Across the assembly line multiple spot jettison system of one kind and method
Technical field
The present invention relates to a kind of production line systems, and in particular to across the assembly line multiple spot jettison system of one kind and method.
Background technology
Garment hanging system is for realizing the preparation to ready-made clothes, and existing garment hanging system is often deposited for monomer
Without the contact in structure or flow direction between each garment hanging system.And larger clothes making is for enterprise, workshop sometimes
Interior that multiple garment hanging systems can be arranged, in the existing control mode to hanging clothes, these garment hanging systems are each other
Between it is general not will produce contact, each garment hanging system is respectively with an independent interior circulation form realization clothing function.Root
It, generally can be in a garment hanging system when building garment hanging system according to the preparation section for the clothes usually to be produced
Tens work stations of upper setting, the process that these work stations can correspond to clothes are usually sewing one at a work station
Procedure will complete entire process and be subjected to one completely to prepare flowing water process.But present human cost, time cost by
Gradually promoted, it would be desirable to it is a set of to break the whole up into parts, and energy poly- zero is whole Production line process, each work is sequentially undergone in change
The line production system of sequence improves working efficiency.
Application No. is the patents of invention of CN201210098981.9 to disclose a kind of intelligence hanging pipeline system, specific
Disclose the system and read the card reader of clothes hanger information and be mounted on the exit of work station, clothes rack incoming and it is outbound using branch rail and
The mode of ring road guiding passes in and out work station, and when clothes hanger is out of the station, main orbit not will disconnect, and entering the station for clothes hanger is not with outbound
It is controlled by card reader, but by system computerized comprehensive overall arrangement, station controller voluntarily judges and controls, and sends out to greatest extent
The effect for waving assembly line, greatly promotes production efficiency.But whole flow process is still and needs gradually to carry out, and needs by longer
Cycle, still cannot significantly improve production efficiency in one independence.
It is thrown so we need to design a set of across the assembly line multiple spot that can be launched with diameter to aiming station on assembly line
Place system.
Invention content
The present invention is in order to solve the above technical problems, provide across the assembly line multiple spot jettison system of one kind and method.
Across the assembly line multiple spot jettison system of one kind, including a plurality of assembly line, and be used for workpiece across assembly line setting
Directly it is transported to the multiple spot putting module of the aiming station of the centre of the assembly line.
The technical program has the beneficial effect that:It can be by the multiple spot putting module of across assembly line setting position directly by workpiece
The aiming station for launching required dispensing saves the circulation time by unnecessary station, improves working efficiency.
As the preferred of the technical program, the multiple spot putting module include for input the workpiece input track of workpiece,
The first delivery track for shifting the workpiece between different assembly lines, for by workpiece same assembly line difference
The second delivery track shifted between station,
The workpiece input track is connected with each assembly line workpiece is delivered to target pipeline from the workpiece input track;
The workpiece input track is connected with second delivery track workpiece is delivered to institute from second delivery track
State workpiece input track;
Second delivery track and first delivery track linking from first delivery track by workpiece to be delivered to institute
State the second delivery track.It is by the workpiece input track, first delivery track, second delivery track that workpiece is fast
Speed is launched into assembly line, and the time cost initially launched is reduced, and improves working efficiency.
As the preferred of the technical program, the workpiece input track is arranged in a second direction in a plurality of elementary stream
Side;
First delivery track is arranged across a plurality of assembly line in a second direction;
Second delivery track is connected along first direction with first delivery track;
The first direction intersects with the second direction.The workpiece input track, first delivery track and a plurality of stream
Waterline intersection setting, realizes across assembly line dispensing workpiece;The further preferably described first direction is vertical with the second direction,
Convenient for mechanical erection and use.
As the preferred of the technical program, first delivery track is arranged above the assembly line, and described second is defeated
Track is sent to be arranged in the top or side of the assembly line.Dispensing function can more be quickly finished.
As the preferred of the technical program, first delivery track includes being set to first delivery track and the stream
Unit is launched in lifting at waterline crossover location;The lifting is launched unit and is connect with assembly line, and across assembly line carry out work is used for
The scheduling of part is shifted.Unit, which is launched, by lifting realizes transfer of the workpiece between assembly line and first delivery track.
As the preferred of the technical program, workpiece input track is connected with second delivery track by mounting unit;
Second delivery track is connected with first delivery track by mounting unit.There is provided employee's by mounting unit
Workpiece.
Across the assembly line multiple spot put-on method of one kind being suitable for across assembly line multiple spot jettison system, including step:
S1, workpiece input the multiple spot putting module through the workpiece input track;
S2, workpiece are delivered to aiming station through the multiple spot putting module.
The technical program has the beneficial effect that:It can be by changing method directly by the mesh of workpiece dispensing to required dispensing
Station is marked, the circulation time by unnecessary station is saved, improves working efficiency.
As the preferred of the technical program, the step S2 includes:
S2-1, workpiece enter second delivery track through the workpiece input track;
S2-2, workpiece are delivered to corresponding first delivery track of the aiming station through second delivery track;
S2-3, workpiece are delivered to aiming station through first delivery track.
As the preferred of the technical program, the workpiece input track is with second delivery track by mounting unit rank
It connects;
Second delivery track is connected with first delivery track by mounting unit;
In the step S2-1, the workpiece enters second conveyor track through the mounting unit from the workpiece input track
Road;
In the step S2-2, the workpiece enters first conveyor track through the mounting unit from second delivery track
Road.
As the preferred of the technical program, first delivery track includes being set to first delivery track and the stream
Unit is launched in lifting at waterline crossover location;The lifting is launched unit and is connect with assembly line, and across assembly line carry out work is used for
The scheduling of part is shifted;
In the step S2-3, workpiece launches unit by the lifting, enters aiming station institute from first delivery track
Assembly line.
Description of the drawings
Fig. 1 is a kind of schematic diagram of across assembly line multiple spot jettison system of the present invention;
Fig. 2 is a kind of flow chart of across assembly line multiple spot put-on method of the present invention;
Fig. 3 is the particular flow sheet of step S2 in a kind of across assembly line multiple spot put-on method of the present invention;
Fig. 4 is the schematic diagram of embodiment three.
Specific implementation mode
This specific embodiment is only explanation of the invention, is not the limitation to invention, those skilled in the art
The modification that not creative contribution can be made to the present embodiment as needed after reading this specification, but as long as in this hair
The protection of Patent Law is all received in bright right.
Embodiment one
It is as shown in Figure 1 a kind of across assembly line multiple spot jettison system, including a plurality of assembly line 1, and the use being arranged across assembly line 1
In the multiple spot putting module 2 of the aiming station for the centre that workpiece is directly transported to the assembly line 1.Assembly line 1 includes annular
Backbone, the processing stations being arranged symmetrically in annular backbone both sides along annular active direction.Workpiece to be processed can pass through clothing
The pendants such as frame are articulated on annular backbone and are moved along annular backbone, pass through each station on annular backbone path successively, reach
To when needing to be processed station, it is articulated to processing stations from annular backbone and is processed.The workpiece processed can be from station
It mounts again into annular backbone, into being recycled to next station in assembly line.Workpiece in a pipeline can only be with flowing water
The operation beat of line, with fixed movement speed along fixed direction(Such as clockwise or counter-clockwise), successively by edge
The multiple stations arranged around annular backbone.In general, the one end for being fixed on assembly line in the prior art is arranged for launching
Workpiece to be processed(Such as dress material cut-parts)Station, the starting point of the process as assembly line, workpiece from the station mount enter
The annular backbone of assembly line is processed into expected semi-finished product or finished product by each station on annular backbone successively.So
And assembly line is after arrangement installs, the equipment of each station can change easily, and according to the difference of converted products, it needs
The manufacturing procedure and processing content wanted are different.For specific converted products, not necessarily it is required for from assembly line starting point
Station start to process, however, there remains entering assembly line through the starting point, pass through each station successively then along assembly line, arrive
Up to aiming station, the processing stand-by period of workpiece is longer, affects production efficiency.
In the technical solution of the present embodiment, directly workpiece can be thrown by the multiple spot putting module 2 being arranged across assembly line
The aiming station launched required for being put into.Such as in process of production, different workpiece need to be suitable by whole flow process by traditional process
Sequence is transported to corresponding station, is transported to after the labor and materials of relatively rear process just have to pass through the process links of front corresponding
Station, wastes the time, and required workpiece directly can be transported to corresponding station, saved by across assembly line multiple spot jettison system
By the circulation time of unnecessary station, working efficiency is improved.
The multiple spot putting module 2 includes for inputting the workpiece input track 21 of workpiece, being used for the workpiece not
With the first delivery track 22 shifted between assembly line, for shifting workpiece between the different station of same assembly line
Two delivery tracks 23.Assembly line 1 is the circular orbit being arranged along straight line in Fig. 1;The workpiece input track 21 is to be arranged more
The circular orbit of side where the process starting point of assembly line;First delivery track 22 is arranged in a second direction in assembly line
The top of plane where annular backbone, and cross over all assembly lines;Second delivery track 23 is to be arranged along first direction
Circular orbit.First direction intersects with second direction(It is preferred that substantially vertical setting)So that the first delivery track and second defeated
Send track interlaced arrangement.The top of plane where the main orbit in assembly line can be arranged in second delivery track, can also be arranged
In the side of assembly line.The workpiece input track 21 is connect with a plurality of assembly line 1, assembly line 1 and the workpiece input track
21 connection is the same side, workpiece(Such as cut-parts to be processed), if necessary to the station where the initial position from assembly line
Start to process, then workpiece is inputted in mounting into after the workpiece input track 21, and mesh is delivered to through the workpiece input track 21
The assembly line 1 where station is marked, into the fabrication cycles of the assembly line.
Further, the end for the workpiece input track 21 that second delivery track 23 is arranged, and in a second direction
The side or top of assembly line are arranged in parallel in a plurality of assembly line.Second delivery track 23 and workpiece input track 21
It is connected by mounting unit 200.Preferably, the second delivery track 23 can also have it is a plurality of, it is parallel respectively to be set with each assembly line
It sets.First delivery track 22 is arranged across a plurality of assembly line in a second direction, one end of the first delivery track 22 and the
Two delivery tracks 23 are connected by mounting unit 200.First delivery track 22 can have a plurality of, be in respectively on each assembly line
Different stations or machining area intersect, and lifting is equipped at crossover location and launches unit 100.Lifting launch unit 100 with
Assembly line 1 connects, to being in the crossed position the workpiece transfer on the first delivery track 22 to the assembly line being connected
Station or machining area.If necessary from the station where the centre position of assembly line(Centre position in the present embodiment
The station at place is other stations other than station where the initial process of assembly line in assembly line)Start to process, then
Workpiece is after mounting inputs the workpiece input track 21, as workpiece input track runs to second parallel with the assembly line
At 23 corresponding position of delivery track, the second delivery track 23 is entered by mounting unit 200.And in the second delivery track
The mounting unit 200 that corresponding first delivery track, 22 and second delivery track 23 of aiming station is run in 23, through the mounting
Unit enters the first delivery track 22.The assembly line where aiming station is run to along the first delivery track 22.Also, it is logical
It crosses the lifting being connected with the assembly line on the first delivery track and launches the aiming station that the assembly line is arrived in unit dispensing.Due to first
Delivery track 22 and the second delivery track 23 are independently arranged with each assembly line, and the setting of the speed of service can be detached from each assembly line
Productive temp setting, using different from a assembly line speed of service, and higher than the speed of each assembly line speed of service, realization
The fast accurate of workpiece is launched.Workpiece launches the lifting of unit 100 by first delivery track 22 and by the lifting
The dispensing completed between assembly line is launched, so that workpiece is directly launched the aiming station to required dispensing, saves and pass through
The circulation time of unnecessary station improves working efficiency.
In addition, the workpiece in the present embodiment can be between the workpiece input track 21, second delivery track 23
Mutually circulation, improves relevance grade of the system to different places, and 21 director space of workpiece input track is limited not in place
It, can be by can mutually circulate between the workpiece input track 21, second delivery track 23 in the case of enough, Xiang Jiang
Workpiece is sent to target pipeline.
Embodiment two
It is as Figure 2-3 a kind of across assembly line multiple spot put-on method, adapts to for across assembly line multiple spot jettison system, including step
Suddenly:
S1, workpiece input the multiple spot putting module 2 through the workpiece input track 21;
S2, workpiece are delivered to aiming station through the multiple spot putting module 2.
It can be saved by unnecessary by changing method directly by workpiece dispensing to the aiming station of required dispensing
The circulation time of station improves working efficiency.
The workpiece input track 21 is connected with second delivery track 23 by mounting unit 200, and described second is defeated
Track 23 is sent to be connected by mounting unit 200 with first delivery track 22.Workpiece is in the workpiece input track 21, described
It can mutually circulate between second delivery track 23.
For example, in process of production, the station on the front half section assembly line of a plurality of assembly line 1 is all in idle state, only
There is the station on the second half section working, directly workpiece conveying can be launched by first delivery track 22 arrive work at this time
Station at.
S2-1, workpiece enter second delivery track through the mounting unit 200 from the workpiece input track.
S2-2, workpiece enter first delivery track through the mounting unit from second delivery track.
First delivery track 22 includes being set at first delivery track 22 and 1 crossover location of the assembly line
Unit 100 is launched in lifting;The lifting is launched unit 100 and is connect with assembly line, and the scheduling for across assembly line carry out workpiece turns
It moves.To meet actual need of work, first delivery track 22 is generally spaced in 2 meters in the vertical direction with assembly line 1
Left and right.First delivery track 22, to aiming station conveying workpieces, is realized across assembly line 1 across parallel a plurality of assembly line 1
Quick conveying is launched, and the working time is saved, and promotes working efficiency.
S2-3, workpiece launch unit, the stream where entering aiming station from first delivery track by the lifting
Waterline.
Embodiment three,
Based on embodiment one, with embodiment one the difference is that:
As shown in figure 4, assembly line 1 includes multiple working groups, the working group includes at least a pair of arranged symmetrically along first direction
Station.The assignment transfer list for shifting workpiece between different operating group is provided between two groups of adjacent working groups
Member 300.Wherein, the assignment transfer unit 300 is that application No. is a kind of assignment transfer dresses disclosed in CN201310529201.6
It sets.The assignment transfer unit 300, for shifting workpiece between the symmetrical station, and station is symmetrical arranged
It is advantageous in that the transfer for facilitating workpiece.
In the actual production process, for example, shoe-making process can include in entire production process a repetition process, this
It is identical manufacture craft to repeat process, when the workpiece that when processing uses difference in this flowing water link under different progresses half
Finished work-piece repeats process and is arranged in same group of working group for resource optimization, in traditional process line, repeats
The different station on flowing water is arranged in process, needs more stations, longer assembly line.After grouping improves, process will be repeated
The design of all stations in same group of working group, reduce station quantity, but exist the when of reaching station group every time be required for undergoing it is whole
Cycle in a flowing water, all setting fast grouping transfers, making can be straight from present ongoing station under different progresses
Distribution buanch unit was connected by whole group workpiece transfer to the first delivery track 22, then by the first delivery track 22 that workpiece is defeated
It send to the second delivery track 23, second delivery track 23 is conveyed by corresponding first delivery track 22 of target operation group
It is delivered to target operation group.
Although the embodiments of the invention are described in conjunction with the attached drawings, but those of ordinary skill in the art can be in appended power
Profit makes various deformations or amendments in the range of requiring.