CN108560561A - A kind of collection Support of Foundation Pit Excavation and it is lifted on integrated mechanical equipment - Google Patents

A kind of collection Support of Foundation Pit Excavation and it is lifted on integrated mechanical equipment Download PDF

Info

Publication number
CN108560561A
CN108560561A CN201810336657.3A CN201810336657A CN108560561A CN 108560561 A CN108560561 A CN 108560561A CN 201810336657 A CN201810336657 A CN 201810336657A CN 108560561 A CN108560561 A CN 108560561A
Authority
CN
China
Prior art keywords
foundation pit
lifted
mechanical equipment
integrated
collection support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810336657.3A
Other languages
Chinese (zh)
Inventor
孔维强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810336657.3A priority Critical patent/CN108560561A/en
Publication of CN108560561A publication Critical patent/CN108560561A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

A kind of collection Support of Foundation Pit Excavation and it is lifted on integrated mechanical equipment, constructed for city integrated piping lane.The organic machine of three gantry cranes is combined with girder steel, forms rectangular frame, iron plate is installed at surrounding and top;It is moved on spandrel girder by skid beam and is hung to precast concrete module in foundation pit from ground;Universal driving wheel is installed under three gantry crane column legs;On the ground, remaining four groups of driving wheel is in foundation pit for two groups of driving wheels of foremost;Vibration hammer is arranged in the front end of equipment, and fender pile is squeezed into below ground before excavation;Equipment using runner bucket continuously excavate and transported the soil dug out with conveyer belt;It is sieved equipped with electronic dregs in transmission end of tape, screening sorting processing is carried out to dregs;The crane column leg of back is articulated and connected with main body, can together be removed related column leg in turning.

Description

A kind of collection Support of Foundation Pit Excavation and it is lifted on integrated mechanical equipment
One, technical field
The present invention relates to a kind of mechanical equipment, the grooving of collection underground pipe gallery foundation pit, branch in the enclosed space can be realized Crater wall function is protected in one, and the function of concrete pipe gallery module can be lifted simultaneously.
Two, technical background
Currently, conventional underground pipe gallery construction all uses excavator to excavate bright ditch, fender pile supporting crater wall is manually laid, then Using the form of construction work of crane lifting precast concrete module.Common process excavates bright ditch using excavator influences environment, work Efficiency has low;Artificial laying fender pile needs multi agent cooperation that could complete;Crane lifting operation needs Special crane parking stall, occupies construction Place is unfavorable for the construction operation in urban congestion region.
Three, invention content
Problem to be solved:
It is an object of the present invention to provide a kind of mechanical equipments, construct for city integrated piping lane.For realize its function need solve with Lower problem:1, it is to meet environmental requirement, needs to carry out excavation of foundation pit operation in the enclosed space, this requires equipment shapes to advise It is whole, to install coffer;2, it is to reduce construction site, needs to carry out lifting operation using gantry crane;3, in order to ensure to set It is standby to be moved forward according to installation progress, it needs that driving wheel is arranged;4, it is to guarantee smoothly by prefabricated piping lane module from ground Face is hung in foundation pit, and equipment is needed to have supporting member in ground and foundation pit simultaneously;5, it is to ensure Excavation Process safety, It needs to complete fender pile supporting operation before excavation;6, it is to improve excavation speed, needs to use " excavation-conveying " inline process Carry out excacation;7, need the dregs Screening Treatment that will be dug out after the completion of lifting, using satisfactory dregs it is reserved as time It bankets;8, foundation pit narrow space, equipment turning is inconvenient, needs to take measures to reduce equipment turning radius.
Solution
The object of the present invention is achieved like this, with girder steel by 3 gantry crane organic assemblings, forms rectangular frame, surrounding and Top is installed by iron plate;Not only can be with closed operation region, but also Active workings can be saved;By skid beam, movement will be pre- on spandrel girder Concrete modular processed is hung to from ground in foundation pit;One group of universal driving wheel is installed under each column leg of 3 gantry cranes, to realize The mobile turning function of equipment;On the ground, remaining 4 groups of postposition driving wheel is placed in foundation pit preposition 2 groups of driving wheels, and height difference can be with It is adjusted according to cutting depth;Vibration hammer is set in the front end of equipment, fender pile can be squeezed into ground while advancing Hereinafter, carrying out security protection for follow-up excavation;The mud that equipment using runner bucket continuously excavate and will be dug out with conveyer belt Soil transports immediately;It is sieved equipped with electronic dregs in transmission end of tape, screening sorting processing is carried out to dregs, satisfactory dregs stays It is used as backfill down;2 groups of driving wheels of back are articulated and connected by column leg and main body, can related column leg is together in turning It removes, only stays a pair of driving wheels in foundation pit, turning radius of the equipment in foundation pit can be reduced.
Four, it illustrates
Attached drawing 1 is a kind of collection Support of Foundation Pit Excavation and is lifted on integrated mechanical equipment front view;
Attached drawing 2 is a kind of collection Support of Foundation Pit Excavation and is lifted on integrated mechanical equipment top view;
Attached drawing 3 is a kind of collection Support of Foundation Pit Excavation and is lifted on integrated mechanical equipment side view;
Attached drawing 4 is a kind of collection Support of Foundation Pit Excavation and is lifted on integrated mechanical equipment axonometric drawing;
Attached drawing 5 is runner bucket enlarged drawing in Fig. 4;
In figure:1 girder steel;2 gantry cranes;3 skid beams;4 spandrel girders;The universal driving wheel of 5 postpositions;6 preposition universal driving wheels;7 vibrations Hammer;8 runner buckets;9 conveyer belts;10 hinged links;11 electronic dregs sieves.
Five, specific implementation mode
In figure 4, the organic machine of three gantry cranes (2) is combined with girder steel (1), forms rectangular frame, surrounding and top Portion is installed by iron plate;It is moved on spandrel girder (4) by skid beam (3) and is hung to installation module in foundation pit from ground;3 gantry cranes (2) universal driving wheel is installed under column leg;On the ground, remaining four groups of postposition driving wheel (5) is in foundation pit for two groups of front driving wheels (6) Interior, height difference can be adjusted according to cutting depth;Equipment front end setting vibration hammer (7), fender pile squeeze into ground with Under, carry out security protection for follow-up excavation;Equipment using runner bucket (8) continuously excavate and will be dug out with conveyer belt (9) Soil transport;It is equipped with electronic dregs in transmission end of tape and sieves (11), screening sorting processing, satisfactory slag are carried out to dregs Soil gives over to backfill;The crane column leg of back is articulated and connected (10) with main body, can together be removed related column leg in turning, It only stays a pair of driving wheels in foundation pit, reduces turning radius.

Claims (9)

1. a kind of collection Support of Foundation Pit Excavation and being lifted on integrated mechanical equipment;By gantry crane, skid beam, spandrel girder, universal drive Driving wheel, vibration hammer, runner bucket, conveyer belt composition;Its characteristic use girder steel by three gantry cranes, vibration hammer, runner bucket, Conveyer belt, electronic dregs sieve are integrated into a whole.
2. collection Support of Foundation Pit Excavation according to claim 1 and be lifted on integrated mechanical equipment, it is characterized in that surrounding and It is closed with iron plate at top.
3. collection Support of Foundation Pit Excavation according to claim 1 and integrated mechanical equipment is lifted on, it is characterized in that using girder steel Three gantry cranes are integrated into a whole.
4. collection Support of Foundation Pit Excavation according to claim 1 and integrated mechanical equipment is lifted on, it is characterized in that using girder steel Vibration hammer and gantry crane are integrated into a whole.
5. collection Support of Foundation Pit Excavation according to claim 1 and integrated mechanical equipment is lifted on, it is characterized in that using girder steel Runner bucket is integrated into a whole with gantry crane.
6. collection Support of Foundation Pit Excavation according to claim 1 and integrated mechanical equipment is lifted on, it is characterized in that conveyer belt It is integrated into a whole with gantry crane.
7. collection Support of Foundation Pit Excavation according to claim 1 and integrated mechanical equipment is lifted on, it is characterized in that by electronic Dregs sieve is integrated into a whole with gantry crane.
8. collection Support of Foundation Pit Excavation according to claim 1 and integrated mechanical equipment is lifted on, it is characterized in that front two A driving wheel has height difference with remaining four groups.
9. collection Support of Foundation Pit Excavation according to claim 1 and integrated mechanical equipment is lifted on, it is characterized in that rear portion two A driving wheel supporting leg is articulated and connected with main body.
CN201810336657.3A 2018-04-16 2018-04-16 A kind of collection Support of Foundation Pit Excavation and it is lifted on integrated mechanical equipment Withdrawn CN108560561A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810336657.3A CN108560561A (en) 2018-04-16 2018-04-16 A kind of collection Support of Foundation Pit Excavation and it is lifted on integrated mechanical equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810336657.3A CN108560561A (en) 2018-04-16 2018-04-16 A kind of collection Support of Foundation Pit Excavation and it is lifted on integrated mechanical equipment

Publications (1)

Publication Number Publication Date
CN108560561A true CN108560561A (en) 2018-09-21

Family

ID=63535153

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810336657.3A Withdrawn CN108560561A (en) 2018-04-16 2018-04-16 A kind of collection Support of Foundation Pit Excavation and it is lifted on integrated mechanical equipment

Country Status (1)

Country Link
CN (1) CN108560561A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113404051A (en) * 2021-06-29 2021-09-17 中国建筑第八工程局有限公司 Lateral soil pouring equipment for height-limited space in foundation pit and foundation pit earthwork excavation method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5040921A (en) * 1989-10-13 1991-08-20 Torok Frank J Segmented tunnel system
CN105714851A (en) * 2016-02-29 2016-06-29 济南轨道交通集团有限公司 Integrated construction device for assembly type underground diaphragm wall or precast pile and cast-in-place underground station and construction method adopting same
CN106088149A (en) * 2016-08-05 2016-11-09 中交第二航务工程局有限公司 A kind of mechanization rapid constructing method of precast splice type underground gallery
CN107724425A (en) * 2017-09-19 2018-02-23 中建科技有限公司深圳分公司 The mechanized construction equipment and construction method of a kind of prefabricated pipe gallery

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5040921A (en) * 1989-10-13 1991-08-20 Torok Frank J Segmented tunnel system
CN105714851A (en) * 2016-02-29 2016-06-29 济南轨道交通集团有限公司 Integrated construction device for assembly type underground diaphragm wall or precast pile and cast-in-place underground station and construction method adopting same
CN106088149A (en) * 2016-08-05 2016-11-09 中交第二航务工程局有限公司 A kind of mechanization rapid constructing method of precast splice type underground gallery
CN107724425A (en) * 2017-09-19 2018-02-23 中建科技有限公司深圳分公司 The mechanized construction equipment and construction method of a kind of prefabricated pipe gallery

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113404051A (en) * 2021-06-29 2021-09-17 中国建筑第八工程局有限公司 Lateral soil pouring equipment for height-limited space in foundation pit and foundation pit earthwork excavation method

Similar Documents

Publication Publication Date Title
CN109296378B (en) Down-the-hole drill matched breaking hammer tunneling and excavating construction method
CN101775821B (en) Device and method for vertically transporting earthwork through reverse construction method
CN107218048A (en) The shape of a hoof development machine promoted by crawler belt
CN102535474A (en) Construction method for deep-foundation pit excavation
CN103938512A (en) Reverse construction method of newly built road with existing expressway in underneath penetrating manner
CN109339096A (en) A kind of construction integrated constructing device of pipe gallery open cut precast assembly and its construction method
CN101736763B (en) Foundation pit excavator
CN108560561A (en) A kind of collection Support of Foundation Pit Excavation and it is lifted on integrated mechanical equipment
CN103741742B (en) Ditcher
CN107366322A (en) A kind of milling digging machine of automatic material-absorbing
CN206768833U (en) A kind of concrete support and steel lattice column attachment structure
RU2141030C1 (en) Device for construction of mine shafts
CN109630123A (en) Deep shaft rock ripper
CN212225215U (en) Accurate jacking equipment of line box culvert construction for railway construction
CN206942770U (en) A kind of shape of a hoof development machine promoted by crawler belt
CN105649619A (en) Multifunctional drill loader
CN112962534B (en) Large-area dredging dredger fill foundation structure and treatment method thereof
CN204875893U (en) Four track rubbles excavate all -in -one
KR20020024912A (en) Method of construct a tunnel
CN206873489U (en) A kind of subway station roof shield hole retaining wall structure
CN214423379U (en) Side slope deluge ditch processing structure
McGowan The typology and techniques of alluvial mining: the example of the Shoalhaven and Mongarlowe goldfields in southern New South Wales
CN201982104U (en) Excavation bucket of excavation bucket loader for tunnel driving
CN218843199U (en) Auxiliary device that unearths is excavated fast to deep and large foundation ditch
CN112502167A (en) Slope rain-sprinkling ditch treatment structure and construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20180921