Invention content
Technical problem to be solved by the invention is to provide a kind of accumulated snow shoveling devices, can solve above-mentioned present technology
The problems in.
The present invention is achieved through the following technical solutions:A kind of accumulated snow shoveling device of the present invention, including vehicle push bracket
And the first cavity in the vehicle push bracket inner opening to the right is set, it is slidably connected with elevator in first cavity
Body, screw-thread fit is connected with the adjusting threaded rod extended up and down in the elevator body, extends end at the top of the adjusting threaded rod
End is rotatably assorted with the first cavity top inner wall to be connect, and adjusting threaded rod bottom extending end be connected by power has first
Motor, first motor outer surface is embedded in the first cavity top inner wall and connection fixed thereto, the liter
Link is installed on drop body right end section, the link right end is installed with clear snow head, is equipped with and inclines in the elevator body
The suction snow chamber tiltedly extended, the suction snow chamber bottom righthand side extending end penetrate through the link and the clear snow head, the shovel respectively
It is equipped with the clear snow chamber communicated with the suction snow chamber bottom righthand side in snow head, is equipped in the elevator body and avenges chamber left upper end with the suction
The snow melting chamber communicated, the elevator body is interior to be equipped with positioned at the snow melting chamber upper left corner and avenges chamber corresponding second with the suction
Cavity, the elevator body is interior to be equipped with positioned at second cavity rear end and along the third sky inhaled snow chamber and extended to the right
Chamber, the third cavity bottom righthand side extending end are put in the clear snow head, and the suction snow intracavitary is equipped with prolongs along suction snow chamber
The first rotation axis stretched, first rotation axis are equipped with helical blade, and the first rotation axis left upper end extending end is put in
In second cavity and the inner wall between second cavity and the snow melting chamber is rotatably assorted and connect, described first turn
Moving axis left upper end extending end is equipped with first bevel gear, rotation in the inner wall between second cavity and the third cavity
Be connected with front and back the second rotation axis extended, second rotation axis front end extending end put in second cavity and
It is equipped with to the second bevel gear with the ratcheting connection of the first bevel gear, the second rotation shaft rear end extending end in end
It puts in the third cavity and is equipped with first pulley in end, the snow melting intracavitary, which is equipped with, is located at first rotation axis bottom
Electromagnetism heat supply network, height where the electromagnetism heat supply network avenges the bottom interior wall of chamber and the snow melting chamber connectivity part less than described inhale, institute
The water level detection gauge being equipped in snow melting intracavitary left end inner wall positioned at the 9 Cr 2 steel using electromagnetic heating sieve bottom is stated, in the snow melting chamber bottom interior wall
It communicates equipped with the outlet pipe extended downwardly, the outlet pipe is interior to be equipped with intelligent drainage function brake gear, the first cavity bottom inner wall
The vehicle push bracket bottom end face, institute are run through in the interior through-hole being equipped with to be halved together with the outlet pipe, the via bottoms end
It states clear snow intracavitary and is equipped with clear snow roller, the clear snow roller circumferential direction is equipped with the scraper plate of front and back extension, is set on the clear snow roller
There are the front and back third rotation axis extended, third rotation axis front end extending end to be rotatably assorted with the clear snow chamber front inner wall
Connection, third rotation shaft rear end extending end put in the third cavity and have in end be connected by power second electronic
Machine, second motor outer surface is embedded in the inner wall of third cavity rear end and connection fixed thereto, and the third turns
Moving axis is located at the part in the third cavity and is equipped with the second belt wheel, and power connects between the first pulley and second belt wheel
It is connected to belt.
Preferably technical solution, the intelligent drainage function brake gear include the round gate being arranged in the outlet pipe
And the 4th cavity in the round gate left end is set, round gate is equipped with the 4th rotation axis that left and right extends, described
4th rotation axis right end extending end is rotatably assorted with the outlet pipe right end inner wall and connect, and the 4th rotation axis left end extends
End puts in the 4th cavity and is equipped with turbine, the 4th rotation axis and the outlet pipe and the 4th sky in end
Inner wall between chamber is rotatably assorted connection, is equipped in the 4th cavity to be connect with the turbo-power and front and back extension
Scroll bar, scroll bar front end extending end is rotatably assorted with the 4th cavity front inner wall and connect, and the scroll bar rear end is prolonged
Stretching end be connected by power has third motor, third motor outer surface to be embedded in the inner wall of the 4th cavity rear end,
The third motor and the water level detection gauge Electricity Federation.
Preferably technical solution is installed with front and back symmetrical fixed pad on the vehicle push bracket left end end face, described
Fixed pad is equipped with handle, and control panel, the control panel and the water level detection gauge, institute are installed at the top of the handle horizontal section
State the first motor and second motor Electricity Federation.
Preferably technical solution, the vehicle push bracket bottom four corners are equipped with wheel.
The beneficial effects of the invention are as follows:The configuration of the present invention is simple, it is easy to operate, it is open to the right by being arranged in vehicle push bracket
First cavity, is slidably connected with lifting body in the first cavity, and screw-thread fit is connected in elevator body extends up and down
Threaded rod is adjusted, adjusting threaded rod top extending end is rotatably assorted with the first cavity top inner wall to be connect, and threaded rod bottom is adjusted
Portion's extending end be connected by power has the first motor, the first motor outer surface be embedded in the first cavity bottom inner wall and
Connection fixed thereto, the lifting body right end are installed with link, and left end setting clear snow frame is, it can be achieved that automatic control in link
Clear snow frame lifting work processed is convenient for close proximity to ground clear snow, is easy to store, easy to operate, further through snow melting is arranged in elevator body
Chamber communicates the suction extended equipped with oblique lower right in snow melting chamber right end inner wall and avenges chamber, inhales snow chamber and runs through link and clear snow frame, shovel
The clear snow chamber that setting is connected to suction snow chamber bottom righthand side extending end in snow frame inhales snow intracavitary setting edge and inhales first turn that snow chamber extends
Moving axis is circumferentially with helical blade in the first rotation axis, and the second cavity positioned at the snow melting chamber upper left corner is equipped in elevator body, the
Two cavity rear ends are equipped with along the third cavity for inhaling snow chamber extension, and third cavity bottom righthand side extending end extends in clear snow frame, the
One rotation axis left upper end extending end puts in the second cavity and is equipped with the first tooth runner, the second cavity and third cavity in end
Between inner wall in be rotatably assorted and be connected with front and back the second rotation axis extended, the second rotation axis front end extending end puts in the
It is equipped with the second bevel gear with the ratcheting connection of first bevel gear in two cavitys and in end, the second rotation shaft rear end extending end is stretched
Friendly first pulley is set in into third cavity and in end, clear snow chamber is equipped with clear snow roller, and clear snow roller circumferential direction is equipped with scraper plate, shovel
The third rotation axis that roller is equipped with front and back extension is avenged, third rotation axis is rotatably assorted with clear snow chamber front end extending end and connect,
Third rotation shaft rear end extending end puts in third cavity and has the second motor in end be connected by power, in third cavity
Third rotation axis is equipped with the second belt wheel, and be connected by power has belt, it can be achieved that automatic clear snow between first pulley and the second belt wheel
And the work of accumulated snow is conveyed in time, it can work continuously, be not easy to plug, improve clear snow efficiency, electromagnetism is equipped with further through snow melting intracavitary
Heat supply network, 9 Cr 2 steel using electromagnetic heating sieve bottom are equipped with water-level instrumentation, and outlet pipe is equipped in chemical chamber bottom interior wall, Intelligent drainage is equipped in outlet pipe
For Gate appts., it can be achieved that automatically processing the accumulated snow scooped up, simple and practicable, raising clear snow work continuity is time saving and energy saving, meanwhile,
Improve clear snow working effect.
Specific implementation mode
As Figure 1-Figure 5, a kind of accumulated snow shoveling device of the invention, including vehicle push bracket 3 and setting are pushed away in the vehicle
The first cavity 31 of 3 inner opening of frame to the right is slidably connected with lifting body 4, the elevator in first cavity 31
4 screw-internal thread fit of body is connected with the adjusting threaded rod 32 extended up and down, the 32 top extending end of adjusting threaded rod with it is described
First cavity, 31 top inner wall is rotatably assorted connection, and 32 bottom extending end be connected by power of the adjusting threaded rod has first electronic
Machine 321,321 outer surface of the first motor is embedded in 31 top inner wall of the first cavity and connection fixed thereto, institute
It states and is installed with link 5 on lifting 4 right end section of body, 5 right end of the link is installed with clear snow head 6, the lifting body 4
Interior to be equipped with the suction for tilting and extending and avenge chamber 43, suctions avenges 43 bottom righthand side extending end of chamber and penetrates through the link 5 and described respectively
Clear snow head 6, the clear snow head 6 is interior to be equipped with the clear snow chamber 61 communicated with suction snow 43 bottom righthand side of chamber, is set in the lifting body 4
Have and is located at 42 upper left of snow melting chamber with the snow melting chamber 42 inhaled snow 43 left upper end of chamber and communicated, interior be equipped with of the lifting body 4
Angle and second cavity 41 corresponding with suction snow chamber 43, the lifting body 4 is interior to be equipped with after second cavity 41
It holds and along the third cavity 45 inhaled snow chamber 43 and extended to the right, 45 bottom righthand side extending end of the third cavity puts in institute
It states in clear snow head 6, described inhale is equipped in snow chamber 43 along first rotation axis 431 inhaled snow chamber 43 and extended, first rotation
Axis 431 is equipped with helical blade 432, first rotation axis, 431 left upper end extending end put in second cavity 41 and
Inner wall between second cavity 41 and the snow melting chamber 42, which is rotatably assorted, to be connect, 431 upper left of the first rotation axis
Extending end is held to be equipped with first bevel gear 411, rotation in the inner wall between second cavity 41 and the third cavity 45
It is connected with front and back the second rotation axis 413 extended, it is empty that second rotation axis, 413 front end extending end puts in described second
It is equipped with to the second bevel gear 412 with 411 ratcheting connection of the first bevel gear, second rotation in chamber 41 and in end
413 rear end extending end of axis puts in the third cavity 45 and is equipped with first pulley 451 in end, is set in the snow melting chamber 42
There are the electromagnetism heat supply network 421 positioned at 431 bottom of the first rotation axis, height where the electromagnetism heat supply network 421 to be avenged less than the suction
The bottom interior wall of chamber 43 and 42 connectivity part of snow melting chamber is equipped in the snow melting chamber 42 in left end inner wall and is located at the 9 Cr 2 steel using electromagnetic heating
The water level detection gauge 44 of 421 bottom of net communicates in 42 bottom interior wall of snow melting chamber equipped with the outlet pipe 422 extended downwardly, institute
State and be equipped with intelligent drainage function brake gear in outlet pipe 422, be equipped in 31 bottom interior wall of the first cavity to the outlet pipe
422 through-holes 33 being halved together, 33 bottom end of the through-hole run through 3 bottom end face of vehicle push bracket, are set in the clear snow chamber 61
There are clear snow roller 611,611 circumferential direction of clear snow roller to be equipped with the scraper plate 613 of front and back extension, set on the clear snow roller 611
There are the front and back third rotation axis 612 extended, 612 front end extending end of the third rotation axis and 61 front inner wall of clear snow chamber
Be rotatably assorted connection, and 612 rear end extending end of the third rotation axis puts in the third cavity 45 and connects in end power
It is connected to the second motor 454,454 outer surface of the second motor is embedded in 45 rear end inner wall of the third cavity and therewith
Be fixedly connected, the third rotation axis 612 be located at the part in the third cavity 45 be equipped with the second belt wheel 453, described first
Be connected by power has belt 452 between belt wheel 451 and second belt wheel 453.
Valuably, the intelligent drainage function brake gear include the round gate 4221 being arranged in the outlet pipe 422 and
The 4th cavity 46 in 4221 left end of the round gate is set, and round gate 4221 is equipped with the 4th rotation axis that left and right extends
463,463 right end extending end of the 4th rotation axis is rotatably assorted with 422 right end inner wall of the outlet pipe and connect, and the described 4th
463 left end extending end of rotation axis puts in the 4th cavity 46 and is equipped with turbine 461, the 4th rotation axis in end
Inner wall between 463 and the outlet pipe 422 and the 4th cavity 46 is rotatably assorted connection, is set in the 4th cavity 46
Have to the scroll bar 462 with 461 be connected by power of the turbine and front and back extension, 462 front end extending end of the scroll bar with it is described
4th cavity, 46 front inner wall is rotatably assorted connection, and 462 rear end extending end be connected by power of the scroll bar has third motor
464,464 outer surface of third motor is embedded in 46 rear end inner wall of the 4th cavity, the third motor 464 with
44 Electricity Federation of the water level detection gauge realizes that automatic stabilisation opens round gate 4221, prevents from being washed open by water too early, causes accumulated snow stifled
Plug.
Valuably, front and back symmetrical fixation pad 34 is installed on 3 left end end face of the vehicle push bracket, on the fixed pad 34
Equipped with handle 341, control panel 342, the control panel 342 and the water level detecting are installed at the top of 341 horizontal segment of the handle
Instrument 44, first motor 321 and 454 Electricity Federation of the second motor, realization device automated operation are convenient for control device
Moving direction effectively roots out accumulated snow.
Valuably, 3 bottom four corners of vehicle push bracket are equipped with wheel 35, convenient for steady mobile Filtting device.
When original state, lifting body 4 is located at 31 top of the first cavity, at this point, clear snow frame 6 goes out completely away from ground
Water pipe 422 is located at horizontality, outlet pipe 422 is made to be closed completely completely away from through-hole 33, round gate 4221,.
When needing clear snow to work, device is moved integrally to the accumulated snow ground location of required clear snow, control is then passed through
Disk 342 controls the first motor 321 and adjusting threaded rod 32 is driven to rotate, and lifting body 4 is made to move down, when lifting body 4 is moved to
When the first 31 lowest part of cavity, outlet pipe 422 is completely embedded into through-hole 33, and 6 bottom end face of clear snow frame completely attaches to ground, then
Device is set to move forward, at this point, the first motor 321 of control shuts down, meanwhile, it is electronic by the control second of control panel 342
Machine 454 drives the rotation of the second rotation axis 612, the second rotation axis 612 that the second belt wheel 453 and clear snow roller 611 is driven to rotate, clear snow
Roller 611 drives the rotation of scraper plate 613 to be taken off into suction snow chamber 43 to the accumulated snow that will enter in clear snow chamber 61, simultaneously as the
Two belt wheels 453 drive first pulley 451 to rotate by belt 452, and first pulley 451 drives the second rotation axis 413 to rotate, and second
Rotation axis 413 drives second bevel gear 412 to rotate, and second bevel gear 412 drives first bevel gear 411 to rotate, first bevel gear
411 drive the rotation of the first rotation axis 431, the first rotation axis 431 that helical blade 432 is driven to rotate, to by nival zone into snow melting
In chamber 42, when snow is fallen on electromagnetism heat supply network 421, make snow melting, the water of accumulated snow chemical conversion since electromagnetism heat supply network 421 generates heat
Into 42 bottom of snow melting chamber, when water-level instrumentation 44 monitors the higher influence snow melting of water level, third motor is sent a signal to
464 drive scroll bar 462 to rotate, and scroll bar 462 drives turbine 461 to rotate, drive the 4th rotation axis 463 rotation of turbine 461, the 4th turn
Moving axis 463 drives round gate 4221 to rotate, and to keep outlet pipe 422 open-minded, ponding is discharged, when ponding is completely exhausted out,
Water level detection gauge automatically controls third motor 464 and scroll bar 462 is driven to invert, and scroll bar 462 drives turbine 461 to invert, turbine 461
It drives the 4th rotation axis 463 to invert, the reversion of round gate 4221 is made to close outlet pipe 422, to complete the complete clear snow of a step
Work.
When completing the storage of clear snow need of work, the firstth motor 321 is controlled by control panel 342 and drives adjusting screw thread
Bar 32 inverts, and makes to move to 31 top of the first cavity on lifting body 4, at this point, outlet pipe 422 is completely away from through-hole 33, clear snow
Frame 6 is completely away from ground.
The beneficial effects of the invention are as follows:The configuration of the present invention is simple, it is easy to operate, it is open to the right by being arranged in vehicle push bracket
First cavity, is slidably connected with lifting body in the first cavity, and screw-thread fit is connected in elevator body extends up and down
Threaded rod 32 is adjusted, adjusting 32 top extending end of threaded rod is rotatably assorted with the first cavity top inner wall to be connect, and screw thread is adjusted
Bar bottom extending end be connected by power has the first motor, the first motor outer surface to be embedded at the first cavity bottom inner wall
Connection interior and fixed thereto, the lifting body right end are installed with link, and left end setting clear snow frame is, it can be achieved that certainly in link
Dynamic control clear snow frame lifting work, is convenient for close proximity to ground clear snow, is easy to store, easy to operate, further through being arranged in elevator body
Snow melting chamber communicates the suction extended equipped with oblique lower right in snow melting chamber right end inner wall and avenges chamber, inhales snow chamber and runs through link and clear snow
The clear snow chamber that chamber bottom righthand side extending end is connected to is avenged in frame, the interior setting of clear snow frame and suction, is inhaled and is avenged intracavitary setting edge suction snow chamber extension
First rotation axis is circumferentially with helical blade in the first rotation axis, second positioned at the snow melting chamber upper left corner is equipped in elevator body
Cavity, the second cavity rear end are equipped with along the third cavity for inhaling snow chamber extension, and third cavity bottom righthand side extending end extends to clear snow
In frame, the first rotation axis left upper end extending end puts in the second cavity and is equipped with the first tooth runner in end, the second cavity with
It is rotatably assorted in inner wall between third cavity and is connected with front and back the second rotation axis extended, the second rotation axis front end extends end
End puts in the second cavity and is equipped with the second bevel gear with the ratcheting connection of first bevel gear in end, and the second rotation shaft rear end prolongs
It stretches end to put in third cavity and set friendly first pulley in end, clear snow chamber is equipped with clear snow roller, sets in clear snow roller circumferential direction
There are scraper plate, clear snow roller to be equipped with the third rotation axis of front and back extension, third rotation axis is rotated with clear snow chamber front end extending end
It being connected, third rotation shaft rear end extending end puts in third cavity and has the second motor in end be connected by power, the
Third rotation axis in three cavitys is equipped with the second belt wheel, and be connected by power has belt between first pulley and the second belt wheel, can be real
Now automatic clear snow and the in time work of conveying accumulated snow, can work continuously, be not easy to plug, clear snow efficiency be improved, further through snow melting chamber
Interior to be equipped with electromagnetism heat supply network, 9 Cr 2 steel using electromagnetic heating sieve bottom is equipped with water-level instrumentation, is equipped with outlet pipe in chemical chamber bottom interior wall, in outlet pipe
It is simple and practicable equipped with intelligent drainage function brake gear, it can be achieved that automatically processing the accumulated snow scooped up, clear snow work continuity is improved, it is time saving
It is laborsaving, meanwhile, improve clear snow working effect.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any
The change or replacement expected without creative work, should be covered by the protection scope of the present invention.Therefore, of the invention
Protection domain should be determined by the scope of protection defined in the claims.