CN108564207A - Architectural engineering intelligence Authorize to Bid based on BIM manages system - Google Patents

Architectural engineering intelligence Authorize to Bid based on BIM manages system Download PDF

Info

Publication number
CN108564207A
CN108564207A CN201810276808.0A CN201810276808A CN108564207A CN 108564207 A CN108564207 A CN 108564207A CN 201810276808 A CN201810276808 A CN 201810276808A CN 108564207 A CN108564207 A CN 108564207A
Authority
CN
China
Prior art keywords
submodule
bid
module
information model
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810276808.0A
Other languages
Chinese (zh)
Other versions
CN108564207B (en
Inventor
江小燕
胡康
王明辉
欧阳文峰
闫碧琼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei University of Technology
Original Assignee
Hefei University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei University of Technology filed Critical Hefei University of Technology
Priority to CN201810276808.0A priority Critical patent/CN108564207B/en
Publication of CN108564207A publication Critical patent/CN108564207A/en
Application granted granted Critical
Publication of CN108564207B publication Critical patent/CN108564207B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to architectural engineering technical field of information management, specially a kind of architectural engineering intelligence Authorize to Bid based on BIM manages system, including model acquisition module, the optimization module that designs a model, collision detection analysis module, construction simulation optimization module, cost management module and bidding management module, model acquisition module is for obtaining project demands information model;The optimization module that designs a model is used to generate design information model according to project demands information model, searches similar engineering and optimizes;Collision detection analysis module is for carrying out crash analysis and correcting;Construction simulation optimization module is for carrying out simulation and optimizing to construction organization;Cost management module can include the Cost information model of bill of quantities according to the generation of construction information model;Bidding management module is for generating bid information model.The architectural engineering intelligence Authorize to Bid based on BIM of the present invention manages system, solves the problems, such as that data interaction existing for existing Bidding Management System is inconvenient, updates not in time.

Description

Architectural engineering intelligence Authorize to Bid based on BIM manages system
Technical field
The present invention relates to architectural engineering technical field of information management, in particular to a kind of architectural engineering based on BIM Intelligent Authorize to Bid manages system.
Background technology
Building Information Model (Building Information Model, BIM) is an intelligentized building 3D mould Type is capable of data, process and the resource of connecting building lifetime different phase, is the complete description to engineering object, can be built It builds each participant of project generally to use, helps project team to promote the efficiency of decision-making and correctness, therefore, it can be complete by construction project Each stage all information carry out the integrated application of electronization and management in life cycle, can effectively avoid " information island " and " letter Cease tomography " phenomenon.
Have related basic researches of some BIM in terms of bidding both at home and abroad at present, such as Li Xuejun is passed by analyzing Transfer bidding system operation flow and construction budget flow based on BIM, it is proposed that building enterprise's bidding based on BIM System software architecture;Wang Ping etc. has inquired into some the key applications of BIM in bid contrul and tendering process;Shi Yun etc. is analyzed The three big advantages etc. of BIM technology are utilized in bid.
But these current researchs only have studied some application processes and flow of BIM in terms of bidding, with biography Transfer Bidding Management System is similar, mainly to the bidding information interchange of enterprise and the research and development of workflow management, and in engineering Information etc. is not furtherd investigate then, traditional data transfer mode is used between tenderer and tenderer, tenderer must Quantities must be calculated according to the 2D drawings that tenderer provides, there are inefficiency, can not carry out in time data interaction, it is shared and The problems such as update, Project Cost is not calculated accurately in advance, and then influence bidding plans and the Authorize to Bid of tenderer.
Invention content
The technical problem to be solved in the present invention is to provide a kind of building work based on BIM in view of the drawbacks of the prior art Cheng Zhineng Authorize to Bid manages system, can improve the efficiency of bidding management and solve data existing for existing Bidding Management System The problem of interacting inconvenient, update not in time.
In order to solve the above-mentioned technical problem, this patent provides the following technical solutions:
Architectural engineering intelligence Authorize to Bid based on BIM manages system, including:
Model acquisition module, the model acquisition module are used to obtain project demands information according to the project alternative of tenderer Model;
Design a model optimization module, and the optimization module that designs a model includes conceptual design submodule, engineering matching submodule Block and scheme optimization submodule, the conceptual design submodule are used to generate design according to the project demands information model got Information model, engineering matched sub-block are used for according to project demands model and the similar engineering of design information Model Matching, institute Scheme optimization submodule is stated for being optimized to design information model according to the similar engineering that is matched to;
Collision detection analysis module, the collision detection analysis module include member impacts detection sub-module and amendment submodule Block, the member impacts detection sub-module be used for according to after optimization design information model carry out component collision detection analysis and Examining report is analyzed and generated to headroom, and the amendment submodule is for being modified design information model according to examining report;
Construction simulation optimization module, the construction simulation optimization module are used to be generated according to revised design information model Construction information model, the construction simulation optimization module are additionally operable to carry out construction simulation to construction information model and to construction information The construction organization of model optimizes;
Cost management module, the cost management module are used to according to the generation of construction information model include bill of quantities Cost information model;
Bidding management module, the bidding management module be used for according to construction information model, design information model and at This information model generates bid information model, and bidding management module includes quotation management submodule, the quotation pipe Reason submodule generates quotation as a result, carrying out Authorize to Bid for tenderer for analyzing bid information model.
In technical solution of the present invention, by model acquisition module, information mould is obtained using the project alternative that tenderer provides Type, which, which contains, throws information used in bidding process, by this model, establish bid person and winning bidder it Between information organic connections, for system modules work provide data source;
The multiple engineerings similar with current project engineering can be matched by engineering matched sub-block, it is similar according to these Engineering design a model, scheme optimization submodule is compared it with the design information model of tenderer optimizing, generates excellent Change scheme is designed the optimization of scheme for tenderer;
By member impacts detection sub-module, the collision detection of component can be carried out according to the design information model after optimization Analysis and headroom analysis etc., and corresponding examining report is generated, it corrects submodule and design information model is reasonably corrected, Position of collision in discovery scheme and amendment in advance, it is possible to reduce later stage scheme changes, and ensures that scheme is implemented;
By construction simulation optimization module by carrying out construction simulation to construction information model, work progress is made intuitively to open up Reveal and, where the risk that construction can be found out in advance.Then, construction risk is suitably converted, risk is recognized in enhancing Know.So as to improve the level of construction organization, lift technique mark competitiveness;
Bill of quantities can be quick and precisely worked out, bidder is made according to Cost information model by cost management module Quickly correlation engineering amount can be held, without spending a large amount of energy reconstruction engineering amount inventory.Meanwhile Ke Yigen It is adjusted with the detail of engineering according to the characteristics of itself, promotes the efficiency of bid preliminary preparation;Bidding management module is for throwing Mark side carries out relevant management operation of submitting a tender, such as bid documents generating, quotation, business statistics, quotation submodule pass through Bid information model is analyzed, information bank is formed and bidder is facilitated to carry out decision.
Compared with prior art, in technical solution of the present invention engineering design and management be all with BIM engineering information models Core, can realize accurate quantities calculation and information real-time update and correct, improve project cost control accuracy and Operability enables bidder quickly to realize the processes such as bill of quantities verification, construction simulation, is conducive to bidder to certainly Body situation makes rational positioning, and then makes correct decisions, while can be built with the critical engineering problem of research project The vertical engineering technology solution for meeting bidder's own level.In this way, the blindness submitted a tender can be avoided from the starting stage, do To shooting the arrow at the target, be conducive to bidder's selective bidding.Prepared offer by tender and rational construction organization, can be effective Target possibility during ground is promoted, and run smooth for subsequent engineering and facility is provided.
Further, the bidding management module further includes bidding documents management submodule, and the bidding documents management submodule is used for root Bidding documents is generated according to bid information model.
By bidding documents manage submodule can from bid information model obtain bid relevant information, as the construction period arrange, Then construction animation preview, the bill of materials, engineering bill etc. generate bidding documents according to these data informations according to preset format, Using the 3D stereoscopic effects of bid information model, the visual sense of bidding documents can be made stronger, promote project overall effect Show.The quality for improving bidding documents, shows the overall strength of bidder, to promote target possibility in bidder.
Further, the bidding management module further includes acceptance of the bid management submodule, contract management submodule, file administration Module, the acceptance of the bid management submodule is for target project in managing tenderer currently, and the contract management submodule is for throwing Mark side's management contract, the file administration submodule is for the relevant document file that manages and submit a tender.
Submodule, contract management submodule, file administration submodule are managed by acceptance of the bid to may be implemented to entirely submitting a tender The management and control of journey.
Further, quotation management submodule include commercial bid scoring submodule, it is technical bid scoring submodule, pre- Submodule and analysis report is commented to generate submodule, the quotation result includes quotation report, and the commercial bid is commented For molecular modules for scoring the commercial bid of tenderer, technical bid scores submodule for the technical bid progress to tenderer Scoring comments submodule to generate submodule to oneself carrying out pre-judging score, the analysis report for tenderer and be used for according to commercial affairs in advance Mark evaluation submodule, technical bid evaluation submodule and the pre- evaluation result generation quotation report for commenting submodule.By right The design scheme of tenderer carries out the evaluation of the various aspects such as commercial bid, technical bid, ultimately generates quotation report, is conducive to Tenderer refers to, and then enables tenderer to itself there is comprehensive understanding, finds oneself advantage and deficiency, helps to carry High tender probability.
The advantageous effect that the present invention generates:
1, in technical solution of the present invention engineering design and management all using BIM engineering information models as core, can realize Accurate quantities calculation and information real-time update and amendment solve the not side of data interaction existing for existing Bidding Management System Just the problem of, updating not in time.
2, by being compared optimizing to design scheme, generation prioritization scheme is designed the optimization of scheme for tenderer, Reduce and reduce difficulty and the time of tenderer's design optimization.
3, the present invention can enable bidder pass through position of collision and amendment of the collision detection in advance in discovery scheme, can To reduce the change of later stage scheme, ensure that scheme is implemented.
4, where the present invention can allow bidder pass through the risk that construction simulation finds out construction in advance, in order to submit a tender Side suitably converts construction risk, enhances the understanding to risk, so as to improve the level of construction organization, lift technique Mark competitiveness.
5, the present invention can be such that bidder is adjusted with the detail of engineering according to the characteristics of itself, and it is accurate to promote early period of submitting a tender The efficiency of standby work.
6, bidder can carry out relevant management operation of submitting a tender by bidding management, such as bid documents generating, quotation, industry Business statistics etc. can carry out Pre-Evaluation to the design scheme of tenderer from multiple angles, tenderer is made to be known from the excellent of one's own side's case Gesture and deficiency are conducive to improve win bit rate, improve the efficiency and reasonability of bidding management, make the more visualization of bid, visitor Sightization, it is ensured that the validity of bid realizes the trackability of bidding management information, and the archives storages such as bidding documents, contract are got up, Facilitate retrospect and query history project information.
7, the present invention changes traditional papery bid and electronic bidding mode, is transformed to information-based, intelligentized throwing Mark pattern.
Description of the drawings
Fig. 1 is that the present invention is based on the architectural engineering intelligence Authorize to Bid of BIM management systems to apply the logic diagram in example.
Specific implementation mode
Below by specific implementation mode, the present invention is described in further detail:
As shown in Figure 1, architectural engineering intelligence Authorize to Bid management system of the present embodiment based on BIM includes that model obtains mould Block, the optimization module that designs a model, collision detection analysis module, construction simulation optimization module, cost management module and pipe of submitting a tender Module is managed, wherein:
Model acquisition module, model acquisition module are used to obtain project demands information mould according to the project alternative of tenderer Type;
The optimization module that designs a model includes conceptual design submodule, engineering matched sub-block and scheme optimization submodule, side Case design submodule is used to generate design information model according to the project demands information model got, and engineering matched sub-block is used In matching engineering similar with design information model, scheme optimization submodule is used for according to the similar engineering being matched to design Information model optimizes, and scheme optimization submodule includes comparing optimizing submodule and prioritization scheme generation submodule, compares and seeks Excellent submodule is used to carry out optimizing comparison to similar engineering, finds out the design scheme of suitable current project scheme, prioritization scheme It generates submodule to be used to generate prioritization scheme to the design scheme of tenderer according to the design scheme found out, these prioritization schemes can To provide the Optimizing Suggestions of rationalization for owner, and then reduce later stage change;
Collision detection analysis module, collision detection analysis module include member impacts detection sub-module and correct submodule, Member impacts detection sub-module is used to carry out collision detection analysis and the headroom point of component according to the design information model after optimization Examining report is analysed and generated, corrects submodule for being modified to design information model according to examining report;
Construction simulation optimization module is used to carry out construction simulation according to construction information model and be applied to construction information model Work tissue optimizes, and construction simulation optimization module includes that arrangement and method for construction establishment submodule, construction simulation submodule and tissue are excellent Beggar's module, arrangement and method for construction work out submodule and are used to generate arrangement and method for construction according to optimization and revised design information model, apply Work simulation submodule can carry out construction simulation according to arrangement and method for construction, so that work progress is intuitively shown, can look in advance Go out where the risk of construction.Then, construction risk is suitably converted, enhances the understanding to risk, organization optimization submodule For according to the construction risk found out, being optimized to construction organization, the target that develops skill is horizontal;
Cost management module includes the Cost information model of bill of quantities according to the generation of construction information model;Pass through into This management module can quick and precisely work out bill of quantities according to Cost information model, allow bidder quickly to phase It closes quantities to be held, without spending a large amount of energy reconstruction engineering amount inventory.Meanwhile can according to the characteristics of itself and The detail of engineering is adjusted, and promotes the efficiency of bid preliminary preparation;
Bidding management module, bidding management module are used to be believed according to construction information model, design information model and cost It ceases model and generates bid information model, bidding management module includes quotation management submodule, bidding documents management submodule, acceptance of the bid Submodule, contract management submodule and file administration submodule are managed, quotation manages submodule and is used for bid information Model is analyzed, and generates quotation as a result, carrying out Authorize to Bid for tenderer, bidding documents manages submodule and is used for according to bid Information model generates bidding documents, and acceptance of the bid management submodule is such as checked project details, looked into for target project in managing tenderer currently See that project process, statistical correlation data etc., contract management submodule are used for tenderer's management contract, such as newly-built contract, contract are examined Batch, contract check, the operations such as change to the contract, file administration submodule is for the relevant document file that manages and submit a tender.It submits a tender and manages Reason module carries out relevant management operation of submitting a tender, such as bid documents generating, quotation, business statistics, quotation for tenderer Submodule forms information bank and bidder is facilitated to carry out decision by analyzing bid information model.
Quotation management submodule include commercial bid scoring submodule, technical bid scoring submodule, it is pre- comment submodule with And analysis report generate submodule, commercial bid scoring submodule be used for is generated from cost management module bill of quantities, design The information with the relevant single evaluation index of commercial bid is obtained in information model, arrangement and method for construction and bidding documents, such as total offer by tender divides Item engineering unit price, enterprise qualification, prestige, flow of fund statement etc., commercial bid scoring submodule are looked for according to engineering matched sub-block The history engineering database of the similar item arrived, by each single evaluation index information and corresponding information in similar terms bidding plans Average data is compared, and makes specific evaluation, such as it is excellent, good, in, can, difference, then according to preset standardization Algorithm is standardized all evaluation data, in the present embodiment, by the scoring obtained after standards of gradingization processing in 0- In 10 ranges;For technical bid scoring submodule for evaluating technical bid, evaluation method and commercial bid evaluation method are basic It is identical, the information with the relevant single evaluation index of technical bid is obtained from design information model, arrangement and method for construction and bidding documents, such as Construction machinery outfit, arrangement and method for construction, Planning of construction periods, quality assurance measure, Safety assurance measures, progress safeguard measure etc., then According to the history engineering database of similar item, by each single evaluation index information and corresponding information in similar terms bidding plans Average data is compared, and is evaluated, and is then standardized to data according still further to standardization algorithm, is obtained skill Art mark scores;It is pre- to comment submodule for the scoring requirement for tenderer according to the call for tender, oneself every Score index is carried out Pre assessment;Analysis report generates submodule and is used to evaluate submodule, technical bid evaluation submodule according to commercial bid and comments son in advance The evaluation result of module generates quotation report, and tenderer refers to.
In another embodiment, to further increase the safety of this system, conceptual design submodule includes security control Submodule, the security control submodule include scheme segmentation synthesis submodule, size change submodule, material change submodule And data extracting sub-module, data extracting sub-module are used to be joined according to cipher key-extraction dimensional parameters input by user and material Number, the size change submodule are used to carry out size change and reduction, the material to design information model according to dimensional parameters The unreal submodule of qualitative change is for being changed and being restored to the material of material in design information model according to material parameters, the scheme Segmentation synthesis submodule is split storage and reduction for design information model after carrying out size change and material change;With For design drawing, according to cipher key-extraction dimensional parameters input by user and material parameters, then size change submodule according to Dimensional parameters are adjusted each dimensional parameters such as length, width and height in design drawing, and material changes submodule then adjusted design figure Material in paper used in each part, such as reinforcing bar signal, final solution segmentation synthesize submodule by the design drawing after change Divide and is stored;When it is desired to be used, then it needs user to input key, submodule setting segmentation is synthesized by scheme segmentation Drawing reduction is counted, and the size and material of design drawing are restored by size change submodule and material change submodule, Passing through this security control submodule, it can be ensured that other people can not directly obtain the design scheme of tenderer by stealing file, It can prevent other people from obtaining complete scheme by segmentation, by size change and material change procedure, can be provided for other people False design scheme, so that it is guaranteed that other people can not learn the bidding plans of tenderer.
The above are merely the embodiment of the present invention, the common sense such as well known concrete structure and characteristic are not made excessively herein in scheme Description, all common of technical field that the present invention belongs to before one skilled in the art know the applying date or priority date Technological know-how can know the prior art all in the field, and with using routine experiment means before the date Ability, one skilled in the art can improve in conjunction with self-ability under the enlightenment that the application provides and implement we Case, some typical known features or known method should not become the barrier that one skilled in the art implement the application Hinder.It should be pointed out that for those skilled in the art, without departing from the structure of the invention, if can also make Dry modification and improvement, these should also be considered as protection scope of the present invention, these all do not interfere with the effect that the present invention is implemented and Patent practicability.The scope of protection required by this application should be based on the content of the claims, the specific reality in specification Apply the content that the records such as mode can be used for explaining claim.

Claims (4)

1. the architectural engineering intelligence Authorize to Bid based on BIM manages system, it is characterised in that:Including:
Model acquisition module, the model acquisition module are used to obtain project demands information mould according to the project alternative of tenderer Type;
Design a model optimization module, the optimization module that designs a model include conceptual design submodule, engineering matched sub-block and Scheme optimization submodule, the conceptual design submodule are used to generate design information according to the project demands information model got Model, engineering matched sub-block are used for according to project demands model and the similar engineering of design information Model Matching, the side Case optimization submodule is used to optimize design information model according to the similar engineering being matched to;
Collision detection analysis module, the collision detection analysis module include member impacts detection sub-module and correct submodule, The member impacts detection sub-module according to the collision detection of the design information model progress component after optimization for analyzing and only Examining report is analysed and generated to space division, and the amendment submodule is for being modified design information model according to examining report;
Construction simulation optimization module, the construction simulation optimization module are used to be generated according to revised design information model and construct Information model, the construction simulation optimization module are additionally operable to carry out construction simulation to construction information model and to construction information model Construction organization optimize;
Cost management module, the cost management module be used for according to construction information model generate include bill of quantities cost Information model;
Bidding management module, the bidding management module are used to be believed according to construction information model, design information model and cost It ceases model and generates bid information model, bidding management module includes quotation management submodule, quotation management Module generates quotation as a result, carrying out Authorize to Bid for tenderer for analyzing bid information model.
2. the architectural engineering intelligence Authorize to Bid according to claim 1 based on BIM manages system, it is characterised in that:Institute It further includes bidding documents management submodule to state bidding management module, and the bidding documents management submodule is used to be generated according to bid information model Bidding documents.
3. the architectural engineering intelligence Authorize to Bid according to claim 2 based on BIM manages system, it is characterised in that:Institute It further includes acceptance of the bid management submodule, contract management submodule, file administration submodule, the acceptance of the bid management to state bidding management module For submodule for target project in managing tenderer currently, the contract management submodule is used for tenderer's management contract, described File administration submodule is for the relevant document file that manages and submit a tender.
4. the architectural engineering intelligence Authorize to Bid according to claim 1 based on BIM manages system, it is characterised in that:Institute Quotation management submodule is stated to include commercial bid scoring submodule, technical bid scoring submodule, comment submodule and analysis in advance Report generation submodule, the quotation result include quotation report, and the commercial bid scoring submodule is used for throwing The commercial bid of mark side scores, and technical bid scoring submodule comments submodule in advance for scoring the technical bid of tenderer It generates submodule to oneself carrying out pre-judging score, the analysis report for tenderer and is used to evaluate submodule, skill according to commercial bid Art mark evaluates submodule and the pre- evaluation result generation quotation report for commenting submodule.
CN201810276808.0A 2018-03-30 2018-03-30 BIM-based construction engineering intelligent bidding decision management system Expired - Fee Related CN108564207B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810276808.0A CN108564207B (en) 2018-03-30 2018-03-30 BIM-based construction engineering intelligent bidding decision management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810276808.0A CN108564207B (en) 2018-03-30 2018-03-30 BIM-based construction engineering intelligent bidding decision management system

Publications (2)

Publication Number Publication Date
CN108564207A true CN108564207A (en) 2018-09-21
CN108564207B CN108564207B (en) 2021-05-18

Family

ID=63533571

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810276808.0A Expired - Fee Related CN108564207B (en) 2018-03-30 2018-03-30 BIM-based construction engineering intelligent bidding decision management system

Country Status (1)

Country Link
CN (1) CN108564207B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109271739A (en) * 2018-10-20 2019-01-25 中信建筑设计研究总院有限公司 A set of auxiliary bid and purchase system BIM intelligence system
CN109800445A (en) * 2018-11-22 2019-05-24 深圳市建设工程交易服务中心 The processing method and system of the visualization auxiliary assessment of bids are realized based on BIM technology
CN110096814A (en) * 2019-05-05 2019-08-06 广西路桥工程集团有限公司 A kind of digitlization bridge construction system based on BIM model
CN110188997A (en) * 2019-05-13 2019-08-30 赣州和永软件开发有限责任公司 A kind of construction quality cruising resource content evaluation method and its system
CN110334924A (en) * 2019-06-21 2019-10-15 中交二公局第三工程有限公司 CAD, construction integrated management system and method based on BIM
CN111126691A (en) * 2019-12-20 2020-05-08 万翼科技有限公司 Project management method and related product
CN113450072A (en) * 2021-06-29 2021-09-28 上海至贤工程管理咨询有限公司 Building engineering information query system based on Internet of things
CN113743695A (en) * 2020-05-29 2021-12-03 中国石油化工股份有限公司 International engineering project bid quotation risk management method based on big data
CN114548943A (en) * 2022-03-02 2022-05-27 南京长江都市建筑设计股份有限公司 Intelligent building design system and design method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103136626A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for engineering project
CN103295104A (en) * 2013-06-13 2013-09-11 深圳市加斯特工程咨询有限公司 Quota design management method and project investment service platform for cost accounting
CN103500371A (en) * 2013-08-08 2014-01-08 机械工业第六设计研究院有限公司 Change control method based on BIM
CN103577953A (en) * 2013-07-26 2014-02-12 江苏辉源供应链管理有限公司 Method for intelligently matching relationship of logistics service party and resource party
CN105160271A (en) * 2015-08-28 2015-12-16 英威康科技股份有限公司 Restorable file protection device control method and restorable file protection method
CN106022587A (en) * 2016-05-12 2016-10-12 广州络维建筑信息技术咨询有限公司 BIM project progress and cost management system based on earned value theory
CN106202723A (en) * 2016-07-10 2016-12-07 北京工业大学 A kind of BIM subway work method
CN106612172A (en) * 2016-07-15 2017-05-03 四川用联信息技术有限公司 Data change recovery algorithm capable of restoring data authenticity in cloud storage

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103136626A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for engineering project
CN103295104A (en) * 2013-06-13 2013-09-11 深圳市加斯特工程咨询有限公司 Quota design management method and project investment service platform for cost accounting
CN103577953A (en) * 2013-07-26 2014-02-12 江苏辉源供应链管理有限公司 Method for intelligently matching relationship of logistics service party and resource party
CN103500371A (en) * 2013-08-08 2014-01-08 机械工业第六设计研究院有限公司 Change control method based on BIM
CN105160271A (en) * 2015-08-28 2015-12-16 英威康科技股份有限公司 Restorable file protection device control method and restorable file protection method
CN106022587A (en) * 2016-05-12 2016-10-12 广州络维建筑信息技术咨询有限公司 BIM project progress and cost management system based on earned value theory
CN106202723A (en) * 2016-07-10 2016-12-07 北京工业大学 A kind of BIM subway work method
CN106612172A (en) * 2016-07-15 2017-05-03 四川用联信息技术有限公司 Data change recovery algorithm capable of restoring data authenticity in cloud storage

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109271739A (en) * 2018-10-20 2019-01-25 中信建筑设计研究总院有限公司 A set of auxiliary bid and purchase system BIM intelligence system
CN109800445A (en) * 2018-11-22 2019-05-24 深圳市建设工程交易服务中心 The processing method and system of the visualization auxiliary assessment of bids are realized based on BIM technology
CN110096814A (en) * 2019-05-05 2019-08-06 广西路桥工程集团有限公司 A kind of digitlization bridge construction system based on BIM model
CN110096814B (en) * 2019-05-05 2022-08-16 广西路桥工程集团有限公司 Digital bridge construction system based on BIM model
CN110188997A (en) * 2019-05-13 2019-08-30 赣州和永软件开发有限责任公司 A kind of construction quality cruising resource content evaluation method and its system
CN110334924A (en) * 2019-06-21 2019-10-15 中交二公局第三工程有限公司 CAD, construction integrated management system and method based on BIM
CN110334924B (en) * 2019-06-21 2023-04-07 中交二公局第三工程有限公司 BIM-based computer aided design and construction integrated management system and method
CN111126691A (en) * 2019-12-20 2020-05-08 万翼科技有限公司 Project management method and related product
CN113743695A (en) * 2020-05-29 2021-12-03 中国石油化工股份有限公司 International engineering project bid quotation risk management method based on big data
CN113450072A (en) * 2021-06-29 2021-09-28 上海至贤工程管理咨询有限公司 Building engineering information query system based on Internet of things
CN114548943A (en) * 2022-03-02 2022-05-27 南京长江都市建筑设计股份有限公司 Intelligent building design system and design method

Also Published As

Publication number Publication date
CN108564207B (en) 2021-05-18

Similar Documents

Publication Publication Date Title
CN108564207A (en) Architectural engineering intelligence Authorize to Bid based on BIM manages system
CN104573106B (en) A kind of intelligent measures and procedures for the examination and approval of the urban construction of case-based reasioning technology
CN100583098C (en) Data excavation system and method
CN106897568A (en) The treating method and apparatus of case history structuring
CN106570624A (en) Economy management system
CN105844422A (en) Business flow execution method and device
CN103226743A (en) TRL-based technical maturity assessment information processing method for aeronautic equipment
CN112634056A (en) Method, equipment and storage medium for rapidly calculating and updating enterprise share right structure
LU103216B1 (en) Prefabricated building design and actual construction match evaluation method based on bim parameters
CN109165337A (en) A kind of method and system of knowledge based map construction bidding field association analysis
CN109858081A (en) Vehicle product data design collaboration method based on Teamcenter
CN102496083A (en) Method for making manuscripts of credit rating reports
CN103942739A (en) Method for construction of construction project risk knowledge base
Yu et al. [Retracted] Construction and Evaluation of Construction Safety Management System Based on BIM and Internet of Things
EP2637130A1 (en) Collaborative system and method to mine inventions
CN110060157A (en) Credit assessment and system
Li et al. Research and application of computer aided design system for product innovation
Romero Generative adversarial network for stock market price prediction
CN113177396B (en) Report generation method and device, computer equipment and storage medium
CN113052557A (en) Three-dimensional model generation and analysis system and method for approval
CN101882173A (en) Cited topological object coding/naming method for online collaborative design
CN106796432A (en) It is determined that the method and system of the sampling plan for checking composite component
Yousif et al. A framework for integrating green highway performance data with the carbon footprint calculator in Malaysia
CN116915404B (en) Engineering data cross-chain collaboration method and system based on block chain technology
Greulich Near-optimal location of two landings on flat, uniform terrain

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210518