CN204875893U - Four track rubbles excavate all -in -one - Google Patents
Four track rubbles excavate all -in -one Download PDFInfo
- Publication number
- CN204875893U CN204875893U CN201520389744.7U CN201520389744U CN204875893U CN 204875893 U CN204875893 U CN 204875893U CN 201520389744 U CN201520389744 U CN 201520389744U CN 204875893 U CN204875893 U CN 204875893U
- Authority
- CN
- China
- Prior art keywords
- mechanical arm
- excavate
- rubbles
- track
- base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Shovels (AREA)
Abstract
The utility model discloses four track rubbles excavate all -in -one belongs to the construction machinery field, including scraper bowl, arm, crusher hammer, base, driver's cabin, track. The utility model discloses four track rubbles excavate all -in -one adopts two arms, lets the excavator have simultaneously and excavates function and rubble function, promotes work efficiency greatly, four track rubbles excavate all -in -one adopts four tracks, and it is more nimble to move like this, starts sooner, has good trafficability characteristic. The utility model discloses the power supply is powerful, and easy operation is convenient, and work efficiency is high, can be extensive be applied to every field such as industry construction, civil buildings, road construction, municipal works, especially showing more in the in -process advantage that the engineering was salvageed, market prospect is wide.
Description
Technical field
The utility model belongs to building machinery technical field, and particularly a kind of four crawler belt rubbles excavate all-in-one.
Background technology
Excavator is a kind of engineering mechanical device common on building sites, and existing pair of shovel crawler motion is dumb, starts slow, weak to the adhesive power of soil, specific pressure is comparatively large, and can not adapt to rugged road surface, mobility is poor, poor by property, by shoal, narrow ditch, abrupt slope or other obstructions time need lay separately and prepare road, in the process excavated, run into complicated landform, be easily absorbed in ditch, new workplace cannot be put into very soon, inefficiency.
In addition, existing excavator only has a mechanical arm, excavation and rubble function can not be processed simultaneously, when running into adamantine stone in the process excavated, if do not change stone breaker, be easy to the scraper bowl damaging excavator, as long as stone is broken into pieces so first change stone breaker, change scraper bowl again could continue to excavate, seriously in the course of the work delayed the time, too increase the labour intensity of workman.
Therefore need badly in the middle of prior art and want a kind of new technical scheme to solve this problem.
Summary of the invention
Technical problem to be solved in the utility model is: provide a kind of four crawler belt rubbles to excavate all-in-one, solve existing pair of shovel crawler motion dumb, start slow, weak to the adhesive power of soil, specific pressure is larger, rugged road surface can not be adapted to, mobility is poor, poor by property, by shoal, narrow ditch, abrupt slope or other obstructions time need lay separately and prepare road, in the process excavated, run into complicated landform, be easily absorbed in ditch, new workplace cannot be put into very soon, inefficiency; Existing excavator only has a mechanical arm, excavation and rubble function can not be processed simultaneously, when running into adamantine stone in the process excavated, if do not change stone breaker, be easy to damage the scraper bowl of excavator, as long as so first change stone breaker stone is broken into pieces, then change scraper bowl and could continue excavation, seriously waste time in the course of the work, too increase the technical problems such as the labour intensity of workman.
A kind of four crawler belt rubbles excavate all-in-one, comprise scraper bowl, mechanical arm, grinder hammerhead, base, driver's cabin, crawler belt, one end of described mechanical arm is by welding and be bolted on base, the other end of mechanical arm is connected with scraper bowl or grinder hammerhead, the outer setting of mechanical arm has hydraulically extensible bar, the quantity of mechanical arm is 2, and two mechanical arms are arranged on the both sides of driver's cabin respectively; Described driver's cabin is fixed by welding in the middle part of base upper surface; Described scraper bowl is connected with the hydraulically extensible bar of a mechanical arm and this mechanical arm with bolt respectively by axle; Described grinder hammerhead is connected with the hydraulically extensible bar of another mechanical arm and this mechanical arm with bolt respectively by axle; The quantity of described crawler belt is 4, and is connected with the bottom of base respectively by suspension.
The suspension of described connecting band track and base is independent suspension system.
By above-mentioned design, the utility model can reach following beneficial effect:
The utility model four crawler belt rubble excavates all-in-one, adopts double mechanical arms, allows excavator have data mining duty and rubble function simultaneously, greatly promote operating efficiency; Four crawler belt rubbles excavate all-in-one and adopt four crawler belts, can move so more flexible, start faster; There is the good property passed through, to the strong adhesion of soil, specific pressure is less, rugged road surface can be adapted to, there is good mobility, not needing to lay and prepare road comes by shoal, narrow ditch, abrupt slope and other obstructions, simultaneously the utility model also have turning flexibly, advantage fast.
Four crawler belt rubbles excavate all-in-one and can realize excavating and rubble function simultaneously, and motion flexibly, power source is powerful, simple to operation, operating efficiency is high, can be widely used in the every field such as industrial construction, civilian construction, road construction, municipal engineering, especially in the process of engineering first-aid repair, advantage is more remarkable, wide market.
Accompanying drawing explanation
Below in conjunction with the drawings and the specific embodiments, the utility model is described in further detail:
Fig. 1 is the structural representation that the utility model four crawler belt rubble excavates all-in-one.
In figure, 1-scraper bowl, 2-mechanical arm, 3-grinder hammerhead, 4-base, 5-driver's cabin, 6-crawler belt.
Detailed description of the invention
As shown in the figure, the utility model four crawler belt rubble excavates all-in-one, it is characterized in that: comprise scraper bowl 1, mechanical arm 2, grinder hammerhead 3, base 4, driver's cabin 5, crawler belt 6, one end of described mechanical arm 2 is by welding and be bolted on base 4, the other end of mechanical arm 2 is connected with scraper bowl 1 or grinder hammerhead 3, the outer setting of mechanical arm 2 has hydraulically extensible bar, and the quantity of mechanical arm 2 is 2, and two mechanical arms 2 are arranged on the both sides of driver's cabin 5 respectively; Described driver's cabin 5 is fixed by welding in the middle part of base 4 upper surface; Described scraper bowl 1 is connected with the hydraulically extensible bar of a mechanical arm 2 and this mechanical arm 2 with bolt respectively by axle; Described grinder hammerhead 3 is connected with the hydraulically extensible bar of another mechanical arm 2 and this mechanical arm 2 with bolt respectively by axle; The quantity of described crawler belt 6 is 4, and is connected respectively by the bottom of suspension with base 4.
The suspension of described connecting band track 6 and base 4 is independent suspension system.
The utility model four crawler belt rubble excavates all-in-one, after entering construction plant, as first carried out digging operation, then first press excavation button, the mechanical arm 2 then connecting grinder hammerhead 3 closes up to driver's cabin 5 to be packed up, and the excavation bar in operation driver's cabin 5, can realize digging operation.
When needs carry out rubble operation, press rubble button, then the mechanical arm 2 connecting scraper bowl 1 closes up to driver's cabin 5 to be packed up, and rubble bar in operation driver's cabin 5, can realize rubble operation.When a mechanical arm 2 is not packed up, another mechanical arm 2 can not be started working, and fully ensure that the safety of operation.
Claims (2)
1. four crawler belt rubbles excavate all-in-one, it is characterized in that: comprise scraper bowl (1), mechanical arm (2), grinder hammerhead (3), base (4), driver's cabin (5), crawler belt (6), one end of described mechanical arm (2) is by welding and be bolted on base (4), the other end of mechanical arm (2) is connected with scraper bowl (1) or grinder hammerhead (3), the outer setting of mechanical arm (2) has hydraulically extensible bar, the quantity of mechanical arm (2) is 2, and two mechanical arms (2) are arranged on the both sides of driver's cabin (5) respectively, described driver's cabin (5) is fixed by welding in the middle part of base (4) upper surface, described scraper bowl (1) is connected with the hydraulically extensible bar of a mechanical arm (2) and this mechanical arm (2) with bolt respectively by axle, described grinder hammerhead (3) is connected with the hydraulically extensible bar of another mechanical arm (2) and this mechanical arm (2) with bolt respectively by axle, the quantity of described crawler belt (6) is 4, and is connected respectively by the bottom of suspension with base (4).
2. four crawler belt rubbles according to claim 1 excavate all-in-one, it is characterized in that: the suspension of described connecting band track (6) and base (4) is independent suspension system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520389744.7U CN204875893U (en) | 2015-06-08 | 2015-06-08 | Four track rubbles excavate all -in -one |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520389744.7U CN204875893U (en) | 2015-06-08 | 2015-06-08 | Four track rubbles excavate all -in -one |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204875893U true CN204875893U (en) | 2015-12-16 |
Family
ID=54820285
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520389744.7U Expired - Fee Related CN204875893U (en) | 2015-06-08 | 2015-06-08 | Four track rubbles excavate all -in -one |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204875893U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108915014A (en) * | 2018-05-29 | 2018-11-30 | 山东科技大学 | A kind of crawler type precipice rubble remove device |
CN111335386A (en) * | 2020-03-07 | 2020-06-26 | 四川中港建设工程有限公司 | Water conservancy ditch excavation construction device and construction method thereof |
-
2015
- 2015-06-08 CN CN201520389744.7U patent/CN204875893U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108915014A (en) * | 2018-05-29 | 2018-11-30 | 山东科技大学 | A kind of crawler type precipice rubble remove device |
CN111335386A (en) * | 2020-03-07 | 2020-06-26 | 四川中港建设工程有限公司 | Water conservancy ditch excavation construction device and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103835720B (en) | Hard Rock Breaking System | |
CN205024740U (en) | Civil engineering uses multi -functional excavating machinery | |
CN206667324U (en) | A kind of engineering machinery presses road all-in-one with multi-functional digging and soil-shifting | |
CN102704941A (en) | Slurry shield stone-crushing device | |
CN204875893U (en) | Four track rubbles excavate all -in -one | |
CN206815427U (en) | A kind of broken excavating gear of foundation ditch open cut | |
CN103343688B (en) | Surface mine clear end machine | |
CN202391436U (en) | Multifunctional mounting machine | |
CN104032784A (en) | Bulldozer with vibration function for civil engineering | |
JP6688397B2 (en) | Clean and efficient mining method | |
CN103741742B (en) | Ditcher | |
CN107975080A (en) | A kind of earth mover | |
CN202645583U (en) | Muddy water shield stone breaking device | |
CN2846515Y (en) | Crushing and digging device | |
CN202164643U (en) | Quick connector for excavating machine | |
CN203668994U (en) | Ditcher | |
CN202164638U (en) | Hydraulic orange-peel grab for excavator | |
CN207538094U (en) | A kind of multifunctional excavator | |
CN204875907U (en) | Push pedal of building bull -dozer | |
CN208039343U (en) | A kind of ditching machinery | |
CN203594060U (en) | Excavator used safely | |
CN203096784U (en) | Novel excavator | |
CN205857266U (en) | A kind of power shovel of civil engineering | |
CN102363968B (en) | Spatial excavator with two-range-of-motion (two-ROM) movable arm, one-ROM bucket rod and two-ROM bucket | |
CN207176789U (en) | Head is dug in blade type milling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151216 Termination date: 20160608 |
|
CF01 | Termination of patent right due to non-payment of annual fee |