CN108517966A CN201810258517.9A CN201810258517A CN108517966A CN 108517966 A CN108517966 A CN 108517966A CN 201810258517 A CN201810258517 A CN 201810258517A CN 108517966 A CN108517966 A CN 108517966A
Authority
CN
China
Prior art keywords
base frame
ground
frame
several
described matrix
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810258517.9A
Other languages
Chinese (zh)
Other versions
CN108517966B (en
Inventor
蔡荣华
孔德旺
任魁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Soup Spring Construction Group Co Ltd
Original Assignee
Nanjing Soup Spring Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Soup Spring Construction Group Co Ltd filed Critical Nanjing Soup Spring Construction Group Co Ltd
Priority to CN201810258517.9A priority Critical patent/CN108517966B/en
Publication of CN108517966A publication Critical patent/CN108517966A/en
Application granted granted Critical
Publication of CN108517966B publication Critical patent/CN108517966B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34315Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes

Abstract

The invention discloses one kind assembling detachable building structure and construction technique entirely, it is related to housing construction field, its key points of the technical solution are that ground includes several matrix components, described matrix component includes base frame and several clump weights for being placed on inside base frame;Spacing board is provided between the adjacent clump weight, the spacing board and base frame are detachably connected;Described matrix frame, which is located at below clump weight, offers accommodating chamber, and several stretching holes being connected to accommodating chamber are offered in described matrix frame;Lifter plate is placed in the accommodating chamber, the upper surface of the lifter plate is provided with several lifting columns along the sliding of stretching hole, and the lower face of the lifter plate is provided with the hydraulic cylinder of several synchronizations;The side of described matrix frame symmetrically offers link slot, and several fasteners are inserted in the link slot, has achieved the purpose that the recycling rate of waterused for improving ground.

Description

One kind assembling detachable building structure and construction technique entirely
Technical field
The present invention relates to a kind of housing construction fields, more specifically, it relates to which a kind of assembling detachable building entirely Structure and construction technique.
Background technology
Dismountable house is widely popularized the temporary home etc. as building site since its installation and removal is convenient.
The Chinese patent that existing Authorization Notice No. is CN104818865 discloses a kind of prefabricated buildings and construction method, It includes several house units.Several house units are stacked successively on structure foundation, then fixed structure are used to realize room The fixation in room.
But structure foundation generally uses concreting, and after by house moving position, the new installation position of one side It sets and needs to re-lay structure foundation, and the structure foundation in original installation site needs to remove.Therefore it can cause to build The waste for building object ground is unfavorable for the recycling of construction material.
Invention content
In view of the deficiencies of the prior art, the present invention intends to provide one kind assembling detachable building knot entirely Structure has the advantage for the recycling rate of waterused for improving ground.
To achieve the above object, the present invention provides following technical solutions:
One kind assembles detachable building structure entirely, including room body and the ground that is arranged below room body, the ground include Several matrix components, described matrix component include base frame and several clump weights for being placed on inside base frame;Adjacent institute State be provided between clump weight with base frame side wall spacing board disposed in parallel, the spacing board and base frame detachably connect It connects;The accommodating chamber below clump weight is offered in described matrix frame, offers several in described matrix frame and is accommodated The stretching hole of chamber connection;Lifter plate is placed in the accommodating chamber, the upper surface of the lifter plate is provided with several edges and stretches out hole The lifting column of sliding, the lower face of the lifter plate are provided with the hydraulic cylinder of several synchronizations;The side of described matrix frame is symmetrical Link slot is offered, several fasteners are inserted in the link slot, adjacent described matrix frame is by being correspondingly arranged at connection Fastener connection in slot.
By using above-mentioned technical proposal, can mutually be spliced and fixed matrix component realization ground skeleton using several Assembly and fixation, then by the larger clump weight of quality be placed on matrix component inside increase matrix component quality, from And increase the stability of ground itself.When need remove ground when, can first by the clump weight being arranged inside base frame according to Then secondary removal again releases the fastener of the adjacent base frame of fixation, so as to detach whole base frames, by ground Base is removed from former installation site.Then base frame and clump weight are transported to new installation site again, then base is installed successively Body frame simultaneously places clump weight inside it, to realize the recycling rate of waterused of ground.Pass through the recycling to ground On the one hand the speed that can accelerate construction, shortens the period of construction;On the other hand the building generated when construction can be reduced Rubbish.
Further, the spacing board is provided with fin close to the lower end of base frame, and described matrix frame offers With the sliding slot of fin cooperation.
By using above-mentioned technical proposal, the displacement of limit interval plate is capable of by the cooperation of fin and groove, is reduced Displacement of the spacing board relative to organism frame, to improve the stability of organism frame.
Further, end set of the lifting column far from lifter plate has tray, offers and puts in described matrix frame Set the groove of tray.
By using above-mentioned technical proposal, tray can increase the contact area between lifting column and clump weight, to increase Stability when clump weight having been added to rise.It is recessed by the way that tray to be placed on when clump weight to be placed on to the inside of base frame The inside of slot so that the upper surface of tray and the bottom wall of base frame flush, so that between clump weight and base frame It is fixed more to stablize.
Further, it is symmetrically arranged with hanging ring on the clump weight.
By using above-mentioned technical proposal, because clump weight is made using the larger material of density, will match Needs when picking and placeing of pouring weight facilitate the connection of loop wheel machine and clump weight by the way that hanging ring is arranged by other tools such as loop wheel machine.
Further, firm plate is provided with above whole described matrix components, offering placement on the firm plate hangs The article putting groove of ring.
By using above-mentioned technical proposal, be placed on firm plate above whole matrix components pass through it is solid with base frame It is fixed, the stability of matrix component connection is increased, to improve the stability of ground itself.By the way that hanging ring is placed on glove Reduce the gap between firm plate and clump weight in slot, to improve fixed stabilization between firm plate and matrix component Property.
Further, it is both provided with the friction pad contacted with clump weight on the side wall of described matrix frame and spacing board.
By using above-mentioned technical proposal, on the one hand the friction pad being arranged in base frame and spacing board side wall can increase Stiction greatly between clump weight and base frame increases fixed stability between clump weight and base frame;Another party There is the friction pad of certain elastic force can fill the gap between clump weight and base frame and spacing board in face, and then increase The fixed stability of clump weight.
Another goal of the invention of the present invention is that provide one kind assembling detachable building structure construction technique entirely, It has the advantage for the recycling rate of waterused for improving ground.
One kind assembling detachable building structure construction technique entirely, includes the following steps:
S1, the report of base area quality detection carry out Land leveling, are then laid with ground on the ground, and resistance to plucking anchor is on the corner arranged Bolt it is pre-buried;
S2, earth anchorage in resistance to plucking anchor bolt and is tamped so that after earth anchor supports panel to agree with ground, further according to ground Height is rational to adjust anchor nest, so that earth anchor keeps horizontal with ground;
S3, it channel steel opening upwards is fixed on to be laid in smooth structure is used as ground beam, by several angle steel by ground beam and ground Face is fixed;
S4, the wall transported to job location is lifted, and room body is placed in ground beam and is fixed with ground beam;Room body After installation is complete, flooring module is lifted and installed;
S5, handling and installation are carried out to two layers of room body module, accessory, which is separately provided, in crest table closes up, and extruded sheet is glued with adhesive tape Knot is on crest table;
S6, pediment is lifted and is installed, handling and peace then are carried out to roofing truss, ridge girder and roof boarding respectively Dress;
S7, ridge cover plate is installed and carries out partial correction and reinforcement solutions.
It is convenient by carrying out splicing after each section separate machined by house again by using above-mentioned technical proposal It the dismounting in house and builds, improves the utilization rate in house.Assembling dismountable house entirely improves housing construction simultaneously Speed;It can be in order to detecting and controlling the quality of house each section using standardized production method.
Further, in step sl, the construction procedure that ground is laid with is as follows:
Whole base frames, is then sequentially placed by S11, the quantity that required base frame is determined according to the construction requirement in house On the ground after smooth, and adjacent base frame is passed sequentially through into fastener and is fixedly connected;
S12 and then spacing board is plugged into inside base frame successively, and spacing board and base frame are fixed;
S13, start the height that the hydraulic cylinder inside base frame adjusts lifter plate so that the upper surface of lifting column and base frame Bottom wall flush;
S14 and then the inside that clump weight is placed sequentially in base frame wait for that whole clump weights is placed on the interior of base frame Firm plate is placed on to the top of base frame behind portion, and firm plate and base frame are welded and fixed.
By using above-mentioned technical proposal, applying for ground is realized by mutually splicing several cylinder block sets and fixing Work.It need to be only moved to by the clump weight taking-up being placed on inside matrix component and by organism frame when needing to remove ground new Infield.The reuse that ground is realized by the combination of organism frame and clump weight, improves the profit of building With rate.Simultaneously as clump weight and spacing board are all made of with organism frame and are detachably connected, when clump weight and spacing board damage It is convenient for changing.
In conclusion the invention has the advantages that:
1, by the way that organism frame, clump weight, spacing board and firm plate is arranged, realize ground by the combination of organism frame and clump weight The dismounting of base, to improve the recycling rate of waterused of ground;
2, by the way that accommodating chamber is arranged, stretches out hole, lifter plate, hydraulic cylinder, lifting column, tray and hanging ring, facilitate clump weight from base Body lower portion takes out.
Description of the drawings
Fig. 1 is the overall schematic for assembling detachable building structure in embodiment entirely;
Fig. 2 is the sectional view of matrix component in embodiment;
Fig. 3 is the sectional view of base frame in embodiment;
Fig. 4 is the enlarged drawing of part A in Fig. 3;
Fig. 5 is the partial view of ground in embodiment;
Fig. 6 is the enlarged drawing of part B in Fig. 5.
In figure:1, room body;2, plate is consolidated;21, article putting groove;3, matrix component;4, base frame;41, link slot;411, tight Firmware;42, hole is stretched out;43, accommodating chamber;44, groove;45, friction pad;46, sliding slot;5, clump weight;51, hanging ring;6, spacing board; 61, fin;7, lifter plate;71, hydraulic cylinder;72, lifting column;73, tray.
Specific implementation mode
Below in conjunction with attached drawing, invention is further described in detail.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, people in the art Member can as needed make the present embodiment the modification of not creative contribution after reading this specification, but as long as at this It is all protected by Patent Law in the right of invention.
Embodiment 1:
One kind assembling detachable building structure entirely, referring to Fig.1 comprising ground and the room body 1 being arranged on ground.Ground Include the matrix component 3 of several mutual assembled connections, and the top of whole matrix components 3 is connected with firm plate 2, this reality jointly Firm plate 2 and matrix component 3 in example is applied to be welded and fixed.
With reference to Fig. 2, matrix component 3 includes base frame 4 and several clump weights 5 being placed on inside base frame 4, this reality Apply the concrete block that 5 preferred density of clump weight in example is larger and is easy to get.It is inserted between adjacent clump weight 5 and matrix frame The parallel spacing board 6 of the length direction of frame 4, spacing board 6 and base frame 4 are detachably connected.
With reference to Fig. 2, the side wall that clump weight 5 is bonded with base frame 4 and spacing board 6 is bonded with friction pad 45, the present embodiment The preferably rubber pad with certain elastic force of middle friction pad 45.On the one hand it can increase between clump weight 5 and base frame 4 Stiction;On the other hand there is the friction pad 45 of certain elastic force can fill clump weight 5 and base frame 4 and spacing board 6 Between gap.
With reference to Fig. 2, spacing board 6 has fin 61 close to the end set of base frame 4, and fin 61 is along the length of spacing board 6 Direction is spent to extend.Base frame 4 offers the sliding slot 46 coordinated with fin 61, in order to which limit interval plate 6 is along its width direction Displacement, the preferred T-type in cross section of fin 61 in the present embodiment.
With reference to Fig. 2, accommodating chamber 43 is offered in base frame 4, and offers several and accommodating chamber 43 in base frame 4 and connects The stretching hole 42 of logical setting.43 internal slide of accommodating chamber is provided with lifter plate 7, the top of lifter plate 7 be welded with it is several can be with Stretch out the lifting column 72 that hole 42 is slidably connected.In order to increase the contact area between lifting column 72 and clump weight 5, lifting column 72 is remote End set from lifter plate 7 has a tray 73, and tray 73 and lifting column 72 are integrally formed in the present embodiment.In order to increase tray 73 Contact area between clump weight 5, tray 73 are arranged to inverted circular platform type.
With reference to Fig. 2, the lower face of lifter plate 7 is provided with the hydraulic cylinder 71 of several synchronizations, and whole hydraulic cylinders 71 is equal and holds The bottom wall of chamber 43 received is fixed.
With reference to Fig. 3 and Fig. 4, base frame 4 offers the groove 44 coordinate with tray 73 so that the upper surface of tray 73 with The bottom wall of base frame 4 flushes.
With reference to Fig. 5, the upper end of clump weight 5 is symmetrically arranged with hanging ring 51, and hanging ring 51 and clump weight 5 are welded and fixed.It is firm The lower end of plate 2 offers the article putting groove 21 for placing hanging ring 51.
With reference to Fig. 6, the two sides of base frame 4 symmetrically offer link slot 41, are plugged in the link slot 41 of base frame 4 There are several fasteners 411, adjacent base frame 4 to be fixedly connected by fastener 411.Fastener 411 is preferred in the present embodiment Bolt.
Operation principle is as follows:
Whole base frames 4, is then placed sequentially in by the quantity that required base frame 4 is determined according to the construction requirement in house On ground after smooth, and adjacent base frame 4 is passed sequentially through into fastener 411 and is fixedly connected.
Then spacing board 6 is plugged successively into inside base frame 4, and spacing board 6 and base frame 4 is fixed;Start Hydraulic cylinder 71 inside base frame 4 adjusts the height of lifter plate 7 so that the bottom of the upper surface and base frame 4 of lifting column 72 Wall flushes.
Then clump weight 5 is placed sequentially in the inside of base frame 4, wait for that whole clump weights 5 is placed on base frame 4 Inside after firm plate 2 is placed on to the top of base frame 4, and firm plate 2 and base frame 4 are welded and fixed.Then exist Room body 1 is built to complete the installation in house on firm plate 2.
The room body 1 built on firm plate 2 is removed first when needing the position of mobile house, then uses grinding abrasive disk Equal tools detach firm plate 2 and ground.Then the clump weight 5 being placed on inside base frame 4 is taken out using loop wheel machine.
Matrix component 3 is detached after fastener 411 between adjacent base frame 4 is backed out, then by base frame 4 New installation site is transported with clump weight 5.
Embodiment 2:
One kind assembling detachable building structure construction technique entirely, includes the following steps:
S1, the report of base area quality detection carry out Land leveling, are then laid with ground on the ground, and resistance to plucking anchor is on the corner arranged Bolt it is pre-buried;
S2, earth anchorage in resistance to plucking anchor bolt and is tamped so that after earth anchor supports panel to agree with ground, further according to ground Height is rational to adjust anchor nest, so that earth anchor keeps horizontal with ground;
S3, it channel steel opening upwards is fixed on to be laid in smooth structure is used as ground beam, by several angle steel by ground beam and ground Face is fixed;
S4, the wall transported to job location is lifted, and room body 1 is placed in ground beam and is fixed with ground beam;Room Body 1 is lifted and is installed to flooring module after installation is complete;
S5, handlings and installation are carried out to two layers of 1 module of room body, accessory, which is separately provided, in crest table closes up, and by extruded sheet adhesive tape It is bonded on crest table;
S6, pediment is lifted and is installed, handling and peace then are carried out to roofing truss, ridge girder and roof boarding respectively Dress;
S7, ridge cover plate is installed and carries out partial correction and reinforcement solutions.

Claims (8)

1. one kind assembling detachable building structure, including room body entirely(1)With setting in room body(1)The ground of lower section, it is special Sign is:The ground includes several matrix components(3), described matrix component(3)Including base frame(4)Be placed on matrix Frame(4)Internal several clump weights(5);The adjacent clump weight(5)Between be provided with and base frame(4)Side wall it is parallel The spacing board of setting(6), the spacing board(6)And base frame(4)It is detachably connected;Described matrix frame(4)Inside offer Positioned at clump weight(5)The accommodating chamber of lower section(43), described matrix frame(4)Inside offer several and accommodating chamber(43)Connection is stretched Portal(42);The accommodating chamber(43)Inside it is placed with lifter plate(7), the lifter plate(7)Upper surface be provided with several edges and stretch Portal(42)The lifting column of sliding(72), the lifter plate(7)Lower face be provided with the hydraulic cylinders of several synchronizations(71);It is described Base frame(4)Side symmetrically open up there are four link slot(41), the link slot(41)Inside it is inserted with several fasteners (411), adjacent described matrix frame(4)By being correspondingly arranged at link slot(41)Interior fastener(411)Connection.
2. the complete detachable building structure of assembly according to claim 1, it is characterised in that:The spacing board(6)It leans on Nearly base frame(4)Lower end be provided with fin(61), described matrix frame(4)It offers and fin(61)The sliding slot of cooperation (46).
3. the complete detachable building structure of assembly according to claim 1, it is characterised in that:The lifting column(72)Far From lifter plate(7)End set have tray(73), described matrix frame(4)Inside offer accommodating support block(73)Groove (44).
4. the complete detachable building structure of assembly according to claim 1, it is characterised in that:The clump weight(5)On It is symmetrically arranged with hanging ring(51).
5. the complete detachable building structure of assembly according to claim 4, it is characterised in that:Whole described matrix components (3)Top be provided with firm plate(2), the firm plate(2)On offer placement hanging ring(51)Article putting groove(21).
6. the complete detachable building structure of assembly according to claim 1, it is characterised in that:Described matrix frame(4) And spacing board(6)Side wall on be both provided with and clump weight(5)The friction pad of contact(45).
7. a kind of peace of entirely assembling detachable building structure of use according to any claim in claim 1-6 Fill construction technology, it is characterised in that:Include the following steps:
S1, the report of base area quality detection carry out Land leveling, are then laid with ground on the ground, and resistance to plucking anchor is on the corner arranged Bolt it is pre-buried;
S2, earth anchorage in resistance to plucking anchor bolt and is tamped so that after earth anchor supports panel to agree with ground, further according to ground Height is rational to adjust anchor nest, so that earth anchor keeps horizontal with ground;
S3, it channel steel opening upwards is fixed on to be laid in smooth structure is used as ground beam, by several angle steel by ground beam and ground Face is fixed;
S4, the wall transported to job location is lifted, and room body (1) is placed in ground beam and is fixed with ground beam; Room body (1) is lifted and is installed to flooring module after installation is complete;
S5, handlings and installation are carried out to two layers of room body (1) module, accessory, which is separately provided, in crest table closes up, and by extruded sheet glue Band is bonded on crest table;
S6, pediment is lifted and is installed, handling and peace then are carried out to roofing truss, ridge girder and roof boarding respectively Dress;
S7, ridge cover plate is installed and carries out partial correction and reinforcement solutions.
8. the construction technique of the complete detachable building structure of assembly according to claim 7, it is characterised in that: In step S1, the construction procedure that ground is laid with is as follows:
S11, required base frame is determined according to the construction requirement in house(4)Quantity, then by whole base frames(4)According to It is secondary be placed on it is smooth after ground on, and by adjacent base frame(4)Pass sequentially through fastener(411)It is fixedly connected;
S12 and then by spacing board(6)It is plugged successively into base frame(4)Inside, and by spacing board(6)And base frame(4)Gu It is fixed;
S13, start base frame(4)Internal hydraulic cylinder(71)Adjust lifter plate(7)Height so that lifting column(72)It is upper End face and base frame(4)Bottom wall flush;
S14 and then by clump weight(5)It is placed sequentially in base frame(4)Inside, wait for whole clump weights(5)It is placed on base Body frame(4)Inside after by firm plate(2)It is placed on base frame(4)Top, and by firm plate(2)And base frame (4)It is welded and fixed.
CN201810258517.9A 2018-03-27 2018-03-27 Fully-assembled detachable building house structure and installation and construction process Active CN108517966B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810258517.9A CN108517966B (en) 2018-03-27 2018-03-27 Fully-assembled detachable building house structure and installation and construction process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810258517.9A CN108517966B (en) 2018-03-27 2018-03-27 Fully-assembled detachable building house structure and installation and construction process

Publications (2)

Publication Number Publication Date
CN108517966A true CN108517966A (en) 2018-09-11
CN108517966B CN108517966B (en) 2020-04-07

Family

ID=63434118

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810258517.9A Active CN108517966B (en) 2018-03-27 2018-03-27 Fully-assembled detachable building house structure and installation and construction process

Country Status (1)

Country Link
CN (1) CN108517966B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113026955A (en) * 2021-03-22 2021-06-25 安宜建设集团有限公司 Assembly type building structure with stable structure and construction method thereof

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587693A (en) * 2012-03-09 2012-07-18 沈汉杰 Two-storey modular villa building and construction method thereof
CN104234070A (en) * 2014-07-23 2014-12-24 冠鲁建设股份有限公司 Steel structure and foundation pre-burying connection structure and construction method
CN204345071U (en) * 2014-12-16 2015-05-20 大连振田涂装工程有限公司 A kind of adjustable support for supporting pipeline
CN104790420A (en) * 2009-10-20 2015-07-22 Keba股份公司 Foundation system for receiving load of housing or of at least one housing module of a self-service automatic machine
CN204626644U (en) * 2015-04-07 2015-09-09 开平市翰联电力设计有限公司 10kV prepackage type power distribution room Modularization assembled structure
CN105672479A (en) * 2015-12-25 2016-06-15 黑龙江高格建材科技股份有限公司 Full-assembly detachable building structure and installation and construction technology
EP3091132A1 (en) * 2015-05-05 2016-11-09 Sitem-Pro s.r.l. Prefabricated, modular structure
CN205935217U (en) * 2016-08-22 2017-02-08 王一 Modular assembly formula building structure
US20170159283A1 (en) * 2006-10-11 2017-06-08 The Mattamy Corporation Housing manufacturing system and method
CN106939613A (en) * 2017-02-28 2017-07-11 天津大学 A kind of four rise gantry type wind power foundation structure and its construction method certainly
CN106988565A (en) * 2017-04-12 2017-07-28 郑州市卧龙游乐设备有限公司 A kind of easy-to-mount mobile swimming pool barricade
CN107100273A (en) * 2017-05-09 2017-08-29 福建国强新型环保建材有限公司 A kind of assembled integrated house and its installation method

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170159283A1 (en) * 2006-10-11 2017-06-08 The Mattamy Corporation Housing manufacturing system and method
CN104790420A (en) * 2009-10-20 2015-07-22 Keba股份公司 Foundation system for receiving load of housing or of at least one housing module of a self-service automatic machine
CN102587693A (en) * 2012-03-09 2012-07-18 沈汉杰 Two-storey modular villa building and construction method thereof
CN104234070A (en) * 2014-07-23 2014-12-24 冠鲁建设股份有限公司 Steel structure and foundation pre-burying connection structure and construction method
CN204345071U (en) * 2014-12-16 2015-05-20 大连振田涂装工程有限公司 A kind of adjustable support for supporting pipeline
CN204626644U (en) * 2015-04-07 2015-09-09 开平市翰联电力设计有限公司 10kV prepackage type power distribution room Modularization assembled structure
EP3091132A1 (en) * 2015-05-05 2016-11-09 Sitem-Pro s.r.l. Prefabricated, modular structure
CN105672479A (en) * 2015-12-25 2016-06-15 黑龙江高格建材科技股份有限公司 Full-assembly detachable building structure and installation and construction technology
CN205935217U (en) * 2016-08-22 2017-02-08 王一 Modular assembly formula building structure
CN106939613A (en) * 2017-02-28 2017-07-11 天津大学 A kind of four rise gantry type wind power foundation structure and its construction method certainly
CN106988565A (en) * 2017-04-12 2017-07-28 郑州市卧龙游乐设备有限公司 A kind of easy-to-mount mobile swimming pool barricade
CN107100273A (en) * 2017-05-09 2017-08-29 福建国强新型环保建材有限公司 A kind of assembled integrated house and its installation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113026955A (en) * 2021-03-22 2021-06-25 安宜建设集团有限公司 Assembly type building structure with stable structure and construction method thereof

Also Published As

Publication number Publication date
CN108517966B (en) 2020-04-07

Similar Documents

Publication Publication Date Title
US5246640A (en) Method of constructing a wall from pourable concrete material
CN103215894A (en) Mobile temporary prestress tension anchor block
CN108517966A (en) One kind assembling detachable building structure and construction technique entirely
CN109296117B (en) Composite hollow inner template light partition wall and construction method
US3768167A (en) Brick laying jig
US2858031A (en) Frame for tilt-up wall
AU2003288420A1 (en) Vertical alignment and levelling of modular building units
CN217761022U (en) Comprehensive operation trolley for construction of air cushion type surge chamber of hydropower station
JP3032052U (en) Construction equipment for pier reinforcement work
NL1042196B1 (en) Method for insulating a facade of a building
CN1131225A (en) Building floor form unit construction method and device
CN218264930U (en) Assembly type laminated slab joint template mounting device
CN109853746A (en) One kind can turnover container board house base steel plinth and its construction method
JP2000154595A (en) Execution method of domed construction
JP3192543B2 (en) Building demolition method
CN211736342U (en) Integral type mortar scraping and plastering template system for light partition wall
AU647783B2 (en) Improved building techniques
JPH09296610A (en) Outside curing unit
JP2020176449A (en) Form system and method of constructing concrete structure using the same
SU973766A1 (en) Method of assembling rafter shapes and jig for performing same
JP2000257266A (en) Building skeleton constructing method
JPS5925061B2 (en) On-site installation method for large tiles and formwork panels for on-site installation
JPH09195519A (en) Prefabricated frame for pier reinforcing work, and its usage
JPH08105060A (en) Exposed concrete foundation of building and the like
JP2520037B2 (en) How to build a seismic isolated building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A fully assembled detachable building structure and its installation and construction technology

Effective date of registration: 20211116

Granted publication date: 20200407

Pledgee: Jiangsu Zijin Rural Commercial Bank Co.,Ltd. Jiangbei New Area Branch

Pledgor: NANJING TANGQUAN CONSTRUCTION GROUP CO.,LTD.

Registration number: Y2021320000332

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220803

Granted publication date: 20200407

Pledgee: Jiangsu Zijin Rural Commercial Bank Co.,Ltd. Jiangbei New Area Branch

Pledgor: NANJING TANGQUAN CONSTRUCTION GROUP CO.,LTD.

Registration number: Y2021320000332

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A fully assembled detachable building house structure and installation construction technology

Effective date of registration: 20220805

Granted publication date: 20200407

Pledgee: Jiangsu Zijin Rural Commercial Bank Co., Ltd. Pukou Sub-branch

Pledgor: NANJING TANGQUAN CONSTRUCTION GROUP CO.,LTD.

Registration number: Y2022320000436

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230726

Granted publication date: 20200407

Pledgee: Jiangsu Zijin Rural Commercial Bank Co.,Ltd. Pukou Sub branch

Pledgor: NANJING TANGQUAN CONSTRUCTION GROUP CO.,LTD.

Registration number: Y2022320000436

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A fully assembled and detachable building structure and installation construction process

Effective date of registration: 20230731

Granted publication date: 20200407

Pledgee: Jiangsu Zijin Rural Commercial Bank Co.,Ltd. Pukou Sub branch

Pledgor: NANJING TANGQUAN CONSTRUCTION GROUP CO.,LTD.

Registration number: Y2023980050170

PE01 Entry into force of the registration of the contract for pledge of patent right