CN108562804A - Intelligent grid terminal real-time detection method and device - Google Patents

Intelligent grid terminal real-time detection method and device Download PDF

Info

Publication number
CN108562804A
CN108562804A CN201711472975.4A CN201711472975A CN108562804A CN 108562804 A CN108562804 A CN 108562804A CN 201711472975 A CN201711472975 A CN 201711472975A CN 108562804 A CN108562804 A CN 108562804A
Authority
CN
China
Prior art keywords
electric network
network terminal
monitoring system
real
time monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711472975.4A
Other languages
Chinese (zh)
Inventor
蔡彦童
张智亮
李芹
何俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Zhongyuan Electronic Information Co Ltd
Original Assignee
Wuhan Zhongyuan Electronic Information Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Zhongyuan Electronic Information Co Ltd filed Critical Wuhan Zhongyuan Electronic Information Co Ltd
Priority to CN201711472975.4A priority Critical patent/CN108562804A/en
Publication of CN108562804A publication Critical patent/CN108562804A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The present invention provides intelligent grid terminal real-time detection method and device, it is related to calibrating detection technique field, wherein the intelligent grid terminal real-time detection method includes:First, current function command frame is handed down to tested electric network terminal by electric network terminal real-time monitoring system, wherein, the number of tested electric network terminal is multiple, secondly, electric network terminal real-time monitoring system is analyzed after receiving the data that tested electric network terminal replys function command frame, it is whether normal to detect the corresponding function of tested electric network terminal, later, when the result of analysis is qualified, next function command frame is handed down to tested electric network terminal by electric network terminal real-time monitoring system, it is whether normal to detect other corresponding functions of tested electric network terminal, pass through above-mentioned processing procedure, so that tested electric network terminal realizes multi-protocols multiple terminals compatibility, False Rate is low, it is efficient, safe detection, and, detection process also adapts to communication, it is convenient and efficient.

Description

Intelligent grid terminal real-time detection method and device
Technical field
The present invention relates to calibration detection technique field more particularly to intelligent grid terminal real-time detection methods and device.
Background technology
As the technologies such as communication, computer, automation obtain application extensively and profoundly in power grid, and with conventional electric power skill Art organically blends, and electric network terminal product has deeply covered all trades and professions, the residential area of electricity consumption, the production of common electric network terminal Product include the various special transformer acquisition terminals (I types, II types, type III) of national grid, centralized automatic meter-reading terminal data collector (I types, II types), load management terminal, the Distribution transformer of acquisition terminal (I types, II types) and south electric network.
Along with national grid《DLT698.45 acquiring electric energy informations and the data exchange of management system-object-oriented are assisted View》Release, new agreement electric network terminal demand will constantly increase.And it is original《1376.1-2013 main website is communicated with acquisition terminal Agreement》Electric network terminal still and deposit, in this way, traditional detection mode exposes many limitations, cannot not only be compatible with simultaneously Two kinds of agreements (DLT698.45 and 1376.1-2013), and the terminal type used is single;Or can only accomplish that acquisition differentiates, But it cannot accomplish statistical analysis and be provided simultaneously with parameter setting and calibration function;The acquisition of each function of electric network terminal product or Parameter setting is required for gradually carrying out and confirming the consumption a large amount of time;It cannot be to testing staff, Check-Out Time, tested power grid The version of terminal, each communication module version are traced in real time;Since the difference of human factor may will produce erroneous judgement, efficiency Lowly.
Invention content
In view of this, the embodiment of the present invention has been designed to provide intelligent grid terminal real-time detection method and device, Electric network terminal is tested from trend by electric network terminal real-time monitoring system and carries out Function detection one by one, improve whole to tested power grid The detection efficiency at end.
In a first aspect, an embodiment of the present invention provides intelligent grid terminal real-time detection methods, including:
Current function command frame is handed down to tested electric network terminal by electric network terminal real-time monitoring system, wherein tested electricity The number of network termination is multiple;
Electric network terminal real-time monitoring system divides after receiving the data that tested electric network terminal replys function command frame Analysis;
When the result of analysis is qualified, next function command frame is handed down to tested by electric network terminal real-time monitoring system Electric network terminal.
With reference to first aspect, an embodiment of the present invention provides the first possible embodiments of first aspect, wherein work( The number of energy command frame is limited multiple, and, each function command frame is used for detecting the different function of tested electric network terminal.
With reference to first aspect, an embodiment of the present invention provides second of possible embodiments of first aspect, wherein electricity Before current function command frame is handed down to tested electric network terminal by network termination real-time monitoring system, further include:
Electric network terminal real-time monitoring system is configured according to the preset standard of user terminal;
Electric network terminal real-time monitoring system by when serial ports, infrared data interface or 485 interface with tested electric network terminal Connection.
The possible embodiment of with reference to first aspect the first, an embodiment of the present invention provides the third of first aspect Possible embodiment, wherein method further includes:
After function command frame issues, electric network terminal real-time monitoring system recovers tested electric network terminal Factory is arranged;
The only code of tested electric network terminal is disposed as 0 by electric network terminal real-time monitoring system;
Electric network terminal real-time monitoring system carries out standard parameter setting to tested electric network terminal;
Whether electric network terminal real-time monitoring system testing standard parameter is arranged success;
When test result is successfully, electric network terminal real-time monitoring system adds the quantity of qualified tested electric network terminal One;
When test result is unsuccessful, electric network terminal real-time monitoring system will carry out standard to tested electric network terminal again Parameter setting.
The third possible embodiment with reference to first aspect, an embodiment of the present invention provides the 4th kind of first aspect Possible embodiment, wherein method further includes:
It is successfully to be tested detection time information, the end of electric network terminal that electric network terminal real-time monitoring system, which extracts test result, Hold version information and communication module version information;
Electric network terminal real-time monitoring system by detection time information, terminal versions information and communication module version information on Pass to production management end.
The 4th kind of possible embodiment with reference to first aspect, an embodiment of the present invention provides the 5th kind of first aspect Possible embodiment, wherein method further includes:
When the result of analysis is unqualified or when test result is unsuccessful, electric network terminal real-time monitoring system will refer to Show that lamp is lighted;
Electric network terminal real-time monitoring system sends out repair prompting message to production management end.
Second aspect, an embodiment of the present invention provides intelligent grid terminal real-time detection apparatus, including:
Command frame issues module, and current function command frame is handed down to tested electricity for electric network terminal real-time monitoring system Network termination, wherein the number of tested electric network terminal is multiple;
Analysis module receives what tested electric network terminal replied function command frame for electric network terminal real-time monitoring system It is analyzed after data;
Command frame issues module again, for when the result of analysis is qualified, electric network terminal real-time monitoring system will under One function command frame is handed down to tested electric network terminal.
In conjunction with second aspect, an embodiment of the present invention provides the first possible embodiments of second aspect, wherein also Including:
Configuration module is configured for electric network terminal real-time monitoring system according to the preset standard of user terminal;
Link block, for electric network terminal real-time monitoring system by when serial ports, infrared data interface or 485 interface with Tested electric network terminal connection.
The third aspect, the embodiment of the present invention also provide a kind of terminal, including memory and processor, and memory is for depositing Storage supports processor to execute the intelligent grid terminal real-time detection method that above-mentioned aspect provides, and processor is configurable for holding The program stored in line storage.
Fourth aspect, the embodiment of the present invention also provide a kind of computer readable storage medium, computer readable storage medium On be stored with computer program, when computer is run by processor execute any of the above-described method the step of.
Intelligent grid terminal real-time detection method and device provided in an embodiment of the present invention, wherein the intelligent grid terminal Real-time detection method includes:First, current function command frame is handed down to tested power grid end by electric network terminal real-time monitoring system End, wherein the number of tested electric network terminal is multiple, and secondly, electric network terminal real-time monitoring system receives tested electric network terminal It is analyzed after the data replied function command frame, needs exist for illustrating, the i.e. tested power grid of data of reply is whole End is running the data returned after corresponding function after receiving function command frame, later, when the result of analysis is qualified, electricity Next function command frame is handed down to tested electric network terminal by network termination real-time monitoring system, continues to carry out tested electric network terminal The detection of next function, by above-mentioned processing procedure, electric network terminal real-time monitoring system is realized to being tested electric network terminal work( The automatic of energy is tested one by one, avoids the complicated processes of different function point different step completion, while realizing automatic detection Detection efficiency is substantially increased, also, meets the detection for being tested electric network terminal to different function, accomplishes to cover all electricity as possible The institute of network termination is functional, ensure that the detection of multiple functions of the tested electric network terminal in the case where meeting compatible various protocols.
Other features and advantages of the present invention will illustrate in the following description, also, partly become from specification It obtains it is clear that understand through the implementation of the invention.The purpose of the present invention and other advantages are in specification, claims And specifically noted structure is realized and is obtained in attached drawing.
To enable the above objects, features and advantages of the present invention to be clearer and more comprehensible, preferred embodiment cited below particularly, and coordinate Appended attached drawing, is described in detail below.
Description of the drawings
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art Embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, in being described below Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor It puts, other drawings may also be obtained based on these drawings.
Fig. 1 shows the first pass figure for the intelligent grid terminal real-time detection method that the embodiment of the present invention is provided;
Fig. 2 shows the second flow charts for the intelligent grid terminal real-time detection method that the embodiment of the present invention is provided;
Fig. 3 shows the structural framing figure for the intelligent grid terminal real-time detection apparatus that the embodiment of the present invention is provided;
Fig. 4 shows the structure connection figure for the intelligent grid terminal real-time detection apparatus that the embodiment of the present invention is provided.
Icon:110- command frames issue module;111- analysis modules;112- command frames issue module again;100- is configured Module;101- link blocks.
Specific implementation mode
Below in conjunction with attached drawing in the embodiment of the present invention, technical solution in the embodiment of the present invention carries out clear, complete Ground describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Usually exist The component of the embodiment of the present invention described and illustrated in attached drawing can be arranged and be designed with a variety of different configurations herein.Cause This, the detailed description of the embodiment of the present invention to providing in the accompanying drawings is not intended to limit claimed invention below Range, but it is merely representative of the selected embodiment of the present invention.Based on the embodiment of the present invention, those skilled in the art are not doing The every other embodiment obtained under the premise of going out creative work, shall fall within the protection scope of the present invention.
Currently, traditional detection mode cannot be compatible with two kinds simultaneously during being detected to tested electric network terminal Agreement, also, can only accomplish that acquisition differentiates, it cannot accomplish statistical analysis and be provided simultaneously with parameter setting and calibration function.In this way, The acquisition of each function of tested electric network terminal or parameter setting are required for gradually carrying out and need to consume a large amount of time, Version, each communication module version of Check-Out Time, tested electric network terminal can not be traced in real time simultaneously, due to it is artificial because The difference of element may will produce erroneous judgement, and efficiency is also low.
Based on this, an embodiment of the present invention provides intelligent grid terminal real-time detection method and devices, below by implementation Example is described.
Embodiment 1
Referring to Fig. 1 and Fig. 2, the intelligent grid terminal real-time detection method that the present embodiment proposes specifically includes following steps:
Step S101:Current function command frame is handed down to tested electric network terminal by electric network terminal real-time monitoring system, this In need to illustrate, in this application, the number for being tested electric network terminal is multiple, is tested electric network terminal and electric network terminal Various protocols can be compatible between real-time monitoring system, i.e., compatible power grid (national grid and south electric network) various protocols, including National grid is newest《The data exchange agreement of DLT698.45 acquiring electric energy informations and management system-object-oriented》、 《The data exchange agreement of DLT698.45 acquiring electric energy informations and management system-object-oriented》With《The limited duty of CHINA SOUTHERN POWER Ren companies metering automation terminal uplink communication protocol》.In addition, in implementation process, tested electric network terminal includes to national grid Special transformer acquisition terminal (I types, II types, type III), centralized automatic meter-reading terminal data collector (I types, II types), acquisition terminal (I types, II types) and south electric network load management terminal, Distribution transformer real-time detection.In the present embodiment, function command The number of frame is limited multiple, also, each function command frame is used for detecting the different function of tested electric network terminal.
Step S102:Electric network terminal real-time monitoring system receives the data that tested electric network terminal replys function command frame After analyzed, with judge be tested electric network terminal corresponding function it is whether qualified.
Step S103:When the result of analysis is qualification, i.e., the corresponding function of tested electric network terminal is qualified, electric network terminal Real-time monitoring system continues next function command frame being handed down to tested electric network terminal to be clicked again without user terminal Deng operation, and then facilitates user terminal and used.
Above-mentioned each step is described in detail below, step S101 electric network terminals real-time monitoring system will be current Function command frame is handed down to before tested electric network terminal, further includes:
Step S001:Electric network terminal real-time monitoring system is configured according to the preset standard of user terminal, due to quilt Survey between electric network terminal and electric network terminal real-time monitoring system can compatible various protocols, the use ginseng under each different agreement Number is different from, that is, need to log in after electric network terminal real-time monitoring system first according to standard and user terminal requirement to system configuration into Row is filled in and is chosen, in general, the parameter used in configuration is that user terminal is preset, and is pre-entered into electric network terminal and supervises in real time Examining system, it is convenient and efficient so that user terminal is selected.
Step S002:Electric network terminal real-time monitoring system passes through when serial ports, infrared data interface or 485 interface and tested Electric network terminal connects.Communication mode between electric network terminal real-time monitoring system and tested electric network terminal need first rely on hardware into Row connection needs to use serial ports, infrared data interface or 485 interfaces by electric network terminal real-time monitoring system and tested electricity in advance Network termination is attached.
In addition, intelligent grid terminal real-time detection method further includes:
(1) after function command frame issues, i.e., to be tested electric network terminal all functional tests all after the completion of, electricity Network termination real-time monitoring system carries out factory reset to tested electric network terminal, to facilitate it in implementation process into enforcement With.
(2) the only code of tested electric network terminal is disposed as 0 by electric network terminal real-time monitoring system, to eliminate test phase one The influence of a little signalings and reply.
(3) electric network terminal real-time monitoring system carries out standard parameter setting to tested electric network terminal, needs exist for Bright, the purpose of standard parameter setting is that have according to certain agreement of user terminal in order to which some is tested electric network terminal The configuration of body, in this way, user terminal no longer needs to carry out manual configuration to tested electric network terminal, it is time saving and energy saving.
(4) whether electric network terminal real-time monitoring system testing standard parameter is arranged success, can by the setting of the step Further ensure that be tested electric network terminal has set standard parameter before normal use, so as to directly be connect with power grid It is logical.
(5) when test result is successfully, electric network terminal real-time monitoring system is by the quantity of qualified tested electric network terminal Add one, also, electric network terminal real-time monitoring system can also record tested electric network terminal qualified after tested one by one, so as to avoid The artificial process investigate and record one by one, it is convenient and efficient.
(6) when test result is unsuccessful, electric network terminal real-time monitoring system will again carry out tested electric network terminal Standard parameter is arranged.During the test, tested electric network terminal cannot normally be arranged to the reason of standard parameter, on the one hand be Test process goes wrong, and in this case, electric network terminal real-time monitoring system will be again to being tested electric network terminal into rower Quasi- parameter setting is placed obstacles to avoid standard parameter caused by manual operation etc.;On the other hand it is the hardware setting of itself Problem, in this case, electric network terminal real-time monitoring system can also carry out standard parameter to tested electric network terminal again and set It sets, is determined as hardware problem when unsuccessful again.
In addition, intelligent grid terminal real-time detection method further includes:
(1) electric network terminal real-time monitoring system extraction test result is the detection time letter of successfully tested electric network terminal Breath, terminal versions information and communication module version information can also record testing staff's information etc. in some implementation processes.
(2) electric network terminal real-time monitoring system is by detection time information, terminal versions information and communication module version information Upload to production management end.Above-mentioned detection time information, terminal versions information and communication module version information are recorded Production management end can realize the real-time monitoring to detection information and later stage retrospect.
In addition, intelligent grid terminal real-time detection method further includes:
(1) when the result of analysis is unqualified or when test result is unsuccessful, electric network terminal real-time monitoring system Indicator light is lighted, i.e., when the result of analysis is unqualified, i.e., when the function of tested electric network terminal is abnormal, electric network terminal is real When monitoring system indicator light (for example, red light or orange lamp etc.) is lighted, by the display alarm related personnel of indicator light and When repair;When test result is unsuccessful, i.e., when the standard parameter setting of tested electric network terminal is unsuccessful, electric network terminal Real-time monitoring system lights indicator light (for example, red light or orange lamp etc.), passes through the display alarm related personnel of indicator light It repairs in time.
(2) electric network terminal real-time monitoring system sends out repair prompting message to production management end, to inform relevant work Personnel's (being usually that distance is tested the nearest staff of electric network terminal) repair in time, convenient and efficient.
An application example is named to be described in detail, for example, to state's net new standard《DLT698.45 energy informations are adopted The data exchange agreement of collection and management system-object-oriented》Tested electric network terminal parameter setting in need setting go out factory owner IP And spare IP, the specific implementation process is as follows:
Sending and receiving for the data that tested electric network terminal is carried out by serial ports, then, first, is supervised in real time in electric network terminal Spcomm serial ports controls are imported in examining system, are handled with the transmission and reception that carry out data.In order to easy to operate, in electric network terminal Real-time monitoring system adds a TBitBtn button control again, and it is to click this button to achieve function, automatically to being tested power grid Terminal is tested, and is handled in the OnClick events of this control;A timer TTimer control is added, to not having Correct data is received to carry out retransmitting judgement processing.
Here it is that it is facilitated to be logged in be tested the purpose that main IP and spare IP is arranged in electric network terminal under illustrating first, The process of setting master, standby IP are as follows:
It is sent to tested electric network terminal:68 2F 00 43 45 AA AA AA AA AA AA 10 BF 70 06 01 00 45 00 03 00 01 02 02 02 09 04 0A 9E F3 D6 12 24 06 02 02 09 04 00 00 00 00 12 00 00 00 80 6B 16
Receive the reply for being tested electric network terminal:68 19 00 C3 05 56 11 58 26 00 00 10EB 63 86 01 00 45 00 03 00 00 00 00 6E 4D 16
Later, inquiry is needed to lead, whether standby IP is arranged success, and detailed process is as follows:
It is sent to tested electric network terminal:68 17 00 43 45 56 11 58 26 00 00 10 10 8B 05 01 00 45 00 03 00 00 DE 63 16
Receive the reply for being tested electric network terminal:68 26 00 C3 05 56 11 58 26 00 00 10 68 EC 85 01 00 45 00 03 00 01 01 01 02 02 09 04 0A 9E F3 D6,12 24 06 00 00 E0 21 16, i.e., Show to lead if receiving the reply, standby IP is arranged successfully.
Later, function command frame issues similar with the process of code is received with signaling during reception reply, still, signaling and receipts The particular content of code needs different according to the type of different function command frame.It is as follows:
1 compiling initialization Spcomm serial ports controls.
2 foundations《The data exchange agreement of DLT698.45 acquiring electric energy informations and management system-object-oriented》Middle data mark It is that transmission frame is carried out analyzing processing by 4,500 0300 remote communication module protocol contents to know, and judges the IP to be sent (10.158.243.214:9222) content occupy byte and send form (using Bin coding or BCD coding), then into Row compiling sends compiled content by serial ports control pComm.WriteCommData.
3 after serial ports receives terminal returned data then in Spcomm serial ports controls pComm.ReceiveData into line number It is judged that processing, basis for estimation is all then according to state's net new standard《DLT698.45 acquiring electric energy informations with management system-towards The data exchange agreement of object》Whether the DARType after received Data Identification 4,500 0300 and Data Identification is confirmation It identifies (00), the two condition all meets, and prompts to return to confirmation, then carries out the transmission and reception of subsequent frame;Inquire-receive frame is sentenced It is disconnected:Received Data Identification 4,500 0300 and foundation《DLT698.45 acquiring electric energy informations and management system-object-oriented Data exchange agreement》The parsing of 4,500 0300 property content of middle Data Identification, correct coding form occupy byte specified Whether several contents is that the main IP contents that are arranged before are consistent, as equal, be determined as qualification, carry out the transmission of subsequent frame and connect It receives;Judge that result fails to meet condition in two kinds of situations as above, then the timer control in triggering carries out retransmission process judgement, surpasses Crossing sending times also does not have qualification to be then determined as that communication failure, terminal stop detection.
It is the setting and inquiry of individual feature as described above, can be owned according to terminal in electric network terminal real-time monitoring system Function be detected successively, after all function judgements are all qualified, then qualification record is resident locally Access data In library, record is either automatically or manually uploaded on production management end, is monitored and follow-up retrospect convenient for real-time.
In conclusion intelligent grid terminal real-time detection method provided in this embodiment includes:First, electric network terminal is real-time Current function command frame is handed down to tested electric network terminal by monitoring system, and in this application, the number of tested electric network terminal is Multiple, secondly, electric network terminal real-time monitoring system carries out after receiving the data that tested electric network terminal replys function command frame Analysis, to judge whether the function of currently testing works well, later, when the result of analysis is qualified, electric network terminal is real-time Next function command frame is handed down to tested electric network terminal by monitoring system, to carry out the next work(of tested electric network terminal automatically The test of energy, by above-mentioned processing procedure, is realized to all kinds of until the function until being tested electric network terminal has all been tested Performance test of the electric network terminal under different agreement, test process is simple, and substantially increases detection efficiency.
Embodiment 3
Referring to Fig. 3 and Fig. 4, present embodiments providing intelligent grid terminal real-time detection apparatus includes:Command frame issues mould Current function command frame is handed down to tested electric network terminal by block 110 for electric network terminal real-time monitoring system, wherein tested The number of electric network terminal is multiple, analysis module 111, and tested electric network terminal pair is received for electric network terminal real-time monitoring system It is analyzed after the data that function command frame is replied, command frame issues module 112 again, for being qualification when the result of analysis When, next function command frame is handed down to tested electric network terminal by electric network terminal real-time monitoring system.
In addition, intelligent grid terminal real-time detection apparatus further includes:Configuration module 100 monitors in real time for electric network terminal System is configured according to the preset standard of user terminal, and link block 101 passes through for electric network terminal real-time monitoring system It is connect with tested electric network terminal when serial ports, infrared data interface or 485 interface.
Intelligent grid terminal real-time detection apparatus provided in an embodiment of the present invention, the intelligent grid provided with above-described embodiment Terminal real-time detection method technical characteristic having the same reaches identical technology so can also solve identical technical problem Effect.
The embodiment of the present invention additionally provides a kind of terminal, including memory and processor, and memory is supported for storing Processor executes above-described embodiment method, and processor is configurable for executing the program stored in memory.
The embodiment of the present invention also provides a kind of computer readable storage medium, and meter is stored on computer readable storage medium Calculation machine program, when computer is run by processor the step of the method for execution any of the above-described.
It should be noted that each embodiment in this specification is described in a progressive manner, each embodiment weight Point explanation is all difference from other examples, and the same or similar parts between the embodiments can be referred to each other. The technique effect of the intelligent grid terminal real-time detection method and device that the embodiment of the present invention is provided, realization principle and generation Identical with preceding method embodiment, to briefly describe, device embodiment part does not refer to place, can refer to preceding method embodiment Middle corresponding contents.
In several embodiments provided herein, it should be understood that disclosed device and method can also pass through Other modes are realized.The apparatus embodiments described above are merely exemplary, for example, the flow chart in attached drawing and block diagram Show device, method and the architectural framework in the cards of computer product, the function of multiple embodiments according to the present invention And operation.In this regard, each box in flowchart or block diagram can represent a module, section or a part for code, institute The part for stating module, section or code includes one or more executable instructions for implementing the specified logical function.Also it answers When note that at some as in the realization method replaced, the function of being marked in box can also be to be different from being marked in attached drawing The sequence of note occurs.For example, two continuous boxes can essentially be basically executed in parallel, they sometimes can also be by opposite Sequence execute, this is depended on the functions involved.It is also noted that each box in block diagram and or flow chart and The combination of box in block diagram and or flow chart can use the dedicated hardware based system of function or action as defined in executing It unites to realize, or can realize using a combination of dedicated hardware and computer instructions.
In addition, each function module or unit in each embodiment of the present invention can integrate and to form an independence Part, can also be modules individualism, can also two or more modules be integrated to form an independent portion Point.
It, can be with if the function is realized and when sold or used as an independent product in the form of software function module It is stored in a computer read/write memory medium.Based on this understanding, technical scheme of the present invention is substantially in other words The part of the part that contributes to existing technology or the technical solution can be expressed in the form of software products, the meter Calculation machine software product is stored in a storage medium, including some instructions are used so that a computer equipment (can be People's computer, server or network equipment etc.) it performs all or part of the steps of the method described in the various embodiments of the present invention. And storage medium above-mentioned includes:USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), arbitrary access are deposited Reservoir (RAM, Random Access Memory), magnetic disc or CD etc. are various can be with the medium of store code.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence, can not be interpreted as indicating or implying relative importance.Moreover, term " packet Include ", "comprising" or any other variant thereof is intended to cover non-exclusive inclusion so that including the mistake of a series of elements Journey, method, article or equipment include not only those elements, but also include other elements that are not explicitly listed, either Further include for elements inherent to such a process, method, article, or device.In the absence of more restrictions, by sentence The element that "including a ..." limits, it is not excluded that also deposit in the process, method, article or apparatus that includes the element In other identical element.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, any made by repair Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.It should be noted that:Similar label and letter exist Similar terms are indicated in following attached drawing, therefore, once being defined in a certain Xiang Yi attached drawing, are then not required in subsequent attached drawing It is further defined and is explained.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any Those familiar with the art in the technical scope disclosed by the present invention, can easily think of the change or the replacement, and should all contain Lid is within protection scope of the present invention.Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (10)

1. intelligent grid terminal real-time detection method, which is characterized in that including:
Current function command frame is handed down to tested electric network terminal by electric network terminal real-time monitoring system, wherein the tested electricity The number of network termination is multiple;
The electric network terminal real-time monitoring system receives the data that the tested electric network terminal replys the function command frame After analyzed;
When the result of analysis is qualified, next function command frame is handed down to tested by the electric network terminal real-time monitoring system Electric network terminal.
2. intelligent grid terminal real-time detection method according to claim 1, which is characterized in that the function command frame Number is limited multiple, and, each function command frame is used for detecting the different function of tested electric network terminal.
3. intelligent grid terminal real-time detection method according to claim 1, which is characterized in that the electric network terminal is real-time Before current function command frame is handed down to tested electric network terminal by monitoring system, further include:
The electric network terminal real-time monitoring system is configured according to the preset standard of user terminal;
The electric network terminal real-time monitoring system by when serial ports, infrared data interface or 485 interface with the tested power grid Terminal connects.
4. intelligent grid terminal real-time detection method according to claim 2, which is characterized in that the method further includes:
After the function command frame issues, the electric network terminal real-time monitoring system carries out tested electric network terminal extensive Multiple default setting;
The only code of the tested electric network terminal is disposed as 0 by the electric network terminal real-time monitoring system;
The electric network terminal real-time monitoring system carries out standard parameter setting to the tested electric network terminal;
The electric network terminal real-time monitoring system tests whether the standard parameter is arranged success;
When test result is successfully, the electric network terminal real-time monitoring system adds the quantity of qualified tested electric network terminal One;
When test result is unsuccessful, the electric network terminal real-time monitoring system will again carry out the tested electric network terminal Standard parameter is arranged.
5. intelligent grid terminal real-time detection method according to claim 4, which is characterized in that the method further includes:
When the electric network terminal real-time monitoring system extracts the detection that the test result is the successful tested electric network terminal Between information, terminal versions information and communication module version information;
The electric network terminal real-time monitoring system is by the detection time information, the terminal versions information and the communication module Version information uploads to production management end.
6. intelligent grid terminal real-time detection method according to claim 5, which is characterized in that the method further includes:
When the result of the analysis is unqualified or when the test result is unsuccessful, the electric network terminal monitors in real time System lights indicator light;
The electric network terminal real-time monitoring system sends out repair prompting message to the production management end.
7. intelligent grid terminal real-time detection apparatus, which is characterized in that including:
Command frame issues module, and current function command frame is handed down to tested power grid end for electric network terminal real-time monitoring system End, wherein the number of the tested electric network terminal is multiple;
Analysis module receives the tested electric network terminal to the function command for the electric network terminal real-time monitoring system It is analyzed after the data that frame is replied;
Command frame issues module again, for when the result of analysis is qualified, the electric network terminal real-time monitoring system will under One function command frame is handed down to tested electric network terminal.
8. intelligent grid terminal real-time detection apparatus according to claim 7, which is characterized in that further include:
Configuration module is configured for the electric network terminal real-time monitoring system according to the preset standard of user terminal;
Link block, for the electric network terminal real-time monitoring system by when serial ports, infrared data interface or 485 interface with The tested electric network terminal connection.
9. a kind of terminal, which is characterized in that including memory and processor, the memory supports processor to hold for storing Any one of row claim 1 to 6 the method, the processor is configurable for executing the journey stored in the memory Sequence.
10. a kind of computer readable storage medium, it is stored with computer program on computer readable storage medium, feature exists In when computer is run by processor the step of any one of execution the claims 1 to 6 the method.
CN201711472975.4A 2017-12-29 2017-12-29 Intelligent grid terminal real-time detection method and device Pending CN108562804A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711472975.4A CN108562804A (en) 2017-12-29 2017-12-29 Intelligent grid terminal real-time detection method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711472975.4A CN108562804A (en) 2017-12-29 2017-12-29 Intelligent grid terminal real-time detection method and device

Publications (1)

Publication Number Publication Date
CN108562804A true CN108562804A (en) 2018-09-21

Family

ID=63530468

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711472975.4A Pending CN108562804A (en) 2017-12-29 2017-12-29 Intelligent grid terminal real-time detection method and device

Country Status (1)

Country Link
CN (1) CN108562804A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111611256A (en) * 2020-04-30 2020-09-01 广东良实机电工程有限公司 Equipment energy consumption monitoring method and device, terminal equipment and storage medium
CN112947247A (en) * 2021-03-23 2021-06-11 天津科技大学 Personnel monitoring method based on machine vision and single chip microcomputer control

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102331534A (en) * 2011-06-09 2012-01-25 航天科工深圳(集团)有限公司 Power distribution terminal detecting system and method
CN102540133A (en) * 2011-12-26 2012-07-04 北京煜邦电力技术有限公司 Automatic detecting system and method for intelligent grid data collecting terminal
CN104618940A (en) * 2014-12-17 2015-05-13 广东电网有限责任公司江门供电局 Remote monitoring system and method of power acquiring terminal network
CN104952239A (en) * 2014-03-28 2015-09-30 惠州学院 Testing device and testing method for collector
CN204884160U (en) * 2015-08-25 2015-12-16 武汉中原电子信息公司 Ammeter data collection station detecting system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102331534A (en) * 2011-06-09 2012-01-25 航天科工深圳(集团)有限公司 Power distribution terminal detecting system and method
CN102540133A (en) * 2011-12-26 2012-07-04 北京煜邦电力技术有限公司 Automatic detecting system and method for intelligent grid data collecting terminal
CN104952239A (en) * 2014-03-28 2015-09-30 惠州学院 Testing device and testing method for collector
CN104618940A (en) * 2014-12-17 2015-05-13 广东电网有限责任公司江门供电局 Remote monitoring system and method of power acquiring terminal network
CN204884160U (en) * 2015-08-25 2015-12-16 武汉中原电子信息公司 Ammeter data collection station detecting system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111611256A (en) * 2020-04-30 2020-09-01 广东良实机电工程有限公司 Equipment energy consumption monitoring method and device, terminal equipment and storage medium
CN111611256B (en) * 2020-04-30 2023-05-09 广东良实机电工程有限公司 Equipment energy consumption monitoring method and device, terminal equipment and storage medium
CN112947247A (en) * 2021-03-23 2021-06-11 天津科技大学 Personnel monitoring method based on machine vision and single chip microcomputer control

Similar Documents

Publication Publication Date Title
CN104935489B (en) A kind of information collection networking method and power information acquire network
CN113014449B (en) Local communication protocol pressure testing method and system of electricity consumption information acquisition system
WO2015106605A1 (en) Method for testing station level of intelligent substation
CN102724006B (en) Rapid self-checking system and method of satellite comprehensive testing system
CN107909131B (en) Intelligent ODN equipment and automatic fiber core control method
CN106712001A (en) Data modeling method for network message recording analysis device
CN103123485A (en) Intelligent data acquisition and control terminal and Internet of Things system with same
CN102468984A (en) Method and system for testing electricity consumption information acquisition system, and master station
WO2015149596A1 (en) Iec61850-based communication simulation method for leakage current on-line monitoring device
CN104123134A (en) Intelligent electricity use data management method and system based on AMI and J2EE
WO2015149594A1 (en) Iec61850-based communication simulation method for partial discharge on-line monitoring device
CN107333288B (en) Communication fault detection method and device for field equipment of electricity consumption information acquisition system
CN104394020A (en) Automatic fault processing and safety control system and method for power information collection device
CN107341609B (en) Energy efficiency management system and method based on cloud platform
CN104391244A (en) Closed loop test method of relay protection apparatus and system thereof
CN103107914A (en) Detection method and detection system for remote power acquisition terminal
WO2015149595A1 (en) Iec61850-based communication simulation method for insulation on-line monitoring device
CN109450084B (en) Intelligent substation multilayer protocol collaborative analysis method based on information data link
CN111541574A (en) Visual inspection method and system for intelligent substation
CN111046543A (en) Intelligent substation test simulation method
CN112700020A (en) Full life cycle management system of equipment based on sweep sign indicating number
CN110752670A (en) Intelligent substation relay protection intelligent inspection system and inspection method
CN108562804A (en) Intelligent grid terminal real-time detection method and device
CN104392603B (en) A kind of live power information collecting device intelligent diagnosis system
KR20150000567A (en) Apparatus for remote meter reading protocol of binary type and apparatus and method for task scheduling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180921

RJ01 Rejection of invention patent application after publication