CN108560500A - A kind of sluice water blocking building structure for going sightseeing - Google Patents

A kind of sluice water blocking building structure for going sightseeing Download PDF

Info

Publication number
CN108560500A
CN108560500A CN201810314618.3A CN201810314618A CN108560500A CN 108560500 A CN108560500 A CN 108560500A CN 201810314618 A CN201810314618 A CN 201810314618A CN 108560500 A CN108560500 A CN 108560500A
Authority
CN
China
Prior art keywords
sightseeing
dam body
water blocking
building structure
arch dam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810314618.3A
Other languages
Chinese (zh)
Other versions
CN108560500B (en
Inventor
李贺敏
杨佳晶
李肖亮
张辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heilongjiang Guozhi Tourism Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810314618.3A priority Critical patent/CN108560500B/en
Publication of CN108560500A publication Critical patent/CN108560500A/en
Application granted granted Critical
Publication of CN108560500B publication Critical patent/CN108560500B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/20Movable barrages; Lock or dry-dock gates

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Revetment (AREA)

Abstract

The present invention provides a kind of sluice water blocking building structure for going sightseeing, including leading directly to plank road, hang drawing steel wire rope, motor, bearing plate, winding roller, with motor support platform sling, as soon as from top to bottom offering sliding slot at eating on the left and right inner wall of the outflow channel front position, and gate is slidably disposed within the inside of this sliding slot at two, and then gate is dead by outflow channel downslide closure gate;It draws Steel wire rope lock to be close to connect with hanging at corresponding two also by link at two in the top of the gate;The straight-through plank road is horizontal to be connected at three between arch dam body, and the bottom of straight-through plank road is supported by bridge pier at six, this at six bridge pier be located at three inside the arcuate recess of arch dam body in corresponding respectively in pairs.The setting of arch dam body at the present invention three, the arch dam body constitutes the sightseeing plank road of continuous bend at three, and the sightseeing plank road of continuous bend can increase the sightseeing length of main body dam, can accommodate more tourists and carry out walking sightseeing.

Description

A kind of sluice water blocking building structure for going sightseeing
Technical field
The invention belongs to sluice water blocking technical field of buildings more particularly to a kind of sluice water blocking buildings for going sightseeing Structure.
Background technology
The sightseeing tour in fish pond is extremely hot with the improvement of people ' s living standards, this just needs one kind to be done exclusively for going sightseeing The dam of optimization design meets the demand of going sightseeing of people.
Patent by retrieving such as CN203866781U discloses a kind of fan-shaped ecoscape dam, including arch dam body, Arch dam body includes upstream face, back side, top and bottom;Wherein, upstream face is domes, and back side includes cobblestone slurry Several tooth sockets are arranged for ecological layer of plants, bottom surface at waveform curved surface the lowest point in waveform curved surface made of block, and tooth socket is inserted into river The batholith of bed, entire back side are in covering of the fan structure, several fan-shaped skeleton one ends of back side bottom connection, the fan-shaped skeleton other end Portion is gathered together to form water outlet, and fan-shaped skeleton one end is gradually reduced to other end width.The present invention have it is simple in structure, make Cheap, sturdy and durable, the humane breath of valence is high, aesthetic measure is high and has the function of the features such as ecological, environmental protective.
A kind of copper coin shape ecoscape dam, including arch dam are disclosed in the patent of such as Patent No. CN203866786U Body, arch dam body include upstream face, back side, top and bottom;Wherein, upstream face is domes, and back side includes goose ovum Several copper coin shape pier studs, bottom is arranged for ecological layer of plants, top surface at waveform curved surface the lowest point in waveform curved surface made of stone grouts Several tooth sockets are arranged in face, and tooth socket is inserted into the batholith in riverbed.The present invention has simple in structure, low cost, sturdy and durable, humane Breath is high, aesthetic measure is high and has the function of the features such as ecological, environmental protective.
The integrated functionality of patent is less at above-mentioned two, is not directed to go sightseeing and does excessive optimization design, and above-mentioned two The taking-up cleaning operation that gear fish strainer or gear fish strainer are not provided in place's patent is relatively complicated, so as to cause gear fish strainer It is also more inconvenient to damage replacement operation.
Then, it in view of this, study improvement for existing structure and missing, provides and a kind of is used to go sightseeing Sluice water blocking building structure, to achieve the purpose that with more more practical value.
Invention content
The sluice water blocking building structure that in order to solve the above technical problem, the present invention provides a kind of for going sightseeing, with It is less to solve existing sluice water blocking building integrated functionality, is not directed to go sightseeing and does excessive optimization design, and at above-mentioned two The taking-up cleaning operation that gear fish strainer or gear fish strainer are not provided in patent is relatively complicated, so as to cause the damage of gear fish strainer Bad replacement operation also more inconvenient problem.
The purpose and effect for the sluice water blocking building structure that the present invention is used to go sightseeing, by the institute of technological means in detail below Reach:
A kind of sluice water blocking building structure for going sightseeing, including arch dam body, permeable dike, filter plate, supporting rod, side Side pedal, filter plate slot, outflow channel, gear fishnet, gate, computer room, sky shade, fishing platform, stack wall, up/down steps, spud pile, Straight-through plank road, hangs drawing steel wire rope, motor, bearing plate, winding roller and motor support platform sling, the master of the water blocking building structure Dam structure is that arch dam body bumps connect to be formed at three, and uniform array reinforces branch on the back arcwall face of arch dam body at three Support has many places wedge securing plate;The left and right ends of the arch dam body, which are all connected with, at the left and right sides two is provided with permeable dike at one, And the top half of permeable dike is semicircle setting, lower plate portions are that rectangle is arranged;The circle of the permeable dike top half Run through on column dam body and equidistantly offers the permeable slot of many places semicircle pie;The top plan slicing of the permeable dike is provided with step Row pedal, and the support of this walking pedal side is provided with guardrail at one;The supporting rod is arranged in direct bending, and its vertical support Bar support is placed on the inside of permeable dike on curved wall, and horizontal strut is connected and fixed on the side wall of permeable dike top walking pedal On;The they sup-port horizontal array has many places, and equidistant interval is placed between the permeable slot of each semicircle pie;Horizontal array The apical support of the supporting rod of setting in a row is welded with side pedal at one, and equidistantly runs through on this side pedal and open up There is many places rectangular channel;The inside for the permeable slot of many places circle pie being provided on the permeable dike offers filter plate at one and inserts Slot, and this filter plate slot is located at the excessive junction of top walking pedal and curved wall on the inside of permeable dike;Convex is arranged at two Vertical extend has poured stack wall at one inwardly the middle of the arch dam body, the top of this stack wall at two, which supports, to be set It is equipped with guardrail, and the front end of stack wall is all connected with and has poured cylinder spud pile at one again at two;The apical support of the spud pile It is fixed with sky shade at one, and the outer eaves support of spud pile top end face is provided with one and encircles for protection column;The recessed institute set outside middle The centre position for stating arch dam body offers a prescription shape discharge sump, and is connected at one and puts on the left and right inner wall of discharge sump Water channel road, and this outflow channel supports be extended outward;The apical support of the outflow channel is provided with computer room at one, and Horizontal equidistant welding is supported by H steel shape motor support platform sling at three on the left and right inner wall of this computer room, this motor support platform sling at three The equal screw threads for fastening in bottom have motor at one, bearing plate at speed reducer and two at one;The motor is integral type with speed reducer Rotation connection setting, and the central rotating shaft of speed reducer sequentially passes through the Bearing inner being embedded on bearing plate at two;It is described to subtract Interval welding is provided with winding roller at two on the central rotating shaft of fast machine, and hangs the one ends wound of drawing steel wire rope in another on winding roller End locking is connected to the inside of gear fishnet braced frame top link;On the left and right inner wall of the outflow channel front position by As soon as it is upper and under offer eat at sliding slot, and gate is slidably disposed within the inside of this sliding slot at two, and then gate will be under outflow channel Sliding closure gate is dead;It draws Steel wire rope lock to be close to connect with hanging at corresponding two also by link at two in the top of the gate;It is described straight Transit shed road is horizontal to be connected at three between arch dam body, and the bottom of straight-through plank road is supported by bridge pier at six, this at six bridge pier be in It is corresponding respectively in pairs to be located at three inside the arcuate recess of arch dam body.
Further, interval is supported by a certain distance between the side pedal and the walking pedal on permeable dike top.
Further, the inside of the filter plate, which is inlayed, is welded with strainer, and left and right sidewall is excessively arranged for semi-cylindrical, and As soon as its top be also welded at lift-pull handle, filter plate is inserted in by the side walls of its semi-cylindrical in filter plate slot Portion.
Further, the arch dam body constitutes the sightseeing plank road of continuous bend at three.
Further, the left and right sides of the stack wall is symmetrically arranged with up/down steps everywhere at two.
Further, the outer eaves circular array of spud pile top end face is supported by fishing platform at three, and this is at three The top on side block column is that circular arc is excessively arranged outside fishing platform.
Further, the gear fishnet is provided at two altogether, this at two gear fishnet be slidably plugged in the interior of outflow channel Portion is simultaneously spaced and is supported by a certain distance, and keeps off the top of fishnet at two and hang drawing steel wire at corresponding two by link at two Cord lock, which is close to, to be connect.
Further, symmetric support has support at two to hang on the top end face of motor support platform sling described in H steel shapes at three Plate, and this at three support platform sling be fixedly connected with computer room ceiling.
Compared with prior art, the present invention has the advantages that:
The setting of side pedal and permeable dike, the interstitial spaces between side pedal and permeable dike are that the lifting of filter plate is extracted out Provide working space.
The setting of filter plate, before filter plate can stop fry and the sundries blocking in water is placed in the permeable slot of semicircle pie Half part avoids sundries from causing cleaning inconvenient the entire semicircle permeable slot blocking of pie, and filter plate uses the dress of sliding plug With mode, its pull can easily be taken out to the cleaning for carrying out sundries.
The setting of arch dam body at three, the arch dam body constitutes the sightseeing plank road of continuous bend at three, continuously The sightseeing plank road of bending can increase the sightseeing length of main body dam, can accommodate more tourists and carry out walking sightseeing.
The setting of up/down steps can conveniently rest against the sightseeing boat at left and right sides of stack wall up and down by up/down steps.
The setting of fishing platform, fishing platform provides special space of fishing, and the circular arc on its outer side block column for fishing friend at three Excessively setting can put the folding and unfolding for facilitating fishing rod.
The setting of motor support platform sling, there is symmetric support on the top end face of motor support platform sling described in H steel shapes at three Support platform sling at two, and this at three support platform sling be fixedly connected with computer room ceiling, support platform sling that can reinforce motor branch at two The support strength for supportting platform sling, avoids motor support platform sling from occuring bending and deformation in the process of long-time service.
The setting of fishnet is kept off at two, is kept off fishnet a preparation and a use at two, can be used alternatingly and sundries thereon is replaced Rinse cleaning.
Description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is three dimensional structure diagram of the present invention;
Fig. 3 is that the present invention looks up three dimensional structure diagram;
Fig. 4 is Fig. 1 partial enlargements figure structure schematic representation of the present invention;
Fig. 5 is 7 partial enlargement figure structure schematic representation of sky shade of the present invention;
Fig. 6 is computer room internal structure schematic diagram of the present invention;
Fig. 7 is motor drive relational structure schematic diagram of the present invention;
Fig. 8 is permeable dike structural schematic diagram of the present invention;
Fig. 9 is permeable dike structural schematic diagram of the present invention;
8 partial enlarged view of Figure 10 Invention figures.
In figure:1- arch dam bodys, 2- permeable dikes, 201- filter plates, 202- supporting rods, the sides 203- pedal, 204- filter plates are inserted Slot, 3- outflow channels, 4- keep off fishnet, 5- gates, 6- computer rooms, 7- sky shades, the fishing platforms 8-, 9- stack walls, 10- up/down steps, 11- Spud pile, 12- lead directly to plank road, and 13- hangs drawing steel wire rope, 14- motors, 141- bearing plates, 142- winding rollers, 15- motor supports Platform sling.
Specific implementation mode
The present invention is described further below in conjunction with attached drawing:
Embodiment:
As shown in attached drawing 1 to attached drawing 8:
The present invention provides a kind of sluice water blocking building structure for going sightseeing, including arch dam body 1, permeable dike 2, filter Plate 201, supporting rod 202, side pedal 203, filter plate slot 204, outflow channel 3 keep off fishnet 4, gate 5, computer room 6, sky shade 7, fishing platform 8, stack wall 9, up/down steps 10, spud pile 11, lead directly to plank road 12, hang draw steel wire rope 13, motor 14, bearing plate 141, the main dam structure of winding roller 142 and motor support platform sling 15, the water blocking building structure is that arch dam body 1 is recessed at three Convex connection is formed, and uniform array reinforcing is supported by many places wedge securing plate on the back arcwall face of arch dam body 1 at three;Left and right The left and right ends of the arch dam body 1, which are all connected with, at both sides two is provided with permeable dike 2 at one, and the top half of permeable dike 2 is Semicircle setting, lower plate portions are arranged for rectangle;Run through on the circular cylindrical shape dam body of 2 top half of the permeable dike and equidistantly opens Equipped with the permeable slot of many places semicircle pie;The top plan slicing of the permeable dike 2 is provided with walking pedal, and this walking pedal Side support is provided with guardrail at one;The supporting rod 202 is arranged in direct bending, and its vertical strut support is placed in permeable dike On 2 inside curved walls, horizontal strut is connected and fixed on the side wall of 2 top walking pedal of permeable dike;The supporting rod 202 Support horizontal array has many places, and equidistant interval is placed between the permeable slot of each semicircle pie;Horizontal array setting in a row The apical support of the supporting rod 202 is welded with side pedal 203 at one, and equidistantly runs through on this side pedal 203 and offer Many places rectangular channel;The inside for the permeable slot of many places circle pie being provided on the permeable dike 2 offers filter plate slot at one 204, and this filter plate slot 204 is located at the excessive junction of top walking pedal and 2 inside curved wall of permeable dike;Convex at two Vertical extend has poured stack wall 9 at one inwardly for the middle for the arch dam body 1 being arranged, the top of this stack wall 9 at two Support is provided with guardrail, and the front end of stack wall 9 is all connected with and has poured cylinder spud pile 11 at one again at two;The spud pile 11 apical support is fixed with sky shade 7 at one, and the outer eaves support of 1 top end face of spud pile is provided with one and encircles for protection column;It is intermediate The centre position of the outer recessed arch dam body 1 set in place offers a prescription shape discharge sump, and on the left and right inner wall of discharge sump Outflow channel 3 at one are connected with, and this outflow channel 3 supports be extended outward;The top branch of the outflow channel 3 Support is provided with computer room 6 at one, and horizontal equidistant welding is supported by H steel shape motor support at three and hangs on the left and right inner wall of this computer room 6 Plate 15, the equal screw threads for fastening in bottom of this motor support platform sling 15 at three have at one at motor 14, one bearing block at speed reducer and two Plate 141;The motor 14 is that integral type rotation connection is arranged, and the central rotating shaft of speed reducer sequentially passes through axis at two with speed reducer The Bearing inner being embedded on bearing plate 141;Interval welding is provided with winding roller at two on the central rotating shaft of the speed reducer 142, and hang and the one ends wound of steel wire rope 13 is drawn to be connected to 4 braced frame top of gear fishnet in other end locking on winding roller 142 The inside of link;It is from top to bottom offered on the left and right inner wall of 3 front position of the outflow channel and eats sliding slot at one, and gate 5 are just slidably disposed within the inside of this sliding slot at two, and then gate 5 is dead by 3 downslide closure gate of outflow channel;The top of the gate 5 The locking of steel wire rope 13 is drawn to connect with being hung at corresponding two also by link at two;Horizontal be connected at three of the straight-through plank road 12 is encircleed Between shape dam body 1, and the bottom of straight-through plank road 12 is supported by bridge pier at six, this at six bridge pier in correspondence is located at respectively in pairs At three inside the arcuate recess of arch dam body 1.
Explanation:Arch dam body 1, permeable dike 2, outflow channel 3, stack wall 9, straight-through plank road 12, spud pile 11 and computer room 6 are equal Be made of concreting, their guardrails with metal material, motor support platform sling 15 and supporting rod 202 connection support side Formula is welding, and the fixed position interior embedding fixed iron plate of edge in advance need to be being corresponded to when pouring the above-mentioned each building structure of forming, into And it can be directly welded and fixed with iron plate embedding in advance in the fixed metal structure of support.
Wherein, interval is supported by a certain distance between the walking pedal on 2 top of the side pedal 203 and permeable dike, Interstitial spaces between side pedal 203 and permeable dike 2 provide working space for the lifting extraction of filter plate 201.
Wherein, the inside of the filter plate 201, which is inlayed, is welded with strainer, and left and right sidewall is excessively arranged for semi-cylindrical, and As soon as its top be also welded at lift-pull handle, filter plate 201 is inserted in filter plate slot by the side walls of its semi-cylindrical 204 inside, filter plate 201 can stop fry and the sundries blocking in water are placed in the first half of the permeable slot of semicircle pie Point, avoid sundries from causing cleaning inconvenient the entire semicircle permeable slot blocking of pie, and filter plate 201 is using the assembly of sliding plug Its pull can easily be taken out the cleaning for carrying out sundries by mode.
Wherein, the arch dam body 1 constitutes the sightseeing plank road of continuous bend, the sightseeing plank road of continuous bend at three The sightseeing length that main body dam can be increased can accommodate more tourists and carry out walking sightseeing.
Wherein, the left and right sides of the stack wall 9 is symmetrically arranged with up/down steps 10 everywhere at two, passes through up/down steps 10 The sightseeing boat of 9 left and right sides of stack wall can be conveniently rested against up and down.
Wherein, the outer eaves circular array of 11 top end face of the spud pile is supported by fishing platform 8 at three, and this is fished at three The top on 8 outer side block column of Yutai is that circular arc is excessively arranged, and fishing platform 8 provides special space of fishing for fishing friend at three, and The excessively setting of the circular arc on its outer side block column can put the folding and unfolding for facilitating fishing rod.
Wherein, the gear fishnet 4 is provided at two altogether, this at two gear fishnet 4 be slidably plugged in the inside of outflow channel 3 And be spaced and be supported by a certain distance, and keep off the top of fishnet 4 at two and drawing steel wire is hung at corresponding two by link at two 13 locking of rope connects, and 4 a preparation and a use of fishnet is kept off at two, can be used alternatingly and carry out alternately rinsing cleaning to sundries thereon.
Wherein, symmetric support has support platform sling at two on the top end face of motor support platform sling 15 described in H steel shapes at three, And this at three support platform sling be fixedly connected with 6 ceiling of computer room, support platform sling that can reinforce the branch of motor support platform sling 15 at two Intensity is supportted, motor support platform sling 15 is avoided to occur bending and deformation in the process of long-time service.
The specifically used mode of the present embodiment and effect:
In the present invention, for the rotation and lifting control of motor 14 at three can pass through simple self-locking limit circuit realize therefore It does not do in specification and specifically repeats, in addition both feet need to separately be trampled in walking pedal and side when pull takes out filter plate 201 On pedal 203 and bending squats down and pull taking-up operation, it should also be noted that by the infiltration of moisture vapor corruption can be occurred for guardrail for a long time Erosion is got rusty, and then should be inspected periodically the support construction intensity of guardrail and be replaced in time to the guardrail of damage.
Wherein, the vertical line in attached drawing 6,7 of the invention, not marks lead, but hangs and draw steel wire rope 13.
Using technical solution of the present invention or those skilled in the art under the inspiration of technical solution of the present invention, if Similar technical solution is counted out, and reaches above-mentioned technique effect, is to fall into protection scope of the present invention.

Claims (8)

1. a kind of sluice water blocking building structure for going sightseeing, it is characterised in that:The sluice water blocking for being used to go sightseeing Building structure includes arch dam body, permeable dike, filter plate, supporting rod, side pedal, filter plate slot, outflow channel, gear fishnet, lock Door, computer room, sky shade, fishing platform, stack wall, up/down steps, spud pile lead directly to plank road, hang drawing steel wire rope, motor, bearing plate, The main dam structure of winding roller and motor support platform sling, the water blocking building structure is that arch dam body bumps connect to be formed at three, And uniform array reinforcing is supported by many places wedge securing plate on the back arcwall face of arch dam body at three;It is described at the left and right sides two The left and right ends of arch dam body, which are all connected with, is provided with permeable dike at one, and the top half of permeable dike is semicircle setting, under Plate portion is divided into rectangle setting;Run through on the circular cylindrical shape dam body of the permeable dike top half and equidistantly offers many places semicircle cake The permeable slot of shape;The top plan slicing of the permeable dike is provided with walking pedal, and the support of this walking pedal side is provided with one Locate guardrail;The supporting rod is arranged in direct bending, and its vertical strut support is placed on the inside of permeable dike on curved wall, horizontal Strut is set to be connected and fixed on the side wall of permeable dike top walking pedal;The they sup-port horizontal array has many places, and waits It is placed between the permeable slot of each semicircle pie away from interval;The apical support of the supporting rod of horizontal array setting in a row is welded There is side pedal at one, and equidistantly runs through on this side pedal and offer many places rectangular channel;What is be provided on the permeable dike is more The inside of the round permeable slot of pie in place offers filter plate slot at one, and this filter plate slot be located at top walking pedal with it is permeable The excessive junction of curved wall on the inside of dam;The middle for the arch dam body that convex is arranged at two is vertical inwardly to be extended Stack wall at one is poured, the top of this stack wall at two, which supports, is provided with guardrail, and the front end of stack wall is all connected with and pours again at two There is cylinder spud pile at one;The apical support of the spud pile is fixed with sky shade at one, and spud pile top end face is outer Eaves support is provided with one and encircles for protection column;The centre position of the recessed arch dam body set offers a prescription shape and discharges water outside middle Slot, and outflow channel at one is connected on the left and right inner wall of discharge sump, and this outflow channel supports be extended outward; The apical support of the outflow channel is provided with computer room at one, and horizontal equidistant welding is supported by three on the left and right inner wall of this computer room Locate H steel shape motor support platform slings, the equal screw threads for fastening in bottom of this motor support platform sling at three has motor at one, at one speed reducer and Bearing plate at two;The motor is that integral type rotation connection is arranged, and the central rotating shaft of speed reducer sequentially passes through with speed reducer The Bearing inner being embedded on bearing plate at two;Interval welding is provided with coiling at two on the central rotating shaft of the speed reducer Roller, and hang and the one ends wound of steel wire rope is drawn to be connected in the link of gear fishnet braced frame top in other end locking on winding roller Portion;As soon as from top to bottom offering sliding slot at eating on the left and right inner wall of the outflow channel front position, and gate sliding is set In the inside of this sliding slot at two, and then gate is dead by outflow channel downslide closure gate;The top of the gate is hung also by two Ring draws Steel wire rope lock to be close to and connect with being hung at corresponding two;The straight-through plank road is horizontal to be connected at three between arch dam body, and straight The bottom in transit shed road is supported by bridge pier at six, this at six bridge pier in the corresponding arch for being located at arch dam body at three respectively in pairs Inside grooves.
2. the sluice water blocking building structure for going sightseeing as described in claim 1, it is characterised in that:The side pedal with Interval is supported by a certain distance between the walking pedal on permeable dike top.
3. the sluice water blocking building structure for going sightseeing as described in claim 1, it is characterised in that:The inside of the filter plate It inlays and is welded with strainer, left and right sidewall is that semi-cylindrical is excessively arranged, and its top has also been welded into lift-pull handle at one, filter Plate is just inserted in the inside of filter plate slot by the side walls of its semi-cylindrical.
4. the sluice water blocking building structure for going sightseeing as described in claim 1, it is characterised in that:The arch dam at three Body constitutes the sightseeing plank road of continuous bend.
5. the sluice water blocking building structure for going sightseeing as described in claim 1, it is characterised in that:The stack wall at two The left and right sides is symmetrically arranged with up/down steps everywhere.
6. the sluice water blocking building structure for going sightseeing as described in claim 1, it is characterised in that:The spud pile top The outer eaves circular array of end face is supported by fishing platform at three, and this top on side block column is that circular arc is excessive outside fishing platform at three Setting.
7. the sluice water blocking building structure for going sightseeing as described in claim 1, it is characterised in that:The gear fishnet is set altogether Be equipped at two, this at two gear fishnet be slidably plugged in the inside of outflow channel and interval and be supported by a certain distance, and at two It keeps off the top of fishnet and hangs by link at two and at corresponding two drawing Steel wire rope lock and be close to and connect.
8. the sluice water blocking building structure for going sightseeing as described in claim 1, it is characterised in that:At three described in H steel shape Equal symmetric support has at two a support platform sling on the top end face of motor support platform sling, and this at three support platform sling with computer room ceiling It is fixedly connected.
CN201810314618.3A 2018-04-10 2018-04-10 A sluice manger plate building structure for tourism sightseeing Expired - Fee Related CN108560500B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810314618.3A CN108560500B (en) 2018-04-10 2018-04-10 A sluice manger plate building structure for tourism sightseeing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810314618.3A CN108560500B (en) 2018-04-10 2018-04-10 A sluice manger plate building structure for tourism sightseeing

Publications (2)

Publication Number Publication Date
CN108560500A true CN108560500A (en) 2018-09-21
CN108560500B CN108560500B (en) 2021-09-10

Family

ID=63534408

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810314618.3A Expired - Fee Related CN108560500B (en) 2018-04-10 2018-04-10 A sluice manger plate building structure for tourism sightseeing

Country Status (1)

Country Link
CN (1) CN108560500B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700208A (en) * 2019-10-17 2020-01-17 中国电建集团贵阳勘测设计研究院有限公司 Wave urban landscape lake overflow weir structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100130107A (en) * 2009-06-02 2010-12-10 진주산업대학교 산학협력단 Method for constructing eco-bridge system of combined moving way with fish and benthos
CN202164583U (en) * 2011-07-23 2012-03-14 黄河勘测规划设计有限公司 Culvert gate
CN203129084U (en) * 2012-12-05 2013-08-14 江苏省城市规划设计研究院 Ecological water-loving type revetment structure of water edge
CN103924551A (en) * 2014-04-25 2014-07-16 环境保护部南京环境科学研究所 Pre-dam processing system characterized in landscape integration

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100130107A (en) * 2009-06-02 2010-12-10 진주산업대학교 산학협력단 Method for constructing eco-bridge system of combined moving way with fish and benthos
CN202164583U (en) * 2011-07-23 2012-03-14 黄河勘测规划设计有限公司 Culvert gate
CN203129084U (en) * 2012-12-05 2013-08-14 江苏省城市规划设计研究院 Ecological water-loving type revetment structure of water edge
CN103924551A (en) * 2014-04-25 2014-07-16 环境保护部南京环境科学研究所 Pre-dam processing system characterized in landscape integration

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700208A (en) * 2019-10-17 2020-01-17 中国电建集团贵阳勘测设计研究院有限公司 Wave urban landscape lake overflow weir structure

Also Published As

Publication number Publication date
CN108560500B (en) 2021-09-10

Similar Documents

Publication Publication Date Title
CN205007181U (en) Patient's device of bathing
CN108560500A (en) A kind of sluice water blocking building structure for going sightseeing
CN216713037U (en) Shallow foundation pit operation equipment
CN205875194U (en) Pouring jacket cofferdam bearing platform structure
CN205778395U (en) A kind of multifunction burglary-resisting window
CN208415975U (en) The safety device of elevator shaft in house building course
CN110424496A (en) A kind of change off land deep water water-fetching head structure structure and its construction method
CN202104836U (en) Inflatable bathing pool
CN107217746A (en) Removable ring health care building structure and preparation method thereof
CN108035393A (en) A kind of dredger of conveniently moving
CN206629800U (en) A kind of aquatic fry growing pond fry collection device
CN109748194A (en) A kind of hoisting equipment for building
CN107821303A (en) Fish pond sewage sucking system
CN107913537A (en) A kind of first processing unit of sewage
CN206511857U (en) Rectilinear concrete feeder
CN210238785U (en) Multifunctional outdoor prefabricated house
CN207287622U (en) A kind of rod mill rod adding device
CN209384254U (en) A kind of catch pit
CN206110321U (en) Building balcony
CN207377174U (en) Build combined type adjustable support frame
CN214786567U (en) A safety protection structure for water conservancy construction
CN207418218U (en) A kind of hung moving platform for Steel Structure Installation
CN205434751U (en) Underground lifesaving device
CN217992941U (en) Small-size prefabricated component inner membrance shedder
CN213773738U (en) Construction rainfall drainage structures

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190530

Address after: 563000 No. 5 Nanshan Road, Honghuagang District, Zunyi City, Guizhou Province

Applicant after: Fan Xiaoyu

Address before: 210000 No. 1 Wenyuan Road, Xianlin Street University City, Qixia District, Nanjing, Jiangsu Province

Applicant before: Li Hemin

SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20210820

Address after: 154600 room 701, unit 4, building 16, Yinquan community, Taoshan District, Qitaihe City, Heilongjiang Province

Applicant after: He Mingli

Address before: 563000 No. 5 Nanshan Road, Honghuagang District, Zunyi City, Guizhou Province

Applicant before: Fan Xiaoyu

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211008

Address after: 154600 room 106, No. 66, Datong Street, Taoshan District, Qitaihe City, Heilongjiang Province

Patentee after: Heilongjiang Guozhi Tourism Co.,Ltd.

Address before: 154600 room 701, unit 4, building 16, Yinquan community, Taoshan District, Qitaihe City, Heilongjiang Province

Patentee before: He Mingli

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210910