CN106149723B - Civil engineering piling machine - Google Patents

Civil engineering piling machine Download PDF

Info

Publication number
CN106149723B
CN106149723B CN201610733274.0A CN201610733274A CN106149723B CN 106149723 B CN106149723 B CN 106149723B CN 201610733274 A CN201610733274 A CN 201610733274A CN 106149723 B CN106149723 B CN 106149723B
Authority
CN
China
Prior art keywords
pile
rig
ring
fixed frame
slide rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610733274.0A
Other languages
Chinese (zh)
Other versions
CN106149723A (en
Inventor
朱永祥
董波
葛易
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chuzhou Vocational and Technical College
Original Assignee
Chuzhou Vocational and Technical College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chuzhou Vocational and Technical College filed Critical Chuzhou Vocational and Technical College
Priority to CN201610733274.0A priority Critical patent/CN106149723B/en
Publication of CN106149723A publication Critical patent/CN106149723A/en
Application granted granted Critical
Publication of CN106149723B publication Critical patent/CN106149723B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/22Placing by screwing down

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

Civil engineering piling machine, including two root posts, coordinate installation slip cap on per root post, slip cap can move up and down along column, fixed frame is installed between slip cap, the middle part of fixed frame sets rig, the both sides of rig open up vertical sliding groove, fixed frame inside middle portion is provided with guide pad, guide pad is located in sliding groove, the output shaft of rig down and installs coordinating block, two annulus slide rails are provided with fixed frame, coordinate between annulus slide rail and be provided with ring-shaped slide circle, ring-shaped slide circle can rotate along annulus slide rail, several mounting holes are uniformly opened up on ring-shaped slide circle, bearing block is provided with each mounting hole, the outer ring of bearing block and mounting hole secure fit.Pile is driven to rotate by rig, while hydraulic cylinder drives slip cap to move down, pile is driven piles by the way of rotation on the ground., can be by rotating pile corresponding to annular sliding ring adjustment for the stake holes of different-diameter requirement, reduction changes the time used in stake, effectively improves efficiency of construction.

Description

Civil engineering piling machine
Technical field
The invention belongs to field of civil engineering, specifically a kind of civil engineering piling machine.
Background technology
Small building is driven piles operate when, it is necessary to according to requirements, change the pile of different-diameter, and existing beat General only one pile post of installation on stake machine, when changing pile, can only shutdown operation, have impact on the efficiency of construction.It is and existing Piling machine, the general working method that underground is hammered using direct voltage, i.e.,:Pile hangs down into underground under gravity drop hammer effect, so as to Stake holes is got, then again extracts the pile of piling machine, fill concrete in stake holes.The working method that this high pressure hammers is right The impact resistance of pile requires very high, and the in general pile life-span is shorter, and is extracting the process of pile, it is necessary to consume larger The energy, it is not economical enough.
The content of the invention
The present invention provides a kind of civil engineering piling machine, the defects of to solve in the prior art.
The present invention is achieved by the following technical programs:
Civil engineering piling machine, including two root posts, per coordinating installation slip cap on root post, slip cap can be along vertical Post is moved up and down, and fixed frame is installed between slip cap, and the middle part of fixed frame sets rig, and the both sides of rig open up vertical slip Groove, fixed frame inside middle portion are provided with guide pad, and guide pad is located in sliding groove, and the output shaft of rig down and installs coordinating block, Two annulus slide rails are provided with fixed frame, coordinates between annulus slide rail and is provided with ring-shaped slide circle, ring-shaped slide circle can be along annulus Slide rail is rotated, and several mounting holes are uniformly opened up on ring-shaped slide circle, is provided with bearing block in each mounting hole, the outer ring of bearing block and Pile is fixedly mounted in mounting hole secure fit, the inner ring of bearing block, and the diameter of each pile is different, and cross is opened up at the top of pile Shape groove, coordinating block can coordinate with cross bath grafting on the output shaft of rig;The both sides of column are respectively mounted hydraulic cylinder, hydraulic cylinder Piston rod down, the top of the piston rod of hydraulic cylinder connection slip cap.
Civil engineering piling machine as described above, the bottom mounting seat of described column, the bottom installation ten thousand of base To wheel, the bottom installation hydraulic jack of base, the piston rod of hydraulic jack is down.
Civil engineering piling machine as described above, the two bottom sides of described circular slide rail respectively install three lamp sockets, lamp Seat is string configuration, and the upper end of lamp socket is hinged with circular slide rail, and laser lamp, laser lamp are installed in each lamp socket lower end Direction of illumination down, electric putter is installed between the bottom of lamp socket and circular slide rail, the both ends of electric putter respectively with lamp socket, circle Slide rail is hinged.
It is an advantage of the invention that:The present invention, which is arranged in construction site, to be needed at pile driving position, pile towards pile driving position, Rotating annular sliding ring makes the pile of corresponding diameter mobile drill, makes coordinating block and stake on the output shaft of rig still further below down The cross bath of post coordinates.Pile is driven to rotate by rig, while hydraulic cylinder drives slip cap to move down, pile is on ground It is upper to be driven piles by the way of rotation., can be by rotating annular sliding ring adjustment pair for the stake holes of different-diameter requirement The pile answered, the time changed used in pile is effectively reduced, improves efficiency of construction.While pile is rotation in pile hole Motion, the power that is no longer hit effect, service life are longer.In addition, when extracting pile, rig is inverted.This rotation The working method of formula pile pulling post has the characteristics of resistance is small, energy consumption is low, cost is low.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are this hairs Some bright embodiments, for those of ordinary skill in the art, without having to pay creative labor, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is the structural representation of the present invention;Fig. 2 is the enlarged drawing along the sectional view of Fig. 1 line A-A;Fig. 3 is Fig. 1 B The enlarged drawing of direction view;Fig. 4 is the enlarged drawing of Fig. 1 C direction views.
Reference:The annular of 1 column, 2 fixed frame, 3 slip cap, 4 rig, 5 sliding groove, 6 guide pad, 7 annulus slide rail 8 The universal wheel of 15 base of sliding ring 9 mounting hole, 10 bearing block, 11 pile, 12 cross bath, 13 coordinating block, 14 hydraulic cylinder 16 The electric putter of 17 jack, 18 lamp socket, 19 laser lamp 20.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is Part of the embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art The every other embodiment obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
Civil engineering piling machine, as illustrated, including two root posts 1, installation slip cap 3 is often coordinated on root post 1, it is sliding Dynamic set 3 can be moved up and down along column 1, and fixed frame 2 is installed between slip cap 3, and the middle part of fixed frame 2 sets rig 4, rig 4 Both sides open up vertical sliding groove 5, the inside middle portion of fixed frame 2 is provided with guide pad 6, and guide pad 6 is located in sliding groove 5, rig 4 Output shaft down and coordinating block 13 is installed, two annulus slide rails 7 are provided with fixed frame 2, between annulus slide rail 7 cooperation be provided with ring Shape sliding ring 8, ring-shaped slide circle 8 can rotate along annulus slide rail 7, several mounting holes 9 uniformly be opened up on ring-shaped slide circle 8, often Bearing block 10, outer ring and the secure fit of mounting hole 9 of bearing block 10 are provided with individual mounting hole 9, the inner ring of bearing block 10 fixes peace Pile 11 is filled, the diameter of each pile 11 is different, and the top of pile 11 opens up cross bath 12, coordinated on the output shaft of rig 4 Block 13 can coordinate with the grafting of cross bath 12;The both sides of column 1 are respectively mounted hydraulic cylinder 14, the piston rod of hydraulic cylinder 14 down, The top of the piston rod connection slip cap 3 of hydraulic cylinder 14.
The present invention, which is arranged in construction site, to be needed at pile driving position, and pile 11 rotates ring-shaped slide towards pile driving position Circle 8 makes the pile of corresponding diameter down, is moving down rig 4, makes coordinating block 13 and the ten of pile 11 on the output shaft of rig 4 Font groove 12 coordinates.Pile 11 is driven to rotate by rig 4, while hydraulic cylinder 14 drives slip cap 3 to move down, pile 11 exists Driven piles on ground by the way of rotation.For the stake holes of different-diameter requirement, can be adjusted by rotating annular sliding ring 8 Pile 11 corresponding to whole, the time changed used in stake is reduced, effectively improves efficiency of construction.Pile 11 no longer receives impulsive force, because This service life is longer.Rig 4 inverts, you can extracts pile 11.
Specifically, it is mobile of the invention for convenience, the bottom mounting seat 15 of the column 1 described in the present embodiment, base 15 bottom installation universal wheel 16, the bottom installation hydraulic jack 17 of base 15, the piston rod of hydraulic jack 17 is down.It is logical Cross universal wheel 16 can the convenient mobile present invention on building sites, after reaching specified location, by hydraulic jack 17 to It is lower to prop up the present invention, improve the stability in the course of work.
Specifically, position and the diameter of piling, the two bottom sides of the circular slide rail 7 described in the present embodiment are determined for convenience Respectively three lamp sockets 18 of installation, lamp socket 18 are string configuration, and the upper end of lamp socket 18 is be hinged with circular slide rail 7, under each lamp socket 18 End installation laser lamp 19, the direction of illumination of laser lamp 19 down, is installed between the bottom of lamp socket 18 and circular slide rail 7 Electric putter 20, the both ends of electric putter 20 are be hinged with lamp socket 18, circular slide rail 7 respectively.When rig 4 is located at peak, pass through six Individual laser lamp 19 is aimed downwardly, and six points of irradiation can form the combination of an approximate circle point, and electric putter 20 is released Position can change the angle of irradiation.The diameter and the Data Integration of the release location of electric putter 20 that can will correspond to pile 11, When being changed during use to corresponding pile 11, can be formed by the irradiation of laser lamp 19 luminous point determine piling position and Diameter, use are more convenient.
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although The present invention is described in detail with reference to the foregoing embodiments, it will be understood by those within the art that:It still may be used To be modified to the technical scheme described in foregoing embodiments, or equivalent substitution is carried out to which part technical characteristic; And these modification or replace, do not make appropriate technical solution essence depart from various embodiments of the present invention technical scheme spirit and Scope.

Claims (3)

1. civil engineering piling machine, it is characterised in that:Including two root posts(1), per root post(1)It is upper to coordinate installation slip cap (3), slip cap(3)Can be along column(1)Move up and down, slip cap(3)Between fixed frame is installed(2), fixed frame(2)Middle part Rig is set(4), rig(4)Both sides open up vertical sliding groove(5), fixed frame(2)Inside middle portion is provided with guide pad(6), Guide pad(6)Positioned at sliding groove(5)It is interior, rig(4)Output shaft down and coordinating block is installed(13), fixed frame(2)Inside it is provided with Two annulus slide rails(7), annulus slide rail(7)Between coordinate be provided with ring-shaped slide circle(8), ring-shaped slide circle(8)Can be along annulus Slide rail(7)Rotate, ring-shaped slide circle(8)On uniformly open up several mounting holes(9), each mounting hole(9)It is interior to be provided with bearing block (10), bearing block(10)Outer ring and mounting hole(9)Secure fit, bearing block(10)Inner ring be fixedly mounted pile(11), respectively Individual pile(11)Diameter it is different, pile(11)Top open up cross bath(12), rig(4)Output shaft on coordinating block (13)Can be with cross bath(12)Grafting coordinates;Column(1)Both sides be respectively mounted hydraulic cylinder(14), hydraulic cylinder(14)Piston Bar down, hydraulic cylinder(14)Piston rod connection slip cap(3)Top.
2. civil engineering piling machine according to claim 1, it is characterised in that:Described column(1)Bottom installation Base(15), base(15)Bottom installation universal wheel(16), base(15)Bottom installation hydraulic jack(17), hydraulic pressure thousand Jin top(17)Piston rod down.
3. civil engineering piling machine according to claim 1, it is characterised in that:Described circular slide rail(7)Bottom Both sides are respectively installed by three lamp sockets(18), lamp socket(18)For string configuration, lamp socket(18)Upper end and circular slide rail(7)It is be hinged, Each lamp socket(18)Lower end is installed by laser lamp(19), laser lamp(19)Direction of illumination down, lamp socket(18)Under Portion and circular slide rail(7)Between electric putter is installed(20), electric putter(20)Both ends respectively with lamp socket(18), circular slide rail(7) It is be hinged.
CN201610733274.0A 2016-08-27 2016-08-27 Civil engineering piling machine Active CN106149723B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610733274.0A CN106149723B (en) 2016-08-27 2016-08-27 Civil engineering piling machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610733274.0A CN106149723B (en) 2016-08-27 2016-08-27 Civil engineering piling machine

Publications (2)

Publication Number Publication Date
CN106149723A CN106149723A (en) 2016-11-23
CN106149723B true CN106149723B (en) 2018-04-03

Family

ID=57343582

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610733274.0A Active CN106149723B (en) 2016-08-27 2016-08-27 Civil engineering piling machine

Country Status (1)

Country Link
CN (1) CN106149723B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109440767A (en) * 2018-10-30 2019-03-08 孙霞伢 A kind of construction techniques

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106400800A (en) * 2016-12-02 2017-02-15 郑州经度知识产权代理服务有限公司 Reciprocated circulation type pile driver
CN109441343B (en) * 2018-10-30 2020-09-15 广东吉利建设工程有限公司 Piling equipment for constructional engineering
CN110777783B (en) * 2019-11-13 2020-08-21 浙江木田工具股份有限公司 Domestic farm pile driver

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100558991C (en) * 2007-02-02 2009-11-11 武汉华威建筑桩工机械有限责任公司 A kind of cord rolling automatic pile driving hammer
CN102287134A (en) * 2010-06-21 2011-12-21 王保瑞 Hydraulic motive power foundation pile drilling machine mechanism
KR20130085354A (en) * 2012-01-19 2013-07-29 백인우 Apparatus for piling screw pile
JP2014051837A (en) * 2012-09-07 2014-03-20 Earth Pick:Kk Casing chuck mechanism
CN103422502B (en) * 2013-07-15 2015-12-23 山河智能装备股份有限公司 A kind of piling machinery that slipping-shoe device is housed
CN204491605U (en) * 2015-03-17 2015-07-22 济南轨道交通集团有限公司 A kind of cross shaped pile embraces pressure Pile holding mechanism

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109440767A (en) * 2018-10-30 2019-03-08 孙霞伢 A kind of construction techniques

Also Published As

Publication number Publication date
CN106149723A (en) 2016-11-23

Similar Documents

Publication Publication Date Title
CN106149723B (en) Civil engineering piling machine
CN102304922B (en) Full-pile casing construction device
CN107217910A (en) Supply line's electric pole plants lever apparatus and its plants bar method
CN104265164B (en) The creeping into draw to dig of plateau mountain foundation pit excavation construction equipment carries native device
CN207332754U (en) Electric pole is digged pit upright bar integrated apparatus
CN104265156B (en) The drawing to dig of plateau mountain foundation pit excavation construction equipment carries native device
CN104196072B (en) Plateau mountain foundation pit excavation construction equipment
CN104594802A (en) Hydraulic combined impact hammer drilling machine
CN204371098U (en) A kind of Combined hydraulic jump bit rig
CN107627782A (en) A kind of engineering machinery wheel for strengthening earth-grasping force
CN205224034U (en) Prestressing force pile driver
CN203499559U (en) Conveniently moved hydraulic anchoring drill for roadway
CN207609374U (en) Lift self-travel type full-sleeve full-rotation drill
CN206987509U (en) Supply line's electric pole plants lever apparatus
CN107654191B (en) Crawler-type double-arm multi-angle jumbolter
CN206256893U (en) Short space internal drilling pile-forming apparatus
CN105275388A (en) Drilling equipment for building pile foundation with square cross section
CN202131986U (en) Pile driver
CN106583782B (en) Heavy caliber pipe-jacking anti-drag mud hole drill aperture apparatus and its construction method
CN210033275U (en) Vehicle-mounted rotary piling and drilling machine
CN104988921B (en) Multifunction guard rail breakdown van
CN210529685U (en) Hollow drill rod excavator
CN203584300U (en) Roof bolter with hoisting equipment
CN203383224U (en) Tension-free cast-in-place pile structure
CN102767190A (en) Tower foundation and method for manufacturing same

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhu Yongxiang

Inventor after: Zhang Yanyi

Inventor after: Zhang Xinqun

Inventor after: Xu Zouying

Inventor after: Dong Bo

Inventor after: Wang Jie

Inventor before: Zhu Yongxiang

Inventor before: Dong Bo

Inventor before: Ge Yi

GR01 Patent grant
GR01 Patent grant