CN108520399A - Line project onsite acceptance system and method based on cloud storage PMS2.0 platforms - Google Patents
Line project onsite acceptance system and method based on cloud storage PMS2.0 platforms Download PDFInfo
- Publication number
- CN108520399A CN108520399A CN201810290439.0A CN201810290439A CN108520399A CN 108520399 A CN108520399 A CN 108520399A CN 201810290439 A CN201810290439 A CN 201810290439A CN 108520399 A CN108520399 A CN 108520399A
- Authority
- CN
- China
- Prior art keywords
- cloud storage
- platforms
- acceptance
- test system
- handheld terminal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000003860 storage Methods 0.000 title claims abstract description 50
- 238000000034 method Methods 0.000 title claims abstract description 15
- 238000012360 testing method Methods 0.000 claims abstract description 52
- 238000004891 communication Methods 0.000 claims abstract description 14
- 238000010276 construction Methods 0.000 claims description 22
- 230000003416 augmentation Effects 0.000 claims description 3
- 238000012545 processing Methods 0.000 claims description 2
- 238000013459 approach Methods 0.000 claims 1
- 238000007726 management method Methods 0.000 description 10
- 230000005540 biological transmission Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000012544 monitoring process Methods 0.000 description 3
- 238000013461 design Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012550 audit Methods 0.000 description 1
- 230000033228 biological regulation Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 230000001939 inductive effect Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000014759 maintenance of location Effects 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06V—IMAGE OR VIDEO RECOGNITION OR UNDERSTANDING
- G06V20/00—Scenes; Scene-specific elements
- G06V20/10—Terrestrial scenes
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- Health & Medical Sciences (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Game Theory and Decision Science (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Data Mining & Analysis (AREA)
- Multimedia (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to a kind of line project onsite acceptance systems based on cloud storage PMS2.0 platforms, the system includes multiple examination target, communication module, Acceptance Test System handheld terminal and cloud storage PMS2.0 platform equipped with identity, cloud storage PMS2.0 platforms include server, monitor terminal and central database, server is connect with Acceptance Test System handheld terminal, central database is connect with server, and monitor terminal is connect with server;The invention further relates to a kind of acceptance methods, this method is based on above system, Acceptance Test System handheld terminal is identified and positions to checking and accepting target, target information is sent to cloud storage PMS2.0 platforms with location information by communication module to be handled and monitored, cloud storage PMS2.0 platforms return to mission bit stream to Acceptance Test System handheld terminal, to execute and confirm examination task.Compared with prior art, the present invention has many advantages, such as to ensure engineering high quality, improves and check and accept efficiency.
Description
Technical field
The present invention relates to a kind of process management and control technologies, more particularly, to a kind of linemen's based on cloud storage PMS2.0 platforms
Journey onsite acceptance system and method.
Background technology
Development with social economy and structural adjustment implementation, urban construction and Living consumption gradually carry
Height, power grid is fast-developing, and new circuit is constantly built and puts into operation.How control construction quality, improve construction efficiency, specification and checked and accepted
Journey ensures that the completion time of project must be solved the problems, such as before every line clear.Continue to increase to transmission line of electricity with construction team
The continuous improvement of quality management and control requirement after putting into operation, Utilities Electric Co. are increasing for line maintenance maintenance work pressure.According to going through
History data statistics, construction quality are to cause the principal element of city line failure, engineering caused by management and control is ineffective in work progress
Poor quality is to cause fortune line fault main inducing.
Engineering construction authorities of Chinese Government are to the management of the units such as design, construction, material installation supply and to work
Journey item purpose receipt control, Main Basiss relevant industries standard and system regulation, by carrying out industry money to unit practitioner
The audit of matter qualification, permits access and project feasibility study, assessment, project verification, scheme evaluating, Design approval, engineering at certification identification
Hold give out a contract for a project, engineering site in project supervision and process of construction checks and accepts inspection Check to implement.The examination of line construction is that circuit is built
If highly important link, the examination for line construction, existing quality management and control devices are backward, inconvenient, due to a lack of appointing
Business management and procedure quality retrospect cause line construction to cannot achieve effective closed loop, check and accept inefficiency, and be unfavorable for work
The effective monitoring of journey.
Invention content
It is an object of the present invention to overcome the above-mentioned drawbacks of the prior art and provide a kind of overall processes to manage in real time
The line project onsite acceptance system and method based on cloud storage PMS2.0 platforms of control, high quality management and control.
The purpose of the present invention can be achieved through the following technical solutions:
Line project onsite acceptance system based on cloud storage PMS2.0 platforms, the system include:
Multiple examination targets equipped with identity;
Communication module;
Acceptance Test System handheld terminal:For being identified to checking and accepting target, the Acceptance Test System handheld terminal includes knowing
Other device and positioning device;
Cloud storage PMS2.0 platforms:It is connect by communication module with each Acceptance Test System handheld terminal, for appointing to checking and accepting
Business create and handle in real time, and the cloud storage PMS2.0 platforms include server, monitor terminal and central database, institute
The server stated is connect with Acceptance Test System handheld terminal, for the information of identification to be handled, the central database with
Server connects, and for being stored and being managed to data, the monitor terminal is connect with server, for engineering site
Situation is monitored in real time.
Preferably, the Acceptance Test System handheld terminal is set in each business post that engineering site is checked and accepted.
Preferably, the business post includes examination side, construction party and O&M side.
Preferably, the positioning device includes GNSS receiver module and satellite-based augmentation system.
Preferably, the identification device include for shoot check and accept target identities mark camera and with camera connect
The processor connect.
Preferably, the monitor terminal includes display screen.
Preferably, the communication module is Internet of Things.
Preferably, the Acceptance Test System is additionally provided with fire wall, which deposits set on Acceptance Test System handheld terminal with cloud
Between storage PMS2.0 platforms.
Preferably, the Acceptance Test System handheld terminal includes smart mobile phone and tablet computer.
Line project onsite acceptance method based on cloud storage PMS2.0 platforms, this method be based on above system, including with
Lower step:
1) in the examination side of engineering site by the identification device of Acceptance Test System handheld terminal to being tested with identity
It receives target to be identified, real-time gathering project field data, and engineering site data is sent to cloud storage using Internet of Things
PMS2.0 platforms, meanwhile, Acceptance Test System handheld terminal positions the shaft tower of engineering site by positioning device, and shaft tower is determined
Position information is sent to cloud storage PMS2.0 platforms by communication module;
2) cloud storage PMS2.0 platforms determine examination task according to the engineering site data of acquisition, and will check and accept mission bit stream
It is sent to construction party and the Acceptance Test System handheld terminal of O&M side;
3) after the Acceptance Test System handheld terminal of construction party obtains examination mission bit stream, addition equipment operation is executed, and will hold
Data after row are sent to examination side by Internet of Things, the Acceptance Test System handheld terminal of O&M side obtains check and accept mission bit stream after,
Assignment operation is executed, and mission bit stream is sent to the Acceptance Test System handheld terminal of examination side by Internet of Things;
4) after the Acceptance Test System handheld terminal of examination side obtains mission bit stream, onsite acceptance work is executed, and pass through camera shooting
Head shoots field condition, by Internet of Things by the image feedback of shooting to cloud storage PMS2.0 platforms, completes to check and accept work
Make.
Compared with prior art, the present invention has the following advantages:
(1) the present invention is based on line project onsite acceptance system features in convenient, the intelligence of cloud storage PMS2.0 platforms, to line
The problem of road construction engineering, forms the Whole Course Management of closed loop, and each business post can pass through Acceptance Test System hand
It holds terminal real-time tracking project progress situation or carries out task distribution, improve examination efficiency;
(2) monitor terminal of cloud storage PMS2.0 platforms can real-time query construction quality in the present invention, it is ensured that engineering is high-quality
Amount is completed on schedule with high standards, and Acceptance Test System handheld terminal and the cloud storage PMS2.0 platforms be responsible for organically combine, can be with
Ensure the up to standard of line project quality in site, business administration is required really to implement in routine work;
(3) present invention combines cloud storage PMS2.0 platforms and technology of Internet of things, is carried out to line project onsite acceptance real-time
Managing and control system checks and accepts engineering site and realizes that real-time management and control brings more multivalence by big data, the tupe of cloud computing
Value;
(4) the line Acceptance Test System handheld terminal of present system is equipped with positioning device, and shaft tower can be achieved in the course of receiving
Deng the real-time navigation capability for checking and accepting target device;
(5) fire wall is equipped in present system, the safety for ensureing information transmission.
Description of the drawings
Fig. 1 is the structure diagram of present system;
Shown in figure label:
1, Acceptance Test System handheld terminal, 2, communication module, 3, fire wall, 4, server, 5, central database, 6, monitoring eventually
End.
Specific implementation mode
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.
Embodiment
As shown in Figure 1, the present invention relates to a kind of line project onsite acceptance system based on cloud storage PMS2.0 platforms, packet
Include multiple examination target, Acceptance Test System handheld terminal 1, communication module 2, fire wall 3 and cloud storages equipped with identity
PMS2.0 platforms, Acceptance Test System handheld terminal 1 are connect by communication module 2 with cloud storage PMS2.0 platforms, and information exchange is used for.
Acceptance Test System handheld terminal 1 be set to engineering site check and accept each business post in, including examination side, construction party and
O&M side.Acceptance Test System handheld terminal 1 is equipped with the identification device for examination target to be identified and is used for checking and accepting target,
The positioning device that such as shaft tower is positioned.Identification device includes camera and the processor that is connect with camera, positioning device
Including GNSS receiver module and satellite-based augmentation system.
Cloud storage PMS2.0 platforms include server 4, central database 5 and monitor terminal 6.Server 4 and Acceptance Test System
Handheld terminal 1 connects, for handling the information of identification;Central database 5 is connect with server 4, for data into
Row storage and management;Monitor terminal 6 is connect with server 4, the data for being stored according to server 4 to engineering site situation into
Row real time monitoring.Monitor terminal uses display screen, and communication module is Internet of Things.Intelligent hand can be used in Acceptance Test System handheld terminal 1
Machine or tablet computer.
Fire wall 3 is set between Acceptance Test System handheld terminal 1 and cloud storage PMS2.0 platforms, the safety for ensureing information
Transmission.
The invention further relates to a kind of acceptance method, this method is based on above system, and specific steps include:
1) in the examination side of engineering site by the identification device of Acceptance Test System handheld terminal to being tested with identity
It receives target to be identified, after the data at real-time gathering project scene, it is flat to send data to cloud storage PMS2.0 using Internet of Things
The server of platform, cloud storage PMS2.0 platforms is stored and is handled to data;The positioning device pair of Acceptance Test System handheld terminal
The shaft tower of engineering site is positioned, and the location information of shaft tower is sent to cloud storage PMS2.0 platforms by Internet of Things simultaneously;
2) cloud storage PMS2.0 platforms determine examination task according to the engineering site data of processing, and will check and accept mission bit stream
It is sent to construction party and the Acceptance Test System handheld terminal of O&M side;
3) after the Acceptance Test System handheld terminal of construction party obtains examination mission bit stream, addition equipment operation is executed, and will hold
Data after row are sent to examination side by Internet of Things, the Acceptance Test System handheld terminal of O&M side obtains check and accept mission bit stream after,
Assignment operation is executed, and mission bit stream is sent to the Acceptance Test System handheld terminal of examination side by Internet of Things;
4) after the Acceptance Test System handheld terminal of examination side obtains mission bit stream, onsite acceptance work is executed, and pass through camera shooting
Head shoots field condition, by Internet of Things by the image feedback of shooting to cloud storage PMS2.0 platforms, completes to check and accept work
Make.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any
The staff for being familiar with the art in the technical scope disclosed by the present invention, can readily occur in various equivalent modifications or replace
It changes, these modifications or substitutions should be covered by the protection scope of the present invention.Therefore, protection scope of the present invention should be with right
It is required that protection domain subject to.
Claims (10)
1. the line project onsite acceptance system based on cloud storage PMS2.0 platforms, which is characterized in that including:
Multiple examination targets equipped with identity;
Communication module;
Acceptance Test System handheld terminal:For being identified to checking and accepting target, the Acceptance Test System handheld terminal includes that identification fills
It sets and positioning device;
Cloud storage PMS2.0 platforms:Connect by communication module with each Acceptance Test System handheld terminal, for check and accept task into
Row creates in real time and processing, the cloud storage PMS2.0 platforms include server, monitor terminal and central database, described
Server is connect with Acceptance Test System handheld terminal, for the information of identification to be handled, the central database and service
Device connects, and for being stored and being managed to data, the monitor terminal is connect with server, for engineering site situation
It is monitored in real time.
2. the line project onsite acceptance system according to claim 1 based on cloud storage PMS2.0 platforms, feature exist
In the Acceptance Test System handheld terminal is set in each business post that engineering site is checked and accepted.
3. the line project onsite acceptance system according to claim 2 based on cloud storage PMS2.0 platforms, feature exist
In the business post includes examination side, construction party and O&M side.
4. the line project onsite acceptance system according to claim 1 based on cloud storage PMS2.0 platforms, feature exist
In the positioning device includes GNSS receiver module and satellite-based augmentation system.
5. the line project onsite acceptance system according to claim 1 based on cloud storage PMS2.0 platforms, feature exist
In the identification device includes for shooting the processor checked and accepted the camera of target identities mark and connect with camera.
6. the line project onsite acceptance system according to claim 1 based on cloud storage PMS2.0 platforms, feature exist
In the monitor terminal includes display screen.
7. the line project onsite acceptance system according to claim 1 based on cloud storage PMS2.0 platforms, feature exist
In the communication module is Internet of Things.
8. the line project onsite acceptance system according to claim 1 based on cloud storage PMS2.0 platforms, feature exist
In the Acceptance Test System is additionally provided with fire wall, which is set to Acceptance Test System handheld terminal and cloud storage PMS2.0 platforms
Between.
9. the line project onsite acceptance system according to claim 1 based on cloud storage PMS2.0 platforms, feature exist
In the Acceptance Test System handheld terminal includes smart mobile phone and tablet computer.
10. a kind of using line project onsite acceptance of claim 1~9 any one of them based on cloud storage PMS2.0 platforms
The acceptance method of system, which is characterized in that this approach includes the following steps:
1) in the examination side of engineering site by the identification device of Acceptance Test System handheld terminal to the examination mesh with identity
Mark is identified, real-time gathering project field data, and engineering site data are sent to cloud storage PMS2.0 using Internet of Things
Platform, meanwhile, Acceptance Test System handheld terminal positions the shaft tower of engineering site by positioning device, the location information of shaft tower
It is sent to cloud storage PMS2.0 platforms by communication module;
2) cloud storage PMS2.0 platforms determine examination task according to the engineering site data of acquisition, and will check and accept mission bit stream and send
To construction party and the Acceptance Test System handheld terminal of O&M side;
3) after mission bit stream is checked and accepted in the Acceptance Test System handheld terminal acquisition of construction party, addition equipment operation is executed, and will be after execution
Data examination side is sent to by Internet of Things, the Acceptance Test System handheld terminal of O&M side obtains check and accept mission bit stream after, execute
Assignment operation, and mission bit stream is sent to the Acceptance Test System handheld terminal of examination side by Internet of Things;
4) after the Acceptance Test System handheld terminal of examination side obtains mission bit stream, onsite acceptance work is executed, and will by camera
Field condition is shot, and by Internet of Things by the image feedback of shooting to cloud storage PMS2.0 platforms, completes checking and accepting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810290439.0A CN108520399A (en) | 2018-04-03 | 2018-04-03 | Line project onsite acceptance system and method based on cloud storage PMS2.0 platforms |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810290439.0A CN108520399A (en) | 2018-04-03 | 2018-04-03 | Line project onsite acceptance system and method based on cloud storage PMS2.0 platforms |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108520399A true CN108520399A (en) | 2018-09-11 |
Family
ID=63431098
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810290439.0A Pending CN108520399A (en) | 2018-04-03 | 2018-04-03 | Line project onsite acceptance system and method based on cloud storage PMS2.0 platforms |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108520399A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110751454A (en) * | 2019-09-19 | 2020-02-04 | 国网山东省电力公司济宁供电公司 | Cable accessory installation process control system and method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105868903A (en) * | 2016-03-25 | 2016-08-17 | 国网山东省电力公司济宁供电公司 | System for managing acceptance and transferring to fixed asset of newly commissioned transformation device and working method thereof |
CN106056690A (en) * | 2016-05-24 | 2016-10-26 | 国网天津武清供电有限公司 | Line-protecting intelligent inspection method and system based on big data, cloud platform and internet of things |
CN106296857A (en) * | 2016-08-01 | 2017-01-04 | 上海曦途信息科技有限公司 | A kind of cruising inspection system and method for inspecting thereof |
CN206921161U (en) * | 2016-12-22 | 2018-01-23 | 河南威斯盾电子科技有限公司 | It is a kind of to include inspection management and defect processing and the intelligent inspection system of examination |
-
2018
- 2018-04-03 CN CN201810290439.0A patent/CN108520399A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105868903A (en) * | 2016-03-25 | 2016-08-17 | 国网山东省电力公司济宁供电公司 | System for managing acceptance and transferring to fixed asset of newly commissioned transformation device and working method thereof |
CN106056690A (en) * | 2016-05-24 | 2016-10-26 | 国网天津武清供电有限公司 | Line-protecting intelligent inspection method and system based on big data, cloud platform and internet of things |
CN106296857A (en) * | 2016-08-01 | 2017-01-04 | 上海曦途信息科技有限公司 | A kind of cruising inspection system and method for inspecting thereof |
CN206921161U (en) * | 2016-12-22 | 2018-01-23 | 河南威斯盾电子科技有限公司 | It is a kind of to include inspection management and defect processing and the intelligent inspection system of examination |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110751454A (en) * | 2019-09-19 | 2020-02-04 | 国网山东省电力公司济宁供电公司 | Cable accessory installation process control system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107610269A (en) | A kind of power network big data intelligent inspection system and its intelligent polling method based on AR | |
CN110971878A (en) | Engineering field management system | |
CN106980072A (en) | A kind of electric line operation maintenance management system | |
CN109767513A (en) | A kind of pipe network equipment inspection device and pipe network equipment method for inspecting | |
CN107798489A (en) | A kind of electric network operation site safety management method based on wechat platform | |
CN102968690A (en) | Real-time social fire safety work quality tracing system and method | |
CN108985572A (en) | A kind of region distribution net equipment breakdown repair method based on location-based service | |
CN105404968A (en) | GIS based power transmission line center management system | |
CN206849087U (en) | A kind of grid maintenance task and power failure program data processing system | |
CN108470386A (en) | A kind of cable run intelligent inspection system based on GPS and cloud platform | |
CN108389008A (en) | Power distribution network resource management system | |
CN107103407A (en) | A kind of power transmission cable based on Internet of Things installs management system | |
CN106157166A (en) | Intelligent power supply gathers service system | |
CN105184519A (en) | Standardized safety operation tracing management system | |
CN108322248A (en) | A kind of maintenance system and method based on collaboration unmanned plane safety and reliability | |
CN110009195A (en) | Thermal power plant's risk pre-control management system based on physical vlan information fusion technology | |
CN109905492A (en) | Operation safety management system and method based on distributed modular data center | |
CN104794771B (en) | One kind patrols inspection automatic planning and a device | |
CN104463050A (en) | Elevator maintenance system and method based on two-dimensional code and global positioning system | |
CN108288128A (en) | A kind of transmission line of electricity methods of risk assessment and system | |
CN104966329A (en) | System for intelligent scheduling and polling of photovoltaic power station | |
CN107506881A (en) | A kind of transformer movement method for inspecting and system | |
CN108649703A (en) | One kind is based on big data distribution O&M and breakdown repair system and operation method | |
CN106530653B (en) | Power information acquisition method | |
CN108520399A (en) | Line project onsite acceptance system and method based on cloud storage PMS2.0 platforms |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180911 |