CN108536984A - A kind of information infrastructure intermediate item progress three-dimensional visualization method - Google Patents

A kind of information infrastructure intermediate item progress three-dimensional visualization method Download PDF

Info

Publication number
CN108536984A
CN108536984A CN201810356475.2A CN201810356475A CN108536984A CN 108536984 A CN108536984 A CN 108536984A CN 201810356475 A CN201810356475 A CN 201810356475A CN 108536984 A CN108536984 A CN 108536984A
Authority
CN
China
Prior art keywords
progress
dimensional
project
modeling
intermediate item
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810356475.2A
Other languages
Chinese (zh)
Inventor
彭健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Shaoguan Power Supply Bureau Guangdong Power Grid Co Ltd
Original Assignee
Guangdong Power Grid Co Ltd
Shaoguan Power Supply Bureau Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Power Grid Co Ltd, Shaoguan Power Supply Bureau Guangdong Power Grid Co Ltd filed Critical Guangdong Power Grid Co Ltd
Priority to CN201810356475.2A priority Critical patent/CN108536984A/en
Publication of CN108536984A publication Critical patent/CN108536984A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2111/00Details relating to CAD techniques
    • G06F2111/20Configuration CAD, e.g. designing by assembling or positioning modules selected from libraries of predesigned modules

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Theoretical Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Architecture (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to power system information administrative skill fields, more particularly, to a kind of information infrastructure intermediate item progress three-dimensional visualization method.Include the following steps:S1:Three-dimensional modeling is carried out with 3 d modeling software, and modeling data is directed into monitoring system;S2:The modularization parameter and computation rule of setting project progress of implementation, and it is directed into monitoring system;S3:System initialization configuration is carried out to the modularization parameter and computation rule of project implementation progress;S4:According to project actual implementation progress typing construction speed;S5:Three-dimensional display project process.It is shown by three-dimensional modeling, three-dimensional progress, it, being capable of various visual angles, various dimensions, objective, the true project process of implementation display in conjunction with progress computation rule.

Description

A kind of information infrastructure intermediate item progress three-dimensional visualization method
Technical field
The present invention relates to power system information administrative skill fields, more particularly, to a kind of information infrastructure category Mesh progress three-dimensional visualization method.
Background technology
The LAN of department is implemented at present, computer room is implemented, the progress of implementation of terminal buying intermediate item, is all by filling in table Lattice carry out project process record and report, and there is false can not really understand grasp project process disorderly the case where report.
Fill up a form single, there are randomness, can not various visual angles, various dimensions, implement to show objective, true project into Degree.
Invention content
The present invention is at least one defect overcome described in the above-mentioned prior art, provides a kind of information infrastructure intermediate item Progress three-dimensional visualization method, being capable of various visual angles, various dimensions, objective, the true project process of implementation display.Avoid project process False, disorderly report.
In order to solve the above technical problems, the technical solution adopted by the present invention is:A kind of information infrastructure intermediate item progress Three-dimensional visualization method includes the following steps:
S1:Three-dimensional modeling is carried out with 3 d modeling software, and modeling data is directed into monitoring system;
S2:The modularization parameter and computation rule of setting project progress of implementation, and it is directed into monitoring system;
S3:System initialization configuration is carried out to the modularization parameter and computation rule of project implementation progress;
S4:According to project actual implementation progress typing construction speed;
S5:Three-dimensional display project process.
Further, the specific method of step S2 is:The level of projects module and a is initialized according to project actual content Each module, is corresponded to each key node of project by number, and completes the initialization of each accounting, then according to the submodule in module Number of blocks further segments the accounting of each submodule.
Further, the computation rule of step S2 is:After project implementation content three-dimensional modeling, manual setting number of modules The accounting number of amount and each module, and reserved each module can arbitrarily divide the interface of arbitrary number of level submodule, it can space after to be done Divide display that part is completed, unfinished portion can programming count Percent Complete numerical value.
Further, the project includes Local area network construction project, terminal procurement item and terminal security intermediate item.
Further, the specific process of Local area network construction project is as follows:
The content that transformation is implemented will be needed defeated by dimensional Modeling Technology by existing two dimensional surface construction budget CAD diagram in project Uniaxial direct tensile is three-dimensional building after entering true height value, and by acquiring textures information, generates formal building graphics, so Model is accurate to every Local area network construction in building again and cable, floor switch cabinet and floor switch is transformed by emphasis afterwards; After completing modeling, by completed and unfinished floor, LAN circuit, switch port by different color markings, And the true numerical value Percent Complete progress of programming count.
Further, the specific process of terminal procurement item is as follows:
By terminal by carrying out three-dimensional modeling in the manufacture stage, the module assembled for completing all kinds of terminal devices really completes percentage Than, then in the logistics distribution stage, in conjunction with existing GIS electronic maps background, GPS means of transports real-time positioning information and Logistics distribution process is carried out true scene modeling and scene restores, i.e., has been set to manufacture point by virtual city modeling technique Point, office building are set to terminal, show complete the true ratio in whole section of road to embody Percent Complete, final programming count on the way True Percent Complete progress.
Further, the specific process of terminal security intermediate item is as follows:
By security classes equipment by carrying out three-dimensional modeling in the manufacture stage, the module assembled for completing all kinds of terminal devices is really completed Percentage, then in the logistics distribution stage, in conjunction with existing GIS electronic maps background, the real-time positioning information of GPS means of transports And virtual city modeling technique, logistics distribution process is subjected to true scene modeling and scene restores, i.e., it is manufacture point is fixed For starting point, office building is set to terminal, shows complete the true ratio in whole section of road to embody Percent Complete, finally automatically on the way Count true Percent Complete progress.
Further, in step s 5, project process is visualized by computer, mobile phone or flatbed three-dimensional.
Further, the 3 d modeling software includes 3DMax, Maya, UG, proE or solidwork.
Compared with prior art, advantageous effect is:It is shown by three-dimensional modeling, three-dimensional progress, in conjunction with progress computation rule, It being capable of various visual angles, various dimensions, objective, the true project process of implementation display.Avoid project process false, disorderly report.
Description of the drawings
Fig. 1 is the flow diagram of the present invention.
Specific implementation mode
The attached figures are only used for illustrative purposes and cannot be understood as limitating the patent;It is attached in order to more preferably illustrate the present embodiment Scheme certain components to have omission, zoom in or out, does not represent the size of actual product;To those skilled in the art, The omitting of some known structures and their instructions in the attached drawings are understandable.Being given for example only property of position relationship described in attached drawing Illustrate, should not be understood as the limitation to this patent.
As shown in Figure 1, a kind of information infrastructure intermediate item progress three-dimensional visualization method, includes the following steps:
S1:Three-dimensional modeling is carried out with 3 d modeling software, and modeling data is directed into monitoring system;
S2:The modularization parameter and computation rule of setting project progress of implementation, and it is directed into monitoring system;
S3:System initialization configuration is carried out to the modularization parameter and computation rule of project implementation progress;
S4:According to project actual implementation progress typing construction speed;
S5:Three-dimensional display project process.
Further, the specific method of step S2 is:The level of projects module and a is initialized according to project actual content Each module, is corresponded to each key node of project by number, and completes the initialization of each accounting, then according to the submodule in module Number of blocks further segments the accounting of each submodule.
Further, the computation rule of step S2 is:After project implementation content three-dimensional modeling, manual setting number of modules The accounting number of amount and each module, and reserved each module can arbitrarily divide the interface of arbitrary number of level submodule, it can space after to be done Divide display that part is completed, unfinished portion can programming count Percent Complete numerical value.
Further, the project includes Local area network construction project, terminal procurement item and terminal security intermediate item.
Further, the specific process of Local area network construction project is as follows:
Local area network construction project:The content for needing transformation to implement in project is led to by existing two dimensional surface construction budget CAD diagram It is three-dimensional building to cross uniaxial direct tensile after dimensional Modeling Technology inputs true height value, and by acquiring textures information, is generated just The building graphics of formula, then emphasis again by model be accurate to every Local area network construction in building be transformed cable, floor exchange Cabinet and floor switch;After completing modeling, completed and unfinished floor, LAN circuit, switch port are led to Cross different color markings, and the true numerical value Percent Complete progress of programming count.
Further, the specific process of terminal procurement item is as follows:
By terminal by carrying out three-dimensional modeling in the manufacture stage, the module assembled for completing all kinds of terminal devices really completes percentage Than, then in the logistics distribution stage, in conjunction with existing GIS electronic maps background, GPS means of transports real-time positioning information and Logistics distribution process is carried out true scene modeling and scene restores, i.e., has been set to manufacture point by virtual city modeling technique Point, office building are set to terminal, show complete the true ratio in whole section of road to embody Percent Complete, final programming count on the way True Percent Complete progress.
Further, the specific process of terminal security intermediate item is as follows:
By security classes equipment by carrying out three-dimensional modeling in the manufacture stage, the module assembled for completing all kinds of terminal devices is really completed Percentage, then in the logistics distribution stage, in conjunction with existing GIS electronic maps background, the real-time positioning information of GPS means of transports And virtual city modeling technique, logistics distribution process is subjected to true scene modeling and scene restores, i.e., it is manufacture point is fixed For starting point, office building is set to terminal, shows complete the true ratio in whole section of road to embody Percent Complete, finally automatically on the way Count true Percent Complete progress.
Further, in step s 5, project process is visualized by computer, mobile phone or flatbed three-dimensional.
Further, the 3 d modeling software includes 3DMax, Maya, UG, proE or solidwork.
Obviously, the above embodiment of the present invention be only to clearly illustrate example of the present invention, and not be pair The restriction of embodiments of the present invention.For those of ordinary skill in the art, may be used also on the basis of the above description To make other variations or changes in different ways.There is no necessity and possibility to exhaust all the enbodiments.It is all this All any modification, equivalent and improvement etc., should be included in the claims in the present invention made by within the spirit and principle of invention Protection domain within.

Claims (9)

1. a kind of information infrastructure intermediate item progress three-dimensional visualization method, which is characterized in that include the following steps:
S1:Three-dimensional modeling is carried out with 3 d modeling software, and modeling data is directed into monitoring system;
S2:The modularization parameter and computation rule of setting project progress of implementation, and it is directed into monitoring system;
S3:System initialization configuration is carried out to the modularization parameter and computation rule of project implementation progress;
S4:According to project actual implementation progress typing construction speed;
S5:Three-dimensional display project process.
2. a kind of information infrastructure intermediate item progress three-dimensional visualization method according to claim 1, which is characterized in that The specific method of step S2 is:The level and number that projects module is initialized according to project actual content, each module is corresponded to In each key node of project, and the initialization of each accounting is completed, is then further segmented according to the submodule quantity in module The accounting of each submodule.
3. a kind of information infrastructure intermediate item progress three-dimensional visualization method according to claim 1, which is characterized in that The computation rule of step S2 is:After project implementation content three-dimensional modeling, the accounting of manual setting module number and each module Number, and reserved each module can arbitrarily divide the interface of arbitrary number of level submodule, three-dimensional can distinguish display after to be done is completed part, Unfinished portion, can programming count Percent Complete numerical value.
4. a kind of information infrastructure intermediate item progress three-dimensional visualization method according to claim 1, which is characterized in that The project includes Local area network construction project, terminal procurement item and terminal security intermediate item.
5. a kind of information infrastructure intermediate item progress three-dimensional visualization method according to claim 4, which is characterized in that The specific process of Local area network construction project is as follows:
The content that transformation is implemented will be needed defeated by dimensional Modeling Technology by existing two dimensional surface construction budget CAD diagram in project Uniaxial direct tensile is three-dimensional building after entering true height value, and by acquiring textures information, generates formal building graphics, so Model is accurate to every Local area network construction in building again and cable, floor switch cabinet and floor switch is transformed by emphasis afterwards; After completing modeling, by completed and unfinished floor, LAN circuit, switch port by different color markings, And the true numerical value Percent Complete progress of programming count.
6. a kind of information infrastructure intermediate item progress three-dimensional visualization method according to claim 4, which is characterized in that The specific process of terminal procurement item is as follows:
By terminal by carrying out three-dimensional modeling in the manufacture stage, the module assembled for completing all kinds of terminal devices really completes percentage Than, then in the logistics distribution stage, in conjunction with existing GIS electronic maps background, GPS means of transports real-time positioning information and Logistics distribution process is carried out true scene modeling and scene restores, i.e., has been set to manufacture point by virtual city modeling technique Point, office building are set to terminal, show complete the true ratio in whole section of road to embody Percent Complete, final programming count on the way True Percent Complete progress.
7. a kind of information infrastructure intermediate item progress three-dimensional visualization method according to claim 4, which is characterized in that The specific process of terminal security intermediate item is as follows:
By security classes equipment by carrying out three-dimensional modeling in the manufacture stage, the module assembled for completing all kinds of terminal devices is really completed Percentage, then in the logistics distribution stage, in conjunction with existing GIS electronic maps background, the real-time positioning information of GPS means of transports And virtual city modeling technique, logistics distribution process is subjected to true scene modeling and scene restores, i.e., it is manufacture point is fixed For starting point, office building is set to terminal, shows complete the true ratio in whole section of road to embody Percent Complete, finally automatically on the way Count true Percent Complete progress.
8. a kind of information infrastructure intermediate item progress three-dimensional visualization method according to claim 1, which is characterized in that In step s 5, project process is visualized by computer, mobile phone or flatbed three-dimensional.
9. a kind of information infrastructure intermediate item progress three-dimensional visualization method according to claim 1, which is characterized in that The 3 d modeling software includes 3DMax, Maya, UG, proE or solidwork.
CN201810356475.2A 2018-04-19 2018-04-19 A kind of information infrastructure intermediate item progress three-dimensional visualization method Pending CN108536984A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810356475.2A CN108536984A (en) 2018-04-19 2018-04-19 A kind of information infrastructure intermediate item progress three-dimensional visualization method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810356475.2A CN108536984A (en) 2018-04-19 2018-04-19 A kind of information infrastructure intermediate item progress three-dimensional visualization method

Publications (1)

Publication Number Publication Date
CN108536984A true CN108536984A (en) 2018-09-14

Family

ID=63478690

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810356475.2A Pending CN108536984A (en) 2018-04-19 2018-04-19 A kind of information infrastructure intermediate item progress three-dimensional visualization method

Country Status (1)

Country Link
CN (1) CN108536984A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102930374A (en) * 2012-09-27 2013-02-13 乐华建科技(北京)有限公司 System for realizing project management by using three-dimensional model for simulating reality
CN103425054A (en) * 2013-08-21 2013-12-04 国家电网公司 Electric power tunnel construction control method based on digitization
CN104166892A (en) * 2014-06-19 2014-11-26 国家电网公司 Engineering management and control method and system based on three-dimensional design system
CN104729587A (en) * 2015-03-27 2015-06-24 国家电网公司 Large electric power material transportation monitoring system and method
CN106815702A (en) * 2016-12-23 2017-06-09 上海天地汇供应链管理有限公司 A kind of Smartway dispatch management method
CN107273640A (en) * 2017-07-11 2017-10-20 黄河勘测规划设计有限公司 Hydraulic and Hydro-Power Engineering Schedule monitoring method based on three-dimensional digital model

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102930374A (en) * 2012-09-27 2013-02-13 乐华建科技(北京)有限公司 System for realizing project management by using three-dimensional model for simulating reality
CN103425054A (en) * 2013-08-21 2013-12-04 国家电网公司 Electric power tunnel construction control method based on digitization
CN104166892A (en) * 2014-06-19 2014-11-26 国家电网公司 Engineering management and control method and system based on three-dimensional design system
CN104729587A (en) * 2015-03-27 2015-06-24 国家电网公司 Large electric power material transportation monitoring system and method
CN106815702A (en) * 2016-12-23 2017-06-09 上海天地汇供应链管理有限公司 A kind of Smartway dispatch management method
CN107273640A (en) * 2017-07-11 2017-10-20 黄河勘测规划设计有限公司 Hydraulic and Hydro-Power Engineering Schedule monitoring method based on three-dimensional digital model

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
郑云等: "BIM-GIS技术在建筑供应链可视化中的应用研究", 《施工技术》 *
金雄杰: "基于 BIM 的建设项目进度控制研究", 《中国优秀博硕士学位论文全文数据库(硕士)工程科技Ⅱ辑(月刊)》 *
陈建军等: "基建工程现场状态管理系统的应用研究", 《华北电力技术》 *
陶鹏鹏等: "BIM和GIS集成提高建筑供应链管理", 《山西建筑》 *
马震: "基于BIM的益通仲伯物流厂房工程项目进度管理研究", 《中国优秀博硕士学位论文全文数据库(硕士)工程科技Ⅱ辑(月刊)》 *

Similar Documents

Publication Publication Date Title
CN106951583B (en) Method for virtually arranging monitoring cameras on construction site based on BIM technology
CN111241618A (en) Intelligent construction site information processing method and system based on BIM model and application
CN108399652A (en) Method, apparatus, storage medium and the terminal device of City Buried Pipeline three-dimension monitor model foundation
CN106802993A (en) A kind of exhibiting method of the operation of the electric network swim under three-dimensional scenic
CN106027962B (en) The coverage rate calculation method and device of video monitoring, points distributing method and system
CN111724481A (en) Method, device, equipment and storage medium for three-dimensional reconstruction of two-dimensional image
CN104392482A (en) Substation engineering project three-dimensional calculation quantity model generation system and method
CN107102991A (en) A kind of shaft tower parametric modeling method in three-dimension GIS system
CN106067189A (en) Magnanimity three-dimensional cable and channel pattern automation modeling and rendering intent
CN112489213A (en) Three-dimensional terrain model generation method and device, electronic equipment and storage medium
CN114297746A (en) Rendering method and device of building information model, electronic equipment and storage medium
CN114818060A (en) Highway construction management method and device and related equipment
CN103093493A (en) High-precision three-dimensional object modeling method with power grid equipment existing
CN102063534A (en) High furnace overhaul project schedule three-dimensional simulation device and method
CN103839186B (en) Mine operating condition 3D visualization method based on object-message tree
CN110941867A (en) Construction method of standardized site layout based on BIM
CN105095593A (en) Patterned topology generating method and system
CN108536984A (en) A kind of information infrastructure intermediate item progress three-dimensional visualization method
CN109785422A (en) The construction method and device of three-dimensional power grid scene
JP6212398B2 (en) Landscape quantification device
CN108898679A (en) A kind of method of component serial number automatic marking
CN112700548A (en) Fusion method of BIM (building information modeling) model and video information in visual transformer substation
CN107767458B (en) Irregular triangulation network curved surface geometric topology consistency analysis method and system
CN106033623A (en) 3D visualized mass data processing method, apparatus and system thereof
CN207424933U (en) A kind of building element tagging system based on Building Information Model

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180914