on each assembly line Different stations or machining area intersect, and lifting is equipped at crossover location and launches unit 100.Lifting launch unit 100 with Assembly line 1 connects, to being in the crossed position the workpiece transfer on the first delivery track 22 to the assembly line being connected Station or machining area.If necessary from the station where the centre position of assembly line(Centre position in the present embodiment The station at place is other stations other than station where the initial process of assembly line in assembly line)Start to process, then Workpiece is after mounting inputs the workpiece input track 21, as workpiece input track runs to second parallel with the assembly line At 23 corresponding position of delivery track, the second delivery track 23 is entered by mounting unit 200.And in the second delivery track The mounting unit 200 that corresponding first delivery track, 22 and second delivery track 23 of aiming station is run in 23, through the mounting Unit enters the first delivery track 22.The assembly line where aiming station is run to along the first delivery track 22.Also, it is logical It crosses the lifting being connected with the assembly line on the first delivery track and launches the aiming station that the assembly line is arrived in unit dispensing.Due to first Delivery track 22 and the second delivery track 23 are independently arranged with each assembly line, and the setting of the speed of service can be detached from each assembly line Productive temp setting, using different from a assembly line speed of service, and higher than the speed of each assembly line speed of service, realization The fast accurate of workpiece is launched.Workpiece launches the lifting of unit 100 by first delivery track 22 and by the lifting The dispensing completed between assembly line is launched, so that workpiece is directly launched the aiming station to required dispensing, saves and pass through The circulation time of unnecessary station improves working efficiency.
In addition, the workpiece in the present embodiment can be between the workpiece input track 21, second delivery track 23 Mutually circulation, improves relevance grade of the system to different places, and 21 director space of workpiece input track is limited not in place It, can be by can mutually circulate between the workpiece input track 21, second delivery track 23 in the case of enough, Xiang Jiang Workpiece is sent to target pipeline.
Embodiment two
It is as Figure 2-3 a kind of across assembly line multiple spot put-on method, adapts to for across assembly line multiple spot jettison system, including step Suddenly:
S1, workpiece input the multiple spot putting module 2 through the workpiece input track 21;
S2, workpiece are delivered to aiming station through the multiple spot putting module 2.
It can be saved by unnecessary by changing method directly by workpiece dispensing to the aiming station of required dispensing The circulation time of station improves working efficiency.
The workpiece input track 21 is connected with second delivery track 23 by mounting unit 200, and described second is defeated Track 23 is sent to be connected by mounting unit 200 with first delivery track 22.Workpiece is in the workpiece input track 21, described It can mutually circulate between second delivery track 23.
For example, in process of production, the station on the front half section assembly line of a plurality of assembly line 1 is all in idle state, only There is the station on the second half section working, directly workpiece conveying can be launched by first delivery track 22 arrive work at this time Station at.
S2-1, workpiece enter second delivery track through the mounting unit 200 from the workpiece input track.
S2-2, workpiece enter first delivery track through the mounting unit from second delivery track.
First delivery track 22 includes being set at first delivery track 22 and 1 crossover location of the assembly line Unit 100 is launched in lifting;The lifting is launched unit 100 and is connect with assembly line, and the scheduling for across assembly line carry out workpiece turns It moves.To meet actual need of work, first delivery track 22 is generally spaced in 2 meters in the vertical direction with assembly line 1 Left and right.First delivery track 22, to aiming station conveying workpieces, is realized across assembly line 1 across parallel a plurality of assembly line 1 Quick conveying is launched, and the working time is saved, and promotes working efficiency.
S2-3, workpiece launch unit, the stream where entering aiming station from first delivery track by the lifting Waterline.
Embodiment three,
Based on embodiment one, with embodiment one the difference is that:
As shown in figure 4, assembly line 1 includes multiple working groups, the working group includes at least a pair of arranged symmetrically along first direction Station.The assignment transfer list for shifting workpiece between different operating group is provided between two groups of adjacent working groups Member 300.Wherein, the assignment transfer unit 300 is that application No. is a kind of assignment transfer dresses disclosed in CN201310529201.6 It sets.The assignment transfer unit 300, for shifting workpiece between the symmetrical station, and station is symmetrical arranged It is advantageous in that the transfer for facilitating workpiece.
In the actual production process, for example, shoe-making process can include in entire production process a repetition process, this It is identical manufacture craft to repeat process, when the workpiece that when processing uses difference in this flowing water link under different progresses half Finished work-piece repeats process and is arranged in same group of working group for resource optimization, in traditional process line, repeats The different station on flowing water is arranged in process, needs more stations, longer assembly line.After grouping improves, process will be repeated The design of all stations in same group of working group, reduce station quantity, but exist the when of reaching station group every time be required for undergoing it is whole Cycle in a flowing water, all setting fast grouping transfers, making can be straight from present ongoing station under different progresses Distribution buanch unit was connected by whole group workpiece transfer to the first delivery track 22, then by the first delivery track 22 that workpiece is defeated It send to the second delivery track 23, second delivery track 23 is conveyed by corresponding first delivery track 22 of target operation group It is delivered to target operation group.
Although the embodiments of the invention are described in conjunction with the attached drawings, but those of ordinary skill in the art can be in appended power Profit makes various deformations or amendments in the range of requiring.

Claims (10)

1. a kind of across assembly line multiple spot jettison system, it is characterised in that:Including a plurality of assembly line, and across the use of assembly line setting In the multiple spot putting module of the aiming station for the centre that workpiece is directly transported to the assembly line.
2. across the assembly line multiple spot jettison system of one kind according to claim 1, it is characterised in that:The multiple spot launches mould Block includes the first conveying for inputting the workpiece input track of workpiece, for shifting the workpiece between different assembly lines Track, the second delivery track for shifting workpiece between the different station of same assembly line,
The workpiece input track is connected with each assembly line workpiece is delivered to target pipeline from the workpiece input track;
The workpiece input track is connected with second delivery track workpiece is delivered to institute from the workpiece input track State the second delivery track;
Second delivery track and first delivery track linking from second delivery track by workpiece to be delivered to institute State the first delivery track.
3. across the assembly line multiple spot jettison system of one kind according to claim 2, it is characterised in that:
The workpiece input track is arranged in a second direction in the side of a plurality of elementary stream;
First delivery track is arranged in a second direction to be arranged across a plurality of assembly line;
Second delivery track is connected along first direction with first delivery track;
The first direction intersects with the second direction.
4. across the assembly line multiple spot jettison system of one kind according to claim 3, it is characterised in that:
First delivery track is arranged above the assembly line;
Second delivery track is arranged in the top or side of the assembly line.
5. across the assembly line multiple spot jettison system of one kind according to claim 2, it is characterised in that:First delivery track It include the lifting dispensing unit at first delivery track and the assembly line crossover location;Unit is launched in the lifting It is connect with assembly line, the scheduling for across assembly line carry out workpiece is shifted.
6. across the assembly line multiple spot jettison system of one kind according to claim 2, it is characterised in that:
Workpiece input track is connected with second delivery track by mounting unit;
Second delivery track is connected with first delivery track by mounting unit.
7. a kind of across assembly line multiple spot put-on method is suitable for across the assembly line multiple spot jettison system described in claim 2, special Sign is, including step:
S1, workpiece input the multiple spot putting module through the workpiece input track;
S2, workpiece are delivered to aiming station through the multiple spot putting module.
8. across the assembly line multiple spot put-on method of one kind according to claim 7, it is characterised in that:
The step S2 includes:
S2-1, workpiece enter second delivery track through the workpiece input track;
S2-2, workpiece are delivered to corresponding first delivery track of the aiming station through second delivery track;
S2-3, workpiece are delivered to aiming station through first delivery track.
9. across the assembly line multiple spot put-on method of one kind according to claim 8, it is characterised in that:
Workpiece input track is connected with second delivery track by mounting unit;
Second delivery track is connected with first delivery track by mounting unit;
In the step S2-1, workpiece enters second delivery track through the mounting unit from the workpiece input track;
In the step S2-2, the workpiece enters first conveyor track through the mounting unit from second delivery track Road.
10. across the assembly line multiple spot put-on method of one kind according to claim 7, it is characterised in that:
First delivery track includes being set to first delivery track to launch with the lifting at the assembly line crossover location Unit;The lifting is launched unit and is connect with assembly line, and the scheduling for across assembly line carry out workpiece is shifted;
In the step S2-3, workpiece launches unit by the lifting, enters aiming station institute from first delivery track Assembly line.
CN201810420653.3A 2018-05-04 2018-05-04 Cross-pipeline multipoint delivery system and method Active CN108584335B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810420653.3A CN108584335B (en) 2018-05-04 2018-05-04 Cross-pipeline multipoint delivery system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810420653.3A CN108584335B (en) 2018-05-04 2018-05-04 Cross-pipeline multipoint delivery system and method

Publications (2)

Publication Number Publication Date
CN108584335A true CN108584335A (en) 2018-09-28
CN108584335B CN108584335B (en) 2019-12-27

Family

ID=63619820

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810420653.3A Active CN108584335B (en) 2018-05-04 2018-05-04 Cross-pipeline multipoint delivery system and method

Country Status (1)

Country Link
CN (1) CN108584335B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109132423A (en) * 2018-10-18 2019-01-04 江西福润达实业有限责任公司 A kind of intelligent control method of Furniture manufacturing assembly line
CN109132422A (en) * 2018-10-18 2019-01-04 江西福润达实业有限责任公司 A kind of Furniture manufacturing assembly line and its control method
CN109132421A (en) * 2018-10-18 2019-01-04 江西福润达实业有限责任公司 A kind of control method of Furniture manufacturing assembly line
CN109335590A (en) * 2018-11-15 2019-02-15 陈国� The autocontrol method of workpiece transmission assembly line

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08151111A (en) * 1994-11-30 1996-06-11 Nippon Kanegiisaa Kk Trolley conveyer for hanger sorter or the like
EP1258439A1 (en) * 2001-05-15 2002-11-20 Franz Gärtner Installations for conveying items on conveying paths by means of cam-driven transport roller
CN201499675U (en) * 2009-09-11 2010-06-09 台州飞跃双星成衣机械有限公司 Bridge connection structure for hanging pipelines
CN202016728U (en) * 2011-01-21 2011-10-26 宁波圣瑞思服装机械有限公司 Intelligent clothing production suspension equipment system
CN202296069U (en) * 2011-10-12 2012-07-04 上海三禾服装机械制造有限公司 Automatic separation suspension conveying system
CN102707684A (en) * 2012-05-25 2012-10-03 宁波圣瑞思服装机械有限公司 Intelligent-production hoisting system and control method
CN104106863A (en) * 2014-07-09 2014-10-22 南通明兴科技开发有限公司 Bridging station
CN104276387A (en) * 2013-07-10 2015-01-14 上海衣拿制衣设备有限公司 Distribution-transfer device and hanging system
CN204872633U (en) * 2015-08-03 2015-12-16 沈阳金杯江森自控汽车内饰件有限公司 Automatic system in shipment of IP
CN204916936U (en) * 2015-08-18 2015-12-30 云南浩祥服饰有限公司 Multi -functional clothing suspension system

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08151111A (en) * 1994-11-30 1996-06-11 Nippon Kanegiisaa Kk Trolley conveyer for hanger sorter or the like
EP1258439A1 (en) * 2001-05-15 2002-11-20 Franz Gärtner Installations for conveying items on conveying paths by means of cam-driven transport roller
CN201499675U (en) * 2009-09-11 2010-06-09 台州飞跃双星成衣机械有限公司 Bridge connection structure for hanging pipelines
CN202016728U (en) * 2011-01-21 2011-10-26 宁波圣瑞思服装机械有限公司 Intelligent clothing production suspension equipment system
CN202296069U (en) * 2011-10-12 2012-07-04 上海三禾服装机械制造有限公司 Automatic separation suspension conveying system
CN102707684A (en) * 2012-05-25 2012-10-03 宁波圣瑞思服装机械有限公司 Intelligent-production hoisting system and control method
CN104276387A (en) * 2013-07-10 2015-01-14 上海衣拿制衣设备有限公司 Distribution-transfer device and hanging system
CN104106863A (en) * 2014-07-09 2014-10-22 南通明兴科技开发有限公司 Bridging station
CN204872633U (en) * 2015-08-03 2015-12-16 沈阳金杯江森自控汽车内饰件有限公司 Automatic system in shipment of IP
CN204916936U (en) * 2015-08-18 2015-12-30 云南浩祥服饰有限公司 Multi -functional clothing suspension system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109132423A (en) * 2018-10-18 2019-01-04 江西福润达实业有限责任公司 A kind of intelligent control method of Furniture manufacturing assembly line
CN109132422A (en) * 2018-10-18 2019-01-04 江西福润达实业有限责任公司 A kind of Furniture manufacturing assembly line and its control method
CN109132421A (en) * 2018-10-18 2019-01-04 江西福润达实业有限责任公司 A kind of control method of Furniture manufacturing assembly line
CN109335590A (en) * 2018-11-15 2019-02-15 陈国� The autocontrol method of workpiece transmission assembly line

Also Published As

Publication number Publication date
CN108584335B (en) 2019-12-27

Similar Documents

Publication Publication Date Title
CN108584335A (en) Across the assembly line multiple spot jettison system of one kind and method
CN108529157A (en) A kind of assembly line launches transfer system and method
CN102847630B (en) Spraying production line
CN106355333A (en) Reconstructible production system and method
CN106400100B (en) Full-automatic electrolytic polissoir
CN106393112A (en) Multi-robot welding method and system
CN105562937A (en) Laser marking method, laser marking equipment and laser marking system
CN103848343B (en) A kind of handling system overhead traveling crane motion control method towards there being track switch to convert
JP2015500746A (en) Manufacturing plant operating method
CN102981468A (en) Robot transport and dispatching and manufacturing system and method integrating machining and assembling and method
CN110070235A (en) A kind of flexible dispatching method of multiple mobile robot
CN105956689A (en) Transportation and production coordinated scheduling method based on improved particle swarm optimization
CN105631759A (en) Steel making factory multi-target scheduling plan compiling method considering molten iron supply condition
CN109607107A (en) A kind of product line automatic distribution system and distribution method
CN104950684A (en) Swarm robot collaborative scheduling measurement and control method and system platform
CN108689134A (en) Across the assembly line multiple spot transfer system of one kind and method
CN109319410A (en) The full-automatic horizontal tinuous production of wiring board
CN104700157B (en) A kind of across unit work piece production method for searching path considering that transport capacity is limited
CN110109433A (en) The buffer area Intelligent logistics based on roller-way of flexible Flow Shop dispatch system
CN207724298U (en) A kind of novel truss robot
CN106200580A (en) A kind of orderly input and output material method of shunting
CN116079710A (en) Robot PLC control system and method for automatic production line
CN104122862A (en) Production line connecting system and method without master control
CN209736096U (en) Automatic sorting device based on transfer equipment and assembly line
CN110253281B (en) Assembly production line and bogie assembly method applying same

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Taizhou City, Zhejiang province Jiaojiang District 318000 leap Branch Park building 32

Patentee after: Zhejiang Yina Intelligent Technology Co.,Ltd.

Address before: Taizhou City, Zhejiang province Jiaojiang District 318000 leap Branch Park building 32

Patentee before: INA INTELLIGENT TECHNOLOGY (ZHEJIANG) Co.,Ltd.

IP01 Partial invalidation of patent right
IP01 Partial invalidation of patent right

Commission number: 4W111367

Conclusion of examination: Maintain the validity of the patent right based on claims 1-8 submitted by the patentee on January 20, 2021

Decision date of declaring invalidation: 20210705

Decision number of declaring invalidation: 50768

Denomination of invention: A cross pipeline multi-point delivery system and method

Granted publication date: 20191227

Patentee: Zhejiang Yina Intelligent Technology Co.,Ltd.