CN108517901A - Double casing structures for test pile - Google Patents

Double casing structures for test pile Download PDF

Info

Publication number
CN108517901A
CN108517901A CN201810245639.4A CN201810245639A CN108517901A CN 108517901 A CN108517901 A CN 108517901A CN 201810245639 A CN201810245639 A CN 201810245639A CN 108517901 A CN108517901 A CN 108517901A
Authority
CN
China
Prior art keywords
casing
outer casing
interior
water filling
test pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810245639.4A
Other languages
Chinese (zh)
Inventor
李超
唐雪云
崔炳辰
雷斌
王荣发
杨静
许国兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Gongkan Geotechnical Group Co Ltd
Original Assignee
Shenzhen Gongkan Geotechnical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Gongkan Geotechnical Group Co Ltd filed Critical Shenzhen Gongkan Geotechnical Group Co Ltd
Priority to CN201810245639.4A priority Critical patent/CN108517901A/en
Publication of CN108517901A publication Critical patent/CN108517901A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures

Abstract

The present invention relates to the technical fields of ground dead load test pile, disclose double casing structures for test pile, including outer casing, the interior casing of the inside for being placed in outer casing and multiple for outer casing and the relatively-stationary fixed link of interior casing, interior casing has glade plane space with outer casing;Outer casing is equipped with water filling port, and water filling port is connected to glade plane space, and outer casing is equipped with the waterstop for preventing the water filling of water filling port institute from flowing out glade plane space;When inside outer casing and interior casing insertion foundation pit, outer casing and soil layer contact, interior casing is contacted with pile body, and when cutting off multiple fixed links, outer casing can opposite sliding with interior casing.By water filling port water filling, noted water filling is made to enter in glade plane space, greatly reduces the resistance between outer casing and interior casing;After test pile completion reaches age, fixed link is cut off so that outer casing can be free to slide with interior casing, and the side friction of empty pile cutoff has thoroughly been isolated, and is effectively ensured and collects true, reliable, effective detection data.

Description

Double casing structures for test pile
Technical field
The present invention relates to the technical fields of ground dead load test pile, more particularly to are used for double casing structures of test pile.
Background technology
With urban construction fast development, high-rise building is more and more, and building foundation engineering stake stress is increasing, Accurately to calculate bearing capacity of pile foundation, before foundation engineering pile driving construction carry out pile foundation static load test pile become increasingly it is necessary to.
But as the depth of deep-foundation pit engineering increases, engineering pile dead load test pile is also got in the difficulty of foundation pit bottom application work Come bigger;When especially deep basal pit is supported using multiple tracks concrete when structure, the dead load of engineering pile can not be implemented at foundation pit bottom at all Experiment.
In the prior art, the foundation engineering of generally deeper and larger foundation pit carries out drill-pouring static load test for pile and exists It is carried out on ground, the bearing capacity of pile foundation is made of bearing capacity of pile tip and two part of pile side friction, due to implementing static load on ground Lotus is tested, and the pile side friction on deep pit digging section stratum is contained in test result, can not really reflect foundation pit bottom engineering pile Bearing capacity actual conditions.
Invention content
The purpose of the present invention is to provide double casing structures for test pile, it is intended to which bored concrete pile is implemented in solution in the prior art Static load test, the problem of test result inaccuracy.
The invention is realized in this way double casing structures for test pile, including outer casing, be placed in the outer casing The interior casing in portion and multiple for the outer casing and the interior relatively-stationary fixed link of casing, the interior casing with it is described Outer casing has glade plane space;Outer casing is equipped with water filling port, and the water filling port is connected to the glade plane space, and the outer casing is equipped with For preventing water filling port institute water filling from flowing out the waterstop of the glade plane space;When the outer casing and the interior casing are embedding When entering inside foundation pit, the outer casing and soil layer contact, the interior casing are contacted with pile body, when cutting off multiple fixed links When, the outer casing and the interior casing can be relative to slidings.
When further, inside the outer casing and interior casing insertion foundation pit, the outer casing and described Interior casing is above the ground level.
When further, inside the outer casing and the interior casing insertion foundation pit, the water filling port is placed in described The top of waterstop.
Further, multiple fixed links are set to the top of the outer casing, and multiple fixed link interlaced arrangements.
Further, multiple fixed links use rigid connection with the oversheath and the interior casing, each described Rigid connection is used between fixed link.
Further, the waterstop is annularly arranged around the interior casing, and described in the waterstop contradicts respectively Interior casing and the outer casing.
Further, along the length direction of the outer casing, the glade plane space is equipped with multiple sequentially spaced apart rings Shape floor.
Compared with prior art, provided by the present invention for double casing structures of test pile, by water filling port water filling, make to be noted Water filling enter in glade plane space, greatly reduce the resistance between outer casing and interior casing;It, will after test pile completion reaches age Fixed link is cut off so that outer casing can be free to slide with interior casing, due in outer casing and interior casing insertion foundation pit Behind portion, outer casing and soil layer contact, interior casing are contacted with pile body, the side friction of empty pile cutoff have thoroughly been isolated, in this way, trying When the static load or resistance to plucking of stake detect, it is effectively ensured and collects true, reliable, effective detection data;Greatly improve test pile Construction and detection keep the data of test pile experiment acquisition truer, more intuitive, more reliable, have to the limitation of place space requirement Effect is that follow-up Pile Foundations Design provides foundation.
Description of the drawings
Fig. 1 is the stereoscopic schematic diagram on the top of the casing of double casing structures provided in an embodiment of the present invention for test pile;
Fig. 2 is the stereoscopic schematic diagram of the bottom end of the casing of double casing structures provided in an embodiment of the present invention for test pile.
Specific implementation mode
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
The same or similar label correspond to the same or similar components in the attached drawing of the present embodiment;In description of the invention In, it is to be understood that if there is the orientation or positional relationship of the instructions such as term "upper", "lower", "left", "right" for based on attached drawing institute The orientation or positional relationship shown, is merely for convenience of description of the present invention and simplification of the description, and does not indicate or imply the indicated dress It sets or element must have a particular orientation, with specific azimuth configuration and operation, therefore the use of position relationship described in attached drawing Language only for illustration, should not be understood as the limitation to this patent, for the ordinary skill in the art, can be with The concrete meaning of above-mentioned term is understood as the case may be.
The realization of the present invention is described in detail below in conjunction with specific embodiment.
Referring to Fig.1 shown in -2, preferred embodiment is provided for the present invention.
For double casing structures of test pile, implement perfusion static load test for pile for solving, test result is inaccurate to ask Topic.
It is set for double casing structures of test pile, including outer casing 10, interior casing 20 and multiple fixed links 40, interior casing 20 In the inside of outer casing 10, multiple fixed links 40 are relatively fixed for outer casing 10 with interior casing 20, interior casing 20 and outer casing 10 have glade plane space.
Outer casing 10 is equipped with water filling port 50, and water filling port 50 is connected to glade plane space and can be injected water by 50 water filling of water filling port Glade plane space;Outer casing 10 is equipped with waterstop 30, and waterstop 30 is for preventing 50 water filling outflow glade plane spaces of water filling port so that The water that water filling port 50 is noted is in glade plane space;When outer casing 10 and interior casing 20 are embedded in inside foundation pit, outer casing 10 It is contacted with soil layer, interior casing 20 is contacted with pile body, and when cutting off multiple fixed links 40, outer casing 10 and interior casing 20 can be opposite In sliding.
Above-mentioned double casing structures for test pile make noted water filling enter glade plane space by 50 water filling of water filling port In, greatly reduce the resistance between outer casing 10 and interior casing 20;After test pile completion reaches age, fixed link 40 is cut It removing so that outer casing 10 can be free to slide with interior casing 20, after outer casing 10 and the insertion foundation pit of interior casing 20 inside, Outer casing 10 and soil layer contact, interior casing 20 are contacted with pile body, the side friction of empty pile cutoff have thoroughly been isolated, in this way, trying When the static load or resistance to plucking of stake detect, it is effectively ensured and collects true, reliable, effective detection data;Greatly improve test pile Construction and detection keep the data of test pile experiment acquisition truer, more intuitive, more reliable, have to the limitation of place space requirement Effect is that follow-up Pile Foundations Design provides foundation.
In the present embodiment, when inside outer casing 10 and the insertion foundation pit of interior casing 20, outer casing 10 and interior casing 20 It is above the ground level;In this way, when externally casing 10 and interior casing 20 are fixed, effectively avoid for fixed outer casing 10 and interior The cement mortar of casing 20 enters glade plane space and enters the inside of outer casing 10 and interior casing 20;In addition, being arranged so just In the insertion and recycling of outer casing 10 and interior casing 20.
When outer casing 10 and interior casing 20 are embedded in inside foundation pit, water filling port 50 is placed in the top of waterstop 30;It is convenient for Water filling is carried out to glade plane space, while ensureing that noted water is in glade plane space.
Furthermore water filling port 50 is in the top of outer casing 10 and interior casing 20, in this way, convenient for being noted to glade plane space Water, while increasing the water filling range of glade plane space, ensure flood effectiveness.
Outer casing 10 and interior casing 20 form double casings, and when inside double casings insertion foundation pit, the top of double casings is high In ground, and the top of double casings has away from the upper surface of foundation pit, and water filling port 50 is located at the upper surface of double casings, in this way, Water filling is carried out to glade plane space convenient for passing through water filling port 50.
Double casings are made by 12mm steel plates, wherein a diameter of d1 (d1=test pile diameters+50mm) of interior casing 20, The length L1=sky pile cutoff length+300mm+500mm of interior casing 20;A diameter of d2 (d2=d1+100mm) of outer casing 10, outside The length L2=L1-500mm of casing 10.
In addition, water filling port 50 is equipped with diversion section, diversion section along extending upward away from foundation pit direction, in this way, when carrying out water filling When, external water injection pipe is attached in diversion section, is convenient for water filling.
Specifically, multiple fixed links 40 are set to the top of outer casing 10, it is convenient for subsequently carrying out multiple fixed links 40 in this way It cuts off;40 interlaced arrangement of multiple fixed links, in this way, when outer casing 10 and interior casing 20 are transported through, bury, in fixed link Under 40 effects, enhance the relative securement of outer casing 10 and interior casing 20.
Multiple fixed links 40 use rigid connection with oversheath and interior casing 20, are connected using hardness between each fixed link 40 It connects;The advantages of this arrangement are as follows effectively ensureing the fixed function of fixed link 40, to ensure outer casing 10 and interior casing 20 Relative securement.
The top of outer casing 10 is equipped with fixed link 40, and the top of interior casing 20 is equipped with fixed link 40, the fixation of outer casing 10 The fixed link 40 of bar 40 and interior casing 20 is interlocked rigid connection, being relatively fixed for outer casing 10 and interior casing 20 is realized, by cutting Except casing 10 fixed link 40 and interior casing 20 fixed link 40, realize that outer casing 10 is opposite with interior casing 20 and slide.
Specifically, waterstop 30 is around the arrangement annular in shape of interior casing 20, also, waterstop 30 contradicts respectively interior casing 20 with And outer casing 10;In this way, along the circumferencial direction of interior casing 20, waterstop 30 can effectively seal the water in glade plane space It is stifled, prevent water from flowing out glade plane space.
Above-mentioned glade plane space is formed along the circumference of interior casing 20, in this way, carrying out water filling, the water noted by water filling port 50 The resistance that outer casing 10 and interior casing 20 can be reduced to the greatest extent collects true, reliable, effective inspection to be effectively ensured Measured data.
In the present embodiment, along the length direction of outer casing 10, glade plane space is equipped with multiple annular plates sequentially arranged, more It is arranged one every 5 meters among a annular plate;Under the action of annular plate, the outer casing 10 of effective reinforcing plate and interior shield The rigidity of cylinder 20, to improve the service life of outer casing 10 and interior casing 20.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention All any modification, equivalent and improvement etc., should all be included in the protection scope of the present invention made by within refreshing and principle.

Claims (7)

1. double casing structures for test pile, which is characterized in that the interior casing including outer casing, the inside for being placed in the outer casing And it is multiple for the outer casing and the interior relatively-stationary fixed link of casing, the interior casing has with the outer casing Glade plane space;Outer casing is equipped with water filling port, and the water filling port is connected to the glade plane space, and the outer casing is equipped with for preventing State the waterstop that the glade plane space is flowed out in the water filling of water filling port institute;Inside the outer casing and the interior casing insertion foundation pit When, the outer casing and soil layer contact, and the interior casing is contacted with pile body, when cutting off multiple fixed links, the outer shield Cylinder and the interior casing can be relative to slidings.
2. being used for double casing structures of test pile as described in claim 1, which is characterized in that when the outer casing and described interior When casing is embedded in inside foundation pit, the outer casing and the interior casing are above the ground level.
3. being used for double casing structures of test pile as described in claim 1, which is characterized in that when the outer casing and described interior When casing is embedded in inside foundation pit, the water filling port is placed in the top of the waterstop.
4. double casing structures for test pile as described in claim 1-3 any one, which is characterized in that multiple fixations Bar is set to the top of the outer casing, and multiple interlaced arrangements of the fixed link.
5. double casing structures for test pile as described in claim 1-3 any one, which is characterized in that multiple fixations Bar uses rigid connection with the oversheath and the interior casing, and rigid connection is used between each fixed link.
6. double casing structures for test pile as described in claim 1-3 any one, which is characterized in that the sealing band It is annularly arranged around the interior casing, and the waterstop contradicts the interior casing and the outer casing respectively.
7. double casing structures for test pile as described in claim 1-3 any one, which is characterized in that along the outer casing Length direction, the glade plane space be equipped with multiple sequentially spaced apart annular plates.
CN201810245639.4A 2018-03-23 2018-03-23 Double casing structures for test pile Pending CN108517901A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810245639.4A CN108517901A (en) 2018-03-23 2018-03-23 Double casing structures for test pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810245639.4A CN108517901A (en) 2018-03-23 2018-03-23 Double casing structures for test pile

Publications (1)

Publication Number Publication Date
CN108517901A true CN108517901A (en) 2018-09-11

Family

ID=63432956

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810245639.4A Pending CN108517901A (en) 2018-03-23 2018-03-23 Double casing structures for test pile

Country Status (1)

Country Link
CN (1) CN108517901A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112459141A (en) * 2020-12-01 2021-03-09 武汉建工集团股份有限公司 Uplift pile uplift resistance detection method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106065622A (en) * 2016-07-19 2016-11-02 中建局集团建设发展有限公司 The double sleeve of the efficient drag reduction of pullout tests stake and pullout tests stake drag reduction method

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106065622A (en) * 2016-07-19 2016-11-02 中建局集团建设发展有限公司 The double sleeve of the efficient drag reduction of pullout tests stake and pullout tests stake drag reduction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112459141A (en) * 2020-12-01 2021-03-09 武汉建工集团股份有限公司 Uplift pile uplift resistance detection method

Similar Documents

Publication Publication Date Title
Wu et al. Soil-tunnel interaction modelling for shield tunnels considering shearing dislocation in longitudinal joints
CN107460882B (en) A kind of retaining piles construction method of deep basal pit closing sealing
CN108411920A (en) A kind of the multiple spot bellows grouting device and its method of control soil deformation
CN107386274A (en) Wear the compound isolation pile and its reinforced construction method of bridge pier in tunnel side
CN202689031U (en) Deep foundation pit retaining and protecting retaining wall
Jiang et al. Case study of the largest concrete earth pressure balance pipe-jacking project in the world
CN110258658A (en) The leakage anticipation of diaphram wall and the construction method of processing
JP2012082676A (en) Displacement controlling method
CN106948390A (en) The double casing structures detected for test pile
CN108517901A (en) Double casing structures for test pile
CN108425383A (en) The construction method of side friction is isolated in test pile
CN110159866B (en) Construction method for reinforcing and reinforcing buried steel pipe
CN108517900A (en) A kind of anti-corrosion method of saline soil area transmission line of electricity bored concrete pile foundation
CN201933516U (en) Double-layer steel sleeve for drilled pile static load test
CN207109805U (en) Wear the compound isolation pile of bridge pier in a kind of tunnel side
CN105780780A (en) Pile-wall combination supporting structure
CN103174169A (en) Cast-in-place H-shaped reinforced concrete and cement soil alternative underground continuous wall and construction method thereof
CN207143929U (en) A kind of Dragsaw type steel-pipe pile
CN103174168A (en) Cast-in-place H-shaped reinforced concrete and cement soil alternative underground continuous wall and construction method thereof
CN105155578B (en) Complicated geological and environment access subway existing support system construction method
CN108205055A (en) Ground Deformation for Shallow Tunnel pilot system under a kind of operation highway
JPH11209998A (en) Impermeable construction method of underground structure by self-standing type double impermeable walls
CN102296618A (en) Sleeve with anchor rod penetrating through diaphragm wall
CN102797483A (en) Pile casing and water-rich strata shield pile casing receiving method
CN104343136B (en) Water-impervious construction method at cut and cover method and cap excavation method diaphram wall interface

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180911