CN108560783A - Building curtain wall construction, installing frame and building - Google Patents
Building curtain wall construction, installing frame and building Download PDFInfo
- Publication number
- CN108560783A CN108560783A CN201810306573.5A CN201810306573A CN108560783A CN 108560783 A CN108560783 A CN 108560783A CN 201810306573 A CN201810306573 A CN 201810306573A CN 108560783 A CN108560783 A CN 108560783A
- Authority
- CN
- China
- Prior art keywords
- fixed frame
- wall
- curtain wall
- building
- ventilation opening
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 46
- 238000009423 ventilation Methods 0.000 claims abstract description 61
- 238000007789 sealing Methods 0.000 claims description 7
- 230000000873 masking effect Effects 0.000 claims description 6
- 238000004080 punching Methods 0.000 claims description 5
- 210000002421 cell wall Anatomy 0.000 claims description 3
- 238000009434 installation Methods 0.000 description 9
- 238000010586 diagram Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 3
- 239000007787 solid Substances 0.000 description 3
- 238000004378 air conditioning Methods 0.000 description 2
- 239000003292 glue Substances 0.000 description 2
- 230000000149 penetrating effect Effects 0.000 description 2
- 238000005273 aeration Methods 0.000 description 1
- 230000003796 beauty Effects 0.000 description 1
- 210000000988 bone and bone Anatomy 0.000 description 1
- 230000003139 buffering effect Effects 0.000 description 1
- 230000004069 differentiation Effects 0.000 description 1
- 239000011521 glass Substances 0.000 description 1
- 230000002045 lasting effect Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000007769 metal material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/96—Curtain walls comprising panels attached to the structure through mullions or transoms
- E04B2/965—Connections of mullions and transoms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
The present invention relates to a kind of building curtain wall construction, installing frame and building, building curtain wall construction includes:Curtain wall unit, curtain wall unit include the first wall and the second wall, and the first wall is opposite with the second wall interval, and the first wall and the second wall cooperatively form the groove position of building;And installing frame, installing frame is set between the first wall and the second wall and positioned at curtain wall unit close to indoor side, installing frame include with the first fixed frame of the first wall connecting and with the second fixed frame of the second wall connecting, first fixed frame connect with the second fixed frame and cooperatively forms concave structure, and the first fixed frame and/or the second fixed frame are equipped with ventilation opening.Installing frame, including:First fixed frame;And second fixed frame, the second fixed frame and/or the first fixed frame are equipped with ventilation opening, the second fixed frame is connect with the first fixed frame, and the second fixed frame and the first fixed frame cooperatively form concave structure.Building, including building curtain wall construction as described above.
Description
Technical field
The present invention relates to aeration technology fields, more particularly to a kind of building curtain wall construction, installing frame and building.
Background technology
In order to increase the comfort of gravity-flow ventilation in building, traditional glass-wall building is mostly by increasing on curtain wall
If opening door-leaf come solve the problem of gravity-flow ventilation thus bring be building need curtain wall increase transom come realize open
The installation of fan.This structure can cause the elevation of building of building not succinct enough, and the globality of building curtain wall is destroyed.
Invention content
Based on this, it is necessary to provide a kind of building curtain wall construction, installing frame and building, make the elevation of building letter of building
It is clean, avoid the globality of building curtain wall from being destroyed.
Its technical solution is as follows:
A kind of building curtain wall construction, including:Curtain wall unit, the curtain wall unit include the first wall and the second wall, institute
State that the first wall is opposite with second wall interval, and first wall cooperatively forms the recessed of building with second wall
Slot position;And installing frame, the installing frame are set between first wall and second wall and are located at the curtain wall list
Member close to indoor side, the installing frame include with the first fixed frame of first wall connecting and with second wall
Second fixed frame of body connection, first fixed frame connect with second fixed frame and cooperatively form concave structure, institute
It states the first fixed frame and/or second fixed frame is equipped with ventilation opening.
Above-mentioned building curtain wall construction includes the curtain wall unit cooperatively formed by the first wall and the second wall, curtain wall unit
The groove position of building is formed, installing frame is the concave structure cooperatively formed by the first fixed frame and the second fixed frame.Work as installation
When frame is fixed between the first wall and the second wall, curtain wall unit forms groove position, and the first fixed frame and the second fixed frame
For indent in curtain wall unit close to indoor side, this building curtain wall construction concealment is high, while need not increase in curtain wall horizontal
Keel realize the installation of opening door-leaf, perfectly maintain the globality of elevation of building appearance.
Technical solution is illustrated further below:
Further, the building curtain wall construction further includes the first control aerofoil, and the first control aerofoil includes being respectively positioned on institute
It states installing frame and is equipped with the first ventilation opening close to the first control wind portion of outdoor side and the second control wind portion, first fixed frame,
Second fixed frame is equipped with the second ventilation opening, and first control wind portion is located at the first ventilation opening and is additionally operable to masking position
In the first control wind portion close to the installing frame of indoor side, second control wind portion is located at second ventilation opening,
And it is additionally operable to masking and is located at the described second installing frame for controlling wind portion close to indoor side.
Further, the building curtain wall construction further includes the second control wind for being respectively positioned on the installing frame close to indoor side
Plate and third control aerofoil, the second control aerofoil connect with first fixed frame and positioned at first ventilation openings, and described the
Three control aerofoils connect with second fixed frame and are located at second ventilation opening.
Further, the first control aerofoil, the second control aerofoil and the third control aerofoil are perforated plate.
Further, the punching rate of the perforated plate is in 70 40 percent to percent range.
Further, the building curtain wall construction further includes the first keying fan and second opens and closes fan, and described first opens and closes fan
It is set on first fixed frame and is opened and closed with first ventilation opening and coordinated, described second, which opens and closes fan, is set to described the
It opens and closes on two fixed frames and with second ventilation opening and coordinates.
Further, the building curtain wall construction further include the first seal being set on first fixed frame and
The second seal being set on second fixed frame, when described first, which opens and closes fan, is closed, described first is close
Sealing with it is described first open and close fan sealing cooperation, when it is described second open and close fan be closed when, the second seal with
Described second opens and closes fan envelope cooperation.
Further, first wall forms the cell wall of the groove position, first wall with second wall
The gap size formed with second wall is in increasing trend along the indoor direction to outdoor.
The technical program also provides a kind of installing frame, including:First fixed frame;And second fixed frame, described second fixes
Frame and/or first fixed frame are equipped with ventilation opening, and second fixed frame is connect with first fixed frame, and described the
Two fixed frames cooperatively form concave structure with first fixed frame.
The first fixed frame and the second fixed frame in above-mentioned installation circle cooperatively form concave structure, when it is fixed on
When on curtain wall, in curtain wall, concealment is high for the first fixed frame and the second fixed frame indent, while need not increase horizontal dragon in curtain wall
Bone realizes the installation of opening door-leaf, perfectly maintains the globality of elevation of building appearance.
The technical program also provides a kind of building, which is characterized in that including building curtain wall construction as described above.
Above-mentioned building include the curtain wall unit cooperatively formed by the first wall and the second wall, and curtain wall unit forms building
Groove position, installing frame is the concave structure cooperatively formed by the first fixed frame and the second fixed frame.When installing frame is fixed on
When between the first wall and the second wall, since curtain wall unit forms groove position, and the first fixed frame and the second fixed frame indent
In curtain wall unit close to indoor side, this building curtain wall construction concealment is high, while need not increase transom in curtain wall
It realizes the installation of opening door-leaf, perfectly maintains the globality of elevation of building appearance.
Description of the drawings
Fig. 1 is the overlooking structure diagram of the building curtain wall construction described in the embodiment of the present invention one;
Fig. 2 is the overlooking structure diagram of the building curtain wall construction described in the embodiment of the present invention two;
Fig. 3 is the overlooking structure diagram of the building curtain wall construction described in the embodiment of the present invention three;
Fig. 4 is the dimensional structure diagram of the building curtain wall construction described in the embodiment of the present invention three;
Fig. 5 is partial enlargement structural representation at the A of the building curtain wall construction described in Fig. 4;
Fig. 6 is partial enlargement structural representation at the B of the building curtain wall construction described in Fig. 4.
Reference sign:
11, the first wall, the 12, second wall, the 100, first fixed frame, the 110, first ventilation opening, the 200, second fixed frame,
210, the second ventilation opening, the 310, first control aerofoil, the 311, first control wind portion, the 312, second control wind portion, 313, eyelet, 314, plate sheet
Body, the 320, second control aerofoil, 330, third control aerofoil, 410, first opens and closes fan, and 420, second opens and closes fan, the 510, first buffering
Part, the 520, second bolster, 610, first seal, 620, second seal.
Specific implementation mode
To make the objectives, technical solutions, and advantages of the present invention more comprehensible, below in conjunction with attached drawing and specific embodiment party
Formula, the present invention is further described in detail.It should be understood that the specific embodiments described herein are only solving
The present invention is released, protection scope of the present invention is not limited.
It should be noted that when element is referred to as " being fixed on " another element, it can be directly on another element
Or there may also be elements placed in the middle.When an element is considered as " connection " another element, it can be directly connected to
To another element or it may be simultaneously present centering elements.Term as used herein " vertical ", " horizontal ", " left side ",
" right side " and similar statement for illustrative purposes only, are not offered as being unique embodiment.
Unless otherwise defined, all of technologies and scientific terms used here by the article and belong to the technical field of the present invention
The normally understood meaning of technical staff is identical.Used term is intended merely to description tool in the description of the invention herein
The purpose of the embodiment of body, it is not intended that in the limitation present invention.Term " and or " used herein includes one or more
Any and all combinations of relevant Listed Items.
Heretofore described " first ", " second " do not represent specific quantity and sequence, are only used for the differentiation of title.
Embodiment one
As shown in Figure 1, a kind of building curtain wall construction, including curtain wall unit and installing frame, curtain wall unit include the first wall
11 and second wall 12, the first wall 11 and the second wall 12 be spaced relatively, and the first wall 11 and the second wall 12 coordinate shape
At the groove position of building;Installing frame is set between the first wall 11 and the second wall 12, and positioned at curtain wall unit close to indoor
Side, installing frame include the first fixed frame 100 being connect with the first wall 11 and connect with the second wall 12 second fix
Frame 200, the first fixed frame 100 connect with the second fixed frame 200 and cooperatively form concave structure, the first fixed frame 100 and/
Or second fixed frame 200 is equipped with ventilation opening.
Specifically, one end of the first fixed frame 100 and one end of the second fixed frame 200 pass through the side that buckles and be threadedly coupled
Formula links together and the first fixed frame 100 and the second fixed frame 200 cooperatively form " V " font.First fixed frame 100 it is another
One end is connect by structure glue with the first wall 11, and the other end of the second fixed frame 200 is connected by structure glue and the second wall 12
It connects.
It should be noted that can be zigzag using the exterior wall of the building of the building curtain wall construction described in the present embodiment,
Zigzag exterior wall forms multiple groove positions, and the first wall 11 and the second wall 12 form the cell wall and the first wall of groove position
11 and second the gap size that is formed between wall 12 along it is indoor to outdoor direction be in increasing trend.Building curtain wall construction can edge
Vertical direction is installed between the first wall 11 and the second wall 12.
Optionally, ventilation opening is offered on the first fixed frame 100 and the second fixed frame 200, it is of course also possible to individually exist
Ventilation opening is opened up on first fixed frame 100 or the second fixed frame 200.Specifically, the first fixed frame 100 and the second fixed frame 200
On offer ventilation opening, in this way, in the concave structure cooperatively formed by the first fixed frame 100 and the second fixed frame 200
Both sides, which are equipped with ventilation opening, can meet the ventilation requirement of refuge story battery limits.
Above-mentioned building curtain wall construction includes the curtain wall unit cooperatively formed by the first wall 11 and the second wall 12, curtain wall
Unit forms the groove position of building, and installing frame is the concave knot cooperatively formed by the first fixed frame 100 and the second fixed frame 200
Structure.When installing frame is fixed between the first wall and the second wall, curtain wall unit forms groove position, and the first fixed frame 100
With 200 indent of the second fixed frame in curtain wall unit close to indoor side, this building curtain wall construction concealment is high, is not required to simultaneously
To increase transom to realize the installation of opening door-leaf in curtain wall, perfectly maintain the globality of elevation of building appearance.
In the present embodiment, the ventilation opening of above-mentioned building curtain wall construction is constantly in conducting state, the building curtain wall knot
Structure can be set to the refuge story on building.In this way, can ensure there is adequate ventilation amount in refuge story always, meets refuge story and set
The ventilation requirement of preparation area.
Embodiment two
As shown in Fig. 2, a kind of building curtain wall construction, including the curtain wall unit in embodiment one and installing frame, distinctive points
It is:Building curtain wall construction in the present embodiment further includes the first control aerofoil 310, second control aerofoil 320 and third control aerofoil
330。
Specifically, the first fixed frame 100 is equipped with the first ventilation opening 110, and the second fixed frame 200 is equipped with the second ventilation opening
210, the first control aerofoil 310 includes the first control wind portion 311 positioned at the first ventilation opening 110 and close to outdoor side and positioned at the
Second control wind portion 312 of two ventilation openings 210 and close outdoor side.First control wind portion 311 is additionally operable to masking and is located at the first control wind
Close to the installing frame of indoor side, the second control wind portion 312 is additionally operable to masking and is located at the second control wind portion 312 close to interior one in portion 311
The installing frame of side.In this way, when external wall of building is watched in the external world, the first control aerofoil 310 plays a part of covering installing frame, further
Improve the tidiness of building curtain wall construction.
Optionally, the first control aerofoil 310 is perforated plate, and plate ontology can be arcuate structure, such as " C " font or " U " word
Type, eyelet 313 are simultaneously column-spacingly opened on plate ontology.
Further, the punching rate of perforated plate is in 70 40 percent to percent range.In this way, can be according to
The included angle of one fixed frame 100 and the second fixed frame 200 designs the punching rate of perforated plate, meets indoor air-conditioning requirement.
Further, the aperture opening ratio of perforated plate is regulatable, opens and closes plate for example, being equipped at eyelet 313, opening and closing plate can
To control the opening and closing situation of eyelet.In this way, the punching rate of perforated plate can be changed according to outdoor air quantity and wind speed size, to the greatest extent
Possibly promote indoor comfort degree.Opening and closing plate can be and the rotation of the inner wall of eyelet or the glass being slidably connected or other metal materials
Material.
Optionally, it is solid to be fixed on the first fixed frame 100 and second in a manner of buckling or be threadedly coupled for the first control aerofoil 310
Determine on frame 200, and first controls the part opposite with the first ventilation opening 110 of aerofoil 310 as the first control wind portion 311, first controls aerofoil
The part opposite with the second ventilation opening 210 is the second control wind portion 312.Outdoor wind first has to by the first control 310 ability of aerofoil
Interior is entered, for wind when by the first control aerofoil 310, it is indoor to which control is logical that plate ontology can prevent a part of wind from entering
Air quantity, remaining wind is by hole, at the moment wind speed can effectively be slowed down, to provide comfortable ventilated environment for interior.Together
When, plate ontology can also be effectively prevented extraneous rain and enter interior, avoid indoor environment impacted.
Second control aerofoil 320 is set to the first ventilation opening 110 and close to indoor side, third control aerofoil 330 is set to
Second ventilation opening 210 and the close indoor side.
Optionally, the second control aerofoil 320 and third control aerofoil 330 are also perforated plate, and perforated plate includes plate ontology, plate sheet
Body is equipped with eyelet, and plate ontology is square structure, for example, rectangle or square.
In the present embodiment, which can be set to the aerial hall balcony on building.In this way, both ensureing
There is the comfort of lasting gravity-flow ventilation in balcony, and rainwater can be prevented to be directly entered interior, influences outdoor use quality.
Embodiment three
As in Figure 3-5, a kind of building curtain wall construction, including the curtain wall unit in embodiment one and installing frame, difference
Point is:Building curtain wall construction in the present embodiment further includes that the first control aerofoil 310, first opens and closes fan 410 and the second keying fan
420。
Specifically, the first fixed frame 100 is equipped with the first ventilation opening 110, and the second fixed frame 200 is equipped with the second ventilation opening
210, first, which opens and closes fan 410, is set on the first fixed frame 100 and opens and closes cooperation with the first ventilation opening 110, and second opens and closes fan
420 are set on the second fixed frame 200 and open and close cooperation with the second ventilation opening 210.
Optionally, it first opens and closes fan and 410 is rotatably assorted on the inner wall of the first ventilation opening 110, second opens and closes and fan 420 and the
The inner wall of two ventilation openings 210 is rotatably assorted.For example, the inner wall of the first ventilation opening 110 is equipped with the first sleeve, first opens and closes fan
410 are equipped with the first rotating shaft for penetrating and being rotatablely connected in the first sleeve and with the first sleeve;On the inner wall of second ventilation opening 210
Equipped with second sleeve, second, which opens and closes fan 420, is equipped with first turn for penetrating and being rotatablely connected in second sleeve and with second sleeve
Axis.
Or first open and close fan 410 and be slidably matched with the inner wall of the first ventilation opening 110, second opens and closes and fans 420 and second
The inner wall of ventilation opening 210 is slidably matched.For example, the first outer wall for opening and closing fan 410 is equipped with the first sliding part, the first ventilation opening
110 inner wall is equipped with the first sliding groove, and the first sliding part is slidably matched with the first sliding groove;It is set on the outer wall of second keying fan 420
There are the second sliding part, the inner wall of the second ventilation opening 210 to be equipped with second sliding slot, the second sliding part is slidably matched with second sliding slot.
Please continue to refer to Fig. 3 to Fig. 6, further, in this embodiment building curtain wall construction further include that both ends are used respectively
The first bolster 510 and both ends are respectively used to and second fixes that 410 abut are fanned in being opened and closed with the first fixed frame 100 and first
Frame 200 and second opens and closes the second bolster 520 that fan 420 abuts.
Specifically, the first bolster 510 and the second bolster 520 are made of soft rubber, and the first bolster 510 and
Second bolster 520 is strip, and first opens and closes fan 410 and second open and close fan 420 and be equipped with card slot in the vertical direction, and first
Bolster 510 and the second bolster 520 are equipped with the buckle being clamped with card slot.In this way, when opening and closing fan from open state to closing
When state switches, the both ends of bolster can be abutted with fixed frame and keying fan respectively, to avoid keying fan directly and fixed frame
It touches and keying fan or fixed frame is made to damage.
Please continue to refer to Fig. 6, in the present embodiment, building curtain wall construction further includes being set on the second fixed frame 200
Second seal 620, when second, which opens and closes fan 420, is closed, second seal 620 and second opens and closes 420 sealing of fan
Cooperation.Second, which opens and closes fan 420, includes and the first end of the rotation connection of the second fixed frame 200 and opposite with first end second
End, in off position when, second opens and closes between the first end and the second fixed frame 200 of fan 420 and second opens and closes the of fan 420
It may be not accurate and there are gaps due to assembling between two ends and the second fixed frame 200.In this way, being opened and closed at fan 420 second
When closed state, since second seal 620 is to the sealing function in gap, extraneous rainwater cannot be introduced into interior.
Specifically, second seal 620 is caulking gum, and second seal 620 is fastened on the inner wall of the second ventilation opening 210
On, second, which opens and closes fan 420, includes open state and closed state, when second, which opens and closes fan 420, is in open state, the second sealing
Part 620 opens and closes fan with second and 420 is separated from each other, when second, which opens and closes fan 420, is closed, second seal 620 and the
Two open and close the abutting of fan 420.
It should be noted that the structure and connection type of the first keying fan 410 and the first fixed frame 100 are opened and closed with second and are fanned
420 is identical as the structure of the second fixed frame 200 and connection type, and first seal 610 is additionally provided on the first fixed frame 100, the
The structure of one sealing element 610 is consistent with second seal 620 with mounting means, and details are not described herein.
In the present embodiment, which is mountable to the standard office area on building and can be by adjusting the
One opens and closes the open state of fan 410 and the second keying fan 420 to control the air quantity of gravity-flow ventilation.It can lead in spring, autumn, three season of winter
Gravity-flow ventilation is crossed to adjust the indoor air environment of office, few as possible uses air-conditioning, achievees the purpose that ecological energy-saving.Secondly,
First control aerofoil 310 can control ventilation quantity and wind speed, meanwhile, the first control aerofoil 310 is also possible to prevent rainwater and is directly entered room
It is interior, perfectly agree with the rainy climatic characteristic of Lingnan area summer heat, and do not influence facade beauty.
In one embodiment, a kind of installing frame is provided, including:First fixed frame 100;And second fixed frame 200, second fixes
Frame 200 and/or the first fixed frame 100 are equipped with ventilation opening, and the second fixed frame 200 is connect with the first fixed frame 100, and second is solid
Determine frame 200 and the first fixed frame cooperation 100 forms concave structure.
The first fixed frame 100 and the second fixed frame 200 on above-mentioned installing frame cooperatively form concave structure, when it is solid
When on curtain wall, in curtain wall, concealment is high, while need not be in curtain for the first fixed frame 100 and 200 indent of the second fixed frame
Wall increases transom to realize the installation of opening door-leaf, perfectly maintains the globality of elevation of building appearance.
In one embodiment, a kind of building, including building curtain wall construction as described above are provided.
Above-mentioned building include the curtain wall unit cooperatively formed by the first wall 11 and the second wall 12, and curtain wall unit is formed
The groove position of building, installing frame are the concave structure cooperatively formed by the first fixed frame 100 and the second fixed frame 200.Work as peace
It frames up when being fixed between the first wall 11 and the second wall 12, since curtain wall unit forms groove position, and the first fixed frame 100
With 200 indent of the second fixed frame in curtain wall unit close to indoor side, this building curtain wall construction concealment is high, is not required to simultaneously
To increase transom to realize the installation of opening door-leaf in curtain wall, perfectly maintain the globality of elevation of building appearance.
Each technical characteristic of embodiment described above can be combined arbitrarily, to keep description succinct, not to above-mentioned reality
It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited
In contradiction, it is all considered to be the range of this specification record.
Several embodiments of the invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously
It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art
It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention
Range.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (10)
1. a kind of building curtain wall construction, which is characterized in that including:
Curtain wall unit, the curtain wall unit includes the first wall and the second wall, between first wall and second wall
Every opposite, and first wall cooperatively forms the groove position of building with second wall;And
Installing frame, the installing frame are set between first wall and second wall and are located at the curtain wall unit
Close to indoor side, the installing frame include with the first fixed frame of first wall connecting and with second wall
Second fixed frame of connection, first fixed frame connect with second fixed frame and cooperatively forms concave structure, described
First fixed frame and/or second fixed frame are equipped with ventilation opening.
2. building curtain wall construction according to claim 1, which is characterized in that further include the first control aerofoil, first control
Aerofoil includes the first control wind portion and the second control wind portion for being respectively positioned on the installing frame close to outdoor side, on first fixed frame
Equipped with the first ventilation opening, second fixed frame is equipped with the second ventilation opening, first control wind portion is located at the first ventilation opening,
And be additionally operable to masking and be located at the described first installing frame for controlling wind portion close to indoor side, second control wind portion is located at described
At second ventilation opening and it is additionally operable to the installing frame that masking is located at the second control wind portion close to indoor side.
3. building curtain wall construction according to claim 2, which is characterized in that further include being respectively positioned on the installing frame close to room
The the second control aerofoil and third control aerofoil of interior side, the second control aerofoil are connect with first fixed frame and positioned at described
First ventilation opening, the third control aerofoil connect with second fixed frame and are located at second ventilation opening.
4. building curtain wall construction according to claim 3, which is characterized in that the first control aerofoil, the second control wind
Plate and the third control aerofoil are perforated plate.
5. building curtain wall construction according to claim 4, which is characterized in that the punching rate of the perforated plate is 4 percent
In ten to percent 70 ranges.
6. building curtain wall construction according to claim 2, which is characterized in that further include that the first keying fan and second open and close
Fan, described first, which opens and closes fan, is set on first fixed frame and opens and closes cooperation with first ventilation opening, and described second opens
It closes fan and is set on second fixed frame and is opened and closed with second ventilation opening and coordinate.
7. building curtain wall construction according to claim 6, which is characterized in that further include being set on first fixed frame
First seal and the second seal that is set on second fixed frame, open and close fan in closing shape when described first
When state, the first seal opens and closes fan sealing cooperation, when described second, which opens and closes fan, is closed, institute with described first
It states second seal and opens and closes fan envelope cooperation with described second.
8. building curtain wall construction according to claim 1, which is characterized in that first wall and the second wall shape
At the cell wall of the groove position, the gap size formed between first wall and second wall is along interior to outdoor
Direction is in increasing trend.
9. a kind of installing frame, which is characterized in that including:
First fixed frame;And
Second fixed frame, second fixed frame and/or first fixed frame be equipped with ventilation opening, second fixed frame with
The first fixed frame connection, and second fixed frame cooperatively forms concave structure with first fixed frame.
10. a kind of building, which is characterized in that including such as the claims 1-8 any one of them building curtain wall construction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810306573.5A CN108560783A (en) | 2018-04-08 | 2018-04-08 | Building curtain wall construction, installing frame and building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810306573.5A CN108560783A (en) | 2018-04-08 | 2018-04-08 | Building curtain wall construction, installing frame and building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108560783A true CN108560783A (en) | 2018-09-21 |
Family
ID=63534162
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810306573.5A Pending CN108560783A (en) | 2018-04-08 | 2018-04-08 | Building curtain wall construction, installing frame and building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108560783A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110725443A (en) * | 2019-09-26 | 2020-01-24 | 江河创建集团股份有限公司 | Curtain wall system with embedded opening sash |
CN111219007A (en) * | 2020-03-11 | 2020-06-02 | 华东建筑设计研究院有限公司 | Non-light-transmitting curtain wall unit with ventilation component and building curtain wall |
CN114892859A (en) * | 2022-05-24 | 2022-08-12 | 北京凌云宏达幕墙工程有限公司 | Hide wide-angle flat-open type corrosion resistant plate curtain wall structure of hinge |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0780525A1 (en) * | 1995-11-29 | 1997-06-25 | W. HARTMANN & CO (GMBH & CO) | Façade construction |
JP2006152561A (en) * | 2004-11-25 | 2006-06-15 | Ykk Ap株式会社 | Curtain wall |
CN202689277U (en) * | 2012-06-11 | 2013-01-23 | 浙江中南建设集团有限公司 | Hidden type openable window ventilation structure applied to curtain wall |
CN103486686A (en) * | 2013-10-10 | 2014-01-01 | 沈阳远大铝业工程有限公司 | Integrated ventilation type unit curtain wall |
CN203475652U (en) * | 2013-07-05 | 2014-03-12 | 苏州金螳螂幕墙有限公司 | Glass curtain wall with hidden opening sash |
CN204139395U (en) * | 2014-09-22 | 2015-02-04 | 苏州金螳螂幕墙有限公司 | A kind of fold-type curtain wall continuously |
CN205481529U (en) * | 2016-03-22 | 2016-08-17 | 石河子大学 | Automatic thermal -arrest wall ventilation unit who opens and close |
CN206957479U (en) * | 2017-07-17 | 2018-02-02 | 章一峰 | A kind of hidden opening leaf of glass curtain wall |
CN208267180U (en) * | 2018-04-08 | 2018-12-21 | 广州市设计院 | Building curtain wall construction, installing frame and building |
CN217871231U (en) * | 2022-07-27 | 2022-11-22 | 湖南固尔邦幕墙装饰股份有限公司 | Glass curtain wall integrated with hidden ventilation decoration strips |
-
2018
- 2018-04-08 CN CN201810306573.5A patent/CN108560783A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0780525A1 (en) * | 1995-11-29 | 1997-06-25 | W. HARTMANN & CO (GMBH & CO) | Façade construction |
JP2006152561A (en) * | 2004-11-25 | 2006-06-15 | Ykk Ap株式会社 | Curtain wall |
CN202689277U (en) * | 2012-06-11 | 2013-01-23 | 浙江中南建设集团有限公司 | Hidden type openable window ventilation structure applied to curtain wall |
CN203475652U (en) * | 2013-07-05 | 2014-03-12 | 苏州金螳螂幕墙有限公司 | Glass curtain wall with hidden opening sash |
CN103486686A (en) * | 2013-10-10 | 2014-01-01 | 沈阳远大铝业工程有限公司 | Integrated ventilation type unit curtain wall |
CN204139395U (en) * | 2014-09-22 | 2015-02-04 | 苏州金螳螂幕墙有限公司 | A kind of fold-type curtain wall continuously |
CN205481529U (en) * | 2016-03-22 | 2016-08-17 | 石河子大学 | Automatic thermal -arrest wall ventilation unit who opens and close |
CN206957479U (en) * | 2017-07-17 | 2018-02-02 | 章一峰 | A kind of hidden opening leaf of glass curtain wall |
CN208267180U (en) * | 2018-04-08 | 2018-12-21 | 广州市设计院 | Building curtain wall construction, installing frame and building |
CN217871231U (en) * | 2022-07-27 | 2022-11-22 | 湖南固尔邦幕墙装饰股份有限公司 | Glass curtain wall integrated with hidden ventilation decoration strips |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110725443A (en) * | 2019-09-26 | 2020-01-24 | 江河创建集团股份有限公司 | Curtain wall system with embedded opening sash |
CN111219007A (en) * | 2020-03-11 | 2020-06-02 | 华东建筑设计研究院有限公司 | Non-light-transmitting curtain wall unit with ventilation component and building curtain wall |
CN114892859A (en) * | 2022-05-24 | 2022-08-12 | 北京凌云宏达幕墙工程有限公司 | Hide wide-angle flat-open type corrosion resistant plate curtain wall structure of hinge |
CN114892859B (en) * | 2022-05-24 | 2023-08-22 | 北京凌云宏达幕墙工程有限公司 | Large-angle flat-open type stainless steel plate curtain wall structure with hidden hinges |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108560783A (en) | Building curtain wall construction, installing frame and building | |
CN201896567U (en) | Lighttight movable louver and blade sectional material thereof | |
CN208267180U (en) | Building curtain wall construction, installing frame and building | |
JP6479066B2 (en) | Joinery and ventilation valve operation parts | |
CN103994501B (en) | Cabinet air conditioner | |
JP3774741B2 (en) | Natural wind ventilation window | |
CN109113541A (en) | Energy-saving lighting ventilation rainproof shutter | |
CN112031601A (en) | Waterproof and anti-collision sliding door and window and composite door and window | |
JP6184152B2 (en) | Joinery and ventilation valve operation parts | |
CN209539033U (en) | A kind of novel window aluminum profile | |
CN101082262A (en) | Tall building wind-proof yarn window | |
CN2789389Y (en) | Omnibearing mosquito and fly-proofing sliding window | |
CN216744733U (en) | Hidden ventilation structure for curtain wall facade | |
CN205713732U (en) | A kind of sun-shading ventilating coordinates window | |
CN208267701U (en) | A kind of airtight window of double layers | |
JPH051594Y2 (en) | ||
CN219365802U (en) | Three bridge cut-off opening window of aluminum alloy curtain wall | |
JP3181208U (en) | Ventilator | |
CN1281931A (en) | Environmental protection energy-saving window | |
CN209483077U (en) | A kind of novel ventilated windowpane | |
CN208202966U (en) | A kind of flat-open type sash with gauze fan outline border | |
CN211524551U (en) | Foldable window | |
JPH1061343A (en) | Method for taking air in by using window | |
CN207453781U (en) | A kind of module room rain-proof air admission type window | |
JP3213404U (en) | Screen door with rain visor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20210803 Address after: 5103-5103 TIYU East Road, Guangzhou City, Guangdong Province Applicant after: Guangzhou Design Institute Group Co.,Ltd. Address before: 5103-5103 TIYU East Road, Guangzhou City, Guangdong Province Applicant before: GUANGZHOU DESIGN INSTITUTE |
|
TA01 | Transfer of patent application right |