CN108560792A - A kind of outer laying and hanging ornamental prefabricated component mounting structure of building - Google Patents
A kind of outer laying and hanging ornamental prefabricated component mounting structure of building Download PDFInfo
- Publication number
- CN108560792A CN108560792A CN201810380335.9A CN201810380335A CN108560792A CN 108560792 A CN108560792 A CN 108560792A CN 201810380335 A CN201810380335 A CN 201810380335A CN 108560792 A CN108560792 A CN 108560792A
- Authority
- CN
- China
- Prior art keywords
- glue groove
- pendant
- glue
- main
- mounting structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/96—Curtain walls comprising panels attached to the structure through mullions or transoms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Finishing Walls (AREA)
Abstract
The invention discloses including the pendant being installed on skeleton and be arranged storage glue component in the top and bottom for the decorative panel being connect with pendant, the pendant includes the top flat that coordinates and will store up the adhesive in glue component with storage glue component and squeeze out, the storage glue component includes the glue groove for storing adhesive, glue groove side is provided with push plate, the glue groove side is provided with the through-hole being extruded for adhesive, and the present invention has the effect of more can quickly installing decorative panel.
Description
Technical field
The present invention relates to a kind of mounting structures, more specifically, it relates to a kind of outer laying and hanging ornamental prefabricated component installation knot of building
Structure.
Background technology
Building surface now often promotes the aesthetics of building by installing the prefabricated components such as decorative panel.
Currently, the Chinese patent that application publication number is CN105888179A discloses a kind of face brick dried hanging hang structure and face brick
Dry-hanging needs to fill up the gap between each mounting groove and corresponding hanging block using viscose glue in dry-hanging step, will
Second card slot of the upper pendant of two groups of pendants is respectively clamped on the fixture block of corresponding main pendant, by the lower pendant of other two groups of pendants
Third card slot be respectively clamped into the first card slot of corresponding main pendant, complete the cladding of most beneath one piece of face brick.
Worker smears filling mounting groove usually in the hanging basket for being suspended on building surface using viscose glue, and filling is viscous at the scene
Glue more expends the time, so this also results in installation prefabricated component to a certain extent needs longer duration.
Invention content
In view of the deficienciess of the prior art, the invention reside in laying and hanging ornamental prefabricated component mounting structure outside a kind of building of offer,
It is advantageous that decorative panel more can be installed quickly.
The present invention technical purpose technical scheme is that:Including the pendant that is installed on skeleton with
And the storage glue component in the top and bottom for the decorative panel being connect with pendant is set, the pendant includes and storage glue component cooperation
And the top flat of the extrusion of the adhesive in glue component will be stored up, the storage glue component includes the glue groove for storing adhesive, glue groove side
It is provided with push plate, the glue groove side is provided with the through-hole being extruded for adhesive.
By using above-mentioned technical proposal, decorative panel is placed on the top of top flat and top flat is allowed to enter in glue groove,
Adhesive in glue groove, which can be extruded, can fill up glue groove, and top flat can be fixed in glue groove after adhesive.Because subtracting
Lack and smeared adhesive on decorative panel before dry-hang dale, therefore the process of dry-hang dale is allowed to become more convenient,
Improve the efficiency of installation decorative panel.
The present invention is further arranged to:Glue groove is divided into main glue groove and the secondary glue groove of main glue groove both sides, the main glue
It is connected to by through-hole between slot and secondary glue groove, one piece is provided in the main glue groove and promotes mainly plate, the pair with what main glue groove coordinated
Be provided in glue groove one piece with secondary glue groove cooperation and surface be provided with the secondary push plate of through-hole, the plate of promoting mainly is compared to secondary push plate
It is closer to the bottom of glue groove, the pendant can be contacted into main glue groove with plate is promoted mainly, and pendant can enter secondary glue groove and pair
Push plate coordinates.
By using above-mentioned technical proposal, epoxide-resin glue is stored in main glue groove, and solidification is stored in secondary glue groove
Agent, when promoting mainly plate and being moved to the bottom of main glue groove, storage is in main glue groove and promotes mainly the epoxide-resin glue between plate and can be extruded,
The curing agent in secondary glue groove can also be squeezed by secondary push plate and is squeezed into main glue groove simultaneously, and epoxide-resin glue is mixed with curing agent
It can cure rapidly after conjunction, to which top flat to be fixedly arranged in glue groove.Both epoxide-resin glue is separately stored with curing agent, avoid
It is difficult to be extruded because of solidification.
The present invention is further arranged to:It is described promote mainly plate, the side of secondary push plate is both provided with one layer of secluding film.
By using above-mentioned technical proposal, plate is promoted mainly, the side of secondary push plate is both provided with one layer of secluding film, prevent asphalt mixtures modified by epoxy resin
Fat glue is combined with curing agent, and when promoting mainly plate, secondary push plate by top flat promotion, and secluding film is because thickness is thin, intensity is low therefore not
It can stop that epoxide-resin glue is squeezed out with curing agent.
The present invention is further arranged to:The opposite sides for promoting mainly the one side that plate face is open to main glue groove is provided with and master
The main guide pin of glue groove inner wall contact, four sides of the pair push plate towards secondary glue groove open face are provided with the pair being sequentially connected and lead
To piece.
By using above-mentioned technical proposal, it is fixed with and master in the opposite sides for promoting mainly the one side that plate face is open to main glue groove
The main guide pin of glue groove inner wall contact, and be fixed with the pair being sequentially connected in four sides of secondary push plate towards secondary glue groove open face and lead
To piece.The setting of main guide pin and secondary guide pin can allow and promote mainly plate respectively, secondary push plate can be when being pushed by top flat more
Smoothly moved to glue groove bottom.
The present invention is further arranged to:Link block, totally two pieces of the link block, and link block are provided on the skeleton
Opposite sides respectively offers link slot, and the pendant is connected with rotation axis, and the both ends of the rotation axis are located at both sides connection
In the link slot of block.
By using above-mentioned technical proposal, pendant is rotation connection with link block, and pendant can be in two pieces of link blocks
Between slide, by pulling out pendant to one end far from skeleton, can allow between top flat and skeleton there are the space of bigger, from
And it is convenient for the operation of dry-hang dale.
The present invention is further arranged to:Side between two pieces of link blocks close to decorative panel is provided with one piece of coordinating block, institute
It is bonded with coordinating block when stating pendant holding level.
By using above-mentioned technical proposal, the side close to decorative panel between two pieces of link blocks is provided with one piece of cooperation
Block, and pendant keeps being bonded with coordinating block when level, and to ensure after connecting decorative panel with pendant, decorative panel can be protected
It is vertical to hold.
The present invention is further arranged to:The opposite both sides of the link block are provided with closing piece, and lockhole, institute are offered on closing piece
The latch fitting for being provided on decorative panel and coordinating with lockhole is stated, the latch fitting includes the locking bar being connect with decorative panel, and locking bar is close to lockhole
One end be provided with spaced lock valve, the lock lobed can pass through lockhole after becoming.
By using above-mentioned technical proposal, lock valve is difficult to emerge in lockhole after deformation passes through lockhole so that at the beginning of pendant
Step is fixed relative to skeleton.
The present invention is further arranged to:The pendant is symmetrically arranged with two pairs close to the top of decorative panel one end and lower part
Top flat.
By using above-mentioned technical proposal, the top flat on top is inserted into the storage glue component of the lower end of a packaged plaque, under
The decorative panel in portion is inserted into the storage glue component of the upper end of a packaged plaque.
The present invention is further arranged to:The top flat enters main glue groove and one end of secondary glue groove is provided with chamfering.
By using above-mentioned technical proposal, chamfering is set on top flat, to reduce the size of top flat one end, is pushed up to allow
Piece is easier to enter to main glue groove and secondary glue groove.
The present invention is further arranged to:One end that the pendant is located between two pieces of link blocks is connected with top flat, two pieces of companies
One end far from decorative panel is provided with the storage glue component coordinated with top flat between connecing block.
By using above-mentioned technical proposal, the top flat that pendant is located at one end connection between two pieces of link blocks enters to two pieces
In the storage glue component that one end far from decorative panel is arranged between link block, by main glue groove epoxide-resin glue with it is solid in secondary glue groove
Agent extrusion mixing forms adhesive, and top flat is absorbed in into adhesive, and can top flat glue groove be fixedly arranged at after adhesive curing
In, so that pendant is completely fixed relative to skeleton.
In conclusion the invention has the advantages that:
1, by adhesive storage in store up glue component, decorative panel is cladding when on pendant, store up adhesive in glue component oneself
It is dynamic to be extruded and connect with pendant, accelerate the efficiency of dry-hang dale;
2, pendant and skeleton are rotated and are slidably connected in advance, easily can be slided or be rotated pendant and be attached with decorative panel;
3, pendant can quickly be fixed with skeleton, to which decorative panel can be more stably mounted on skeleton.
Description of the drawings
Fig. 1 is the overall structure diagram of the present invention;
Fig. 2 is the first storage glue component and the first top flat cross-sectional view of the present invention;
Fig. 3 is the attachment structure schematic diagram between the pendant and link block of the present invention.
Reference numeral:1, skeleton;2, decorative panel;3, the first storage glue component;4, glue groove;5, main glue groove;6, secondary glue groove;7, main
Push plate;8, secondary push plate;9, secluding film;10, the first top flat;11, main top;12, secondary top;13, chamfering;14, main guide pin;
15, secondary guide pin;16, link slot;17, rotation axis;18, coordinating block;19, closing piece;20, lockhole;21, locking bar;22, valve is locked;23、
Second top flat;24, the second storage glue component;25, link block;26, pendant.
Specific implementation mode
With reference to attached drawing, the present invention will be further described.
Present embodiment discloses laying and hanging ornamental prefabricated component mounting structures outside a kind of building, as shown in Figure 1, including being installed on skeleton
Pendant 26 on 1 and the first storage glue component 3 in the top and bottom for the decorative panel 2 being connect with pendant 26 is set.Pendant 26
After connect with the first storage glue component 3, the adhesive that prestores in the first storage glue component 3 can be extruded to be contacted with pendant 26, and general
Pendant 26 is fixedly arranged in the first storage glue component 3, and then quickly pendant 26 and the first storage glue component 3 link together.
As shown in Figure 1, 2, the first storage glue component 3 includes glue groove 4, and glue groove 4 is divided into 5 liang of main glue groove 5 and main glue groove
The secondary glue groove 6 of side is connected between main glue groove 5 and secondary glue groove 6 by several through-holes.One piece and main glue groove 5 are provided in main glue groove 5
Cooperation and several through-holes are provided on its surface promote mainly plate 7, one piece and the secondary cooperation of glue groove 6 are provided in secondary glue groove 6
The bottom that plate 7 is closer to glue groove 4 compared to secondary push plate 8 is promoted mainly in secondary push plate 8.Promoting mainly storage between plate 7 and main glue groove 5 has ring
Oxygen resin glue, being stored between secondary push plate 8 and secondary glue groove 6 has curing agent.And curing agent is contacted with epoxide-resin glue in order to prevent,
In two secondary glue grooves 6 it is opposite on and promote mainly plate 7 towards 5 bottom of main glue groove while on be fitted with one layer of secluding film
9, secluding film 9 is using the film that thickness is thin, intensity is low.
As shown in Figure 1, 2, pendant 26 includes the first top flat 10 for being positioned close to 2 one end of decorative panel, and the first top flat 10 is in
" mountain " type, 10 interphase of the first top flat to projection portion be with the main top 11 promoting mainly plate 7 and contact, 11 both sides of main top for and pair
The secondary top 12 that push plate 8 contacts.And pendant 26 is symmetrically arranged with two pairs first close to the top of 2 one end of decorative panel and lower part
Top flat 10, first top flat 10 on top are inserted into the first storage glue component 3 of the lower end of a packaged plaque 2, the first top of lower part
Piece 10 is inserted into the first storage glue component 3 of the upper end of a packaged plaque 2.Main top 11 is respectively provided with on the one end at secondary top 12
There is chamfering 13, it is secondary to allow main top 11 to be easier to enter to main glue groove 5 to reduce the size of 10 one end of the first top flat
Top 12 is easier to enter secondary glue groove 6.
Decorative panel 2 is placed on to the top of the first top flat 10, and the first top flat 10 is allowed to enter main glue groove 5 and secondary glue groove 6,
When promoting mainly plate 7 and driving the bottom to main glue groove 5 to move by main top 11, storage is in main glue groove 5 and promotes mainly the epoxy between plate 7
Resin glue can be squeezed out by promoting mainly the through-hole on plate 7 between plate 7 and main glue groove 5 from promoting mainly, while the curing agent in secondary glue groove 6
Also it can be squeezed and be squeezed into main glue groove 5 by secondary push plate 8.And meeting when epoxide-resin glue and curing agent are extruded
Secluding film 9 is destroyed, epoxide-resin glue can cure rapidly after being mixed in main glue groove 5 with curing agent, to consolidate main top 11
In main glue groove 5.
As shown in Figure 1, 2, the opposite sides for the one side promoted mainly plate 7 and be open towards main glue groove 5 be fixed with in main glue groove 5
The both sides relative to the secondary glue groove 6 close to its both sides in main glue groove 5 are arranged in the main guide pin 14 of wall contact, main guide pin 14.And
The secondary guide pin 15 being sequentially connected is fixed in four sides of secondary push plate 8 towards 6 open face of secondary glue groove.Main guide pin 14 is led with pair
Setting to piece 15 can allow and promote mainly plate 7 respectively, secondary push plate 8 can be when being pushed by the first top flat 10 more smoothly to glue
4 bottom of slot moves.
As shown in Figure 1,3, two pieces of link blocks 25 are welded on skeleton 1, and the opposite sides of link block 25 respectively opens up
There is link slot 16, pendant 26 is connected with the rotation axis 17 that both ends are located in the link slot 16 of both sides link block 25, to make
Obtaining pendant 26 can slide along link slot 16 and can form rotation connection relationship with link block 25.Pendant 26 with connect
The setting damping of 25 link position of block can allow the first top flat 10 and skeleton by pulling out pendant 26 to one end far from skeleton 1
There are the spaces of bigger between 1, consequently facilitating carrying out the operation of dry-hang dale 2.It, will be on decorative panel 2 in dry-hang dale 2
The pendant 26 at end rotates and keeps tilting so that the pendant 26 of 2 upper end of decorative panel is difficult to influence the operation of dry-hang dale 2.
After the lower end of decorative panel 2 is connect with pendant 26, the first top flat 10 on the pendant 26 of 2 upper end of decorative panel can be pressed into decorative panel
Pendant 26 and the upper end of decorative panel 2 is allowed to connect in first storage glue component 3 of 2 upper ends.
As shown in Figure 1,3, the side of decorative panel 2 is provided with one piece of coordinating block 18 between two pieces of link blocks 25, and
And pendant 26 keeps being bonded with coordinating block 18 when level, and to ensure after connecting decorative panel 2 with pendant 26,2 energy of decorative panel
It is enough to keep vertical.
As shown in Figure 1,3, the opposite both sides of link block 25 are respectively fixed with one piece of closing piece 19 close to one end of decorative panel 2, lock
Offer lockhole 20 on block 19, be provided with the locking bar 21 being connect with decorative panel 2 on decorative panel 2, locking bar 21 close to lockhole 20 one
End is fixed with the lock valve 22 of the arc of one circle of interval setting, pushes decorative panel 2 to skeleton 1, can pass through lockhole after locking 22 deformation of valve
20.It is difficult to emerge in lockhole 20 after deformation passes through lockhole 20 in lock valve 22, and closing piece 19 is made to be in lock valve 22 and decoration
Between plate 2, fixed relative to skeleton 1 so that pendant 26 is preliminary.
As shown in Figure 2,3, one end that pendant 26 is located between two pieces of link blocks 25 is fixed with shape and 10 phase of the first top flat
With the second top flat 23, one end far from decorative panel 2 between two pieces of link blocks 25 is provided with second coordinated with the second top flat 23
Glue component 24 is stored up, 24 structure of the second storage glue component is identical as the first storage glue component 3.
As shown in Figure 1,3, the second top flat 23 enters in the second storage glue component 24 between two pieces of link blocks 25, by second
The epoxide-resin glue stored up in glue component 24 forms adhesive with curing agent extrusion mixing, and the second top flat 23 is absorbed in into adhesive,
The second top flat 23 can be fixedly arranged in the second storage glue component 24 after adhesive curing, so that pendant 26 is relative to skeleton
1 is completely fixed.
Assigned direction in this specific embodiment is intended merely to facilitate between each component of statement position relationship and mutually
The relationship of cooperation.The above is only a preferred embodiment of the present invention, protection scope of the present invention is not limited merely to above-mentioned
Embodiment, all technical solutions belonged under thinking of the present invention all belong to the scope of protection of the present invention.It should be pointed out that for this technology
For the those of ordinary skill in field, several improvements and modifications without departing from the principles of the present invention, these are improved and profit
Decorations also should be regarded as protection scope of the present invention.
Claims (10)
1. a kind of outer laying and hanging ornamental prefabricated component mounting structure of building, it is characterized in that:Including the pendant (26) that is installed on skeleton (1) with
And setting the top and bottom for the decorative panel (2) connect with pendant (26) storage glue component, the pendant (26) include and
It stores up the cooperation of glue component and the top flat of the extrusion of the adhesive in glue component will be stored up, the storage glue component includes the glue for storing adhesive
Slot (4), glue groove (4) side are provided with push plate, and glue groove (4) side is provided with the through-hole being extruded for adhesive.
2. a kind of outer laying and hanging ornamental prefabricated component mounting structure of building according to claim 1, it is characterized in that:Glue groove (4) is divided
It is divided into main glue groove (5) and the secondary glue groove (6) of main glue groove (5) both sides, by logical between the main glue groove (5) and secondary glue groove (6)
Hole is connected to, and one piece is provided in the main glue groove (5) and promotes mainly plate (7) with what main glue groove (5) coordinated, is set in the pair glue groove (6)
It is equipped with that one piece coordinating with secondary glue groove (6) and surface is provided with the secondary push plate (8) of through-hole, the plate (7) of promoting mainly is pushed away compared to pair
Plate (8) is closer to the bottom of glue groove (4), and the pendant (26) can contact into main glue groove (5) with plate (7) is promoted mainly, and hang
Part (26) can enter secondary glue groove (6) and coordinate with secondary push plate (8).
3. a kind of outer laying and hanging ornamental prefabricated component mounting structure of building according to claim 2, it is characterized in that:It is described to promote mainly plate
(7), the side of secondary push plate (8) is both provided with one layer of secluding film (9).
4. a kind of outer laying and hanging ornamental prefabricated component mounting structure of building according to claim 2, it is characterized in that:It is described to promote mainly plate
(7) opposite sides of the one side towards main glue groove (5) opening is provided with the main guide pin (14) contacted with main glue groove (5) inner wall,
Four sides of the pair push plate (8) towards secondary glue groove (6) open face are provided with the secondary guide pin (15) being sequentially connected.
5. a kind of outer laying and hanging ornamental prefabricated component mounting structure of building according to claim 2, it is characterized in that:The skeleton (1)
On be provided with link block (25), totally two pieces of the link block (25), and the opposite sides of link block (25) respectively offers link slot
(16), the pendant (26) is connected with rotation axis (17), and the both ends of the rotation axis (17) are located at both sides link block (25)
Link slot (16) in.
6. a kind of outer laying and hanging ornamental prefabricated component mounting structure of building according to claim 5, it is characterized in that:Two pieces of link blocks
(25) side of decorative panel (2) is provided with one piece of coordinating block (18) between, when the pendant (26) keeps horizontal and coordinates
Block (18) is bonded.
7. a kind of outer laying and hanging ornamental prefabricated component mounting structure of building according to claim 5, it is characterized in that:The link block
(25) opposite both sides are provided with closing piece (19), and lockhole (20) is offered on closing piece (19), be provided on the decorative panel (2) with
The latch fitting of lockhole (20) cooperation, the latch fitting include the locking bar (21) being connect with decorative panel (2), and locking bar (21) is close to lockhole (20)
One end be provided with spaced lock valve (22), can pass through lockhole (20) after lock valve (22) deformation.
8. a kind of outer laying and hanging ornamental prefabricated component mounting structure of building according to claim 2, it is characterized in that:The pendant (26)
It is symmetrically arranged with two secondary top flats close to the top of decorative panel (2) one end and lower part.
9. a kind of outer laying and hanging ornamental prefabricated component mounting structure of building according to claim 2, it is characterized in that:The top flat enters
One end of main glue groove (5) and secondary glue groove (6) is provided with chamfering (13).
10. a kind of outer laying and hanging ornamental prefabricated component mounting structure of building according to claim 5, it is characterized in that:The pendant
(26) it is located at one end between two pieces of link blocks (25) and is connected with top flat, far from decorative panel (2) between two pieces of link blocks (25)
One end is provided with the storage glue component coordinated with top flat.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810380335.9A CN108560792B (en) | 2018-04-25 | 2018-04-25 | A kind of outer laying and hanging ornamental prefabricated component mounting structure of building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810380335.9A CN108560792B (en) | 2018-04-25 | 2018-04-25 | A kind of outer laying and hanging ornamental prefabricated component mounting structure of building |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108560792A true CN108560792A (en) | 2018-09-21 |
CN108560792B CN108560792B (en) | 2019-09-06 |
Family
ID=63536584
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810380335.9A Active CN108560792B (en) | 2018-04-25 | 2018-04-25 | A kind of outer laying and hanging ornamental prefabricated component mounting structure of building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108560792B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201411865Y (en) * | 2009-06-25 | 2010-02-24 | 桂林市临桂永钜石业有限公司 | Fast dry hanging type stone slab |
CN102003077A (en) * | 2010-12-05 | 2011-04-06 | 中建六局第三建筑工程有限公司 | Stone curtain wall construction method |
CN103923587A (en) * | 2014-04-16 | 2014-07-16 | 杭州之江有机硅化工有限公司 | Preparation method of bicomponent stone dry-hanging glue capable of being cured at normal temperature |
CN206174223U (en) * | 2016-04-12 | 2017-05-17 | 文登蓝岛建筑工程有限公司 | Stealthy panel curtain wall construction of glutinous even formula |
CN107722912A (en) * | 2017-09-15 | 2018-02-23 | 江苏大力士投资有限公司 | The epoxy adhesive of sound insulation and noise reduction |
-
2018
- 2018-04-25 CN CN201810380335.9A patent/CN108560792B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201411865Y (en) * | 2009-06-25 | 2010-02-24 | 桂林市临桂永钜石业有限公司 | Fast dry hanging type stone slab |
CN102003077A (en) * | 2010-12-05 | 2011-04-06 | 中建六局第三建筑工程有限公司 | Stone curtain wall construction method |
CN103923587A (en) * | 2014-04-16 | 2014-07-16 | 杭州之江有机硅化工有限公司 | Preparation method of bicomponent stone dry-hanging glue capable of being cured at normal temperature |
CN206174223U (en) * | 2016-04-12 | 2017-05-17 | 文登蓝岛建筑工程有限公司 | Stealthy panel curtain wall construction of glutinous even formula |
CN107722912A (en) * | 2017-09-15 | 2018-02-23 | 江苏大力士投资有限公司 | The epoxy adhesive of sound insulation and noise reduction |
Non-Patent Citations (1)
Title |
---|
张献等: "建筑外墙石材干挂技术及监理控制要点", 《水利水电技术》 * |
Also Published As
Publication number | Publication date |
---|---|
CN108560792B (en) | 2019-09-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102953499B (en) | There is the manufacture method of translucent MULTILAYER COMPOSITE Constracture unit and the equipment of integrated Side fascia | |
CN206625507U (en) | The assembled skirting of LED light bar can be filled | |
CN208870249U (en) | The internal sealed glass curtain wall of hook groove connection ornamental strip | |
CN205663135U (en) | Waterproof ceramic tile | |
CN200992781Y (en) | Indoor decorative column or beam | |
CN108560792A (en) | A kind of outer laying and hanging ornamental prefabricated component mounting structure of building | |
CN207034825U (en) | A kind of quick-detachable panel light | |
CN211647050U (en) | Seepage-proofing structure of outer wall heat-insulation decorative finished board | |
CN209163132U (en) | A kind of translucent construction wall | |
CN206267497U (en) | The compound line plate of one kind decoration | |
CN205713684U (en) | A kind of integral type door sleeve | |
CN206636095U (en) | Composite decorating board outside a kind of heat insulation type room | |
CN204983380U (en) | Waterproof wallboard | |
CN206110617U (en) | Vertex angle line | |
KR101467981B1 (en) | Waterproof method of sink table | |
CN211037418U (en) | Assembled dry-hanging type reinforced non-combustible partition wall capable of being recycled | |
CN204626671U (en) | External-wall exterior insulation structure | |
CN105507542B (en) | A kind of fixed structure of decorative material layer | |
CN210316231U (en) | Assembled construction grout sleeve | |
CN102535806B (en) | Stone material point hanging installation structure | |
CN208668833U (en) | A kind of fire proof construction decorative panel | |
CN207538405U (en) | A kind of moulding of wall decoration | |
CN206337765U (en) | Insulation and decoration hanging plate and heat-preserving decorating wall | |
CN105370006B (en) | A kind of fixed structure of decorative material layer | |
CN203129488U (en) | Artificial stone heat-insulation composite board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |