CN108517820A - A kind of novel bridge equipment - Google Patents
A kind of novel bridge equipment Download PDFInfo
- Publication number
- CN108517820A CN108517820A CN201810313411.4A CN201810313411A CN108517820A CN 108517820 A CN108517820 A CN 108517820A CN 201810313411 A CN201810313411 A CN 201810313411A CN 108517820 A CN108517820 A CN 108517820A
- Authority
- CN
- China
- Prior art keywords
- motor
- tank
- assembly fixture
- bull stick
- fixedly connected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01H—STREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; DISPERSING OR PREVENTING FOG IN GENERAL CLEANING STREET OR RAILWAY FURNITURE OR TUNNEL WALLS
- E01H1/00—Removing undesirable matter from roads or like surfaces, with or without moistening of the surface
- E01H1/02—Brushing apparatus, e.g. with auxiliary instruments for mechanically loosening dirt
- E01H1/05—Brushing apparatus, e.g. with auxiliary instruments for mechanically loosening dirt with driven brushes
- E01H1/053—Brushing apparatus, e.g. with auxiliary instruments for mechanically loosening dirt with driven brushes having vertical axes
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses a kind of novel bridge equipment, including cabinet and it is arranged in the cabinet inside and the first tank of beginning to the right, the first assembly fixture is equipped in first tank, equipped with the second tank that the beginning is downward in first assembly fixture, activity is connected with that the beginning is downward and pre-and post perforative second assembly fixture in second tank, and third tank is equipped in second assembly fixture.
Description
Technical field
The present invention relates to bridge technology field, specifically a kind of novel bridge equipment.
Background technology
It is often required to carry out clean operation, the bridge pavement cleaning device in tradition to bridge pavement in bridge daily maintenance
It needs excessive human input to operate, and cannot achieve autonomous storage under without using state, working efficiency is low and labour is strong
Degree is big, there are larger drawback, needs to improve.
Invention content
Technical problem to be solved by the invention is to provide a kind of novel bridge equipment, can solve above-mentioned present technology
The problems in.
The present invention is achieved through the following technical solutions:The present invention a kind of novel bridge equipment, including cabinet with
And be arranged in the cabinet inside and the first tank of beginning to the right, it is equipped with the first assembly fixture in first tank, described the
Equipped with the second tank that the beginning is downward in one assembly fixture, in second tank activity it is downward and front and back pass through to be connected with the beginning
The second assembly fixture worn, second assembly fixture is interior to be equipped with third tank, and the first tank left end inner wall is equipped with front and back phase
The projection answered is rotatably assorted in the projection and is connected with front and back the first bull stick to stretch, is fixedly connected on first bull stick
The first taper wheel between two projections, is equipped with first motor in the first tank left end inner wall, and described first
Be connected by power has the second taper wheel being connected with the first taper wheel, first bull stick front and back end tail to fix on motor
It is connected with mutually corresponding third taper wheel, left and right is equipped in first tank and is stretched and front and back corresponding second bull stick, it is described
Second bull stick left and right ends are rotatably connected by bearing and the cabinet, the second bull stick left end be fixedly connected with
The 4th taper wheel that the third taper wheel is connected, be connected on second bull stick it is front and back corresponding and with it is described
The first joint plate and the second joint plate that first assembly fixture is fixedly connected, the second tank top inner wall is interior to be equipped with the second electricity
Machine, the second motor outside are equipped with slowing device, and the slowing device includes slowing down plate and heat absorption thin slice, second motor
Bottom end be connected by power has the stud for stretching and running through downwards second assembly fixture, and it is corresponding to be equipped with left and right in the third tank
Turbine is fixedly connected with the third bull stick to stretch up and down in the turbine, and third bull stick upper end is rotatably pacified by bearing
In second assembly fixture, third bull stick lower end end tail, which is fixedly connected with, cleans wheel with water, is equipped in the third tank
Left and right stretches and positioned at the worm screw of the turbine rear end, the worm screw left and right ends may be rotatably mounted at described second by bearing
In assembly fixture, the 5th taper wheel being fixedly connected on the worm screw between two turbines, after second tank
It holds and is equipped with third motor in inner wall, third motor front end be connected by power has can be connected with the 5th taper wheel the
Six taper wheels.
Preferably technical solution, the cabinet bottom end are equipped with the 4th tank, left and right phase are equipped in the 4th tank
It answers and front and back the 4th bull stick to stretch, front and back corresponding movable pulley, left and right corresponding two is fixedly connected on the 4th bull stick
It is connected with crawler belt between a movable pulley.
Preferably technical solution, the turbine are engaged with the worm screw.
Preferably technical solution, the stud are connected with second assembly fixture.
Preferably technical solution, the plate that slows down are arranged in the top and bottom of second motor and with described
Two motors are fixedly connected, and the heat absorption thin slice is arranged in front-end and back-end of second motor and outer with second motor
Shell is fixedly connected, and the top and bottom of the heat absorption thin slice are fixedly connected with the plate that slows down, the front end of second motor
The heat absorption thin slice of two panels or more is respectively equipped with rear end.
The beneficial effects of the invention are as follows:When being in original state due to the equipment of the present invention, first assembly fixture is located at
The first tank left end and left end surface is in contact with the projection, second assembly fixture are located at the top of second tank
And top end surface is contacted with first assembly fixture.
In use, starting the first motor first drives second bar rotation, make first assembly fixture to the right
It is mobile, it when second joint plate is in contact with the cabinet, controls the third motor and shuts down, at this point, starting institute
It states the second motor and drives stud rotation, make the second assembly fixture slide downward, when second assembly fixture bottom and described the
When one assembly fixture contacts, the 5th taper wheel and the 6th taper wheel are at a fully engaged, and control first motor stops operating, this
When, start and clean wheel rotation with water described in the third motor drive, to realize the Rapid Cleaning to bridge pavement.
After use, the third motor stalls are controlled, starts second motor and drives the stud rotation,
Make the second assembly fixture upward sliding, when the second assembly fixture top end surface is contacted with first assembly fixture, control
Second motor stalls make first assembly at this point, starting the first motor drives second bar rotation
Frame is moved to the left, and when the first assembly fixture left part end face is contacted with the projection, controls the third motor stalls,
To realize the quick storage of first assembly fixture.
The device structure of the present invention is simple, easy to operate, by using starting and storing integrated setting, can greatly reduce
Labor intensity improves bridge inspection and maintenance efficiency.
Description of the drawings
The present invention is described in detail by following specific embodiment and attached drawing for ease of explanation,.
Overall structure diagram when Fig. 1 is a kind of novel bridge equipment non-operation of the present invention;
Fig. 2 is the sectional view in the directions A-A in Fig. 1;
Overall structure diagram when Fig. 3 is a kind of novel bridge equipment operation of the present invention;
Fig. 4 is the external structure schematic diagram of the second motor in the present invention.
Specific implementation mode
As Figure 1-Figure 4, a kind of novel bridge equipment of the invention, including cabinet 100 and setting are in the cabinet
100 inside and the first tank 111 of beginning to the right, first tank 111 is interior to be equipped with the first assembly fixture 101, first dress
With in frame 101 equipped with the second tank 112 that the beginning is downward, in second tank 112 activity be connected with the beginning downwards and
Pre-and post perforative second assembly fixture 102, second assembly fixture 102 is interior to be equipped with third tank 113, and first tank 111 is left
It holds inner wall to be equipped with front and back corresponding projection 103, is rotatably assorted in the projection 103 and is connected with front and back the first bull stick to stretch
155, the first taper wheel 145 being fixedly connected on first bull stick 155 between two projections 103, described
First motor 123 is equipped in one tank, 111 left end inner wall, there is and first taper be connected by power in the first motor 123
The second taper wheel 144 that wheel 145 is connected, first bull stick, 155 front and back end tail are fixedly connected with mutually corresponding third cone
Cincture 143 is equipped with left and right in first tank 111 and stretches and front and back corresponding second bull stick 156, second bull stick 156
Left and right ends are rotatably connected by bearing and the cabinet 100, the second bull stick left end be fixedly connected with it is described
The 4th taper wheel 142 that third taper wheel 143 is connected, be connected on second bull stick 156 it is front and back corresponding and
The first joint plate 211 and the second joint plate 212 being fixedly connected with first assembly fixture 101, second tank, 112 top
The second motor 121 is equipped in inner wall, second motor, 121 outside is equipped with slowing device, and the slowing device includes slowing down plate
1214 have downward stretches and through second assembly fixture with heat absorption thin slice 1215, second motor, 121 bottom end be connected by power
102 stud 153, the third tank 113 is interior to be equipped with the corresponding turbine 131 in left and right, is fixedly connected in the turbine 131
Under the third bull stick 151 that stretches, 151 upper end of third bull stick may be rotatably mounted at second assembly fixture 102 by bearing
Interior, 151 lower end end tail of the third bull stick, which is fixedly connected with, cleans wheel 161 with water, and left and right is equipped in the third tank and is stretched and position
Worm screw 152 in the turbine rear end, 152 left and right ends of the worm screw may be rotatably mounted at second assembly fixture by bearing
In 102, the 5th taper wheel 141 being fixedly connected on the worm screw 152 between two turbines 131, described second
Third motor 122 is equipped in 112 rear end inner wall of tank, 122 front end be connected by power of the third motor has can be with the 5th cone
The 6th taper wheel 146 that cincture 141 is connected.
Valuably, 100 bottom end of the cabinet is equipped with the 4th tank 114, be equipped in the 4th tank 114 left and right it is corresponding and
Front and back the 4th bull stick 154 to stretch, front and back corresponding movable pulley 104 is fixedly connected on the 4th bull stick 154, and left and right is corresponding
Two movable pulleys 104 between be connected with crawler belt 162.
Valuably, the turbine 131 is engaged with the worm screw 152.
Valuably, the stud 153 is connected with second assembly fixture 102.
Valuably, it is described slow down plate 1214 be arranged the top and bottom of second motor 121 and with it is described second electricity
Machine 121 is fixedly connected, the heat absorption thin slice 1215 be arranged the front-end and back-end of second motor 121 and with it is described second electricity
The shell of machine 121 is fixedly connected, and the top and bottom of the heat absorption thin slice 1215 are fixedly connected with the plate 1214 that slows down, institute
The front-end and back-end for stating the second motor 121 are respectively equipped with the heat absorption thin slice 1215 of two panels or more, the heat absorption thin slice 1215
It is described to slow down plate 1214 to reduce described second to absorb and distribute the heat generated when second motor 121 is run
The shaking force that motor 121 generates at runtime prevents shaking force excessive and influences the normal operation of the present apparatus.
When the equipment of the present invention is in original state, first assembly fixture 101 is located at 111 left end of the first tank
And left end surface is in contact with the projection 103, second assembly fixture 102 is located at second tank, 112 top and top
End face is contacted with first assembly fixture 101.
It drives second bull stick 156 to rotate in use, starting the first motor 123 first, makes first assembly
Frame 101 moves right, and when second joint plate 212 is in contact with the cabinet 100, controls the first motor 123 and stops
It only operates, drives stud 153 to rotate at this point, starting second motor 121, make 102 slide downward of the second assembly fixture, when
When second assembly fixture, 102 bottom is contacted with first assembly fixture 101, the 5th taper wheel 141 is bored with the described 6th
Cincture 146 is at a fully engaged, and the second motor 121 of control stops operating, at this point, starting the third motor 122 drives described clean with water
161 rotation of wheel, to realize the Rapid Cleaning to bridge pavement.
It after use, controls the third motor 22 and stops operating, start second motor 121 and drive the stud
153 rotations, make 102 upward sliding of the second assembly fixture, when 102 top end surface of the second assembly fixture and described first are assembled
When frame 101 contacts, controls second motor 121 and stop operating, at this point, starting the first motor 123 drives described second
Bull stick 156 rotates, and so that first assembly fixture 101 is moved to the left, when first assembly fixture, 101 left part end face and the projection
When 103 contact, controls the third motor 123 and stop operating, to realize the quick storage of first assembly fixture 101.
The beneficial effects of the invention are as follows:
When being in original state due to the equipment of the present invention, first assembly fixture is located at the first tank left end and left end table
Face is in contact with the projection, and second assembly fixture is located at the top of second tank and top end surface is assembled with described first
Bridge joint touches.
In use, starting the first motor first drives second bar rotation, make first assembly fixture to the right
It is mobile, it when second joint plate is in contact with the cabinet, controls the third motor and shuts down, at this point, starting institute
It states the second motor and drives stud rotation, make the second assembly fixture slide downward, when second assembly fixture bottom and described the
When one assembly fixture contacts, the 5th taper wheel and the 6th taper wheel are at a fully engaged, and control first motor stops operating, this
When, start and clean wheel rotation with water described in the third motor drive, to realize the Rapid Cleaning to bridge pavement.
After use, the third motor stalls are controlled, starts second motor and drives the stud rotation,
Make the second assembly fixture upward sliding, when the second assembly fixture top end surface is contacted with first assembly fixture, control
Second motor stalls make first assembly at this point, starting the first motor drives second bar rotation
Frame is moved to the left, and when the first assembly fixture left part end face is contacted with the projection, controls the third motor stalls,
To realize the quick storage of first assembly fixture.
The device structure of the present invention is simple, easy to operate, by using starting and storing integrated setting, can greatly reduce
Labor intensity improves bridge inspection and maintenance efficiency.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any
The change or replacement expected without creative work, should be covered by the protection scope of the present invention.Therefore, of the invention
Protection domain should be determined by the scope of protection defined in the claims.
Claims (5)
1. a kind of novel bridge equipment, including cabinet and it is arranged in the cabinet inside and the first tank of beginning to the right, institute
It states and is equipped with the first assembly fixture in the first tank, hold equipped with the second tank that the beginning is downward, described second in first assembly fixture
Activity is connected with that the beginning is downward and pre-and post perforative second assembly fixture in slot, and being equipped with third in second assembly fixture holds
Slot, the first tank left end inner wall are equipped with front and back corresponding projection, are rotatably assorted in the projection and are connected with front and back stretch
The first bull stick, the first taper wheel being fixedly connected on first bull stick between two projections, described first
It is equipped with first motor in tank left end inner wall, be connected by power has in the first motor is connected with the first taper wheel
Second taper wheel, first bull stick front and back end tail are fixedly connected with mutually corresponding third taper wheel, are set in first tank
There is left and right to stretch and front and back corresponding second bull stick, second bull stick left and right ends are rotatably matched by bearing and the cabinet
Connection is closed, the second bull stick left end is fixedly connected with the 4th taper wheel being connected with the third taper wheel, and described the
It is connected with front and back corresponding on two bull sticks and is engaged with the first joint plate and second that first assembly fixture is fixedly connected
Plate, the second tank top inner wall is interior to be equipped with the second motor, and slowing device is equipped on the outside of second motor, described to slow down dress
It sets including slowing down plate and heat absorption thin slice, second motor bottom end be connected by power, which has, to stretch downwards and run through second assembly fixture
Stud, the corresponding turbine in left and right is equipped in the third tank, the third to stretch up and down is fixedly connected in the turbine and is turned
Bar, third bull stick upper end may be rotatably mounted at by bearing in second assembly fixture, third bull stick lower end end tail
It is fixedly connected with and cleans wheel with water, left and right is equipped in the third tank and is stretched and positioned at the worm screw of the turbine rear end, the worm screw
Left and right ends may be rotatably mounted at by bearing in second assembly fixture, is fixedly connected on the worm screw positioned at described in two
The 5th taper wheel between turbine, second tank rear end inner wall is interior to be equipped with third motor, third motor front end power
It is connected with the 6th taper wheel that can be connected with the 5th taper wheel.
2. a kind of novel bridge equipment according to claim 1, it is characterised in that:The cabinet bottom end is equipped with the 4th and holds
Slot, is equipped with that left and right is corresponding and front and back the 4th bull stick to stretch in the 4th tank, before being fixedly connected on the 4th bull stick
Corresponding movable pulley afterwards is connected with crawler belt between corresponding two movable pulleys in left and right.
3. a kind of novel bridge equipment according to claim 1, it is characterised in that:The turbine is engaged with the worm screw.
4. a kind of novel bridge equipment according to claim 1, it is characterised in that:The stud and second assembly fixture
It is connected.
5. a kind of novel bridge equipment according to claim 1, it is characterised in that:The plate that slows down is arranged described second
It the top and bottom of motor and is fixedly connected with second motor, the heat absorption thin slice is arranged in the front end of second motor
It is fixedly connected with rear end and with the shell of second motor, the top and bottom of the heat absorption thin slice are consolidated with the plate that slows down
Fixed connection, the front-end and back-end of second motor are respectively equipped with the heat absorption thin slice of two panels or more.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810313411.4A CN108517820A (en) | 2018-04-10 | 2018-04-10 | A kind of novel bridge equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810313411.4A CN108517820A (en) | 2018-04-10 | 2018-04-10 | A kind of novel bridge equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108517820A true CN108517820A (en) | 2018-09-11 |
Family
ID=63432291
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810313411.4A Withdrawn CN108517820A (en) | 2018-04-10 | 2018-04-10 | A kind of novel bridge equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108517820A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19547104C2 (en) * | 1995-12-16 | 1998-04-09 | Marita Kirschner | Sweeper with a dirt hopper |
CN107097302A (en) * | 2017-05-29 | 2017-08-29 | 何纪全 | A kind of building decorative plates perforating device |
CN107160249A (en) * | 2017-06-06 | 2017-09-15 | 何水明 | A kind of wall surface grinding device of construction and decoration |
CN107435902A (en) * | 2017-03-02 | 2017-12-05 | 陈菊蓉 | A kind of solar LED street lamp of automated cleaning |
CN107584662A (en) * | 2017-07-04 | 2018-01-16 | 宁波市鄞州明联物联科技有限公司 | A kind of Novel water conservancy constructing device |
CN107761535A (en) * | 2017-11-10 | 2018-03-06 | 浦江县飞通电子科技有限公司 | A kind of compact road reparation construction device |
CN107858902A (en) * | 2017-11-09 | 2018-03-30 | 遂昌鸿达机械设计有限公司 | A kind of repair apparatus of portable bridge road |
-
2018
- 2018-04-10 CN CN201810313411.4A patent/CN108517820A/en not_active Withdrawn
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19547104C2 (en) * | 1995-12-16 | 1998-04-09 | Marita Kirschner | Sweeper with a dirt hopper |
CN107435902A (en) * | 2017-03-02 | 2017-12-05 | 陈菊蓉 | A kind of solar LED street lamp of automated cleaning |
CN107097302A (en) * | 2017-05-29 | 2017-08-29 | 何纪全 | A kind of building decorative plates perforating device |
CN107160249A (en) * | 2017-06-06 | 2017-09-15 | 何水明 | A kind of wall surface grinding device of construction and decoration |
CN107584662A (en) * | 2017-07-04 | 2018-01-16 | 宁波市鄞州明联物联科技有限公司 | A kind of Novel water conservancy constructing device |
CN107858902A (en) * | 2017-11-09 | 2018-03-30 | 遂昌鸿达机械设计有限公司 | A kind of repair apparatus of portable bridge road |
CN107761535A (en) * | 2017-11-10 | 2018-03-06 | 浦江县飞通电子科技有限公司 | A kind of compact road reparation construction device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209062705U (en) | Grinding device is used in a kind of processing of automobile gear | |
CN103653203B (en) | Multi-function article for washing vegetable | |
CN108809219A (en) | A kind of household is convenient for the solar panel storing unit of adjusting | |
CN207509295U (en) | A kind of device for cleaning and being sliced for vegetables and fruits | |
CN209030153U (en) | Convenient for clean solar panel | |
CN104911859A (en) | Automatic brushing machine | |
CN209025504U (en) | A kind of landscape pond convenient for cleaning | |
CN208348136U (en) | A kind of rotation charging base for fan | |
CN108517820A (en) | A kind of novel bridge equipment | |
CN209105108U (en) | A kind of novel monocrystaline silicon solar cell component | |
CN108560456A (en) | A kind of bridge equipment | |
CN206910265U (en) | Automatic apparatus for scrubbing and washing | |
CN108527118A (en) | A kind of novel mechanical processing Workpiece treating apparatus | |
CN211008962U (en) | Small wind power generation device | |
CN108378750A (en) | A kind of cleaning mechanism | |
CN108517815A (en) | A kind of improved bridge equipment | |
CN108527099A (en) | A kind of improved mechanical processing Workpiece treating apparatus | |
CN210712080U (en) | Environment-friendly ready-made clothes dyeing machine | |
CN209175692U (en) | A kind of rotating machinery processing work platform | |
CN207919161U (en) | Multifunctional manual elutes cleaning machine | |
CN208892820U (en) | A kind of decontamination cabinet in oral cavity easy to remove | |
CN207921804U (en) | Handheld engineering box lamp | |
CN108527101A (en) | A kind of mechanical processing Workpiece treating apparatus | |
CN206897957U (en) | A kind of Chinese medicine clearing and drying device | |
CN108577682A (en) | A kind of modified cleaning equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20180911 |