CN108547334A - Resistance support cylinder and its application method and dead-load detection method - Google Patents

Resistance support cylinder and its application method and dead-load detection method Download PDF

Info

Publication number
CN108547334A
CN108547334A CN201810563825.2A CN201810563825A CN108547334A CN 108547334 A CN108547334 A CN 108547334A CN 201810563825 A CN201810563825 A CN 201810563825A CN 108547334 A CN108547334 A CN 108547334A
Authority
CN
China
Prior art keywords
rod
opening
cylinder
resistance support
support cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810563825.2A
Other languages
Chinese (zh)
Inventor
陆剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810563825.2A priority Critical patent/CN108547334A/en
Publication of CN108547334A publication Critical patent/CN108547334A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses resistance support cylinders, including:Cylinder, inner hollow, the opposite both sides of cylinder one are respectively arranged with the first opening and the second opening;The body of rod is rotationally arranged at inner barrel, and the body of rod is obliquely installed, and the body of rod is arranged in a manner of it can rotate to both ends and stretched out respectively from the first opening and the second opening;Raising cord, its first end is connected on the body of rod, and raising cord second end is pierced by the top of cylinder, and the tie point of the first end of raising cord on the body of rod is located at below the rotary shaft of the body of rod, when so that being lifted up raising cord, body of rod both ends are stretched out from the first opening and the second opening respectively.The present invention also provides the application methods of resistance support cylinder and dead-load detection method.Weight of the present invention is small, reasonable in design, simple to operate, and the manufacture of equipment, implementation cost are low, can significantly improve the working efficiency that engineering pile foundation carries out dead-load detection testing operation.

Description

Resistance support cylinder and its application method and dead-load detection method
Technical field
The present invention relates to a kind of dedicated for carrying out the kit of dead-load detection to construction project pile foundation.More specifically It says, the present invention relates to a kind of resistance support cylinder and its application methods and dead-load detection method.
Background technology
It is on the increase with large-scale, skyscraper, basis is also increased therewith using the base form of pile foundation, at present to building If the pile foundation of engineering field when carrying out ballast detection experiment used method be ballast method, anchored pile-testing method and earth anchor method mostly, this Several method is all to withstand on test pile stake top using oil jack to be further applied load, and for the counter-force of jack, ballast method passes through Heap weight on reaction frame balances therewith;Counter-force is transmitted to anchoring pile by anchored pile-testing method by reaction frame, the resistance to plucking dynamic balance with anchoring pile;And ground Anchor be then using external force by ground anchorage it is engaging-in in subterranean strata, anchor into over the ground generated when row is promoted larger load to Upper resistance to plucking synthesis mill resistance is balanced by this mill resistance with jack.
But these methods all there are problems that:
It must solve that the source of hundreds of tons of even upper kiloton loads, heap enters and transportation problem for ballast method;Ballast method institute Need mass concrete block effectively go along with sb. to guard him protection because lacking, detection test in the process often occur concrete block landing and Ballast carrier total Collapse phenomenon causes the work safety accidents such as Site Detection staff's injures and deaths, while ballast detection method is equal There are each component installing and dismounting, detection experiment the implementation process time it is long the problems such as.Anchoring pile rule must be provided with more anchoring piles and anti- Power crossbeam, more anchoring piles not only needed for somewhat expensive, curing time is longer, and is easily limited by tonnage and site condition, and And anchoring pile is difficult to reuse;Anchored pile-testing method during the test, when the pressure of load is excessive, is likely to result in anchoring pile body and anchoring pile The plumb joint of pile crown main reinforcement splits or is pulled off, this will directly contribute girder steel and cave in the united reaction frame of anchoring pile, so not The coherent detections instrument such as jack and displacement sensor can be only damaged, and hidden by being buried to the safety of testing crew Suffer from.
Invention content
It is an object of the present invention to provide resistance support cylinder and its application method and dead-load detection method, resistance support cylinders Weight is small, reasonable in design, simple to operate, and the manufacture of equipment, implementation cost are low, can significantly improve engineering pile foundation progress The working efficiency of dead-load detection testing operation.
In order to realize these purposes and other advantages according to the present invention, a kind of resistance support cylinder is provided, including:
Cylinder, inner hollow, the opposite both sides of the cylinder one are respectively arranged with the first opening and the second opening;
The body of rod is rotationally arranged at the inner barrel, and the body of rod is obliquely installed, and the body of rod is can revolve The mode that both ends are stretched out from first opening and second opening respectively is gone to be arranged;
Raising cord, first end are connected on the body of rod, and the raising cord second end is pierced by the top of the cylinder, Tie point of the first end of the raising cord on the body of rod is located at below the rotary shaft of the body of rod so that is lifted up institute When stating raising cord, the body of rod both ends are stretched out from first opening and second opening respectively.
Preferably, the resistance support cylinder further includes:
The first end of recovery line, the recovery line is fixed on the body of rod, and the second end of the recovery line is from the cylinder It being pierced by the top of body, the fixed point of the first end of the recovery line on the body of rod is located above the rotary shaft of the body of rod, When so that being lifted up the recovery line, the body of rod both ends are respectively from described in first opening and the second opening retraction Cylinder.
Preferably, the resistance support cylinder further includes:
Top board and lower platen, the top board and the lower platen are each attached on the body of rod, the top board and The lower platen is lived apart the rotary shaft both sides of the body of rod, and at the body of rod both ends respectively from first opening and described When second opening is stretched out, the top board and the lower platen cover first opening and described second and are open respectively.
Preferably, the resistance support cylinder further includes:
Upper bearing plate and lower bearing plate, the upper bearing plate and the lower bearing plate are separately positioned on the body of rod both ends point Do not stretch out the part of first opening and second opening, and the upper bearing plate and flat where the lower bearing plate Face is each perpendicular to the direction of rotation of the body of rod.
Preferably, the resistance support cylinder further includes:
Lift lever, one end is hinged with the body of rod, and hinge joint is located at below the rotary shaft of the body of rod, described to carry The other end of rising stem and the first end of the raising cord are fixed.
Preferably, the resistance support cylinder further includes:
Body of rod shaft and two shaft holes, described two shaft holes are set to another opposite both sides table of the cylinder Face, body of rod shaft both ends are respectively rotatably arranged in described two shaft holes, and the body of rod is fixed on the bar In body shaft.
Preferably, the resistance support cylinder, the body of rod both ends are respectively formed sharp portion.
Preferably, the resistance support cylinder, the equal circular arc in region that the top and bottom of the cylinder are connected with side Transition.
The present invention also provides the application methods of resistance support cylinder, including:
Drilling;
The resistance support cylinder is hung in the hole being drilled;
Raising cord is promoted with lifting device, until top board and lower platen cover the first opening and the second opening respectively;
Resistance support cylinder after use, discharges raising cord, promotes recovery line and makes body of rod both ends retraction cylinder, and continues to carry It rises recovery line to the resistance support cylinder and returns to ground.
The present invention also provides the dead-load detection methods for using resistance support cylinder, including:
Drilling;
The resistance support cylinder is hung in the hole being drilled;
Raising cord is promoted with lifting device, until top board and lower platen cover the first opening and the second opening respectively;
Raising cord is connect with reaction beam;
Jack is placed at the top of pile foundation to be measured, providing counter-force using reaction beam for jack carries out dead-load detection;
After the completion of dead-load detection, raising cord is discharged, recovery line is promoted and makes body of rod both ends retraction cylinder, and continue to lift up back It receives rope to the resistance support cylinder and returns to ground.
The present invention includes at least following advantageous effect:
1, it is a pre-assembled kit, work that engineering pile foundation dead-load detection resistance support wound packages of the invention, which is set, Making personnel only need to transport and installing engineering static load of pile foundation detection resistance support wound packages is set on recovery line and raising cord, will assemble Engineering pile foundation dead-load detection resistance support wound packages set and hung in the rock-soil layer hole of underground together with to recovery line and raising cord, then Crossbeam counterforce device on raising cord and ground is coupled into fastening, using hydraulic device to engineering pile foundation dead-load detection resistance support Wound packages, which is set, to be lifted up, and resistance support wound packages is recycled to set the upward resistance to plucking resistance generated in underground rock-soil layer, so that it may with Dead-load detection operation is carried out to pile foundation;After detection operation, resistance support wound packages is set to recycle and be reused again, entirely Operating process is simple and convenient, solves the problems, such as at present to carry out pile foundation the handling of required a large amount of ballasts when ballast detection is tested, A large amount of manpower and materials are saved, the huge work of social creativity and business efficiency will be given.
2, structure of the invention reasonable design, operating process is simple and convenient, and the repair of equipment, implementation cost are low, can significantly carry The working efficiency of high engineering pile in situ dead-load detection experiment equally solves and carries out ballast detection experiment when institute to pile foundation at present The handling problem for needing a large amount of ballasts, saves a large amount of manpower and materials, will give the huge work of social creativity and business efficiency.
Part is illustrated to embody by further advantage, target and the feature of the present invention by following, and part will also be by this The research and practice of invention and be understood by the person skilled in the art.
Description of the drawings
Fig. 1 is the structural diagram of the present invention;
When Fig. 2 is that the present invention is not yet promoted, the working state figure of the body of rod;
Fig. 3 is the working state figure of the body of rod in lifting process of the present invention;
Fig. 4 is the working state figure of the body of rod after the present invention is promoted.
Specific implementation mode
Present invention will be described in further detail below with reference to the accompanying drawings, to enable those skilled in the art with reference to specification text Word can be implemented according to this.
As shown in Figs 1-4, the present invention provides a kind of resistance support cylinders, including:
Cylinder 1, inner hollow, the opposite both sides of the cylinder 1 one are respectively arranged with the first opening 2 and second opening 3;
The body of rod 4 is rotationally arranged inside the cylinder 1, and the body of rod is obliquely installed, and the body of rod is with can The mode stretched out from first opening 2 and second opening 3 respectively to both ends (5,6) is rotated to be arranged;
Raising cord 12, first end are connected on the body of rod 4, and the raising cord second end is from the top of the cylinder 1 It is pierced by, the tie point of the first end of the raising cord 12 on the body of rod is located at below the rotary shaft of the body of rod so as to When the upper promotion raising cord, the body of rod both ends (5,6) are stretched out from first opening 2 and second opening 3 respectively.
In the above-mentioned technical solutions, cylinder 1 is square tube, cylinder, preferably cylinder, convenient for being put into hole.Cylinder 1 The hollow structure being vertically arranged, left and right sides setting the first opening 2 of cylinder 1 and the second opening 3, for cylinder, are interpreted as It is four cambered plates by the cylinder quartering, opposite both sides are opposite two cambered plates.The body of rod by middle part rotatably It is arranged inside cylinder 1, the body of rod tilts, and the upper and lower ends of the body of rod are respectively close to the upper edge of the first opening 2 and the second opening 3 Lower edge so that the body of rod when being rotated around rotary shaft, both ends can respectively from first opening 2 and second opening 3 stretch out.Tool Body, by raising cord come so that the body of rod rotates (be set to rotate in the forward direction here), correspondingly, the tie point of raising cord and the body of rod needs It will be in the lower section of rotary shaft, so that the lifting force of raising cord can drive the body of rod to be rotated around rotary shaft.1 top of cylinder can be pre- Stay through-hole so that raising cord can pass through.
It is hung in the good hole of digging together with to raising cord in use, setting assembled resistance support wound packages, uses liquid The lifting devices such as pressure device slowly promote raising cord, and raising cord drives the body of rod to rotate in turn, around the engaging-in hole in both ends of the body of rod Rock-soil layer in, generate a resistance to plucking overall drag, after reaching prestressing force requirement, by raising cord and ground crossbeam counter-force fill It sets and is fastenedly connected, then be further applied load to crossbeam counterforce device by hydraulic jack, reach and dead-load detection experiment is carried out to pile foundation Effect.As it can be seen that the device of the invention is reasonable in design, can be prefabricated in the factory part, can assemble at the scene, operating process letter Just, implementation cost is low to be solved the problems, such as at present to carry out pile foundation the handling of required a large amount of ballasts when ballast detection is tested folk prescription, A large amount of manpower and materials are saved, the huge work of social creativity and business efficiency will be given.
In another technical solution, the resistance support cylinder further includes:
The first end of recovery line 11, the recovery line 11 is fixed on the body of rod, and the second end of the recovery line is from institute The top for stating cylinder 1 is pierced by, and the fixed point 14 of the first end of the recovery line on the body of rod is located at the rotation of the body of rod Above axis so that when being lifted up the recovery line, the body of rod both ends (5,6) are respectively from first opening 2 and described the Two openings 3 are retracted the cylinder 1.Here, recovery line is added on the basis of a upper technical solution, the first end of recovery line is fixed On the body of rod, fixed point 14 is located above rotary shaft, after the first opening 2 and second opening 3 is stretched out at body of rod both ends respectively, is promoted Recovery line can make the body of rod reversely rotate, and body of rod both ends be applied with the power of retraction cylinder 1 so that body of rod both ends are from rock-soil layer Abjection, so that resistance support cylinder can be elevated go back to ground.The top of cylinder 1 can be with reserved through hole so that recovery line can be with It passes through.In this way, after detection operation, resistance support wound packages is set to recycle and be reused again, and cost is reduced.
In another technical solution, the resistance support cylinder further includes:
Top board 7 and lower platen 8, the top board and the lower platen are each attached on the body of rod, the top board Live apart with the lower platen rotary shaft both sides of the body of rod, and at the body of rod both ends respectively from first opening, 2 Hes When second opening 3 is stretched out, the top board and the lower platen cover first opening 2 and second opening respectively 3.Here, top board and lower platen for protecting 1 internal structure of cylinder are more used to that the body of rod to be prevented further to make useless rotation. Top board 7 and lower platen 8 are each attached on the body of rod, at an angle with the body of rod so that body of rod both ends design length part enters When rock-soil layer, top board and lower platen just cover the first opening 2 and second opening 3, but also top board and pushing plate surface It is contradicted with rock-soil layer, the body of rod is prevented to further rotate.In the technical scheme, the first opening 2 and the second opening 3 need to be staggered to set It sets, such as Fig. 4.
In another technical solution, the resistance support cylinder further includes:
Upper bearing plate 16 and lower bearing plate 17, the upper bearing plate 16 and the lower bearing plate 17 are separately positioned on the bar The part of first opening 2 and second opening 3, and the upper bearing plate and described are stretched out in body both ends (5,6) respectively Plane where lower bearing plate is each perpendicular to the direction of rotation of the body of rod 4.Here, upper bearing plate and lower bearing plate are perpendicular to bar Plane where the direction of rotation of body, the upward resistance to plucking resistance for enhancing resistance support cylinder, upper bearing plate and lower bearing plate Width only should be slightly bigger than the width of the body of rod, wide, may be unfavorable for body of rod both ends and enter rock-soil layer.
In another technical solution, the resistance support cylinder further includes:
Lift lever 9, one end is hinged with the body of rod 4, and hinge joint 10 is located at below the rotary shaft of the body of rod, institute The first end for stating the other end and the raising cord of lift lever 9 is fixed.Here there is provided lift lever, it is convenient to the body of rod apply to On active force, be also convenient for connecting more raising cords.
In another technical solution, the resistance support cylinder further includes:
Body of rod shaft 13 and two shaft holes 15, it is another opposite that described two shaft holes 15 are set to the cylinder 1 Both side surface, 13 both ends of body of rod shaft are respectively rotatably arranged in described two shaft holes, and the body of rod is solid It is scheduled in the body of rod shaft.Here there is provided a kind of bodies of rod to be pivotably coupled to the mode inside cylinder 1, i.e. through hole Hole and shaft, it is easy to process, it is easy to use.
In another technical solution, the resistance support cylinder, the body of rod both ends are respectively formed sharp portion.Here, sharp Thorn portion is convenient for piercing rock-soil layer.
In another technical solution, the resistance support cylinder, what the top and bottom of the cylinder 1 were connected with side The equal arc transition in region.Here, arc transition, which can facilitate, to enter in hole below resistance support cylinder, reduces promoted to a certain degree Resistance when resistance support cylinder.
The present invention also provides the application methods of resistance support cylinder, including:
Drilling;
The resistance support cylinder is hung in the hole being drilled;
Raising cord is promoted with lifting device, until top board and lower platen cover the first opening and the second opening respectively;
Resistance support cylinder after use, discharges raising cord, promotes recovery line and makes body of rod both ends retraction cylinder, and continues to carry It rises recovery line to the resistance support cylinder and returns to ground.
In the above-mentioned technical solutions, it is drilled first using drilling machine, the hole of brill is slightly larger than the outer diameter of cylinder, then will Raising cord and recovery line are connect with lifting device, and lifting device can be hydraulic lifting apparatus or mechanical lifting device, then will Resistance support cylinder is put into hole.Then, raising cord is promoted with lifting device so that the body of rod rotates in the forward direction, until top board is under Pressing plate covers the first opening and the second opening respectively, and body of rod both ends can not go successively to rock-soil layer at this time, and resistance support cylinder is formed One resistance to plucking overall drag can carry out the purposes such as dead-load detection using the resistance.After the completion of use, raising cord is discharged, is promoted Recovery line so that the body of rod reversely rotates, and body of rod both ends are deviate from from rock-soil layer, and then recovery line drives resistance support cylinder to return to ground Face.
The present invention also provides the dead-load detection methods for using resistance support cylinder, including:
Drilling;
The resistance support cylinder is hung in the hole being drilled;
Raising cord is promoted with lifting device, until top board and lower platen cover the first opening and the second opening respectively;
Raising cord is connect with reaction beam;
Jack is placed at the top of pile foundation to be measured, providing counter-force using reaction beam for jack carries out dead-load detection;
After the completion of dead-load detection, raising cord is discharged, recovery line is promoted and makes body of rod both ends retraction cylinder, and continue to lift up back It receives rope to the resistance support cylinder and returns to ground.
In the above-mentioned technical solutions, identical as a upper technical solution using the method for resistance support cylinder, here not further It repeats, before carrying out dead-load detection, raising cord is connect with reaction beam, you can provide for jack resistance support cylinder enough Counter-force completes static load of pile foundation detection.
In another technical solution, using the dead-load detection method of resistance support cylinder, including:
(1) engineering pile foundation dead-load detection resistance support wound packages is set good in factory-assembled in advance, is connected again after reaching operation field It connects raising cord and recovery line to can be used, can also be assembled through loose mail in operation field;Then again respectively by raising cord and recycling Rope is fastenedly connected with the mechanically or hydraulically promotion on ground, retracting device.
(2) it at engineering pile foundation dead-load detection scene, descends rock-soil layer to drill over the ground to form hole using machine drilling machinery, so It selects a length to be set much larger than the resistance support wound packages of excavated underground rock-soil layer hole diameter afterwards, while ensuring to protect cylinder Diameter is slightly less than the diameter of excavated underground rock-soil layer drilling.
(3) and then the resistance support wound packages for having had connected raising cord and recovery line is set and hangs onto underground rock-soil layer hole In, on the ground raising cord constantly slowly promoted upwards using mechanically or hydraulically device, slowly being promoted makes raising cord Pull lift lever, slowly promoted at this point, lift lever will pull drag link body lower end, at this moment, the upper end of the body of rod and lower both ends with The body of rod shaft is rotated for circumferential point, since the body of rod is a strip column, when one end of the body of rod is opened Begin rotation, the corresponding other end of the body of rod, which will also synchronize, to be rotated, and the direction of rotation of the two is on the contrary, the body of rod in this way Top and bottom drill bit plate tip part will be with rough ground surface layer on sub-surface hole hole wall in rotary course Mutually contradict, especially upper end drill bit plate point mutually will persistently generate friction under effect of inertia with underground rock-soil layer surface layer, Under rubbing action, the upper end of the body of rod and lower end drill bit plate point will voluntarily creep into and in the engaging-in rock-soil layers to underground, with The whole constantly slowly promotion upwards of support tube device, the upper end of the body of rod and lower end drill bit plate tip position will persistently bore Into in the engaging-in rock-soil layer to underground, when the upper end of the body of rod and lower end crept into when creeping into underground rock-soil layer reach top board and When pushing Board position, top board and lower platen will stop that the upper end of the body of rod and the drill bit plate tip position of lower end continue to creep into respectively In the rock-soil layer of underground, mechanically or hydraulically device on the ground carries out under the action of constantly slowly being promoted upwards raising cord, bar The upper-end part of driving of body and lower end position will can not continue to creep into the engaging-in rock-soil layer to underground with enhancing action, the body of rod two The top board and lower platen of end will be fitted closely with underground ground surface layer securely, at this point, the body of rod in protection cylinder is on ground In tiltedly vertical state in lower rock-soil layer hole, when continuing to lift up support tube device, the body of rod in the engaging-in rock-soil layer to underground will A resistance to plucking overall drag can be formed, the upward resistance to plucking overall drag body of a larger load is formed, enhances resistance support wound packages The whole resistance to plucking resistance upwards set, when resistance support wound packages is set because underground ground layer resistance can not continue up prestretching and reach After prestressing force requires, the crossbeam counterforce device on raising cord and ground is fastenedly connected, then anti-to crossbeam by hydraulic jack Power apparatus is further applied load, and has the function that carry out dead-load detection experiment to pile foundation.Diameter is slightly less than excavated underground rock-soil layer The protection cylinder of bore diameter can also respectively play a supporting role in protection to the soil layer for the surrounding that drills, when the upper end of the body of rod and lower end are bored Head plate pointed drill into and it is engaging-in to hole sidewalls surrounding soil layer during the rock-soil layer of underground, will necessarily be disturbed and then cause hole side table Face soil layer part avalanche, at this point, the protection cylinder of circular preferably can ground-to-ground descend the surface soil layer of soil layer drilling surrounding hole side Play support protective effect.
(4) after static load of pile foundation detection experiment work, raising cord is released using mechanically or hydraulically device on the ground Pulling force makes whole raising cord is fully relaxed to get off, at this point, upper and lower two ends of the body of rod and top board and lower platen also will be from Pine is from then on the ground using mechanically or hydraulically device promotion recovery line, recovery line is constantly slow upwards in the rock-soil layer of underground Under the action of slow promotion, recovery line will strongly extract the upper-end part of driving of the body of rod out from the rock-soil layer of underground, meanwhile, it also can be by bar The lower end position of body is extracted out from the rock-soil layer of underground, is further continued for promoting recovery line, the upper and lower end of the entire body of rod is made to take in completely In the cylinder of the protection cylinder, recovery line is continued to lift up, final entire resistance support wound packages is set and will be promoted onto ground, to resistance After power support tube device rearranges, it can reuse again.
Number of devices and treatment scale described herein are the explanations for simplifying the present invention.To resistance support of the present invention Cylinder will be readily apparent to persons skilled in the art with, modifications and variations.
Although the embodiments of the present invention have been disclosed as above, but its is not only in the description and the implementation listed With it can be fully applied to various fields suitable for the present invention, for those skilled in the art, can be easily Realize other modification, therefore without departing from the general concept defined in the claims and the equivalent scope, the present invention is simultaneously unlimited In specific details and legend shown and described herein.

Claims (10)

1. resistance support cylinder, which is characterized in that including:
Cylinder, inner hollow, the opposite both sides of the cylinder one are respectively arranged with the first opening and the second opening;
The body of rod is rotationally arranged at the inner barrel, and the body of rod is obliquely installed, and the body of rod is can rotate to The mode that both ends are stretched out from first opening and second opening respectively is arranged;
Raising cord, first end are connected on the body of rod, and the raising cord second end is pierced by the top of the cylinder, described Tie point of the first end of raising cord on the body of rod is located at below the rotary shaft of the body of rod so that is lifted up described carry When rising rope, the body of rod both ends are stretched out from first opening and second opening respectively.
2. resistance support cylinder as described in claim 1, which is characterized in that further include:
The first end of recovery line, the recovery line is fixed on the body of rod, and the second end of the recovery line is from the cylinder Top is pierced by, and the fixed point of the first end of the recovery line on the body of rod is located above the rotary shaft of the body of rod so that When being lifted up the recovery line, the body of rod both ends are respectively from first opening and the second opening retraction cylinder Body.
3. resistance support cylinder as described in claim 1, which is characterized in that further include:
Top board and lower platen, the top board and the lower platen are each attached on the body of rod, the top board and described Lower platen is lived apart the rotary shaft both sides of the body of rod, and at the body of rod both ends respectively from first opening and described second When opening is stretched out, the top board and the lower platen cover first opening and described second and are open respectively.
4. resistance support cylinder as described in claim 1, which is characterized in that further include:
Upper bearing plate and lower bearing plate, the upper bearing plate and the lower bearing plate are separately positioned on the body of rod both ends and stretch respectively Go out the part of first opening and second opening, and the plane where the upper bearing plate and the lower bearing plate is equal Perpendicular to the direction of rotation of the body of rod.
5. resistance support cylinder as described in claim 1, which is characterized in that further include:
Lift lever, one end is hinged with the body of rod, and hinge joint is located at below the rotary shaft of the body of rod, the lift lever The first end of the other end and the raising cord fix.
6. resistance support cylinder as described in claim 1, which is characterized in that further include:
Body of rod shaft and two shaft holes, described two shaft holes are set to another opposite both side surface of the cylinder, Body of rod shaft both ends are respectively rotatably arranged in described two shaft holes, and the body of rod is fixed on the body of rod and turns On axis.
7. resistance support cylinder as described in claim 1, which is characterized in that the body of rod both ends are respectively formed sharp portion.
8. resistance support cylinder as described in claim 1, which is characterized in that the top and bottom of the cylinder were connected with side The equal arc transition in region.
9. the application method of resistance support cylinder, which is characterized in that including:
Drilling;
Any resistance support cylinder of claim 1~8 is hung in the hole being drilled;
Raising cord is promoted with lifting device, until top board and lower platen cover the first opening and the second opening respectively;
Resistance support cylinder after use, discharges raising cord, promotes recovery line and makes body of rod both ends retraction cylinder, and continues to lift up back It receives rope to the resistance support cylinder and returns to ground.
10. using the dead-load detection method of resistance support cylinder, which is characterized in that including:
Drilling;
Any resistance support cylinder of claim 1~8 is hung in the hole being drilled;
Raising cord is promoted with lifting device, until top board and lower platen cover the first opening and the second opening respectively;
Raising cord is connect with reaction beam;
Jack is placed at the top of pile foundation to be measured, providing counter-force using reaction beam for jack carries out dead-load detection;
After the completion of dead-load detection, raising cord is discharged, recovery line is promoted and makes body of rod both ends retraction cylinder, and continue to lift up recovery line Ground is returned to the resistance support cylinder.
CN201810563825.2A 2018-06-04 2018-06-04 Resistance support cylinder and its application method and dead-load detection method Pending CN108547334A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810563825.2A CN108547334A (en) 2018-06-04 2018-06-04 Resistance support cylinder and its application method and dead-load detection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810563825.2A CN108547334A (en) 2018-06-04 2018-06-04 Resistance support cylinder and its application method and dead-load detection method

Publications (1)

Publication Number Publication Date
CN108547334A true CN108547334A (en) 2018-09-18

Family

ID=63511764

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810563825.2A Pending CN108547334A (en) 2018-06-04 2018-06-04 Resistance support cylinder and its application method and dead-load detection method

Country Status (1)

Country Link
CN (1) CN108547334A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914494A (en) * 2019-03-28 2019-06-21 中交路桥建设有限公司 A kind of pile foundation soil layer utmost tip resistance test macro

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0669277A1 (en) * 1994-02-28 1995-08-30 Electricite De France Sling for the transportation of loads by helicopter
CA2473507A1 (en) * 2002-01-14 2003-07-17 L'air Liquide Societe Anonyme A Directoire Et Conseil De Surveillance Po Pour L'etude Et L'exploitation Des Procedes Georges Claude Polysulfide measurement methods using colorimetric techniques
CN103266635A (en) * 2013-04-26 2013-08-28 合肥工业大学 Ground-anchor-type pile foundation static load test device and test method
CN104032775A (en) * 2014-06-27 2014-09-10 陆剑 Resistance barrel and method for detecting static loads of engineering pile foundations
CN205676933U (en) * 2016-06-03 2016-11-09 南宁市纪元重载检测科技有限责任公司 Big load mill resistance support stand body device
CN106854878A (en) * 2016-12-28 2017-06-16 陆剑 Engineering pile foundation dead-load detection resistance support panel assembly and its application method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0669277A1 (en) * 1994-02-28 1995-08-30 Electricite De France Sling for the transportation of loads by helicopter
CA2473507A1 (en) * 2002-01-14 2003-07-17 L'air Liquide Societe Anonyme A Directoire Et Conseil De Surveillance Po Pour L'etude Et L'exploitation Des Procedes Georges Claude Polysulfide measurement methods using colorimetric techniques
CN103266635A (en) * 2013-04-26 2013-08-28 合肥工业大学 Ground-anchor-type pile foundation static load test device and test method
CN104032775A (en) * 2014-06-27 2014-09-10 陆剑 Resistance barrel and method for detecting static loads of engineering pile foundations
CN205676933U (en) * 2016-06-03 2016-11-09 南宁市纪元重载检测科技有限责任公司 Big load mill resistance support stand body device
CN106854878A (en) * 2016-12-28 2017-06-16 陆剑 Engineering pile foundation dead-load detection resistance support panel assembly and its application method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914494A (en) * 2019-03-28 2019-06-21 中交路桥建设有限公司 A kind of pile foundation soil layer utmost tip resistance test macro

Similar Documents

Publication Publication Date Title
CN101974905B (en) Pile-embedding method for hollow pile and auger drill for implementing same
CN106088064A (en) A kind of hard stratum precrushing three axle cement mixing pile drilling tool and construction method thereof
CN105862870B (en) Recyclable pattern foundation pit supporting structure Anchor cable-rod support stand body
CN104989272B (en) Upward inverse well drilling process
CN105442605B (en) Extract PHC and be reused in deep foundation pit supporting construction method
CN204662442U (en) Highway barrier hydraulic pressure inner bearing type gets an equipment
CN106149723B (en) Civil engineering piling machine
CN104032775B (en) Engineering pile foundation dead-load detection resistance cylinder and detection method
CN205676933U (en) Big load mill resistance support stand body device
CN108547334A (en) Resistance support cylinder and its application method and dead-load detection method
CN205224034U (en) Prestressing force pile driver
CN207567832U (en) Counterforce device
CN105926594A (en) Double-pipe construction method for static pressure pipe-sinking carrier cast-in-place pile
CN110080775A (en) Complex environment digs a well basic microvariations excavation method
CN208379651U (en) resistance support cylinder
CN205676934U (en) Big resistance support stand body device
CN205116239U (en) Engineering pile foundation static load detects resistance anchor hoe
CN106854878B (en) Engineering pile foundation dead-load detection resistance support panel assembly and its application method
CN1544765A (en) High grade rock and soil anchoring construction method and apparatus
CN207567831U (en) Resistance rack device
CN109339044A (en) A kind of concrete pipe pile construction equipment
CN206376288U (en) Engineering pile foundation dead-load detection resistance support panel assembly
CN105350587B (en) Engineering pile foundation static load detection resistance anchor hoe
CN206158586U (en) A bore and hang integrative rig for island reef foundation construction
CN206487486U (en) A kind of mining TBM safe temporary support device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180918

RJ01 Rejection of invention patent application after publication