CN108580093A - A kind of rope rail high-altitude paint finishing - Google Patents
A kind of rope rail high-altitude paint finishing Download PDFInfo
- Publication number
- CN108580093A CN108580093A CN201810716898.0A CN201810716898A CN108580093A CN 108580093 A CN108580093 A CN 108580093A CN 201810716898 A CN201810716898 A CN 201810716898A CN 108580093 A CN108580093 A CN 108580093A
- Authority
- CN
- China
- Prior art keywords
- rope
- fixed pulleys
- aerial
- ground
- balancing pole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05B—SPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
- B05B13/00—Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
- B05B13/005—Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00 mounted on vehicles or designed to apply a liquid on a very large surface, e.g. on the road, on the surface of large containers
Abstract
A kind of rope rail paint finishing, including high-pressure spraying machine;Further include aerial pulley blocks, ground block group, balancing pole, clump weight and automatic spray gun;Aerial pulley blocks include two aerial fixed pulleys, and two aerial fixed pulleys are connected to the both ends of area to be sprayed high-altitude beam slab;Ground block group includes two ground fixed pulleys, and two ground fixed pulleys are connected to clump weight, and clump weight is seated in ground;Set is installed with the rope rail that slip rope constitutes quadrangle between four fixed pulleys, and balancing pole is hung on the horizontal segment rope rail between two groups of aerial fixed pulleys, and automatic spray gun is installed at the top of balancing pole, and balancing pole both ends are equipped with control drag-line;Automatic spray gun is connected with the high-pressure hose of high-pressure spraying machine.It is used for pile spraying application, simple in structure, easy to operate, and construction efficiency is high, eliminates working at height, has evaded security risk;Reduce frame body to set up, reduce construction cost, can conveniently complete high-altitude spraying operation.
Description
Technical field
The present invention relates to high-altitude spraying technology field, belong to the facility sprayed for pile space, and in particular to one
Kind rope rail high-altitude paint finishing.
Background technology
At present in high-altitude spraying technology field, the high-altitude especially more than headroom 6m generally requires to set up in spraying application
Scaffold carries out spraying application.The setting up, use and remove of scaffold not only need to take considerable time, manpower, and also deposits
Operation lacks convenience in some potential safety problems, construction, and efficiency is low, and cost input is relatively large.
Invention content
The invention mainly solves the technical problem of providing it is a kind of it is safe and convenient, work efficiency is high, it is time saving and energy saving, can grasp
The strong rope rail high-altitude paint finishing of the property made realizes that scaffold spraying application is exempted from high-altitude.
The present invention solves the scheme that its technical problem is taken:A kind of rope rail paint finishing, including high-pressure spraying machine;
It is characterized in that:Further include aerial pulley blocks, ground block group, balancing pole, clump weight and automatic spray gun;Pulley blocks include in the air
Two aerial fixed pulleys, two aerial fixed pulleys are connected to the both ends of area to be sprayed high-altitude beam slab;Ground block group packet
Two ground fixed pulleys are included, two ground fixed pulleys are connected to clump weight, and clump weight is seated in ground;Four fixed pulleys it
Between set be installed with the rope rail that slip rope constitutes quadrangle, balancing pole hangs on the horizontal segment rope rail between two groups of aerial fixed pulleys, puts down
Automatic spray gun is installed at the top of weighing apparatus bar, and balancing pole both ends are equipped with control drag-line;The high-pressure hose of automatic spray gun and high-pressure spraying machine
It is connected.
High-pressure spraying machine is obtained by commercial sources;Fixed pulley is finished product stainless steel pulley;It is coir rope or nylon to slide rope
Rope;Balancing pole makes for stainless steel tube;Welded closure ring at the hitch point of the horizontal segment rope rail of hanging balancing bar, control drag-line are
Coir rope or nylon rope.
High-pressure spraying machine is connected with automatic spray gun, and it is firm so that high-pressure hose is connect, and meets wanting for hose hanging operation
It asks;The control drag-line that balancing pole both ends are equipped with is used for the spraying direction of cable tensios control automatic spray gun;Automatic spray gun can automatically into
The keying of row spraying operation controls.
The present invention is used for pile spraying application, and this invention takes semi automatic machineization behaviour compared with prior art
Make, simple in structure, easy to operate, mobility strong, construction efficiency is high, and construction occupied space greatly reduces, and eliminates staff
Working at height is carried out, security risk has been evaded;Reduce frame body to set up, reduce construction cost, can conveniently complete height
Empty spraying operation.
Description of the drawings
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is that slip rope control sprays region transformation operation schematic diagram;
Fig. 3 is that cable control sprays a bit map operation schematic diagram.
In figure:1-high-pressure spraying machine, 2-aerial fixed pulleys, 3-slip ropes, 4-ground fixed pulleys, 5-clump weights, 6-
Balancing pole, 7-automatic spray guns, 8-control drag-lines, 9-high-pressure hoses, 10-area to be sprayed high-altitude beam slabs, 11-closed-loops.
Specific implementation mode
As shown in Figure 1:A kind of rope rail paint finishing, including the obtained high-pressure spraying machine 1 of commercial sources, high pressure painting
Machine 1 includes high-pressure hose 9;Further include aerial pulley blocks, ground block group, balancing pole 6, clump weight 5 and automatic spray gun 7;In the air
Pulley blocks include two aerial fixed pulleys 2, and two aerial fixed pulleys 2 are connected to the two of area to be sprayed high-altitude beam slab 10
End;Ground block group includes two ground fixed pulleys 4, and two ground fixed pulleys 4 are connected to clump weight 5, and clump weight 5 is put
On ground;Two aerial fixed pulleys 2 cover between two ground fixed pulleys 4 is installed with the rope rail that slip rope 3 constitutes quadrangle, balancing pole
6 hang on the horizontal segment rope rail between two groups of aerial fixed pulleys 2, and automatic spray gun 7,6 liang of balancing pole are installed in the top of balancing pole 6
End is equipped with control drag-line 8;Automatic spray gun 7 is connected with the high-pressure hose 9 of high-pressure spraying machine 1.The horizontal segment rope of hanging balancing bar 6
Closed-loop 11 is welded at the hitch point of rail, balancing pole 6 hangs on closed-loop 11.
Two aerial fixed pulleys 2 and two ground fixed pulleys 4 are finished product stainless steel pulley;Slip rope 3 is coir rope or nylon rope;
Balancing pole 6 makes for stainless steel tube;It is coir rope or nylon rope to control drag-line.
When Specific construction, the rope rail high-altitude paint finishing is installed by Fig. 1:Two aerial fixed pulleys 2 are fixed on and are waited for
10 structure both ends of spraying area high-altitude beam slab, two ground fixed pulleys 4 are taken root fixation with clump weight 5, slip rope 3 be through at two it is aerial
Fixed pulley and two ground fixed pulleys constitute the rope rail of closed quadrangle, by the binding of balancing pole 6 between two aerial fixed pulleys
Horizontal slip rope section, automatic spray gun 7 is being installed on balancing pole top, high-pressure hose 9 is connected and automatic spray gun and is placed on ground
The host of the high-pressure spraying machine 1 in face is simultaneously installed firm, and balancing pole upper/lower terminal is a drag-line 8 respectively to control balancing pole
Top orientation.
Referring to Fig. 2, by pulling slip rope that balancing pole evolution is made to spray position to control;Referring to Fig. 3:By pulling
Rope converts the point specifically sprayed to adjust the orientation of automatic spray gun.It is real by Fig. 2 position and point bit maps as shown in figure 3
Now to the spraying operation of high-altitude contignation 10.
Claims (5)
1. a kind of rope rail paint finishing, including high-pressure spraying machine;It is characterized in that:Further include aerial pulley blocks, ground block
Group, balancing pole(6), clump weight(5)With automatic spray gun(7);Aerial pulley blocks include two aerial fixed pulleys(2), two aerial
Fixed pulley(2)It is connected to area to be sprayed high-altitude beam slab(10)Both ends;Ground block group includes two ground fixed pulleys
(4), two ground fixed pulleys(4)It is connected to clump weight(5), clump weight(5)It is seated in ground;Two aerial fixed pulleys
(2)In two ground fixed pulleys(4)Between set be installed with slip rope 3 constitute quadrangle rope rail, balancing pole(6)Hang on two groups it is aerial
Fixed pulley(2)Between horizontal segment rope rail on, balancing pole(6)Top install automatic spray gun(7), balancing pole(6)Both ends are equipped with
Control drag-line(8);Automatic spray gun(7)With high-pressure spraying machine(1)High-pressure hose(9)It is connected.
2. a kind of rope rail paint finishing as described in claim 1, it is characterised in that:Hanging balancing bar(6)Horizontal segment rope
It is welded with closed-loop at the hitch point of rail(11), balancing pole(6)Hang on closed-loop(11).
3. a kind of rope rail paint finishing as claimed in claim 2, it is characterised in that:Two aerial fixed pulleys(2)With two
Ground fixed pulley(4)For finished product stainless steel pulley.
4. a kind of rope rail paint finishing as claimed in claim 1,2 or 3, it is characterised in that:Slip rope(3)For coir rope or nylon
Rope.
5. a kind of rope rail paint finishing as claimed in claim 4, it is characterised in that:Balancing pole(6)It is made for stainless steel tube;
Control drag-line(8)For coir rope or nylon rope.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810716898.0A CN108580093A (en) | 2018-07-03 | 2018-07-03 | A kind of rope rail high-altitude paint finishing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810716898.0A CN108580093A (en) | 2018-07-03 | 2018-07-03 | A kind of rope rail high-altitude paint finishing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108580093A true CN108580093A (en) | 2018-09-28 |
Family
ID=63635543
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810716898.0A Pending CN108580093A (en) | 2018-07-03 | 2018-07-03 | A kind of rope rail high-altitude paint finishing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108580093A (en) |
Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3910287A1 (en) * | 1989-03-30 | 1990-10-04 | Juelich Wilhelm | Sprinkling apparatus for halls with a water-absorbing floor covering |
JPH07195003A (en) * | 1993-12-28 | 1995-08-01 | Satoo Ura | Sprinkler |
JPH08154880A (en) * | 1994-12-09 | 1996-06-18 | Kanematsu Eng Kk | Automatic cleaning device |
JPH09172889A (en) * | 1995-12-27 | 1997-07-08 | Hiroyuki Ura | Transferring device for travelling body in sprinkling facility and the like |
DE19741126A1 (en) * | 1997-09-15 | 1999-04-01 | Ingenieurbetrieb Kontech Gmbh | Method of coating the inside of cooling towers etc. |
WO1999065800A2 (en) * | 1998-06-18 | 1999-12-23 | Roman Eissfeller | Method and device for processing components |
CN2422058Y (en) * | 2000-05-19 | 2001-03-07 | 赵传祥 | Automatic sprayer |
CN2764496Y (en) * | 2004-12-17 | 2006-03-15 | 姜卓 | Apparatus for spraying paint on flagpole |
CN101066537A (en) * | 2007-04-06 | 2007-11-07 | 西北农林科技大学 | Motor driven sprayer |
CN201208581Y (en) * | 2008-06-25 | 2009-03-18 | 张平安 | 220KV high voltage live insulation cleaning spray gun with pulley support |
CN101743868A (en) * | 2008-12-03 | 2010-06-23 | 河南省农业科学院经济作物研究所 | Novel self-propelled sprinkling and irrigating device |
CN102091681A (en) * | 2009-12-15 | 2011-06-15 | 肖明科 | Long-cantilever sprayer |
CN202823715U (en) * | 2012-10-17 | 2013-03-27 | 山东联迪漆业有限公司 | Emulsion paint spray coating device |
CN206286112U (en) * | 2016-12-24 | 2017-06-30 | 青岛涂汇特机电科技有限公司 | A kind of flush coater lance driving device suitable for small sample |
CN107000247A (en) * | 2014-12-16 | 2017-08-01 | X·罗谢 | For preparing with the apparatus and method of the three-dimensional structure of pantostrat form formation |
CN208554713U (en) * | 2018-07-03 | 2019-03-01 | 甘肃第一建设集团有限责任公司 | A kind of rope rail high-altitude paint finishing |
-
2018
- 2018-07-03 CN CN201810716898.0A patent/CN108580093A/en active Pending
Patent Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3910287A1 (en) * | 1989-03-30 | 1990-10-04 | Juelich Wilhelm | Sprinkling apparatus for halls with a water-absorbing floor covering |
JPH07195003A (en) * | 1993-12-28 | 1995-08-01 | Satoo Ura | Sprinkler |
JPH08154880A (en) * | 1994-12-09 | 1996-06-18 | Kanematsu Eng Kk | Automatic cleaning device |
JPH09172889A (en) * | 1995-12-27 | 1997-07-08 | Hiroyuki Ura | Transferring device for travelling body in sprinkling facility and the like |
DE19741126A1 (en) * | 1997-09-15 | 1999-04-01 | Ingenieurbetrieb Kontech Gmbh | Method of coating the inside of cooling towers etc. |
WO1999065800A2 (en) * | 1998-06-18 | 1999-12-23 | Roman Eissfeller | Method and device for processing components |
CN2422058Y (en) * | 2000-05-19 | 2001-03-07 | 赵传祥 | Automatic sprayer |
CN2764496Y (en) * | 2004-12-17 | 2006-03-15 | 姜卓 | Apparatus for spraying paint on flagpole |
CN101066537A (en) * | 2007-04-06 | 2007-11-07 | 西北农林科技大学 | Motor driven sprayer |
CN201208581Y (en) * | 2008-06-25 | 2009-03-18 | 张平安 | 220KV high voltage live insulation cleaning spray gun with pulley support |
CN101743868A (en) * | 2008-12-03 | 2010-06-23 | 河南省农业科学院经济作物研究所 | Novel self-propelled sprinkling and irrigating device |
CN102091681A (en) * | 2009-12-15 | 2011-06-15 | 肖明科 | Long-cantilever sprayer |
CN202823715U (en) * | 2012-10-17 | 2013-03-27 | 山东联迪漆业有限公司 | Emulsion paint spray coating device |
CN107000247A (en) * | 2014-12-16 | 2017-08-01 | X·罗谢 | For preparing with the apparatus and method of the three-dimensional structure of pantostrat form formation |
CN206286112U (en) * | 2016-12-24 | 2017-06-30 | 青岛涂汇特机电科技有限公司 | A kind of flush coater lance driving device suitable for small sample |
CN208554713U (en) * | 2018-07-03 | 2019-03-01 | 甘肃第一建设集团有限责任公司 | A kind of rope rail high-altitude paint finishing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107700807A (en) | The intelligent spraying equipment and its spraying method of a kind of external wall wall | |
CN207277783U (en) | A kind of intelligent spraying equipment of external wall wall | |
CN109162431A (en) | A kind of high building wall spray robot | |
CN205637541U (en) | Balanced automatic hanging flower basket | |
CN208554713U (en) | A kind of rope rail high-altitude paint finishing | |
CN104477789A (en) | Multifunctional tower crane for building construction and manufacturing and construction methods thereof | |
CN105811308A (en) | Special belaying tool for power transmission line | |
CN204454337U (en) | A kind of building operation Multifunctional tower crane | |
CN105366567A (en) | Intelligent assisting platform for dismounting and mounting of GIS (Gas Insulated Substation) | |
CN204224128U (en) | A kind of safe tower crane | |
CN108580093A (en) | A kind of rope rail high-altitude paint finishing | |
CN204980940U (en) | Multifunctional tower crane | |
CN209703953U (en) | External wall apparatus of plastering | |
CN217432083U (en) | Spraying mechanism for inclined section of cable tower | |
CN203264089U (en) | Portable transformer anti-drop rod | |
CN207312995U (en) | One kind self-control bridge-collision-avoidance wall form hanging device | |
CN109488008A (en) | A kind of coupling type hanger job platform | |
CN104444873A (en) | High-efficiency safety tower crane and manufacturing method thereof | |
CN212883140U (en) | Walking type automatic bridge coating and spraying system | |
CN208500169U (en) | A kind of Multifunctional container haulage equipment | |
CN210239095U (en) | High-rise building outer wall construction is with safe type manned hanging flower basket | |
CN102080499A (en) | Automatically moving drilling device and construction method thereof | |
CN209006355U (en) | A kind of indirect cool tower automatic flushing device | |
CN208525688U (en) | A kind of steel I-beam spraying safety belt suspension protective device | |
CN209200516U (en) | Unmanned plane hang take flexible ladder arrangement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |