CN108560405A - The construction method of assembled column, assembled bridge pier and assembled bridge pier - Google Patents

The construction method of assembled column, assembled bridge pier and assembled bridge pier Download PDF

Info

Publication number
CN108560405A
CN108560405A CN201810785965.4A CN201810785965A CN108560405A CN 108560405 A CN108560405 A CN 108560405A CN 201810785965 A CN201810785965 A CN 201810785965A CN 108560405 A CN108560405 A CN 108560405A
Authority
CN
China
Prior art keywords
column
assembled
spiral
cushion cap
column segment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810785965.4A
Other languages
Chinese (zh)
Inventor
戴恩彬
冯先德
许名志
金军良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongye Changtian International Engineering Co Ltd
Original Assignee
Zhongye Changtian International Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongye Changtian International Engineering Co Ltd filed Critical Zhongye Changtian International Engineering Co Ltd
Priority to CN201810785965.4A priority Critical patent/CN108560405A/en
Publication of CN108560405A publication Critical patent/CN108560405A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

This application discloses the construction methods of a kind of assembled column, assembled bridge pier and assembled bridge pier, wherein assembled column includes:Multiple column segments are embedded with multiple spirals in each column segment, splice assembly between column segment, and the position that the splicing position of each two adjacent column segment corresponds to spiral is provided with operation slot;The spiral of screw steel bar connector, each two adjacent column segment is spliced by screw steel bar connector, and screw steel bar connector is contained in operation slot.Spiral, the screw steel bar connector of the assembled column are standardized product, it is not required to special equipment and customization is processed, simplify construction, reduce construction cost, and using mechanical connection, after the completion of bent cap assembly, subsequent construction can be carried out on column without being in the milk to wait for, shortens the construction period.

Description

The construction method of assembled column, assembled bridge pier and assembled bridge pier
Technical field
The present invention relates to technical field of bridge construction, more particularly to a kind of assembled column.The invention further relates to a kind of packets The construction method of assembled bridge pier and assembled bridge pier containing the assembled column.
Background technology
Prefabricated assembled bridge owner will include precast assembly girder and precast assembly bridge pier.Recently as engineering knot Under the industrialized overall situation of the acceleration of structure process of industrialization, especially domestic construction, promotes bridge pier precast assembly technology and comply with the epoch Development.Assembled bridge pier is at home and abroad gradually widely applied in the substructure of bridge spanning the sea access bridge, urban viaduct etc., And it is expected to the bridge pier structure form as a kind of mainstream.
Assembled bridge pier is exactly that cast-in-place cushion cap and " batch production " prefabricated column segment are used certain connection type It is assembled, one of core technology is between cushion cap and column, being reliably connected between column segment.Existing unit construction bridge There are mainly two types of the connection types of pier, the first is that setting sleeve or reserving hole channel, reinforcing bar are passed through in column segment and cushion cap In sleeve or reserving hole channel, column segment carries out grouting with the reinforcing bar in cushion cap and connects in sleeve or reserving hole channel;Second Kind is between cushion cap and column, and column is attached between segment by steel pipe sleeve, steel pile casting etc..Although these are connected Mode can realize effective connection.But the first grouting-type connection type, junction needs live grouting construction, high to construction requirement, There is also the uncertain factors such as not full of being in the milk, and must etc. slurry intensities reach and can carry out subsequent construction after requirement, the duration compared with It is long.The mode that the columns such as second setting steel pipe sleeve, steel pile casting are attached needs additional processing steel pipe sleeve, steel shield Cylinder etc., processing and installation are complicated, and cost is higher.
In conclusion how to solve the problems, such as that Bridge Pier Construction cost is high, long in time limit, become those skilled in the art urgently It solves the problems, such as.
Invention content
In view of this, the purpose of the present invention is to provide a kind of assembled column, to reduce construction cost, shorten construction work Phase.
It is another object of the present invention to provide a kind of assembled bridge piers including the assembled column, to reduce construction Cost shortens the construction period.
A further object of the present invention is to provide a kind of construction method of assembled bridge pier, to reduce construction cost, contracting The short construction period.
In order to achieve the above objectives, the present invention provides following technical scheme:
A kind of assembled column, including:
Multiple column segments are each axially embedded with multiple spirals, the column in the column segment along it Splice assembly between segment, the splicing position of each two adjacent column segment corresponds to the position setting of the spiral There is operation slot;
The spiral of screw steel bar connector, each two adjacent column segment passes through the spiral Connector splices, and the screw steel bar connector is contained in the operation slot.
Preferably, it in above-mentioned assembled column, after the column segment splicing assembly, is filled in the operation slot There is concrete.
Preferably, in above-mentioned assembled column, the structural strength grade for the concrete filled in the operation slot Higher than the structural strength grade of the concrete of the column segment.
Preferably, in above-mentioned assembled column, it is arranged between the splice ends of each two adjacent column segment There is epoxy glue layer.
Preferably, in above-mentioned assembled column, the lower part splice ends of each column segment are provided with the behaviour Make slot, the lower end of the spiral is located in the operation slot, and the lower face of the spiral and the column There is evacuation spacing between the end face of the lower part splice ends of segment, the upper of the column segment is stretched out in the upper end of the spiral The end face of portion's splice ends, and the length that the upper end of the spiral is stretched out is less than or equal to the evacuation spacing, the operation The axial length of slot is more than the length of the screw steel bar connector.
Preferably, in above-mentioned assembled column, the axial length of the operation slot is greater than or equal to the screw thread 1.5 times of length of reinforcing bar connector.
Preferably, in above-mentioned assembled column, the top splice ends of each column segment are provided with the behaviour Make slot, the upper end of the spiral is located in the operation slot, and the upper surface of the spiral and the column There is evacuation spacing between the end face of the top splice ends of segment, the lower end of the spiral is stretched out under the column segment The end face of portion's splice ends, and the length that the lower end of the spiral is stretched out is less than or equal to the evacuation spacing, the operation The axial length of slot is more than the length of the screw steel bar connector.
Preferably, in above-mentioned assembled column, the axial length of the operation slot is greater than or equal to the screw thread 1.5 times of length of reinforcing bar connector.
Preferably, in above-mentioned assembled column, each each splice ends of the column segment are both provided with described Slot is operated, the end of the spiral is located in the operation slot, the end of the spiral and the column The end face of the splice ends of segment is concordant, and the axial length of the operation slot is greater than or equal to the length of the screw steel bar connector Degree.
Preferably, in above-mentioned assembled column, the spiral arranges one close to the edge of the column segment Week.
The present invention also provides a kind of assembled bridge pier, including cushion cap and column, multiple cushion caps are embedded in the cushion cap Spiral, the column are the assembled column as described in any of the above item, the lower thread reinforcing bar of the assembled column It is connected one to one by screw steel bar connector with the cushion cap spiral of the cushion cap.
Preferably, in above-mentioned assembled bridge pier, the lower thread reinforcing bar of the assembled column is located at the assembly In the operation slot of the lower end of formula column, and the lower face of the lower thread reinforcing bar of the assembled column and the assembled are vertical There is evacuation spacing between the lower face of column, the cushion cap spiral stretches out the upper surface of the cushion cap, and the cushion cap spiral shell The extension elongation of line reinforcing bar is less than or equal to the evacuation spacing.
Preferably, in above-mentioned assembled bridge pier, the lower thread reinforcing bar of the assembled column stretches out the assembly The lower face of formula column, the position that the upper end of the cushion cap corresponds to the cushion cap spiral is provided with operation slot, described to hold The upper end of platform spiral is located in the operation slot, and the upper end of the upper surface and the cushion cap of the cushion cap spiral There is evacuation spacing between face, the extension elongation of the spiral is less than or equal to the evacuation spacing.
Preferably, in above-mentioned assembled bridge pier, the lower thread reinforcing bar of the assembled column is located at the assembly In the operation slot of the lower end of formula column, and the lower face of the lower thread reinforcing bar of the assembled column and the assembled are vertical The lower face of column is concordant, and the position that the upper end of the cushion cap corresponds to cushion cap spiral is provided with the operation slot, described to hold The upper surface of platform spiral is concordant with the upper surface of the cushion cap.
Preferably, in above-mentioned assembled bridge pier, the upper surface of the lower face and the cushion cap of the assembled column Between be provided with epoxy glue layer.
Preferably, in above-mentioned assembled bridge pier, after the assembled column splices with the cushion cap, the operating groove Concrete is filled in hole.
Preferably, in above-mentioned assembled bridge pier, the structural strength grade for the concrete filled in the operation slot Higher than the structural strength grade of the assembled column and the concrete of the cushion cap.
The present invention also provides a kind of construction method of assembled bridge pier, step includes:
S100, by a column segment lifting on the cushion cap, the spiral of the column segment and the cushion cap Cushion cap spiral is spliced by screw steel bar connector in operating slot correspondingly;
Remaining column segment is lifted successively above S200, the column segment in the step S100, and is passed through The spiral of screw steel bar connector connection each two adjacent upright posts segment in the operation slot of column segment, until completing The splicing of assembled bridge pier.
Preferably, further include step S300 after the step S200 in the construction method of above-mentioned assembled bridge pier: The operation slot clog using the high concrete of the concrete structural strength grade than column segment smooth.
Preferably, in the construction method of above-mentioned assembled bridge pier, in the step S100, in the column segment Before being spliced with the cushion cap, first the splice ends in cushion cap and/or column segment smear epoxy glue layer;
In the step S200, before two neighboring column segment is spliced, first in each two adjacent upright posts section The splice ends of one or two of section column segment smear epoxy glue layer.
Compared with prior art, the beneficial effects of the invention are as follows:
Assembled column provided by the invention includes multiple column segments, is axially embedded with along it in each column segment Multiple spirals splice assembly between column segment, and the splicing position of each two adjacent column segment corresponds to spiral Position be provided with operation slot;The spiral of each two adjacent column segment is spliced by screw steel bar connector, and Screw steel bar connector is contained in handle hole.The assembled column is spliced by multiple column segments, and passes through screw-thread steel The dress of pier column can be completed in the spiral being directly connected in two neighboring column segment in operating slot for muscle connector Match, compared with existing use grouting-type connection type, does not need live grouting, follow-up work can be carried out without waiting, contract The short construction period.It, need not be additional compared with the mode that the columns such as existing setting steel pipe sleeve, steel pile casting are attached Steel pipe sleeve, steel pile casting etc. are processed, spiral, screw steel bar connector used in column segment are standardized product, no It needs special equipment and customization to process, simplifies construction, reduce construction cost.
Assembled bridge pier provided by the invention uses the assembled column in the present invention, therefore, having the same beneficial Effect, details are not described herein.
In the construction method of assembled assembled bridge pier provided by the invention, using the column segment in the present invention, first will One column segment corresponds to be lifted on cushion cap and realize by screw steel bar connector and connect;Again on first column segment Lift remaining column segment successively, and it is adjacent to connect in the operation slot of column segment by screw steel bar connector each two The spiral of column segment, until completing the splicing of assembled bridge pier.Compared with prior art, construction cost is reduced, is contracted The short construction period.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this The embodiment of invention for those of ordinary skill in the art without creative efforts, can also basis The attached drawing of offer obtains other attached drawings.
Fig. 1 is a kind of axial sectional diagrammatical view illustration of the column segment of assembled column provided in an embodiment of the present invention;
Fig. 2 is a kind of end structure illustration of the splice ends of column segment provided in an embodiment of the present invention;
Fig. 3 is structural representation when a kind of column segment of assembled bridge pier provided in an embodiment of the present invention is lifted with cushion cap Figure;
Fig. 4 is a kind of column segment provided in an embodiment of the present invention and cushion cap splicing construction schematic diagram;
Fig. 5 is the structural schematic diagram after the completion of assembled bridge pier assembly provided in an embodiment of the present invention.
Wherein, 1 it is spiral, 2 be column segment, 3 be operation slot, 4 be screw steel bar connector, 5 is cushion cap spiral shell Line reinforcing bar, 6 be cushion cap, 7 be epoxy glue layer.
Specific implementation mode
Core of the invention reduces construction cost, shortens the construction period there is provided a kind of assembled column.
The present invention also provides a kind of assembled bridge piers including the assembled column, reduce construction cost, shorten Construction period.
The present invention also provides a kind of construction methods of assembled bridge pier, reduce construction cost, shorten the construction period.
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
- Fig. 5 is please referred to Fig.1, an embodiment of the present invention provides a kind of assembled columns, including multiple column segments 2 and spiral shell Line reinforcing bar connector 4, the quantity at least two of column segment 2, wherein be axially embedded with along it in each column segment 2 The quantity of multiple spirals 1, the spiral 1 in each column segment 2 is identical and position corresponds, column segment 2 it Between splice assembly, the position that the splicing position of each two adjacent column segment 2 corresponds to spiral 1 is provided with and operates slot 3, The end of spiral 1 is located in operation slot 3, and operation slot 3 is connected to outside;The spiral shell of each two adjacent column segment 2 Line reinforcing bar 1 is spliced by 4 screw thread of screw steel bar connector, and screw steel bar connector 4 is contained in operation slot 3, operating groove The cross dimensions in hole 3 is slightly larger than the cross dimensions of screw steel bar connector 4, is operated with installation tool when providing assembled connect empty Between.Each pair of spiral 1 being connected is connected by a screw steel bar connector 4.
The assembled column is spliced by multiple column segments 2, and by screw steel bar connector 4 in operation slot 3 In the spiral 1 that is directly connected in two neighboring column segment 2 assembly of column can be completed, use grouting-type with existing Connection type is compared, and using mechanical connection, does not need live grouting, can be carried out follow-up work without waiting, be shortened construction Duration.Compared with the mode that the columns such as existing setting steel pipe sleeve, steel pile casting are attached, additional processing steel pipe is not needed Sleeve, steel pile casting etc., spiral 3, screw steel bar connector 4 are standardized product used in column segment 2, are not required to special Equipment and customization are processed, and are simplified construction, are reduced construction cost.
In order to protect screw steel bar connector 4, it is avoided to be externally exposed, while screw steel bar connector 4 being avoided to loosen, The corrosion resistance and endurance quality of junction are improved, in the present embodiment, after the splicing assembly of column segment 2, is operated in slot 3 Filled with concrete, to seal up for safekeeping screw steel bar connector 4 and the spiral 1 exposed in operating slot 3.
Further, in the present embodiment, the structural strength grade for operating the concrete filled in slot 3 is higher than column section The structural strength grade of concrete used in section 2.More than a usual high grade, to further improve operation slot 3 In concrete structural strength, improve protective value.
In the present embodiment, it is provided with epoxy glue layer 7 between the splice ends of each two adjacent column segment 2.It is logical It crosses epoxy glue layer 7 to be bonded the column segment 2 mutually spliced, further increases splicing intensity, while avoiding connecting portion There is gap, protects internal structure.
As Figure 1-Figure 5, in the present embodiment, the lower part splice ends of each column segment 2 are provided with operation slot 3, The lower end of spiral 1 is located in operation slot 3, and the end of the lower face of spiral 1 and the lower part splice ends of column segment 2 There is evacuation spacing between face, the end face of the top splice ends of column segment 2, and spiral 1 are stretched out in the upper end of spiral 1 Upper end stretch out length be less than or equal to evacuation spacing, operation slot 3 axial length be more than screw steel bar connector 4 length Degree.
So set, when two neighboring column segment 2 is spliced, as shown in figure 5, under the column segment 2 being located above After portion's splice ends are docked with the top splice ends of underlying column segment 2, the spiral shell of the top stretching of the column segment 2 of lower section Line reinforcing bar 1 is inserted into the lower part operation slot 3 of the column segment 2 of top, since the length that spiral 1 stretches out is less than or equal to Spacing is avoided, therefore, two spirals 1 are there is no interference, the spiral shell that can be docked to two by screw steel bar connector 4 Line reinforcing bar 1 is attached.
Further, in the present embodiment, the axial length of operation slot 3 is greater than or equal to screw steel bar connector 4 1.5 times of length.Before two column segments 2 are docked, screw steel bar connector 4 is fitted into advance in operation slot 3, and is all screwed in It is after two column segments 2 are docked, the half of screw steel bar connector 4 is long on the spiral 1 of the column segment 2 of top Degree is screwed on the spiral 1 of the stretching of the column segment 2 of lower section.It ensure that two neighboring column segment 2 was smoothly spliced Meanwhile reducing the size of operation slot 3 as much as possible, to improve the overall construction intensity of column segment 2.
The structure type of another column segment 2 is present embodiments provided, it is different from the structure of the first column segment 2 The exchange of the structure of the column segment 2 in the present embodiment and the first about 2 pillar construction, i.e. the top of each column segment 2 Splice ends are provided with operation slot 3, and the upper end of spiral 1 is located in operation slot 3, and the upper surface of spiral 1 with it is vertical There is evacuation spacing between the end face of the top splice ends of column segment 2, the lower part of column segment 2 is stretched out in the lower end of spiral 1 The end face of splice ends, and the length that the lower end of spiral 1 is stretched out is less than or equal to evacuation spacing, the axial direction of operation slot 3 is long Length of the degree more than screw steel bar connector 4.
So set, when two neighboring column segment 2 is spliced, the lower part splice ends for the column segment 2 being located above with After the top splice ends docking of underlying column segment 2, the spiral 1 that the lower part of the column segment 2 of top is stretched out is inserted In the upper operating slot 3 for entering the column segment 2 of lower section, since the length that spiral 1 stretches out is less than or equal to evacuation spacing, Therefore, two spirals 1 are there is no interference, can by the spiral 1 that screw steel bar connector 4 docks two into Row connection.
Further, in the present embodiment, the axial length of operation slot 3 is greater than or equal to screw steel bar connector 4 The effect of 1.5 times of length, the structure is identical as the structure function of the first column segment 2, in order to ensure two neighboring column While segment 2 is smoothly spliced, reduce the size of operation slot 3 as much as possible, it is strong with the overall structure for improving column segment 2 Degree..
The structure of the third column segment 2 is present embodiments provided, the first and second of column segment 2 are different from, this Each splice ends of each column segment 2 in embodiment are both provided with operation slot 3, and the end of spiral 1 is located at operation In slot 3, the end of spiral 1 is concordant with the end face of the splice ends of the column segment 2, and the axial length for operating slot 3 is big In or equal to screw steel bar connector 4 length.That is, the both ends positioned at remaining the column segment 2 below of top upright post segment 2 are equal It is provided with operation slot 3, the upper and lower ends of spiral 1 do not stretch out the end face of column segment 2.The 2 same energy of column segment Enough spliced by screw steel bar connector 4.
As shown in Fig. 2, in the present embodiment, spiral 1 is arranged one week close to the edge of column segment 2, spiral 1 For finish rolling deformed bar, structural strength height.Finish rolling deformed bar commonly uses a diameter of 18mm, 25mm, 32mm, 40mm, of the invention Connection method is all applicable in.The quantity of spiral 1 is decided according to the actual requirements, and does not limit herein.
As shown in Figure 3-Figure 5, it is based on assembled column described in any of the above embodiment, the embodiment of the present invention also provides A kind of assembled bridge pier, including cushion cap 6 and column, wherein multiple cushion cap spirals 5 are embedded in cushion cap 6, column is such as Assembled column described in any of the above embodiment, the lower thread reinforcing bar 1 of assembled column and the cushion cap screw-thread steel of cushion cap 6 Muscle 5 is connected one to one by screw steel bar connector 4.
The assembled bridge pier uses the assembled column in the present invention, since assembled column is by multiple column segments 2 It is spliced, and is directly connected in operating slot 3 screw thread in two neighboring column segment 2 by screw steel bar connector 4 Reinforcing bar 1 can be completed the assembly of pier column, and column segment 2 and cushion cap 6 are by screw steel bar connector 4 in operating slot 3 It is directly connected to spiral 1 and cushion cap spiral 5.Compared with existing use grouting-type connection type, live filling is not needed Slurry, can carry out follow-up work, shorten the construction period without waiting.With the opposition such as existing setting steel pipe sleeve, steel pile casting The mode that column is attached is compared, and additional processing steel pipe sleeve, steel pile casting etc., used spiral 1, cushion cap spiral shell are not needed Line reinforcing bar 5 and screw steel bar connector 4 are standardized product, are not required to special equipment and customization is processed, simplify construction, reduce Construction cost.
It present embodiments provides a kind of specific column segment 2 and the splicing construction of cushion cap 6 works as dress as shown in Figure 3-Figure 5 When column segment 2 with formula column is using the first column segment 2 above-mentioned, i.e. the lower thread reinforcing bar 1 of column segment 2 In the operation slot 3 of the lower end of column segment 2, and the lower face of the lower thread reinforcing bar 1 of assembled column and assembled There is evacuation spacing between the lower face of column, then cushion cap spiral 5 stretches out the upper surface of cushion cap 6, and cushion cap spiral 5 Extension elongation be less than or equal to evacuation spacing.In such cases, screw steel bar connector 4 is installed on column segment 2 in advance On spiral 1, and in operation slot 3, after column segment 2 is docked with cushion cap 6, by the half of screw steel bar connector 4 Length is screwed on cushion cap spiral 5.
The splicing construction for present embodiments providing second specific column segment 2 and cushion cap 6, when standing for assembled column When column segment 2 is using second of column segment 2 above-mentioned, i.e., it is vertical to stretch out assembled for the lower thread reinforcing bar 1 of column segment 2 The lower face of column, then the upper end of cushion cap 6 correspond to cushion cap spiral 5 position be provided with operation slot 3, cushion cap spiral 5 Upper end be located at operation slot 3 in, and between the upper surface of cushion cap spiral 5 and the upper surface of cushion cap 6 exist evacuation spacing, The extension elongation of spiral 1 is less than or equal to evacuation spacing.In such cases, screw steel bar connector 4 is installed on holds in advance On the cushion cap spiral 5 of platform 6, and in the operation slot 3 of cushion cap 6, after column segment 2 is docked with cushion cap 6, by screw-thread steel The half length of muscle connector 4 is screwed on the spiral 1 of column segment 2.Since the radial dimension of cushion cap 6 is more than column segment 2 radial dimension, therefore, the radial dimension for the operation slot 3 being arranged on cushion cap 6 accordingly increase, the operation slot on cushion cap 6 3 radially outward edge can extend to the peripheral surface of cushion cap 6, can also be located in cushion cap 6, as long as the diameter of operation slot 3 is outside Edge is located at except the peripheral surface of column segment 2, is revolved to screw steel bar connector 4 in operating slot 3 with facilitating It twists.
The splicing construction for present embodiments providing the third specific column segment 2 and cushion cap 6, when standing for assembled column When column segment 2 is using the third column segment 2 above-mentioned, i.e., the lower thread reinforcing bar 1 of column segment 2 is located at column segment In the operation slot 3 of 2 lower end, and the lower face of the lower face and assembled column of the lower thread reinforcing bar 1 of assembled column Concordantly, then operation slot 3 is also equipped on cushion cap 6, and the upper surface of cushion cap spiral 5 is concordant with the upper surface of cushion cap 6.This In the case of kind, screw steel bar connector 4 is previously installed on the spiral 1 of column segment 2 or on cushion cap spiral 5, After docking, the half length of screw steel bar connector 4 is made to be screwed in respectively on spiral 1 and cushion cap spiral 5.Due to cushion cap 6 radial dimension is more than the radial dimension of column segment 2, therefore, the radial dimension phase for the operation slot 3 being arranged on cushion cap 6 It should increase, the radially outward edge of the operation slot 3 on cushion cap 6 can extend to the peripheral surface of cushion cap 6, can also be located at cushion cap 6 It is interior, as long as the radially outward edge of operation slot 3 is located at except the peripheral surface of column segment 2, to facilitate in operating slot 3 Screw steel bar connector 4 is screwed.
Further, in the present embodiment, it is provided with epoxy between the lower face of assembled column and the upper surface of cushion cap 6 The column segment 2 mutually spliced and cushion cap 6 are bonded by resin adhesive layer 7 by epoxy glue layer 7, and it is strong to further increase splicing Degree, while connecting portion being avoided gap occur, protect internal structure.
In order to protect screw steel bar connector 4, it is avoided to be externally exposed, while screw steel bar connector 4 being avoided to loosen, The corrosion resistance and endurance quality of junction are improved, in the present embodiment, behind column segment 2 and the splicing assembly of cushion cap 6, operation Concrete is filled in slot 3, to seal screw steel bar connector 4 and the spiral 1 exposed and cushion cap spiral 5 up for safekeeping In operating slot 3.
Further, in the present embodiment, the structural strength grade for operating the concrete filled in slot 3 is higher than column section The structural strength grade of concrete used in section 2 and cushion cap 6.More than a usual high grade, to further improve behaviour The structural strength for making the concrete in slot 3, improves protective value.
Based on assembled bridge pier described in any of the above embodiment, the embodiment of the present invention additionally provides a kind of unit construction bridge The construction method of pier, includes the following steps:
Be prefabricated in the factory column segment 2, and after the transport to construction site of column segment 2, live cushion cap 6 has been constructed at this time It completes, is constructed as follows later:
Step S100, as shown in figure 3, a column segment 2 is lifted on cushion cap 6, at this point, the lower end of column segment 2 Face is docked with the upper surface of cushion cap 6, and screw steel bar connector 4 is all screwed on a spiral 1 or cushion cap spiral 5. Later, the rotary screwing thread reinforcing bar connector 4 in operating slot 3, the spiral 1 of the column segment 2 and the cushion cap screw thread of cushion cap 6 Reinforcing bar 5 is spliced by screw steel bar connector 4 in operating slot 3 correspondingly, as shown in Figure 4.
Step S200, as shown in figure 5,2 top of column segment in the step s 100 lifts remaining column segment successively 2, and pass through the screw thread of the connection each two adjacent upright posts segment 2 in the operation slot 3 of column segment 2 of screw steel bar connector 4 Reinforcing bar 1, until completing the splicing of assembled bridge pier.
Further, in the present embodiment, further include step S300 after step S200:Using than column segment 2 The high concrete of concrete structural strength grade will operate slot 3 clog it is smooth, it is more than general high level-one.No matter operating groove Hole 3 is located on column segment 2 or cushion cap 6, carries out filling out envelope by concrete, it is avoided to be externally exposed, to improve connection The corrosion resistance and endurance quality at place, while screw steel bar connector 4 being avoided to loosen.
Further, in the present embodiment, in the step s 100, before column segment 2 and cushion cap 6 are spliced, First the splice ends in cushion cap 6 and/or column segment 2 smear epoxy glue layer 7;
In step s 200, before two neighboring column segment 2 is spliced, first in each two adjacent upright posts segment 2 One or two of column segment 2 splice ends smear epoxy glue layer 7.To mutually it be spliced by epoxy glue layer 7 Column segment 2 between and column segment 2 and cushion cap 6 be bonded, further increase splicing intensity, while connecting portion being avoided to go out Existing gap, protects internal structure.
In the construction method of assembled assembled bridge pier provided by the invention, using the column segment in the present invention, first will One column segment corresponds to be lifted on cushion cap and realize by screw steel bar connector and connect;Again on first column segment Lift remaining column segment successively, and it is adjacent to connect in the operation slot of column segment by screw steel bar connector each two The spiral of column segment, until completing the splicing of assembled bridge pier.Compared with prior art, construction cost is reduced, is contracted The short construction period.
Each embodiment is described by the way of progressive in this specification, the highlights of each of the examples are with other The difference of embodiment, just to refer each other for identical similar portion between each embodiment.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest range caused.

Claims (20)

1. a kind of assembled column, which is characterized in that including:
Multiple column segments (2) are each axially embedded with multiple spirals (1) in the column segment (2) along it, described Splice assembly between column segment (2), the splicing position of each two adjacent column segment (2) corresponds to the spiral (1) position is provided with operation slot (3);
The spiral (1) of screw steel bar connector (4), each two adjacent column segment (2) passes through the spiral shell Line reinforcing bar connector (4) splices, and the screw steel bar connector (4) is contained in the operation slot (3).
2. assembled column according to claim 1, which is characterized in that described after column segment (2) the splicing assembly It operates and is filled with concrete in slot (3).
3. assembled column according to claim 2, which is characterized in that the concrete filled in the operation slot (3) Structural strength grade higher than the column segment (2) concrete structural strength grade.
4. assembled column according to claim 1, which is characterized in that each two adjacent column segment (2) Epoxy glue layer (7) is provided between splice ends.
5. according to claim 1-4 any one of them assembled columns, which is characterized in that each column segment (2) Lower part splice ends are provided with the operation slot (3), and the lower end of the spiral (1) is located in the operation slot (3), and There is evacuation spacing, institute between the lower face of the spiral (1) and the end face of the lower part splice ends of the column segment (2) State spiral (1) upper end stretch out the column segment (2) top splice ends end face, and the spiral (1) The length that upper end is stretched out is less than or equal to the evacuation spacing, and the axial length of the operation slot (3) is more than the screw-thread steel The length of muscle connector (4).
6. assembled column according to claim 5, which is characterized in that the axial length of the operation slot (3) is more than Or 1.5 times of length equal to the screw steel bar connector (4).
7. according to claim 1-4 any one of them assembled columns, which is characterized in that each column segment (2) Top splice ends are provided with the operation slot (3), and the upper end of the spiral (1) is located in the operation slot (3), and There is evacuation spacing, institute between the upper surface of the spiral (1) and the end face of the top splice ends of the column segment (2) State spiral (1) lower end stretch out the column segment (2) lower part splice ends end face, and the spiral (1) The length that lower end is stretched out is less than or equal to the evacuation spacing, and the axial length of the operation slot (3) is more than the screw-thread steel The length of muscle connector (4).
8. assembled column according to claim 7, which is characterized in that the axial length of the operation slot (3) is more than Or 1.5 times of length equal to the screw steel bar connector (4).
9. according to claim 1-4 any one of them assembled columns, which is characterized in that each column segment (2) Each splice ends are both provided with the operation slot (3), and the end of the spiral (1) is located in the operation slot (3), The end of the spiral (1) is concordant with the end face of splice ends of column segment (2) described in this, the operation slot (3) Axial length is greater than or equal to the length of the screw steel bar connector (4).
10. according to claim 1-4 any one of them assembled columns, which is characterized in that the spiral (1) is close to institute The edge for stating column segment (2) is arranged one week.
11. a kind of assembled bridge pier, including cushion cap (6) and column, which is characterized in that be embedded with multiple hold in the cushion cap (6) Platform spiral (5), the column are such as claim 1-10 any one of them assembled columns, the assembled column Spiral described in lower end (1) is connected one to one with the cushion cap spiral (5) by screw steel bar connector (4).
12. assembled bridge pier according to claim 11, which is characterized in that screw thread described in the lower end of the assembled column Reinforcing bar (1) is located in the operation slot (3) of the lower end of the assembled column, and screw thread described in the lower end of the assembled column There is evacuation spacing between the lower face of reinforcing bar (1) and the lower face of the assembled column, the cushion cap spiral (5) is stretched Go out the upper surface of the cushion cap (6), and the extension elongation of the cushion cap spiral (5) is less than or equal to the evacuation spacing.
13. assembled bridge pier according to claim 11, which is characterized in that screw thread described in the lower end of the assembled column Reinforcing bar (1) stretches out the lower face of the assembled column, and the upper end of the cushion cap (6) corresponds to the cushion cap spiral (5) Position is provided with operation slot (3), and it is interior that the upper end of the cushion cap spiral (5) is located at the operation slot (3), and described holds There is evacuation spacing between the upper surface and the upper surface of the cushion cap (6) of platform spiral (5), the spiral (1) Extension elongation is less than or equal to the evacuation spacing.
14. assembled bridge pier according to claim 11, which is characterized in that screw thread described in the lower end of the assembled column Reinforcing bar (1) is located in the operation slot (3) of the lower end of the assembled column, and screw thread described in the lower end of the assembled column The lower face of reinforcing bar (1) is concordant with the lower face of assembled column, and the upper end of the cushion cap (6) corresponds to cushion cap spiral (5) position is provided with the operation slot (3), the upper end of the upper surface and the cushion cap (6) of the cushion cap spiral (5) Face is concordant.
15. according to claim 11-14 any one of them assembled bridge piers, which is characterized in that under the assembled column Epoxy glue layer (7) is provided between end face and the upper surface of the cushion cap (6).
16. according to claim 11-14 any one of them assembled bridge piers, which is characterized in that the assembled column and institute After stating cushion cap (6) splicing, concrete is filled in the operation slot (3).
17. assembled bridge pier according to claim 16, which is characterized in that the coagulation filled in the operation slot (3) Structural strength grade of the structural strength grade of soil higher than the assembled column and the concrete of the cushion cap (6).
18. a kind of construction method of assembled bridge pier, which is characterized in that step includes:
S100, a column segment (2) is lifted on the cushion cap (6), the spiral (1) of the column segment (2) and institute State cushion cap spiral (5) splicing in operation slot (3) by screw steel bar connector (4) correspondingly of cushion cap (6);
Remaining column segment (2) is lifted successively above S200, the column segment (2) in the step S100, and is led to Cross the spiral shell of screw steel bar connector (4) connection each two adjacent upright posts segment (2) in the operation slot (3) of column segment (2) Line reinforcing bar (1), until completing the splicing of assembled bridge pier.
19. the construction method of assembled bridge pier according to claim 18, which is characterized in that after the step S200 also Including step S300:Using the concrete higher than the concrete structural strength grade of column segment (2) by the operation slot (3) Clog smooth.
20. the construction method of the assembled bridge pier according to claim 18 or 19, which is characterized in that in the step S100 In, before the column segment (2) and the cushion cap (6) are spliced, first in the spelling of cushion cap (6) and/or column segment (2) It connects end and smears epoxy glue layer (7);
In the step S200, before two neighboring column segment (2) is spliced, first in each two adjacent upright posts segment One or two of (2) splice ends of column segment (2) smear epoxy glue layer (7).
CN201810785965.4A 2018-07-17 2018-07-17 The construction method of assembled column, assembled bridge pier and assembled bridge pier Pending CN108560405A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810785965.4A CN108560405A (en) 2018-07-17 2018-07-17 The construction method of assembled column, assembled bridge pier and assembled bridge pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810785965.4A CN108560405A (en) 2018-07-17 2018-07-17 The construction method of assembled column, assembled bridge pier and assembled bridge pier

Publications (1)

Publication Number Publication Date
CN108560405A true CN108560405A (en) 2018-09-21

Family

ID=63555528

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810785965.4A Pending CN108560405A (en) 2018-07-17 2018-07-17 The construction method of assembled column, assembled bridge pier and assembled bridge pier

Country Status (1)

Country Link
CN (1) CN108560405A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109944390A (en) * 2019-04-25 2019-06-28 无锡市政设计研究院有限公司 A kind of fabricated construction column and its construction technology
CN111058622A (en) * 2019-12-27 2020-04-24 宁波优造建筑科技有限公司 Large steel mould cast-in-place column construction method adopting binding and lapping mode for column steel bars
CN112030729A (en) * 2020-08-26 2020-12-04 绍兴文理学院 Prefabricated bridge pier and bearing platform connecting system for assembled beam bridge and construction method of prefabricated bridge pier and bearing platform connecting system
CN112720834A (en) * 2020-12-24 2021-04-30 中建七局第二建筑有限公司 Auxiliary mechanism for bridge and using method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202031108U (en) * 2011-03-23 2011-11-09 东南大学 Post-poured band type fabricated pipe-jacking working well
WO2013081408A1 (en) * 2011-12-01 2013-06-06 Lee Hyun-Woo Prefabricated hybrid girder capable of applying prestress to girder using gap difference between contact surfaces of connective parts of blocks, method for applying prestress to prefabricated hybrid girder, continuation method for prefabricated hybrid girder, and manufacturing and assembling method thereof
CN204849569U (en) * 2015-08-10 2015-12-09 江苏建筑职业技术学院 Steel pipe concrete stem stem prefabricated unit construction bridge pier stud of putting more energy into
CN106677056A (en) * 2017-02-16 2017-05-17 上海市城市建设设计研究总院(集团)有限公司 Prefabricated double-column vase bridge pier and assembling construction method thereof
CN107268424A (en) * 2017-07-06 2017-10-20 东南大学 Can fast leveling precast assembly bridge pier structure and its construction method
CN107338804A (en) * 2017-06-13 2017-11-10 安徽建工集团有限公司 A kind of hollow independent composite pile foundation of super-large diameter and its method of construction
CN208649876U (en) * 2018-07-17 2019-03-26 中冶长天国际工程有限责任公司 Assembled column and assembled bridge pier

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202031108U (en) * 2011-03-23 2011-11-09 东南大学 Post-poured band type fabricated pipe-jacking working well
WO2013081408A1 (en) * 2011-12-01 2013-06-06 Lee Hyun-Woo Prefabricated hybrid girder capable of applying prestress to girder using gap difference between contact surfaces of connective parts of blocks, method for applying prestress to prefabricated hybrid girder, continuation method for prefabricated hybrid girder, and manufacturing and assembling method thereof
CN204849569U (en) * 2015-08-10 2015-12-09 江苏建筑职业技术学院 Steel pipe concrete stem stem prefabricated unit construction bridge pier stud of putting more energy into
CN106677056A (en) * 2017-02-16 2017-05-17 上海市城市建设设计研究总院(集团)有限公司 Prefabricated double-column vase bridge pier and assembling construction method thereof
CN107338804A (en) * 2017-06-13 2017-11-10 安徽建工集团有限公司 A kind of hollow independent composite pile foundation of super-large diameter and its method of construction
CN107268424A (en) * 2017-07-06 2017-10-20 东南大学 Can fast leveling precast assembly bridge pier structure and its construction method
CN208649876U (en) * 2018-07-17 2019-03-26 中冶长天国际工程有限责任公司 Assembled column and assembled bridge pier

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109944390A (en) * 2019-04-25 2019-06-28 无锡市政设计研究院有限公司 A kind of fabricated construction column and its construction technology
CN111058622A (en) * 2019-12-27 2020-04-24 宁波优造建筑科技有限公司 Large steel mould cast-in-place column construction method adopting binding and lapping mode for column steel bars
CN112030729A (en) * 2020-08-26 2020-12-04 绍兴文理学院 Prefabricated bridge pier and bearing platform connecting system for assembled beam bridge and construction method of prefabricated bridge pier and bearing platform connecting system
CN112720834A (en) * 2020-12-24 2021-04-30 中建七局第二建筑有限公司 Auxiliary mechanism for bridge and using method thereof

Similar Documents

Publication Publication Date Title
CN208649876U (en) Assembled column and assembled bridge pier
CN108560405A (en) The construction method of assembled column, assembled bridge pier and assembled bridge pier
CN108560402A (en) A kind of prefabricated assembled bent cap and its construction method
CN105735466B (en) Prefabricated wall column one-part form steel bar connecting structure and method
CN108301317B (en) Assembled pier structure and construction method thereof
AU2011293086B2 (en) System for anchoring a load
CN103132506B (en) Bored pile double-deck Reinforced Hoop reinforcing cage processing and fabricating method
CN102099538A (en) Method for the assembly of a tower and tower
CN101761071A (en) Manufacturing method of reinforcement cage of pouring pile with large diameter
CN108104567A (en) Concrete tower longitudinal joint connection structure, method, the method for prefabricating of sheet body and concrete tower
CN207812277U (en) A kind of splicing construction of precast pier and prefabricated cushion cap
CN206279628U (en) A kind of precast concrete reinforcing bar grouting connecting structure
CN108442237A (en) The construction and its construction method that a kind of precast pier and prefabricated cushion cap quickly splice
CN208219631U (en) A kind of borehole filling pile cage of reinforcement protection structure
CN107399656A (en) Outdoor installation elevator and its construction method
CN107060219A (en) A kind of steel concrete supporting structure and method
WO2021212692A1 (en) Stepped-surface early-stage structural column, stepped interface structural column, mold plate, and method
CN108677930A (en) A kind of anti-corrosion centering structure of hole pile cages and its application
CN103103981B (en) Construction method of prestress wedge-shaped pipe pile joint
CN208701659U (en) A kind of anti-corrosion centering structure of hole pile cages
CN210947839U (en) External prestressing force reinforced concrete beam structure
CN106545038A (en) A kind of static load test device
CN209469534U (en) Concrete tower
CN218508257U (en) Prefabricated assembled pier stud of back muscle method
CN204551245U (en) Prefabricated assembled pier column

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination