CN108547366A - A kind of method of arid biogeographic zone highway rainwater-collecting - Google Patents

A kind of method of arid biogeographic zone highway rainwater-collecting Download PDF

Info

Publication number
CN108547366A
CN108547366A CN201810366210.0A CN201810366210A CN108547366A CN 108547366 A CN108547366 A CN 108547366A CN 201810366210 A CN201810366210 A CN 201810366210A CN 108547366 A CN108547366 A CN 108547366A
Authority
CN
China
Prior art keywords
collecting
arid biogeographic
biogeographic zone
gutter
rainwater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810366210.0A
Other languages
Chinese (zh)
Inventor
胡晋茹
陈兵
张晓峰
张峻峰
刘涛
陈琳
张前进
伍玉容
李元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Science And Technology Group Co Ltd
China Academy of Transportation Sciences
Original Assignee
Science And Technology Group Co Ltd
China Academy of Transportation Sciences
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Science And Technology Group Co Ltd, China Academy of Transportation Sciences filed Critical Science And Technology Group Co Ltd
Priority to CN201810366210.0A priority Critical patent/CN108547366A/en
Publication of CN108547366A publication Critical patent/CN108547366A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01CPLANTING; SOWING; FERTILISING
    • A01C21/00Methods of fertilising, sowing or planting
    • A01C21/005Following a specific plan, e.g. pattern
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G22/00Cultivation of specific crops or plants not otherwise provided for

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Soil Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Botany (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a kind of methods of arid biogeographic zone highway rainwater-collecting, include the following steps:1), according to the maximum drainage distance of run-off inverse gutter, excavate saucer type ecological side drain;2), furrow bank it is smooth;3), gutter bottom be laid with waterproof geotextiles;4), backfill;5), 5 8cm cobbles of paving single layer diameter;6), spread grass-seed 7), maintenance management.The present invention uses saucer type ecological side drain, line style smooth, gets close to naturally, section is reasonable, saves the area, anti-evaporating, salt resistance alkali, economic benefit, social benefit and ecological benefits are notable.

Description

A kind of method of arid biogeographic zone highway rainwater-collecting
Technical field
The present invention relates to rainwater utilization technology field, specially a kind of method of arid biogeographic zone highway rainwater-collecting.
Background technology
There is highway pavement water catchment efficiency height, the big advantage of area, the Colony culture for being particularly suitable for doing rainwater to collect rainwater.According to Estimation, northwest Xinjiang, Inner Mongol, Gansu, Qinghai, five provinces and regions standard highway total kilometrage of Ningxia will reach 570,000 kilometers in the end of the year 2013, Even if highway rainwater harvesting and utilization system conservative estimation, if can be on the highway pavement of 10,000 kilometers of semiarid region To popularization and application, 1,400,000 cubes of rainwater harvesting or more (by rainfall 300mm, year collection rate 5% calculate) can be completed every year, is opened It sends out potentiality and scale and benefit is huge.Obviously, without the participation of highway transportation industry, for China's rainwater harvesting technical system It is sufficiently complete.According to the retrieval result of documents and materials, the research of highway rainwater utilization is seldom, lacks theory basis and sets The research of meter technology, and the collection of arid biogeographic zone rainwater on road surface can then fill up the blank of this respect with the research of comprehensive utilization technique, Thus there is an urgent need for carry out.
Invention content
The technical problem to be solved by the present invention is to overcome the insufficient defects of highway rainwater utilization of the prior art, provide one kind The method of arid biogeographic zone highway rainwater-collecting.
In order to solve the above technical problem, the present invention provides the following technical solutions:
A kind of method of arid biogeographic zone highway rainwater-collecting, includes the following steps:
1), according to the maximum drainage distance of run-off inverse gutter, saucer type ecological side drain is excavated;
2), furrow bank is smooth;
3) waterproof geotextiles, are laid in gutter bottom;
4), backfill;
5) single layer diameter 5-8cm cobbles, are spread, playing prevents from eroding and reduce saline and alkaline effect.
6) grass-seed, is spread
7), maintenance management.
Further, the reserved 8~12cm manual amendments in the sideline of saucer type ecological side drain are disconnected to designing in the step 1) Face size.
Further, the sundries that diameter is more than 2cm is removed when furrow bank is smooth in the step 2).Bottom of trench should smooth out neatly, Without the apparent uneven or phenomenon that blocks water.Preferably, camber line is according to the streamlined excavation of projected depth.Geotextiles both sides respectively extend 20cm bound edges.
Further, waterproof geotextile laying is laid with from water outlet block-by-block to gutter starting point in the step 3), initiating terminal Tiling is fixed with U-shaped nail, U-shaped nail horizontal spacing≤20cm, longitudinal pitch≤15cm.After initiating terminal is fixed, gauze pad is pulled out along ditch, Geotextile laying should not be tightened too much or excessively loose, net bottom face should be close to bottom of trench, furrow bank without hanging pleat discount as.A roll has been laid with Finish, longitudinal lap joint length is not less than 15cm, and the connector first spread is under, and the connector spread afterwards is in upper, guarantee connector smooth in water flow.Geotechnique Cloth is often laid with certain length and to be fixed immediately, and the U-shaped nail that Bower Anchor nail is made using 8 millimeters of reinforcing bars of diameter, auxiliary holdfast is selected The U-shaped steel nail and No. 8 U-shaped iron nails that 6 millimeters of diameter.When fixed, nail is close to furrow bank with geotextiles.
Further, after geotextiles are fixed, backfill is carried out using dry soot.Dry soot is cohesive soil, composite fertilizer or macerates The abundant uniform mixing of system fertilizer, divides 2~3 times and manually sheds in geotextiles, and shed thickness control for the first time is advisable in 3~5cm, the Secondary to shed 1~2cm, backfill is until natural subsidence.After shedding every time, spilt in the surface mechanical atomization for shedding soil horizon Water makes the dry ground layer natural subsidence of backfill, and appropriate compacting is carried out after watering.It is required that the furrow bank after banketing is smooth, outside no geotextiles Dew.
Further, the grass-seed in the step 6) be early annual bluegrass, red fescue, rye grass, reed it is one or more Combination.The objective factors such as natural conditions, land occupation condition, soil types according to side slope select grass seeds and per square meter grass-seed amounts, It can well be grown on furrow bank.
The advantageous effect that is reached of the present invention is:Using saucer type ecological side drain, line style is smooth, gets close to naturally, section closes Reason, saves the area, anti-evaporating, salt resistance alkali.
The ecological benefits of the present invention are embodied in many aspects, and main includes increasing surface vegetation, improves miniclimate, increases water Divide partial circulating, sand control, the increase soil organism, improvement soil aggregate structure, reduction water pollution, increase biocenological Diversity etc..For highway, the scale of construction of rainwater utilization measure is limited, therefore main function is the plant for increasing earth's surface Quilt and the desertification for reducing soil, wherein to increase surface vegetation as primary benefit.According to field investigation, arid biogeographic zone desert steppe Biomass is 2~8t/hm2.According to minimum cross section area 2m2It calculates, takes the 8t/hm of the biomass of arid biogeographic zone desert steppe2, 1 is public In highway (both sides) infiltration type ecology Tu Gou can increase biomass 3.2t.And the average biomass of desert steppe per acre is 450kg, It converts like this, every 1 kilometer of highway infiltration type cobble grass ditch increases the biomass that biomass is equivalent to 7 mu of desert steppes, benefit ten newly Divide notable.
Specific implementation mode
Hereinafter, preferred embodiments of the present invention will be described, it should be understood that preferred embodiment described herein is only used In the description and interpretation present invention, it is not intended to limit the present invention.
Embodiment
It is side ditch shape by calculating the maximum drainage distance of design runoff amount inverse gutter for the demonstration pilot project of Ningxia It chooses and reference is provided.It is below 1.5m with the wide B of gutter, bottom of trench longitudinal slope is 0.3% analysis saucer type ecological side drain water force Process.
(1) rainfall duration:The confluence at design control point is taken to last rainfall duration, value is that water catchment area farthest point goes out to gutter Slope concentration at the mouth of a river is lasted the sum of to last with the sewer pipe confluence in ditch.It is now assumed that rainfall duration is 10min.
(2) mean flow rate calculates in gutter, and the discharge capacity of saucer type ecological side drain is calculated by the shallow triangle cross-section of river.
Gutter discharge section area A=0.5 × 0.3 × 1.5=0.225m2
Gutter hydraulic radius R=A/ ρ=0.12m (ρ is cross-section of river wetted perimeter)
When side slope longitudinal slope is 0.3%, mean flow rate is that (n is that bottom of trench is coarse to v=n-1R2/3i1/2=0.38m/s in ditch Coefficient;I is hydraulic gradient, chooses bottom of trench longitudinal slope).N takes rock in highway drainage design specification (JTG/TD33-2012) table 9.2.3 The bright ditch coefficient of roughness of stone matter.
(3) catchment area and average runoff coefficient:It is l to set out mouth of a river spacing, and the catchment area between two water outlets is by two Part forms:A part is catchment area F1=14 × l of road surface range, and bituminous paving runoff coefficient takes Ψ 1=0.95, in addition A part be roadbed slope catchment area F2=(3.9 × 1.5+1) × l (3.9m is slope height, and 1.5 be slope gradient, 1 For side slope slope foot to gutter distance), side slope surface runoff coefficient takes Ψ 2=0.3, Ψ 2 to take highway drainage design specification (JTG/T D33-2012) table 9.1.8 middle coarse grained soils slope surface and curb runoff coefficient.
Total catchment area is F=20.85 × l × 10-6km2
Average runoff coefficient Ψ=(F1 × Ψ 1+F2 × Ψ 2)/F=0.74
(4) Designed recurrence period and rainfall intensity:It is high according to the regulation of highway drainage design specification (JTG/T D33-2012) The fast highway road circle inner slope draining return period is 15 years.
By highway location, highway drainage design specification (JTG/T D33-2012), 5 years Designed recurrence period 10min are looked into Return period conversion coefficient when the rainfall intensity of rainfall duration is q5,10=1.4mm/min, 15 years Designed recurrence periods is cp= 1.72,60min rainfall intensity conversion coefficients are c60=0.4, and 10min rainfall duration conversion coefficients are c10=1.0.Therefore heavy rain Intensity is:Q=cp × c10 × q5,10=1.72 × 1.0 × 1.4=2.4mm/min.
(5) maximum drainage distance when bottom of trench longitudinal slope is 0.3% calculates, according to road Drainage Design specification (JTG/T D33- 2012), design runoff amount is:QF=16.67 × 0.74 × 20.85 Q=16.67 Ψ × l × 2.4 × 10-6m3/s。
When gradient incline is 0.3%, the discharging capacity of gutter is Qc=A × v=0.085m3/s
Gutter discharging capacity has to be larger than its design runoff amount, i.e. Qc>Q, then when gradient incline is 0.3%, it is maximum Drainage distance l=131m.
(6) examine confluence to last hypothesis:Consist of two parts because confluence is lasted, a part is that bituminous paving confluence is lasted T11, another part are that roadbed slope confluence lasts t12, and the two is added.
1. bituminous paving confluence is lasted:
The rugosity coefficient of bituminous paving is m1=0.013, table in highway drainage design specification (JTG/T D33-2012) 9.1.4, road surface horizontal slope is is=0.015, and overland flow length is Ls=14m, and bituminous paving confluence can be calculated and be lasted for: T11=1.74min.
2. roadbed slope confluence is lasted:
The earth's surface rugosity coefficient of roadbed side slope is m2=0.04, and slope surface horizontal slope is is=0.667, the high 3.9m in slope, overland flow Length Ls=8.03m can be calculated roadbed side slope slope concentration and last t12=0.93min.
3. confluence is lasted in ditch:
According to front result of calculation, mean flow rate v=0.38m/s in ditch, it is assumed that water outlet spacing (torrent separation) l is When 131m, confluence in ditch can be obtained and last t2=l/ (60 × v)=131/ (60 × 0.38)=5.8min.
4. confluence is examined to last hypothesis:
It obtains always converging and is lasted for t=t11+t12+t2=1.74+0.93+5.8=8.5min<10min is (assuming that rainfall is gone through When), it meets the requirements.
According to the above water force process, (0.1%-0.6%) 1.5m under the conditions of each gradient incline of the highway is calculated Mean flow rate in the maximum drainage distance (i.e. water outlet distance) and corresponding discharging capacity and ditch of wide saucer type gutter.Similarly, When calculating saucer type gutter width is 2m, in the maximum drainage distance and corresponding discharging capacity and ditch under the conditions of various gradient inclines Mean flow rate.Obtain 1,1.5 meters of table and it is 2.0 meters wide when correspond to different longitudinal slope conditions, corresponding discharging capacity, mean flow rate and Water outlet spacing.
1 saucer type ecological side drain maximum drainage distance 1.5m wide (2.0m wide) of table
Gradient incline (%) Discharging capacity (m3/s) Mean flow rate (m3/s) Water outlet spacing (m)
0.1 0.049(0.079) 0.218(0.264) 76(116)
0.15 0.060(0.097) 0.267(0.323) 93(142)
0.2 0.069(0.112) 0.308(0.373) 107(164)
0.3 0.085(0.137) 0.377(0.457) 131(201)
0.4 0.098(0.158) 0.436(0.528) 152(232)
0.5 0.110(0.177) 0.487(0.590) 170(259)
0.6 0.120(0.194) 0.533(0.647) 186(284)
(7) maximum drainage distance when different gradient inclines:When gradient incline is different numerical value, as can be known from the above table, with The maximum drainage distance of the increase of gradient incline, gutter is also increasing.
According to result of calculation, 1.5m wide saucer type gutter water outlet spacing and bottom of trench longitudinal slope relation curve are obtained.In the public affairs Under the design condition of road, maximum water outlet distance and the relationship of bottom of trench longitudinal slope are:Y=240.08X0.5.It, can basis when gutter designs Each gradient incline calculates the gutter water outlet spacing of respective stretch, to be arranged to gutter.
According to result of calculation, 2.0m wide saucer type gutter water outlet spacing and bottom of trench longitudinal slope relation curve are obtained.Maximum goes out Water distance is from the relationship with bottom of trench longitudinal slope:Y=366.54X0.5
According to above-mentioned calculating structure, saucer type ecological side drain is excavated;Passing through successively --- furrow bank is smooth-it is spread in gutter bottom Water geotextiles-backfill of setting up defences-paving single layer diameter 5-8cm cobbles-spreads grass-seed-maintenance management.Mix-seed-rate is:Annual bluegrass 4g/ m2, red fescue 2g/m2, rye grass 1g/m2
Finally it should be noted that:The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used With technical scheme described in the above embodiments is modified or equivalent replacement of some of the technical features. All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in the present invention's Within protection domain.

Claims (7)

1. a kind of method of arid biogeographic zone highway rainwater-collecting, which is characterized in that include the following steps:
1), according to the maximum drainage distance of run-off inverse gutter, excavate saucer type ecological side drain;
2), furrow bank it is smooth;
3), gutter bottom be laid with waterproof geotextiles;
4), backfill;
5), paving single layer diameter 5-8cm cobbles;
6), spread grass-seed
7), maintenance management.
2. the method for arid biogeographic zone highway rainwater-collecting as described in claim 1, which is characterized in that the step 1)Middle saucer type 8~12cm manual amendments are reserved to design section size in the sideline of ecological side drain.
3. the method for arid biogeographic zone highway rainwater-collecting as described in claim 1, which is characterized in that the step 2)Middle furrow bank is flat The sundries that diameter is more than 2cm is removed when whole.
4. the method for arid biogeographic zone highway rainwater-collecting as described in claim 1, which is characterized in that the step 3)In anti-water and soil Work cloth is laid with from water outlet block-by-block to gutter starting point and is laid with, and initiating terminal tiling is fixed with U-shaped nail, U-shaped nail horizontal spacing≤20cm, Longitudinal pitch≤15cm.
5. the method for arid biogeographic zone highway rainwater-collecting as described in claim 1, which is characterized in that the step 4)Middle viscosity Soil, composite fertilizer or the abundant uniform mixing of retting fertilizer, divide 2~3 times and manually shed in geotextiles.
6. the method for arid biogeographic zone highway rainwater-collecting as claimed in claim 5, which is characterized in that the step 4)Middle first time The thickness control shed is in 3~5cm, and the thickness shed for the second time is 1~2cm, and backfill sheds finish every time until natural subsidence Afterwards, in the surface mechanical atomization watering for shedding soil horizon, make the dry ground layer natural subsidence of backfill, appropriate compacting carried out after watering, Furrow bank after banketing is smooth, and no geotextiles are exposed.
7. the method for arid biogeographic zone highway rainwater-collecting as described in claim 1, which is characterized in that the step 6)In grass-seed For one or more combinations of annual bluegrass, red fescue, rye grass, reed.
CN201810366210.0A 2018-04-23 2018-04-23 A kind of method of arid biogeographic zone highway rainwater-collecting Pending CN108547366A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810366210.0A CN108547366A (en) 2018-04-23 2018-04-23 A kind of method of arid biogeographic zone highway rainwater-collecting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810366210.0A CN108547366A (en) 2018-04-23 2018-04-23 A kind of method of arid biogeographic zone highway rainwater-collecting

Publications (1)

Publication Number Publication Date
CN108547366A true CN108547366A (en) 2018-09-18

Family

ID=63512259

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810366210.0A Pending CN108547366A (en) 2018-04-23 2018-04-23 A kind of method of arid biogeographic zone highway rainwater-collecting

Country Status (1)

Country Link
CN (1) CN108547366A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202954277U (en) * 2012-08-23 2013-05-29 永业建工集团有限公司 Three-dimensional geonet ecological roadbed side ditch
CN205242205U (en) * 2015-12-17 2016-05-18 中国电建集团贵阳勘测设计研究院有限公司 Highway drainage ditch
CN107044081A (en) * 2017-05-19 2017-08-15 东南大学 Environmental street drainage structure
US20170232487A1 (en) * 2012-02-03 2017-08-17 Lite Earth Llc Manufactured composite having synthetic vegetation and impermeable geomembrane, and capping system using same
CN107100227A (en) * 2017-04-26 2017-08-29 贵州建工集团第建筑工程有限责任公司 A kind of pergola on the city road LID biologies are detained ditch construction method
CN206467526U (en) * 2017-01-06 2017-09-05 吉林省农业科学院 A kind of sloping upland agricultural ecological road canal

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170232487A1 (en) * 2012-02-03 2017-08-17 Lite Earth Llc Manufactured composite having synthetic vegetation and impermeable geomembrane, and capping system using same
CN202954277U (en) * 2012-08-23 2013-05-29 永业建工集团有限公司 Three-dimensional geonet ecological roadbed side ditch
CN205242205U (en) * 2015-12-17 2016-05-18 中国电建集团贵阳勘测设计研究院有限公司 Highway drainage ditch
CN206467526U (en) * 2017-01-06 2017-09-05 吉林省农业科学院 A kind of sloping upland agricultural ecological road canal
CN107100227A (en) * 2017-04-26 2017-08-29 贵州建工集团第建筑工程有限责任公司 A kind of pergola on the city road LID biologies are detained ditch construction method
CN107044081A (en) * 2017-05-19 2017-08-15 东南大学 Environmental street drainage structure

Similar Documents

Publication Publication Date Title
CN102174816B (en) Ecological restoration structured approach for unstable earth and rockfill side slope
CN106193245B (en) A kind of paddy field underground reservoir and its construction method for sponge city
CN203080678U (en) Environment-friendly community shock-resistant rainwater ecological utilizing system
CN104631380A (en) Shore type ladder-grade two-dimensional surface flow water filtering riverbed in-situ ecological remediation method
CN206289491U (en) A kind of pavement, greenery patches harvest water system
CN105839605A (en) Novel slope water interception and drainage ditch and design method thereof
CN102888849B (en) A kind of large outdoors colliery refuse dump, loess area micro-slope reconstruction method
CN207032427U (en) A kind of Rainwater collection system suitable for old cell
CN209338948U (en) A kind of water-permeable pavement structure
CN109958099B (en) Urban river channel rain and flood resource regulation and control system
CN105544342A (en) Permeable pavement based urban road time-delay drainage structure
CN208105449U (en) A kind of ecostagnation pond
CN113099929A (en) System and method for improving steep slope tree growth and water and soil loss
CN112663760A (en) LID measure-based urban rainwater runoff regulation and control method
CN106968317A (en) A kind of construction site rainwater recycle reutilization system
CN111549603A (en) Pavement considering water load coupling and construction method thereof
CN108547366A (en) A kind of method of arid biogeographic zone highway rainwater-collecting
CN207512865U (en) A kind of efficient arch is regulated and stored device
Fengtai et al. Study on rainwater utilization engineering mode in northern cities of China
CN111501667B (en) Ecological slope protection structure for hydraulic engineering
CN208594095U (en) A kind of wetland structure combined using wetland technology and rainwater storage
CN107354989A (en) A kind of Rainwater collection system suitable for old cell
CN210049321U (en) Rainwater regulation instrument suitable for in park mountain forest environment
CN208486146U (en) A kind of novel filter infiltration garden road step and sunk type square laying structure
CN108086461B (en) Percolation water-saving circulation system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180918