CN108532637A - Integrated vertical supporting system in reverse operation stage and mounting method thereof - Google Patents
Integrated vertical supporting system in reverse operation stage and mounting method thereof Download PDFInfo
- Publication number
- CN108532637A CN108532637A CN201810388996.6A CN201810388996A CN108532637A CN 108532637 A CN108532637 A CN 108532637A CN 201810388996 A CN201810388996 A CN 201810388996A CN 108532637 A CN108532637 A CN 108532637A
- Authority
- CN
- China
- Prior art keywords
- steel
- steel pipe
- vertical support
- support system
- inverse
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 44
- 238000010276 construction Methods 0.000 claims abstract description 106
- 238000009434 installation Methods 0.000 claims abstract description 21
- 229910000831 Steel Inorganic materials 0.000 claims description 194
- 239000010959 steel Substances 0.000 claims description 194
- 230000010354 integration Effects 0.000 claims description 48
- 239000000758 substrate Substances 0.000 claims description 41
- 238000005192 partition Methods 0.000 claims description 23
- 239000004567 concrete Substances 0.000 claims description 16
- 239000003351 stiffener Substances 0.000 claims description 14
- 238000003466 welding Methods 0.000 claims description 4
- 238000003912 environmental pollution Methods 0.000 abstract description 2
- 230000007547 defect Effects 0.000 abstract 1
- 238000012407 engineering method Methods 0.000 description 8
- 238000011065 in-situ storage Methods 0.000 description 7
- 238000013461 design Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 239000002002 slurry Substances 0.000 description 3
- 230000003068 static effect Effects 0.000 description 3
- 238000012546 transfer Methods 0.000 description 3
- 230000015271 coagulation Effects 0.000 description 2
- 238000005345 coagulation Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000011372 high-strength concrete Substances 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 238000005728 strengthening Methods 0.000 description 2
- 241000282693 Cercopithecidae Species 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000010412 perfusion Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 238000007781 pre-processing Methods 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
- E02D29/05—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench
- E02D29/055—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench further excavation of the cross-section proceeding underneath an already installed part of the structure, e.g. the roof of a tunnel
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/48—Piles varying in construction along their length, i.e. along the body between head and shoe, e.g. made of different materials along their length
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/52—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
- E02D5/523—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
The invention provides a reverse construction stage integrated vertical supporting system and an installation method thereof, aiming at overcoming the defects of the original vertical supporting pile of a reverse construction method, reducing the influence of the vertical supporting pile construction on the surrounding environment, simultaneously accelerating the construction speed of the vertical supporting pile as much as possible and ensuring the pile quality. The method has the characteristics of high construction speed, less environmental pollution, less construction disturbance, high verticality of the upright post and guaranteed pile forming quality.
Description
Technical field
Make stage integration vertical support system and its installation method the present invention relates to a kind of inverse.
Background technology
Contrary sequence method essence is constructed from top to bottom using all or part of main body underground structure as supporting construction
Underground structure and the engineering method for replacing construction with excavation of foundation pit.Once release, the engineering method just with save the duration, save project cost,
Construction protects the advantages such as preferable to be promoted in foundation pit circle rapidly surrounding enviroment and forms a set of more mature construction work
Skill.The inverse reliability for doing the transmission of stage vertical load is the key that whether contrary sequence method can smoothly be implemented.Therefore ensure vertical branch
The construction quality for holding pile is most important.Conventional inverse stage vertical support pile of making uses cast-in-situ bored pile and angle splice joint lattice
Column.And construction process for bored pile is complicated, discarded slurry pollution is larger, long in time limit, can be to it when cast-in-place pile concrete pours
On the generation of support column verticality result even in whole support column compared with large disturbances, when serious and scrapped because verticality is too low;And
Cast-in-situ bored pile is also easy to produce the bad phenomenons such as collapse hole, necking down, broken pile when geological conditions is bad, causes vertical support pile bearing capacity big
Width reduces, or even jeopardizes engineering safety.
Invention content
The purpose of the present invention is to provide a kind of against stage integration vertical support system and its installation method is made, and can solve
Certainly existing construction process for bored pile is complicated, and discarded slurry pollution is larger, long in time limit, influences the verticality of support column, and
Cast-in-situ bored pile is also easy to produce the problems such as collapse hole, necking down, broken pile when geological conditions is bad.
To solve the above problems, the present invention provides, one kind is inverse to make stage integration vertical support system, including:
More steel pipe post stakes being inserted into place foundation elevation structural substrates below;
It is extended above from the structural substrates to more high steel-tube construction columns of structure top mark, every steel-tube construction column
A steel pipe post stake close to the structural substrates end and corresponding position connect;
Perpendicular to each steel-tube construction column and each sandwich beam for being arranged on the different height of each steel-tube construction column
Plate.
Further, above-mentioned against in making stage integration vertical support system, the inside of every steel-tube construction column is poured
Concrete is built.
Further, above-mentioned against in making stage integration vertical support system, the steel pipe post stake or steel-tube construction
Column is spliced by multistage.
Further, it is above-mentioned it is inverse make stage integration vertical support system, the internal diameter of every steel-tube construction column with
The internal diameter of its steel pipe post stake being connected can not wait.
Further, pass through variable diameters Steel Tube Joint, every steel against in making stage integration vertical support system above-mentioned
A steel pipe post stake close to the structural substrates end and corresponding position for pipe structural upright connects, wherein the variable diameters
The section of Steel Tube Joint is terraced font.
Further, above-mentioned against in making stage integration vertical support system, the top surface of the variable diameters Steel Tube Joint
Top sidewall for the annular partition of intermediate trepanning, the annular partition and the variable diameters Steel Tube Joint is welded.
Further, above-mentioned against in making stage integration vertical support system, the outer diameter of the annular partition is equal to institute
State the internal diameter of steel-tube construction column.
Further, above-mentioned against in making stage integration vertical support system, the bottom surface of the variable diameters Steel Tube Joint
Bottom sidewall for circular bulkheads, the circular bulkheads and the variable diameters Steel Tube Joint is welded.
Further, above-mentioned against in making stage integration vertical support system, the diameter of the circular bulkheads is equal to steel
The internal diameter of tube column stake.
Further, further include ribbed stiffener, the ribbed stiffener is pressed above-mentioned against in making stage integration vertical support system
Predetermined interval is distributed on the madial wall of the steel pipe post stake, the inside of one end of every piece of ribbed stiffener and the steel pipe post stake
Wall connects, and the other end is connect with the bottom surface of the circular bulkheads.
Further, above-mentioned against in making stage integration vertical support system, the side wall of the variable diameters Steel Tube Joint
Slope ratio be less than or equal to 1:6.
Further, above-mentioned against in making stage integration vertical support system, the variable diameters Steel Tube Joint is embedded in
Corresponding in a sandwich beam plate of its height and position.
Another side according to the present invention provides a kind of inverse installation method for making stage integration vertical support system, including:
More steel pipe post stakes are inserted into place foundation elevation structural substrates below;
It is arranged from the structural substrates and extends above to more high steel-tube construction columns of structure top mark, by every steel pipe knot
A steel pipe post stake close to the structural substrates end and corresponding position for structure column connects;
Each sandwich beam plate of the setting perpendicular to each steel-tube construction column on the different height of each steel-tube construction column.
Further, in the above-mentioned methods, setting is extended above from the structural substrates to more high steel of structure top mark
After pipe structural upright, further include:
Concrete is poured in the inside of every steel-tube construction column.
Further, in the above-mentioned methods, by every steel-tube construction column close to the structural substrates end and corresponding position
The steel pipe post stake connection set, including:
By the variable diameters Steel Tube Joint that section is terraced font, by the close structural substrates of every steel-tube construction column
End is connect with a steel pipe post stake of corresponding position.
Further, in the above-mentioned methods, by the variable diameters Steel Tube Joint that section is terraced font, by every steel-tube construction
Before the steel pipe post stake connection close to the structural substrates end and corresponding position of column, further include:
The top surface of the variable diameters Steel Tube Joint is set to the annular partition of intermediate trepanning, by the annular partition and institute
State the top sidewall welding of variable diameters Steel Tube Joint.
Further, in the above-mentioned methods, by the variable diameters Steel Tube Joint that section is terraced font, by every steel-tube construction
Before the steel pipe post stake connection close to the structural substrates end and corresponding position of column, further include:
The bottom surface of the variable diameters Steel Tube Joint is provided in round partition board, the circular bulkheads and the variable diameters steel pipe
The bottom sidewall of node is welded.
Further, in the above-mentioned methods, further include:
It is distributed ribbed stiffener on the madial wall of the steel pipe post stake by predetermined interval, by one end of every piece of ribbed stiffener and institute
The madial wall connection of steel pipe post stake is stated, the other end is connect with the bottom surface of the circular bulkheads.
Further, in the above-mentioned methods, by the variable diameters Steel Tube Joint that section is terraced font, by every steel-tube construction
Before the steel pipe post stake connection close to the structural substrates end and corresponding position of column, further include:
The slope ratio of the side wall of the variable diameters Steel Tube Joint is less than or equal to 1:6.
Further, in the above-mentioned methods, perpendicular to each steel-tube construction column and high in the difference of each steel-tube construction column
In the step of each sandwich beam plate being arranged on degree, including:
The variable diameters Steel Tube Joint is embedded in the sandwich beam plate corresponding to its height and position.
Compared with prior art, to overcome contrary sequence method original vertical supporting pile the shortcomings that, reduces vertical support pile and applies
Influence of the work to surrounding enviroment, while accelerating the speed of application of vertical supporting pile as far as possible, ensureing pile quality, the present invention
One kind is provided against stage integration vertical supporting system and its engineering method is made, specially inverse will do stage original vertical support pile
It is changed to the steel pipe of steel pipe material, steel pipe insert structure substrate is extended above in structural substrates to structure top mark as stand column pile
Height links into an integrated entity as column and with steel pipe post stake, and the present invention is in the reliability for ensureing the original vertical force transfer system of contrary sequence method
Meanwhile cast-in-situ bored pile in former engineering method is replaced with into steel-pipe pile, support column replaces with concrete filled steel tubular column.It is fast with speed of application,
Low in the pollution of the environment, construction disturbs residents less, column pile verticality is high, the guaranteed feature of pile quality.
Description of the drawings
Fig. 1 is the inverse structure chart for making stage integration vertical support system of one embodiment of the invention;
Fig. 2 is the structure chart of the variable diameters Steel Tube Joint of one embodiment of the invention;
Fig. 3 is the structure chart of the annular partition of one embodiment of the invention;
Fig. 4 is the structure chart of the circular bulkheads of one embodiment of the invention.
Specific implementation mode
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, below in conjunction with the accompanying drawings and specific real
Applying mode, the present invention is described in further detail.
As shown in Figure 1, the present invention provides, one kind is inverse to make stage vertical support system, including:
More steel pipe post stakes 3 being inserted into 1 structural substrates 2 below of place foundation elevation;
It is extended above to more steel-tube construction columns 4 of 1 or more the place Horizon absolute altitude, often from the structural substrates 2
A steel pipe post stake close to the structural substrates end and corresponding position for root steel-tube construction column connects;
Perpendicular to each steel-tube construction column 4 and each sandwich beam for being arranged on the different height of each steel-tube construction column 4
Plate 5.
Here, the shortcomings that overcome contrary sequence method original vertical supporting pile, reduce the construction of vertical support pile to peripheral ring
The influence in border, while accelerating the speed of application of vertical supporting pile as far as possible, ensureing pile quality, the present invention provides one kind
It is inverse to make stage integration vertical supporting system and its engineering method, it specially inverse will do stage original vertical support pile and be changed to steel pipe
The steel pipe post stake 3 of material, 3 insert structure substrate 2 of steel pipe post stake are used as stand column pile, are extended above to knot in structural substrates 2
Structure top mark high setting steel-tube construction column 4 simultaneously links into an integrated entity with steel pipe post stake 1, and the present invention is ensureing that contrary sequence method is original vertical
The reliability of force transfer system replaces with steel-pipe pile simultaneously, by cast-in-situ bored pile in former engineering method, and support column replaces with steel pipe earth pillar.Its
Have the characteristics that speed of application is fast, low in the pollution of the environment, construction disturbs residents less, column pile verticality is high, pile quality is guaranteed.
The inverse of the present invention is made in one embodiment of stage vertical support system, and the inside of every steel-tube construction column 4 has poured
Concrete.
Here, the Lack of support or sectional dimension in steel-tube construction column 4 increase by limited time, it is perfused in steel pipe high-strength
Coagulation local soil type is spent into concrete filled steel tube system, i.e., pours the strengthening measure of high strength concrete using inside, improves steel-tube construction column
Vertical bearing capacity.
The inverse of the present invention is made in one embodiment of stage vertical support system, the steel pipe post stake 3 or steel-tube construction column 4
It can be spliced by multistage.
Here, the methods of static pressure or hammering, which can be used, in steel pipe post stake 3 enters supporting course.When single steel pipe post stake 3 or
When the length of steel-tube construction column 4 is unsatisfactory for demand, the mode of site welding lengthening can be used until length meets design requirement.
The inverse of the present invention is made in one embodiment of stage vertical support system, and the internal diameter of every steel-tube construction column 4 can not wait
In the internal diameter of coupled steel pipe post stake 3.
Here, the internal diameter of the steel pipe post stake 3 of bottom can be with bigger, to provide holding for bigger in the bottom of supporting system
Power is carried, the internal diameter of the steel-tube construction column 4 on top can be with smaller, to ensure the sectional dimension of steel-tube construction column in limited range
It is interior.
As shown in Fig. 2, the inverse of the present invention is made in one embodiment of stage vertical support system, by variable diameters Steel Tube Joint 6,
The close structural substrates end 2 of every steel-tube construction column 4 is connect with a steel pipe post stake 4 of corresponding position, wherein institute
The section for stating variable diameters Steel Tube Joint 6 is terraced font.
Here, steel-tube construction column 4 and the internal diameter size transitional region of 3 junction of steel pipe post stake can be used such as Fig. 2 institutes
6 schematic diagram of variable diameters Steel Tube Joint shown is attached, and the section of variable diameters Steel Tube Joint 6 is terraced font, can be in steel-tube construction
The internal diameter of column 4 was less than on the case where internal diameter of steel pipe post stake 3, and realization steel-tube construction column 4 is reliable with steel pipe post stake 3
Connection.
As shown in Figures 2 and 3, it is of the invention it is inverse make in one embodiment of stage vertical support system, the variable diameters steel pipe joint
The top surface of point 6 is the annular partition 61 of intermediate trepanning, the top sidewall of the annular partition 61 and the variable diameters Steel Tube Joint 6
Welding.
Herein, on the one hand, annular partition 61 can improve the vertical bearing capacity of variable diameters Steel Tube Joint 6, to prevent steel
The junction circumferential deformation of pipe structural upright 4 and variable diameters Steel Tube Joint 6;On the other hand, the intermediate trepanning of annular partition 61 is just
Enter 6 in variable diameters Steel Tube Joint in concreting.
As shown in Figures 2 and 3, it is of the invention it is inverse make in one embodiment of stage vertical support system, the annular partition 61
Outer diameter is equal to the internal diameter D2 of the steel-tube construction column 4, to ensure to connect fastness.D1 is the outer of steel-tube construction column 4 in Fig. 2
Diameter.
As shown in Figures 2 and 4, it is of the invention it is inverse make in one embodiment of stage vertical support system, the variable diameters steel pipe joint
The bottom surface of point 6 is circular bulkheads 62, and the circular bulkheads 62 and the bottom sidewall of the variable diameters Steel Tube Joint 6 are welded.
Here, circular bulkheads 62 can improve the vertical bearing capacity of variable diameters Steel Tube Joint 6, to prevent steel pipe post stake
3 and variable diameters Steel Tube Joint 6 junction circumferential deformation.
As shown in Figures 3 and 4, it is of the invention it is inverse make in one embodiment of stage vertical support system, the circular bulkheads it is straight
Diameter is equal to the internal diameter D3 of steel pipe post stake, to ensure to connect fastness.In Fig. 3, D is the outer diameter of steel pipe post stake.
As shown in Fig. 2, the inverse of the present invention is made in one embodiment of stage vertical support system, and further include ribbed stiffener 7, it is described to add
Strength rib 7 is distributed in by predetermined interval on the madial wall of the steel pipe post stake 3, and one end of every piece of ribbed stiffener 7 is vertical with the steel pipe
The madial wall of stanchion 3 connects, and the other end is connect with the bottom surface of the circular bulkheads 62, to prevent steel pipe post stake 3 and variable diameters
The junction circumferential deformation of Steel Tube Joint 6.
The inverse of the present invention is made in one embodiment of stage vertical support system, the slope of the side wall of the variable diameters Steel Tube Joint 6
Than being less than or equal to 1:6.
Here, the gradient of the variable diameters Steel Tube Joint 6 is not preferably greater than 1:6, can be small as possible, such as 1:7、1:8, to prevent
Variable diameters Steel Tube Joint lateral deformation.
The inverse of the present invention is made in one embodiment of stage vertical support system, and the variable diameters Steel Tube Joint 6 is embedded in correspondence
In in a sandwich beam plate 5 of its height and position.
Here, the variable diameters Steel Tube Joint should be located in building structure beam slab altitude range as transitional region, a side
Face, place layer structural beam slab in concrete can provide drag for variable diameters Steel Tube Joint lateral deformation, another aspect, institute
It states variable diameters Steel Tube Joint to be embedded in structural beam slab, air insulated can be carried out to variable diameters Steel Tube Joint, prevent variable diameters
Steel Tube Joint gets rusty.
The inverse of the present invention is made in one embodiment of stage vertical support system, and the variable diameters Steel Tube Joint 6 connects the steel
The wall thickness at tube column stake end is more than or equal to the wall thickness of steel pipe post stake 3;The variable diameters Steel Tube Joint 6 connects the steel-tube construction
The wall thickness of stud end is more than or equal to the wall thickness of steel-tube construction column 4, to ensure to connect fastness.
As shown in Figure 1, another side according to the present invention, also provides a kind of inverse peace for making stage integration vertical support system
Dress method, including:
More steel pipe post stakes 3 are inserted into 1 structural substrates 2 below of place foundation elevation;
It is arranged from the structural substrates 2 and extends above high more of structure top mark to 1 or more the place Horizon absolute altitude
Steel-tube construction column 4 stands every steel-tube construction column 4 close to the structural substrates end 2 and a steel pipe of corresponding position
Stanchion 3 connects;
Each sandwich beam plate of the setting perpendicular to each steel-tube construction column 4 on the different height of each steel-tube construction column 4
5。
Here, doing the stage superstructure construction number of plies, construction loads, engineering location geological conditions, wind load according to inverse
With seismic loading size determine steel pipe post stake, steel-tube construction column sectional dimension and length;
The scheme that construction site is transported to after factory's preprocessing can be used in the used steel pipe of steel-tube construction column, can further add
Fast site operation speed, saves the duration;
When steel pipe post pile driving construction, steel pipe post stake is lifted to precalculated position, using hammering or static pressure method by steel pipe
Stake sinks down into projected depth, wherein plurality of sections of steel pipes stand column pile scene can be used when single-unit length of steel pipe is unsatisfactory for design requirement
The mode of splicing ensures that vertical supporting steel pipe post pile length meets design requirement;
Structural beam slab can subsequently be connect to form structural system with steel-tube construction column.It is vertically held if any steel-tube construction column
It is insufficient to carry power, perfusion high-grade concrete measure in steel pipe can be taken to improve vertical bearing capacity.
The shortcomings that overcome contrary sequence method original vertical supporting pile, reduces shadow of the vertical support pile construction to surrounding enviroment
It rings, while accelerating the speed of application of vertical supporting pile as far as possible, ensureing pile quality, make rank the present invention provides a kind of inverse
The integrated vertical supporting system of section and its engineering method specially do inverse stage original vertical support pile and are changed to steel pipe material
Steel pipe post stake, steel pipe insert structure substrate are extended above in structural substrates to structure top mark high setting steel pipe as stand column pile
Structural upright simultaneously links into an integrated entity with steel pipe post stake, and the present invention is ensureing that the reliability of the original vertical force transfer system of contrary sequence method is same
When, cast-in-situ bored pile in former engineering method is replaced with into steel-pipe pile, support column replaces with steel pipe earth pillar.Its fast, ring with speed of application
Border is polluted less, construction disturbs residents less, column pile verticality is high, the guaranteed feature of pile quality.
As illustrated in fig. 1 and 2, it is of the invention it is inverse make in one embodiment of installation method of stage integration vertical support system,
It is arranged from the structural substrates and extends above to more more than place Horizon absolute altitude steel-tube construction columns, also wraps
It includes:
Concrete is poured in the inside of every steel-tube construction column 4.
Here, the Lack of support or sectional dimension in steel-tube construction column increase by limited time, it is perfused in steel pipe high-strength
Coagulation local soil type is spent into concrete filled steel tube system, i.e., pours the strengthening measure of high strength concrete using inside, improves steel-tube construction column
Vertical bearing capacity.
As shown in Fig. 2, the inverse of the present invention is made in one embodiment of installation method of stage integration vertical support system, it will be every
A steel pipe post stake close to the structural substrates end and corresponding position for root steel-tube construction column connects, including:
By the variable diameters Steel Tube Joint 6 that section is terraced font, by the close structure base of every steel-tube construction column 4
Bottom end 2 is connect with a steel pipe post stake 3 of corresponding position.
Here, steel-tube construction column and the internal diameter size transitional region of steel pipe post stake junction can be used as shown in Figure 2
Variable diameters Steel Tube Joint schematic diagram be attached, the section of variable diameters Steel Tube Joint is terraced font, can be in steel-tube construction column
Internal diameter the case where being less than the internal diameter of steel pipe post stake on, realize being reliably connected for steel-tube construction column and steel pipe post stake.
As shown in Figures 2 and 3, it is of the invention it is inverse make in one embodiment of installation method of stage integration vertical support system,
By the variable diameters Steel Tube Joint that section is terraced font, by every steel-tube construction column close to the structural substrates end with it is corresponding
Before the steel pipe post stake connection of position, further include:
The top surface of the variable diameters Steel Tube Joint 6 is set to the annular partition 61 of intermediate trepanning, by the annular partition
61 weld with the top sidewall of the variable diameters Steel Tube Joint 6.
Herein, on the one hand, annular partition can improve the vertical bearing capacity of variable diameters Steel Tube Joint, to prevent steel pipe knot
The junction circumferential deformation of structure column and variable diameters Steel Tube Joint;On the other hand, concrete is convenient in the intermediate trepanning of annular partition
It pours in variable diameters Steel Tube Joint.
As shown in Figures 2 and 4, it is of the invention it is inverse make in one embodiment of installation method of stage integration vertical support system,
By the variable diameters Steel Tube Joint that section is terraced font, by every steel-tube construction column close to the structural substrates end with it is corresponding
Before the steel pipe post stake connection of position, further include:
The bottom surface of the variable diameters Steel Tube Joint 6 is provided in round partition board 62, the circular bulkheads 62 are straightened with described
The bottom sidewall of diameter Steel Tube Joint 6 is welded.
Here, circular bulkheads 62 can improve the vertical bearing capacity of variable diameters Steel Tube Joint 6, to prevent steel pipe post stake
3 and variable diameters Steel Tube Joint 6 junction circumferential deformation.
As shown in Fig. 2, the inverse of the present invention is made in one embodiment of installation method of stage integration vertical support system, also wrap
It includes:
Ribbed stiffener 7 is distributed on the madial wall of the steel pipe post stake 3 by predetermined interval, by one end of every piece of ribbed stiffener 7
It is connect with the madial wall of the steel pipe post stake 3, the other end is connect with the bottom surface of the circular bulkheads 62, to prevent steel pipe post
The junction circumferential deformation of 3 and variable diameters Steel Tube Joint 6.
The inverse of the present invention is made in one embodiment of installation method of stage integration vertical support system, is terraced word by section
The variable diameters Steel Tube Joint of type, by a steel pipe close to the structural substrates end and corresponding position for every steel-tube construction column
Before stand column pile connection, further include:
The slope ratio of the side wall of the variable diameters Steel Tube Joint 6 is less than or equal to 1:6.
Here, the gradient of the variable diameters Steel Tube Joint is not preferably greater than 1:6, can be small as possible, such as 1:7、1:8, to prevent
Variable diameters Steel Tube Joint lateral deformation.
The inverse of the present invention is made in one embodiment of installation method of stage integration vertical support system, perpendicular to each steel pipe knot
Structure column and each sandwich beam plate being arranged on the different height of each steel-tube construction column the step of in, including:
The variable diameters Steel Tube Joint 6 is embedded in the sandwich beam plate 5 corresponding to its height and position.
Here, the variable diameters Steel Tube Joint should be located in building structure beam slab altitude range as transitional region, a side
Face, place layer structural beam slab in concrete can provide restriction for variable diameters Steel Tube Joint lateral deformation, another aspect, institute
It states variable diameters Steel Tube Joint to be embedded in structural beam slab, air insulated can be carried out to variable diameters Steel Tube Joint, prevent variable diameters
Steel Tube Joint gets rusty.
In conclusion use shown in the present invention it is inverse make stage integration vertical support system and its installation method have with
Lower feature:
(1) duration is saved.Hammering or static pressure piling technique can be used in steel pipe post stake, one day most soon can 10 left sides of pile
The right side, far more than bored pile construction speed.
(2) environmental pollution is small.Steel pipe pile driving construction need not handle discarded slurry, advantageous to environmental protection.
(3) steel pipe post pile verticality is high.Steel pipe post pile monkey is hit is not necessarily to casting concrete afterwards in place, avoids concrete
Pour the influence to vertical support column verticality.
(4) pile quality is high.Cast-in-situ bored pile is also easy to produce the bad phenomenons such as necking down, broken pile, substantially reduces pile foundation vertical and holds
Power is carried, and uses steel-pipe pile pile quality high, vertical bearing capacity is guaranteed.
Each embodiment is described by the way of progressive in this specification, the highlights of each of the examples are with other
The difference of embodiment, just to refer each other for identical similar portion between each embodiment.
Obviously, those skilled in the art can carry out invention spirit of the various modification and variations without departing from the present invention
And range.If in this way, these modifications and changes of the present invention belong to the claims in the present invention and its equivalent technologies range it
Interior, then the present invention is also intended to including these modification and variations.
Claims (20)
1. one kind is inverse to make stage integration vertical support system, which is characterized in that including:
It is inserted into the more steel pipe post stakes below of place foundation elevation;
It is extended above from the structural substrates to more high steel-tube construction columns of the structure top mark, every steel-tube construction column
It is connect with a steel pipe post stake of corresponding position;
Each sandwich beam plate being arranged perpendicular to each steel-tube construction column and on the different height of each steel-tube construction column.
2. inverse as described in claim 1 make stage integration vertical support system, which is characterized in that every steel-tube construction column
Inside poured concrete.
Make stage integration vertical support system 3. as described in claim 1 inverse, which is characterized in that the steel pipe post stake or
Steel-tube construction column is spliced by multistage.
4. inverse as described in claim 1 make stage integration vertical support system, which is characterized in that every steel-tube construction column
The internal diameter of the coupled steel pipe post stake of internal diameter differ.
5. inverse as described in claim 1 make stage integration vertical support system, which is characterized in that every steel-tube construction column
It is connected by a steel pipe post stake of variable diameters Steel Tube Joint and corresponding position, wherein the variable diameters Steel Tube Joint is cut
Face is terraced font.
6. inverse as claimed in claim 5 make stage integration vertical support system, which is characterized in that the variable diameters steel pipe joint
The top surface of point is the annular partition of intermediate trepanning, and the top sidewall of the annular partition and the variable diameters Steel Tube Joint is welded.
7. inverse as claimed in claim 6 make stage integration vertical support system, which is characterized in that outside the annular partition
Diameter is equal to the internal diameter of the steel-tube construction column.
8. inverse as claimed in claim 5 make stage integration vertical support system, which is characterized in that the variable diameters steel pipe joint
The bottom surface of point is circular bulkheads, and the bottom sidewall of the circular bulkheads and the variable diameters Steel Tube Joint is welded.
Make stage integration vertical support system 9. as claimed in claim 8 inverse, which is characterized in that the circular bulkheads it is straight
Diameter is equal to the internal diameter of steel pipe post stake.
10. inverse as claimed in claim 8 make stage integration vertical support system, which is characterized in that further include ribbed stiffener, institute
It states ribbed stiffener to be distributed in by predetermined interval on the madial wall of the steel pipe post stake, one end of every piece of ribbed stiffener is vertical with the steel pipe
The madial wall of stanchion welds, and the bottom surface of the other end and the circular bulkheads is welded.
11. inverse as claimed in claim 5 make stage integration vertical support system, which is characterized in that the variable diameters steel pipe
The slope ratio of the side wall of node is less than or equal to 1:6.
12. inverse as claimed in claim 5 make stage integration vertical support system, which is characterized in that the variable diameters steel pipe
Node is embedded in the structural beam slab corresponding to its height and position.
13. a kind of inverse installation method for making stage integration vertical support system, which is characterized in that including:
More steel pipe post stakes are inserted into place foundation elevation structural substrates below;
It is arranged from the structural substrates and extends above to more high steel pipe knots of structure top mark more than the place Horizon absolute altitude
Structure column connects a steel pipe post stake close to the structural substrates end and corresponding position for every steel-tube construction column;
Each sandwich beam plate of the setting perpendicular to each steel-tube construction column on the different height of each steel-tube construction column.
14. the inverse installation method for making stage integration vertical support system as claimed in claim 13, which is characterized in that setting
It is extended above from the structural substrates to more more than place Horizon absolute altitude steel-tube construction columns, further includes:
Concrete is poured in the inside of every steel-tube construction column.
15. the inverse installation method for making stage integration vertical support system as claimed in claim 13, which is characterized in that will be every
A steel pipe post stake close to the structural substrates end and corresponding position for root steel-tube construction column connects, including:
By the variable diameters Steel Tube Joint that section is terraced font, by every steel-tube construction column close to the structural substrates end with
A piece steel pipe post stake of corresponding position connects.
16. the inverse installation method for making stage integration vertical support system as claimed in claim 15, which is characterized in that pass through
Section is the variable diameters Steel Tube Joint of terraced font, by close the structural substrates end and the corresponding position of every steel-tube construction column
A steel pipe post stake connection before, further include:
The top surface of the variable diameters Steel Tube Joint is set to the annular partition of intermediate trepanning, by the annular partition and the change
The top sidewall of diameter Steel Tube Joint is welded.
17. the inverse installation method for making stage integration vertical support system as claimed in claim 15, which is characterized in that pass through
Section is the variable diameters Steel Tube Joint of terraced font, by close the structural substrates end and the corresponding position of every steel-tube construction column
A steel pipe post stake connection before, further include:
The bottom surface of the variable diameters Steel Tube Joint is provided in round partition board, the circular bulkheads and the variable diameters Steel Tube Joint
Bottom sidewall welding.
18. the inverse installation method for making stage integration vertical support system as claimed in claim 17, which is characterized in that also wrap
It includes:
It is distributed ribbed stiffener on the madial wall of the steel pipe post stake by predetermined interval, by one end of every piece of ribbed stiffener and the steel
The madial wall of tube column stake connects, and the other end is connect with the bottom surface of the circular bulkheads.
19. the inverse installation method for making stage integration vertical support system as claimed in claim 15, which is characterized in that pass through
Section is the variable diameters Steel Tube Joint of terraced font, by close the structural substrates end and the corresponding position of every steel-tube construction column
A steel pipe post stake connection before, further include:
The slope ratio of the side wall of the variable diameters Steel Tube Joint is less than or equal to 1:6.
20. the inverse installation method for making stage integration vertical support system as claimed in claim 15, which is characterized in that vertical
In each steel-tube construction column and the step of in each sandwich beam plate being arranged on the different height of each steel-tube construction column, packet
It includes:
The variable diameters Steel Tube Joint is embedded in the sandwich beam plate corresponding to its height and position.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810388996.6A CN108532637A (en) | 2018-04-27 | 2018-04-27 | Integrated vertical supporting system in reverse operation stage and mounting method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810388996.6A CN108532637A (en) | 2018-04-27 | 2018-04-27 | Integrated vertical supporting system in reverse operation stage and mounting method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108532637A true CN108532637A (en) | 2018-09-14 |
Family
ID=63478201
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810388996.6A Pending CN108532637A (en) | 2018-04-27 | 2018-04-27 | Integrated vertical supporting system in reverse operation stage and mounting method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108532637A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203701123U (en) * | 2014-01-24 | 2014-07-09 | 熊翱 | Shallow sea varying diameter single pile foundation |
CN105113715A (en) * | 2015-08-17 | 2015-12-02 | 上海建工二建集团有限公司 | Prefabricated column for reverse construction method and underground structure reverse construction method |
CN105239594A (en) * | 2015-10-30 | 2016-01-13 | 江苏中大建设集团有限公司 | Prestressed pipe pile upright |
CN105442532A (en) * | 2015-11-19 | 2016-03-30 | 杭州江润科技有限公司 | Construction method for pile-head-expanded bored pile |
CN205875193U (en) * | 2016-06-02 | 2017-01-11 | 青岛理工大学 | Assembled stake integral structure |
CN206829149U (en) * | 2017-04-20 | 2018-01-02 | 中南勘察设计院(湖北)有限责任公司 | A kind of stand column pile combining structure |
CN208701748U (en) * | 2018-04-27 | 2019-04-05 | 上海建工二建集团有限公司 | Integrated vertical supporting system in reverse construction stage |
-
2018
- 2018-04-27 CN CN201810388996.6A patent/CN108532637A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203701123U (en) * | 2014-01-24 | 2014-07-09 | 熊翱 | Shallow sea varying diameter single pile foundation |
CN105113715A (en) * | 2015-08-17 | 2015-12-02 | 上海建工二建集团有限公司 | Prefabricated column for reverse construction method and underground structure reverse construction method |
CN105239594A (en) * | 2015-10-30 | 2016-01-13 | 江苏中大建设集团有限公司 | Prestressed pipe pile upright |
CN105442532A (en) * | 2015-11-19 | 2016-03-30 | 杭州江润科技有限公司 | Construction method for pile-head-expanded bored pile |
CN205875193U (en) * | 2016-06-02 | 2017-01-11 | 青岛理工大学 | Assembled stake integral structure |
CN206829149U (en) * | 2017-04-20 | 2018-01-02 | 中南勘察设计院(湖北)有限责任公司 | A kind of stand column pile combining structure |
CN208701748U (en) * | 2018-04-27 | 2019-04-05 | 上海建工二建集团有限公司 | Integrated vertical supporting system in reverse construction stage |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108842791B (en) | Detachable load pile anchor multistage supporting structure and construction method | |
CN110847177A (en) | Fixed verticality adjusting and upward floating preventing device and method with steel pipe supporting column serving as structural column | |
CN107975075B (en) | Construction process for existing load-bearing engineering foundation pile detection structure measures | |
CN104264683B (en) | Building concave shape ultra-deep foundation pit subregion supporting method is protected for three around literary composition | |
CN107642041A (en) | The hollow clump of piles anchorage of super-large diameter | |
JP6127760B2 (en) | Construction method of construction pillar | |
CN102767178A (en) | Stand column pile and construction method thereof | |
CN103437375A (en) | Method for installing steel pipe column under cover and excavation top-down method in segmental-locating mode | |
CN110886507B (en) | Method for increasing storey and expanding under existing building | |
CN109898669B (en) | Construction method for underground first-layer beam column joint by reverse construction method | |
CN113502828B (en) | Processing method for early warning of deep foundation pit | |
CN208701748U (en) | Integrated vertical supporting system in reverse construction stage | |
CN202688989U (en) | Upright pile | |
CN108532637A (en) | Integrated vertical supporting system in reverse operation stage and mounting method thereof | |
CN107642040A (en) | The construction method heavy stone used as an anchor of the hollow clump of piles anchorage of super-large diameter | |
CN203891060U (en) | Permanent steel pipe column positioning system of major structure of cover and excavation top-down station | |
CN115977165A (en) | Reinforced structure of shield tunnel closely through building | |
CN106284331B (en) | Method for improving vertical bearing capacity of large-diameter rock-socketed cast-in-place pile | |
JP6757003B2 (en) | Construction method of double pipe pile and double pipe pile | |
CN209816868U (en) | Built-in truss assembled cylinder spliced pile | |
CN109235453B (en) | Deep foundation pit PRC pipe pile assembled supporting method | |
CN106988327A (en) | A kind of upright controling slip casting steel floral tube pile base beam barrier wall structure and its construction method | |
CN209211434U (en) | It is a kind of inverse to make mounting and positioning device of the steel pipe column in rotary digging bored concrete pile | |
CN208517947U (en) | Steel pipe column can be recycled in combined type | |
CN111980017A (en) | Broken pile reinforcing structure and method for large-diameter cast-in-place pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |