CN108560473A - A kind of accumulated snow shoveling device - Google Patents

A kind of accumulated snow shoveling device Download PDF

Info

Publication number
CN108560473A
CN108560473A CN201810116817.3A CN201810116817A CN108560473A CN 108560473 A CN108560473 A CN 108560473A CN 201810116817 A CN201810116817 A CN 201810116817A CN 108560473 A CN108560473 A CN 108560473A
Authority
CN
China
Prior art keywords
cavity
snow
chamber
rotation axis
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810116817.3A
Other languages
Chinese (zh)
Other versions
CN108560473B (en
Inventor
岑罗琼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Laiwu Yinglei Trading Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810116817.3A priority Critical patent/CN108560473B/en
Publication of CN108560473A publication Critical patent/CN108560473A/en
Application granted granted Critical
Publication of CN108560473B publication Critical patent/CN108560473B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01HSTREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; DISPERSING OR PREVENTING FOG IN GENERAL CLEANING STREET OR RAILWAY FURNITURE OR TUNNEL WALLS
    • E01H5/00Removing snow or ice from roads or like surfaces; Grading or roughening snow or ice
    • E01H5/10Removing snow or ice from roads or like surfaces; Grading or roughening snow or ice by application of heat for melting snow or ice, whether cleared or not, combined or not with clearing or removing mud or water, e.g. burners for melting in situ, heated clearing instruments; Cleaning snow by blowing or suction only
    • E01H5/104Removing devices for dislodging snow or ice; followed by melting the removed material

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Cleaning Of Streets, Tracks, Or Beaches (AREA)

Abstract

The invention discloses a kind of accumulated snow shoveling devices, including vehicle push bracket and the first cavity in the vehicle push bracket inner opening to the right is set, it is slidably connected with lifting body in first cavity, screw-thread fit is connected with the adjusting threaded rod extended up and down in the elevator body, extending end is rotatably assorted with the first cavity top inner wall at the top of the second adjusting threaded rod connect, adjusting threaded rod bottom extending end be connected by power has the first motor, first motor outer surface is embedded in the first cavity top inner wall and connection fixed thereto, it is installed with link on the lifting body right end section, the link right end is installed with clear snow head;The configuration of the present invention is simple, it is easy to operate, convenient for storage, it is moved easily and carries, meanwhile, improve clear snow efficiency and effect.

Description

A kind of accumulated snow shoveling device
Technical field
The present invention relates to clear snow field of mechanical technique, specifically a kind of accumulated snow shoveling device.
Background technology
Current clear snow equipment is traditional, general equipment is assembled using earth scraper or forklift device, this Kind device is not only complicated for operation in clear snow, but also clear snow effect is very poor, needs constantly to pour out accumulated snow, influences clear snow efficiency, And such device, clear snow is coarse to form irregular trace in clear snow on road surface, and accumulated snow can influence vehicle after connecing jelly Traveling, can destroy road surface due to making coarse clear snow head, be badly in need of a kind of urgent need shoveling device at present.
Invention content
Technical problem to be solved by the invention is to provide a kind of accumulated snow shoveling devices, can solve above-mentioned present technology The problems in.
The present invention is achieved through the following technical solutions:A kind of accumulated snow shoveling device of the present invention, including vehicle push bracket And the first cavity in the vehicle push bracket inner opening to the right is set, it is slidably connected with elevator in first cavity Body, screw-thread fit is connected with the adjusting threaded rod extended up and down in the elevator body, extends end at the top of the adjusting threaded rod End is rotatably assorted with the first cavity top inner wall to be connect, and adjusting threaded rod bottom extending end be connected by power has first Motor, first motor outer surface is embedded in the first cavity top inner wall and connection fixed thereto, the liter Link is installed on drop body right end section, the link right end is installed with clear snow head, is equipped with and inclines in the elevator body The suction snow chamber tiltedly extended, the suction snow chamber bottom righthand side extending end penetrate through the link and the clear snow head, the shovel respectively It is equipped with the clear snow chamber communicated with the suction snow chamber bottom righthand side in snow head, is equipped in the elevator body and avenges chamber left upper end with the suction The snow melting chamber communicated, the elevator body is interior to be equipped with positioned at the snow melting chamber upper left corner and avenges chamber corresponding second with the suction Cavity, the elevator body is interior to be equipped with positioned at second cavity rear end and along the third sky inhaled snow chamber and extended to the right Chamber, the third cavity bottom righthand side extending end are put in the clear snow head, and the suction snow intracavitary is equipped with prolongs along suction snow chamber The first rotation axis stretched, first rotation axis are equipped with helical blade, and the first rotation axis left upper end extending end is put in In second cavity and the inner wall between second cavity and the snow melting chamber is rotatably assorted and connect, described first turn Moving axis left upper end extending end is equipped with first bevel gear, rotation in the inner wall between second cavity and the third cavity Be connected with front and back the second rotation axis extended, second rotation axis front end extending end put in second cavity and It is equipped with to the second bevel gear with the ratcheting connection of the first bevel gear, the second rotation shaft rear end extending end in end It puts in the third cavity and is equipped with first pulley in end, the snow melting intracavitary, which is equipped with, is located at first rotation axis bottom Electromagnetism heat supply network, height where the electromagnetism heat supply network avenges the bottom interior wall of chamber and the snow melting chamber connectivity part less than described inhale, institute The water level detection gauge being equipped in snow melting intracavitary left end inner wall positioned at the 9 Cr 2 steel using electromagnetic heating sieve bottom is stated, in the snow melting chamber bottom interior wall It communicates equipped with the outlet pipe extended downwardly, the outlet pipe is interior to be equipped with intelligent drainage function brake gear, the first cavity bottom inner wall The vehicle push bracket bottom end face, institute are run through in the interior through-hole being equipped with to be halved together with the outlet pipe, the via bottoms end It states clear snow intracavitary and is equipped with clear snow roller, the clear snow roller circumferential direction is equipped with the scraper plate of front and back extension, is set on the clear snow roller There are the front and back third rotation axis extended, third rotation axis front end extending end to be rotatably assorted with the clear snow chamber front inner wall Connection, third rotation shaft rear end extending end put in the third cavity and have in end be connected by power second electronic Machine, second motor outer surface is embedded in the inner wall of third cavity rear end and connection fixed thereto, and the third turns Moving axis is located at the part in the third cavity and is equipped with the second belt wheel, and power connects between the first pulley and second belt wheel It is connected to belt.
Preferably technical solution, the intelligent drainage function brake gear include the round gate being arranged in the outlet pipe And the 4th cavity in the round gate left end is set, round gate is equipped with the 4th rotation axis that left and right extends, described 4th rotation axis right end extending end is rotatably assorted with the outlet pipe right end inner wall and connect, and the 4th rotation axis left end extends End puts in the 4th cavity and is equipped with turbine, the 4th rotation axis and the outlet pipe and the 4th sky in end Inner wall between chamber is rotatably assorted connection, is equipped in the 4th cavity to be connect with the turbo-power and front and back extension Scroll bar, scroll bar front end extending end is rotatably assorted with the 4th cavity front inner wall and connect, and the scroll bar rear end is prolonged Stretching end be connected by power has third motor, third motor outer surface to be embedded in the inner wall of the 4th cavity rear end, The third motor and the water level detection gauge Electricity Federation.
Preferably technical solution is installed with front and back symmetrical fixed pad on the vehicle push bracket left end end face, described Fixed pad is equipped with handle, and control panel, the control panel and the water level detection gauge, institute are installed at the top of the handle horizontal section State the first motor and second motor Electricity Federation.
Preferably technical solution, the vehicle push bracket bottom four corners are equipped with wheel.
The beneficial effects of the invention are as follows:The configuration of the present invention is simple, it is easy to operate, it is open to the right by being arranged in vehicle push bracket First cavity, is slidably connected with lifting body in the first cavity, and screw-thread fit is connected in elevator body extends up and down Threaded rod is adjusted, adjusting threaded rod top extending end is rotatably assorted with the first cavity top inner wall to be connect, and threaded rod bottom is adjusted Portion's extending end be connected by power has the first motor, the first motor outer surface be embedded in the first cavity bottom inner wall and Connection fixed thereto, the lifting body right end are installed with link, and left end setting clear snow frame is, it can be achieved that automatic control in link Clear snow frame lifting work processed is convenient for close proximity to ground clear snow, is easy to store, easy to operate, further through snow melting is arranged in elevator body Chamber communicates the suction extended equipped with oblique lower right in snow melting chamber right end inner wall and avenges chamber, inhales snow chamber and runs through link and clear snow frame, shovel The clear snow chamber that setting is connected to suction snow chamber bottom righthand side extending end in snow frame inhales snow intracavitary setting edge and inhales first turn that snow chamber extends Moving axis is circumferentially with helical blade in the first rotation axis, and the second cavity positioned at the snow melting chamber upper left corner is equipped in elevator body, the Two cavity rear ends are equipped with along the third cavity for inhaling snow chamber extension, and third cavity bottom righthand side extending end extends in clear snow frame, the One rotation axis left upper end extending end puts in the second cavity and is equipped with the first tooth runner, the second cavity and third cavity in end Between inner wall in be rotatably assorted and be connected with front and back the second rotation axis extended, the second rotation axis front end extending end puts in the It is equipped with the second bevel gear with the ratcheting connection of first bevel gear in two cavitys and in end, the second rotation shaft rear end extending end is stretched Friendly first pulley is set in into third cavity and in end, clear snow chamber is equipped with clear snow roller, and clear snow roller circumferential direction is equipped with scraper plate, shovel The third rotation axis that roller is equipped with front and back extension is avenged, third rotation axis is rotatably assorted with clear snow chamber front end extending end and connect, Third rotation shaft rear end extending end puts in third cavity and has the second motor in end be connected by power, in third cavity Third rotation axis is equipped with the second belt wheel, and be connected by power has belt, it can be achieved that automatic clear snow between first pulley and the second belt wheel And the work of accumulated snow is conveyed in time, it can work continuously, be not easy to plug, improve clear snow efficiency, electromagnetism is equipped with further through snow melting intracavitary Heat supply network, 9 Cr 2 steel using electromagnetic heating sieve bottom are equipped with water-level instrumentation, and outlet pipe is equipped in chemical chamber bottom interior wall, Intelligent drainage is equipped in outlet pipe For Gate appts., it can be achieved that automatically processing the accumulated snow scooped up, simple and practicable, raising clear snow work continuity is time saving and energy saving, meanwhile, Improve clear snow working effect.
Description of the drawings
The present invention is described in detail by following specific embodiment and attached drawing for ease of explanation,.
Overall structure diagram when Fig. 1 is a kind of accumulated snow shoveling device operation of the present invention;
Fig. 2 is a kind of non-operation structure schematic diagram of accumulated snow shoveling device of the present invention;
Fig. 3 is the structural schematic diagram of A in Fig. 1;
Fig. 4 is the structural schematic diagram of B in Fig. 1;
Fig. 5 is the structural schematic diagram of C in Fig. 4.
Specific implementation mode
As Figure 1-Figure 5, a kind of accumulated snow shoveling device of the invention, including vehicle push bracket 3 and setting are pushed away in the vehicle The first cavity 31 of 3 inner opening of frame to the right is slidably connected with lifting body 4, the elevator in first cavity 31 4 screw-internal thread fit of body is connected with the adjusting threaded rod 32 extended up and down, the 32 top extending end of adjusting threaded rod with it is described First cavity, 31 top inner wall is rotatably assorted connection, and 32 bottom extending end be connected by power of the adjusting threaded rod has first electronic Machine 321,321 outer surface of the first motor is embedded in 31 top inner wall of the first cavity and connection fixed thereto, institute It states and is installed with link 5 on lifting 4 right end section of body, 5 right end of the link is installed with clear snow head 6, the lifting body 4 Interior to be equipped with the suction for tilting and extending and avenge chamber 43, suctions avenges 43 bottom righthand side extending end of chamber and penetrates through the link 5 and described respectively Clear snow head 6, the clear snow head 6 is interior to be equipped with the clear snow chamber 61 communicated with suction snow 43 bottom righthand side of chamber, is set in the lifting body 4 Have and is located at 42 upper left of snow melting chamber with the snow melting chamber 42 inhaled snow 43 left upper end of chamber and communicated, interior be equipped with of the lifting body 4 Angle and second cavity 41 corresponding with suction snow chamber 43, the lifting body 4 is interior to be equipped with after second cavity 41 It holds and along the third cavity 45 inhaled snow chamber 43 and extended to the right, 45 bottom righthand side extending end of the third cavity puts in institute It states in clear snow head 6, described inhale is equipped in snow chamber 43 along first rotation axis 431 inhaled snow chamber 43 and extended, first rotation Axis 431 is equipped with helical blade 432, first rotation axis, 431 left upper end extending end put in second cavity 41 and Inner wall between second cavity 41 and the snow melting chamber 42, which is rotatably assorted, to be connect, 431 upper left of the first rotation axis Extending end is held to be equipped with first bevel gear 411, rotation in the inner wall between second cavity 41 and the third cavity 45 It is connected with front and back the second rotation axis 413 extended, it is empty that second rotation axis, 413 front end extending end puts in described second It is equipped with to the second bevel gear 412 with 411 ratcheting connection of the first bevel gear, second rotation in chamber 41 and in end 413 rear end extending end of axis puts in the third cavity 45 and is equipped with first pulley 451 in end, is set in the snow melting chamber 42 There are the electromagnetism heat supply network 421 positioned at 431 bottom of the first rotation axis, height where the electromagnetism heat supply network 421 to be avenged less than the suction The bottom interior wall of chamber 43 and 42 connectivity part of snow melting chamber is equipped in the snow melting chamber 42 in left end inner wall and is located at the 9 Cr 2 steel using electromagnetic heating The water level detection gauge 44 of 421 bottom of net communicates in 42 bottom interior wall of snow melting chamber equipped with the outlet pipe 422 extended downwardly, institute State and be equipped with intelligent drainage function brake gear in outlet pipe 422, be equipped in 31 bottom interior wall of the first cavity to the outlet pipe 422 through-holes 33 being halved together, 33 bottom end of the through-hole run through 3 bottom end face of vehicle push bracket, are set in the clear snow chamber 61 There are clear snow roller 611,611 circumferential direction of clear snow roller to be equipped with the scraper plate 613 of front and back extension, set on the clear snow roller 611 There are the front and back third rotation axis 612 extended, 612 front end extending end of the third rotation axis and 61 front inner wall of clear snow chamber Be rotatably assorted connection, and 612 rear end extending end of the third rotation axis puts in the third cavity 45 and connects in end power It is connected to the second motor 454,454 outer surface of the second motor is embedded in 45 rear end inner wall of the third cavity and therewith Be fixedly connected, the third rotation axis 612 be located at the part in the third cavity 45 be equipped with the second belt wheel 453, described first Be connected by power has belt 452 between belt wheel 451 and second belt wheel 453.
Valuably, the intelligent drainage function brake gear include the round gate 4221 being arranged in the outlet pipe 422 and The 4th cavity 46 in 4221 left end of the round gate is set, and round gate 4221 is equipped with the 4th rotation axis that left and right extends 463,463 right end extending end of the 4th rotation axis is rotatably assorted with 422 right end inner wall of the outlet pipe and connect, and the described 4th 463 left end extending end of rotation axis puts in the 4th cavity 46 and is equipped with turbine 461, the 4th rotation axis in end Inner wall between 463 and the outlet pipe 422 and the 4th cavity 46 is rotatably assorted connection, is set in the 4th cavity 46 Have to the scroll bar 462 with 461 be connected by power of the turbine and front and back extension, 462 front end extending end of the scroll bar with it is described 4th cavity, 46 front inner wall is rotatably assorted connection, and 462 rear end extending end be connected by power of the scroll bar has third motor 464,464 outer surface of third motor is embedded in 46 rear end inner wall of the 4th cavity, the third motor 464 with 44 Electricity Federation of the water level detection gauge realizes that automatic stabilisation opens round gate 4221, prevents from being washed open by water too early, causes accumulated snow stifled Plug.
Valuably, front and back symmetrical fixation pad 34 is installed on 3 left end end face of the vehicle push bracket, on the fixed pad 34 Equipped with handle 341, control panel 342, the control panel 342 and the water level detecting are installed at the top of 341 horizontal segment of the handle Instrument 44, first motor 321 and 454 Electricity Federation of the second motor, realization device automated operation are convenient for control device Moving direction effectively roots out accumulated snow.
Valuably, 3 bottom four corners of vehicle push bracket are equipped with wheel 35, convenient for steady mobile Filtting device.
When original state, lifting body 4 is located at 31 top of the first cavity, at this point, clear snow frame 6 goes out completely away from ground Water pipe 422 is located at horizontality, outlet pipe 422 is made to be closed completely completely away from through-hole 33, round gate 4221,.
When needing clear snow to work, device is moved integrally to the accumulated snow ground location of required clear snow, control is then passed through Disk 342 controls the first motor 321 and adjusting threaded rod 32 is driven to rotate, and lifting body 4 is made to move down, when lifting body 4 is moved to When the first 31 lowest part of cavity, outlet pipe 422 is completely embedded into through-hole 33, and 6 bottom end face of clear snow frame completely attaches to ground, then Device is set to move forward, at this point, the first motor 321 of control shuts down, meanwhile, it is electronic by the control second of control panel 342 Machine 454 drives the rotation of the second rotation axis 612, the second rotation axis 612 that the second belt wheel 453 and clear snow roller 611 is driven to rotate, clear snow Roller 611 drives the rotation of scraper plate 613 to be taken off into suction snow chamber 43 to the accumulated snow that will enter in clear snow chamber 61, simultaneously as the Two belt wheels 453 drive first pulley 451 to rotate by belt 452, and first pulley 451 drives the second rotation axis 413 to rotate, and second Rotation axis 413 drives second bevel gear 412 to rotate, and second bevel gear 412 drives first bevel gear 411 to rotate, first bevel gear 411 drive the rotation of the first rotation axis 431, the first rotation axis 431 that helical blade 432 is driven to rotate, to by nival zone into snow melting In chamber 42, when snow is fallen on electromagnetism heat supply network 421, make snow melting, the water of accumulated snow chemical conversion since electromagnetism heat supply network 421 generates heat Into 42 bottom of snow melting chamber, when water-level instrumentation 44 monitors the higher influence snow melting of water level, third motor is sent a signal to 464 drive scroll bar 462 to rotate, and scroll bar 462 drives turbine 461 to rotate, drive the 4th rotation axis 463 rotation of turbine 461, the 4th turn Moving axis 463 drives round gate 4221 to rotate, and to keep outlet pipe 422 open-minded, ponding is discharged, when ponding is completely exhausted out, Water level detection gauge automatically controls third motor 464 and scroll bar 462 is driven to invert, and scroll bar 462 drives turbine 461 to invert, turbine 461 It drives the 4th rotation axis 463 to invert, the reversion of round gate 4221 is made to close outlet pipe 422, to complete the complete clear snow of a step Work.
When completing the storage of clear snow need of work, the firstth motor 321 is controlled by control panel 342 and drives adjusting screw thread Bar 32 inverts, and makes to move to 31 top of the first cavity on lifting body 4, at this point, outlet pipe 422 is completely away from through-hole 33, clear snow Frame 6 is completely away from ground.
The beneficial effects of the invention are as follows:The configuration of the present invention is simple, it is easy to operate, it is open to the right by being arranged in vehicle push bracket First cavity, is slidably connected with lifting body in the first cavity, and screw-thread fit is connected in elevator body extends up and down Threaded rod 32 is adjusted, adjusting 32 top extending end of threaded rod is rotatably assorted with the first cavity top inner wall to be connect, and screw thread is adjusted Bar bottom extending end be connected by power has the first motor, the first motor outer surface to be embedded at the first cavity bottom inner wall Connection interior and fixed thereto, the lifting body right end are installed with link, and left end setting clear snow frame is, it can be achieved that certainly in link Dynamic control clear snow frame lifting work, is convenient for close proximity to ground clear snow, is easy to store, easy to operate, further through being arranged in elevator body Snow melting chamber communicates the suction extended equipped with oblique lower right in snow melting chamber right end inner wall and avenges chamber, inhales snow chamber and runs through link and clear snow The clear snow chamber that chamber bottom righthand side extending end is connected to is avenged in frame, the interior setting of clear snow frame and suction, is inhaled and is avenged intracavitary setting edge suction snow chamber extension First rotation axis is circumferentially with helical blade in the first rotation axis, second positioned at the snow melting chamber upper left corner is equipped in elevator body Cavity, the second cavity rear end are equipped with along the third cavity for inhaling snow chamber extension, and third cavity bottom righthand side extending end extends to clear snow In frame, the first rotation axis left upper end extending end puts in the second cavity and is equipped with the first tooth runner in end, the second cavity with It is rotatably assorted in inner wall between third cavity and is connected with front and back the second rotation axis extended, the second rotation axis front end extends end End puts in the second cavity and is equipped with the second bevel gear with the ratcheting connection of first bevel gear in end, and the second rotation shaft rear end prolongs It stretches end to put in third cavity and set friendly first pulley in end, clear snow chamber is equipped with clear snow roller, sets in clear snow roller circumferential direction There are scraper plate, clear snow roller to be equipped with the third rotation axis of front and back extension, third rotation axis is rotated with clear snow chamber front end extending end It being connected, third rotation shaft rear end extending end puts in third cavity and has the second motor in end be connected by power, the Third rotation axis in three cavitys is equipped with the second belt wheel, and be connected by power has belt between first pulley and the second belt wheel, can be real Now automatic clear snow and the in time work of conveying accumulated snow, can work continuously, be not easy to plug, clear snow efficiency be improved, further through snow melting chamber Interior to be equipped with electromagnetism heat supply network, 9 Cr 2 steel using electromagnetic heating sieve bottom is equipped with water-level instrumentation, is equipped with outlet pipe in chemical chamber bottom interior wall, in outlet pipe It is simple and practicable equipped with intelligent drainage function brake gear, it can be achieved that automatically processing the accumulated snow scooped up, clear snow work continuity is improved, it is time saving It is laborsaving, meanwhile, improve clear snow working effect.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any The change or replacement expected without creative work, should be covered by the protection scope of the present invention.Therefore, of the invention Protection domain should be determined by the scope of protection defined in the claims.

Claims (4)

1. a kind of accumulated snow shoveling device, including vehicle push bracket and the first cavity in the vehicle push bracket inner opening to the right is set, It is characterized in that:Lifting body is slidably connected in first cavity, screw-thread fit is connected in the elevator body The adjusting threaded rod of lower extension, extending end and the first cavity top inner wall are rotatably assorted company at the top of the adjusting threaded rod It connects, adjusting threaded rod bottom extending end be connected by power has the first motor, first motor outer surface to be embedded at In the first cavity top inner wall and connection fixed thereto, it is installed with link on the lifting body right end section, it is described Link right end is installed with clear snow head, and the suction for tilting and extending is equipped in the elevator body and avenges chamber, the suction snow chamber bottom righthand side prolongs It stretches end and penetrates through the link and the clear snow head respectively, be equipped in the clear snow head and inhale what snow chamber bottom righthand side communicated with described Clear snow chamber, the elevator body is interior to be equipped with the snow melting chamber communicated with the suction snow chamber left upper end, and the elevator body is interior equipped with position In the snow melting chamber upper left corner and with corresponding second cavity of suction snow chamber, be equipped in the elevator body and be located at described the Two cavity rear ends and the third cavity that extends to the right of snow chamber is inhaled along described, the third cavity bottom righthand side extending end is put in In the clear snow head, the snow intracavitary of inhaling is equipped with the first rotation axis extended along the suction snow chamber, is set in first rotation axis Have a helical blade, the first rotation axis left upper end extending end put in second cavity and with second cavity and institute The inner wall between snow melting chamber to be stated to be rotatably assorted connection, the first rotation axis left upper end extending end is equipped with first bevel gear, It is rotatably assorted in inner wall between second cavity and the third cavity and is connected with front and back the second rotation axis extended, institute State the second rotation axis front end extending end put in second cavity and end be equipped with to the first bevel gear tooth Close the second bevel gear of connection, the second rotation shaft rear end extending end puts in the third cavity and is equipped with the in end One belt wheel, the snow melting intracavitary are equipped with the electromagnetism heat supply network positioned at first rotation axis bottom, height where the electromagnetism heat supply network Less than the bottom interior wall for inhaling snow chamber and the snow melting chamber connectivity part, it is equipped with positioned at described in the snow melting intracavitary left end inner wall The water level detection gauge of 9 Cr 2 steel using electromagnetic heating sieve bottom communicates in the snow melting chamber bottom interior wall equipped with the outlet pipe extended downwardly, it is described go out It is equipped with intelligent drainage function brake gear in water pipe, is equipped in the first cavity bottom inner wall logical to be halved together with the outlet pipe The vehicle push bracket bottom end face is run through in hole, the via bottoms end, and the clear snow intracavitary is equipped with clear snow roller, the clear snow rolling Cylinder circumferential direction is equipped with the scraper plate of front and back extension, and the clear snow roller is equipped with the third rotation axis of front and back extension, and the third turns Moving axis front end extending end is rotatably assorted with the clear snow chamber front inner wall and connect, and the third rotation shaft rear end extending end is stretched There are the second motor, second motor outer surface to be embedded at described in into the third cavity and in end be connected by power In three cavity rear end inner walls and connection fixed thereto, the third rotation axis are located at the part in the third cavity and are equipped with second Belt wheel, be connected by power has belt between the first pulley and second belt wheel.
2. a kind of accumulated snow shoveling device according to claim 1, it is characterised in that:The intelligent drainage function brake gear includes setting It sets the round gate in the outlet pipe and the 4th cavity in the round gate left end is set, round gate is equipped with The 4th rotation axis that left and right extends, the 4th rotation axis right end extending end and the outlet pipe right end inner wall are rotatably assorted company It connects, the 4th rotation axis left end extending end puts in the 4th cavity and is equipped with turbine, the 4th rotation in end Inner wall between axis and the outlet pipe and the 4th cavity is rotatably assorted connection, be equipped in the 4th cavity to The scroll bar of the turbo-power connection and front and back extension, scroll bar front end extending end turn with the 4th cavity front inner wall Dynamic to be connected, the scroll bar rear end extending end be connected by power has third motor, third motor outer surface to be embedded In in the inner wall of the 4th cavity rear end, the third motor and the water level detection gauge Electricity Federation.
3. a kind of accumulated snow shoveling device according to claim 1, it is characterised in that:It is fixed on the vehicle push bracket left end end face There is front and back symmetrical fixed pad, the fixed pad is equipped with handle, control panel is installed at the top of the handle horizontal section, described Control panel and the water level detection gauge, first motor and second motor Electricity Federation.
4. a kind of accumulated snow shoveling device according to claim 1, it is characterised in that:The vehicle push bracket bottom four corners are equipped with vehicle Wheel.
CN201810116817.3A 2018-02-06 2018-02-06 A kind of accumulated snow shoveling device Active CN108560473B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810116817.3A CN108560473B (en) 2018-02-06 2018-02-06 A kind of accumulated snow shoveling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810116817.3A CN108560473B (en) 2018-02-06 2018-02-06 A kind of accumulated snow shoveling device

Publications (2)

Publication Number Publication Date
CN108560473A true CN108560473A (en) 2018-09-21
CN108560473B CN108560473B (en) 2019-07-30

Family

ID=63531295

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810116817.3A Active CN108560473B (en) 2018-02-06 2018-02-06 A kind of accumulated snow shoveling device

Country Status (1)

Country Link
CN (1) CN108560473B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528450A (en) * 2019-09-19 2019-12-03 义乌初晨新能源科技有限公司 A kind of railroad track accumulated snow cleaning plant
CN112593524A (en) * 2021-01-06 2021-04-02 南京亿拉尔科技有限公司 Be used for track traffic ice and snow to clear away monitoring devices

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110656613A (en) * 2019-10-11 2020-01-07 安徽宜家管业有限公司 Accumulated snow cleaning mechanism

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2799667Y (en) * 2005-07-04 2006-07-26 朱均琦 Snow scraping device
WO2013077730A1 (en) * 2011-11-21 2013-05-30 Lely Patent N.V. Device and method for removing dirt from a floor
JP5341033B2 (en) * 2010-07-13 2013-11-13 米久 茅根 Snow pressure equipment
CN203546658U (en) * 2013-10-08 2014-04-16 长春东方水泵有限公司 Multifunctional snow-removing and shaping and loader
CN105696510A (en) * 2016-04-05 2016-06-22 赵明利 Air pressure chain type snow remover and snow removing method
CN205934833U (en) * 2016-07-18 2017-02-08 李沛 Split type sled of changing fast of direct current storage battery electrical heating
CN107354904A (en) * 2017-07-26 2017-11-17 邓泽宇 A kind of snow cleaning truck for road
CN107642063A (en) * 2017-11-16 2018-01-30 熊训祥 A kind of road deicer

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2799667Y (en) * 2005-07-04 2006-07-26 朱均琦 Snow scraping device
JP5341033B2 (en) * 2010-07-13 2013-11-13 米久 茅根 Snow pressure equipment
WO2013077730A1 (en) * 2011-11-21 2013-05-30 Lely Patent N.V. Device and method for removing dirt from a floor
CN203546658U (en) * 2013-10-08 2014-04-16 长春东方水泵有限公司 Multifunctional snow-removing and shaping and loader
CN105696510A (en) * 2016-04-05 2016-06-22 赵明利 Air pressure chain type snow remover and snow removing method
CN205934833U (en) * 2016-07-18 2017-02-08 李沛 Split type sled of changing fast of direct current storage battery electrical heating
CN107354904A (en) * 2017-07-26 2017-11-17 邓泽宇 A kind of snow cleaning truck for road
CN107642063A (en) * 2017-11-16 2018-01-30 熊训祥 A kind of road deicer

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528450A (en) * 2019-09-19 2019-12-03 义乌初晨新能源科技有限公司 A kind of railroad track accumulated snow cleaning plant
CN112593524A (en) * 2021-01-06 2021-04-02 南京亿拉尔科技有限公司 Be used for track traffic ice and snow to clear away monitoring devices

Also Published As

Publication number Publication date
CN108560473B (en) 2019-07-30

Similar Documents

Publication Publication Date Title
CN207070621U (en) A kind of intelligent Chinese yam harvesting robotic
CN108560473B (en) A kind of accumulated snow shoveling device
CN107836153A (en) A kind of municipal afforestation soil environmental protection repair process device
CN109997432A (en) A kind of salt-soda soil prosthetic appliance
CN107975002A (en) A kind of snow shovel removes equipment
CN207295821U (en) One kind is based on hydraulic engineering environment-protective desilting device
CN108330887B (en) A kind of accumulated snow roots out equipment
CN113089752A (en) Underwater dredging robot
CN201045195Y (en) Hydraulic spiral tee mine sump dredging device
CN108625333A (en) A kind of accumulated snow roots out structure
CN108330876A (en) Multifunctional garbage scavenging machine and its cleaning method
CN107558413B (en) A kind of sanitation cart
CN201520993U (en) Novel efficient automatic-controlled walking hydraulic silt remover
CN211898646U (en) Silt solidification treatment device is dredged in river course for hydraulic engineering
CN109019035A (en) A kind of grains upper storehouse machine
CN209914448U (en) Weeding and ditching integrated device for sealwort planting
CN216515798U (en) Dredging device for hydraulic engineering
CN208329030U (en) A kind of dredging device for water conservancy projects
CN111501711B (en) Barrier breaking equipment at front end of dredging ship
CN219196114U (en) Automatic dredging machine
CN219364763U (en) High efficiency hydraulic engineering channel dredging device
CN213407828U (en) Sludge discharge device of sewage treatment tank for environmental protection
CN204508264U (en) Can the coal charge car unloader that gathers dust of scarifying
CN210946943U (en) Silt cleaning device is administered to environment
CN219364759U (en) Hydraulic engineering management dredging device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190702

Address after: 324100 Baimalong 17, Aifeng Village, Xintangbian Town, Jiangshan City, Zhejiang Province

Applicant after: Jiangshan Peiyin New Material Technology Co., Ltd.

Address before: 452370 88 Ping'an Street, Qu Liang Industrial Cluster, Xinmi, Zhengzhou, Henan

Applicant before: Cen Luoqiong

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210625

Address after: 271100 story Street building, Laiwu high tech Zone, Jinan City, Shandong Province

Patentee after: Laiwu yinglei Trading Co.,Ltd.

Address before: 324100 Baimalong 17, Aifeng Village, Xintangbian Town, Jiangshan City, Zhejiang Province

Patentee before: Jiangshan Peiyin New Material Technology Co.,Ltd.