CN108509695A - 一种中小流域暴雨洪水过程线形状推求方法 - Google Patents
一种中小流域暴雨洪水过程线形状推求方法 Download PDFInfo
- Publication number
- CN108509695A CN108509695A CN201810206473.5A CN201810206473A CN108509695A CN 108509695 A CN108509695 A CN 108509695A CN 201810206473 A CN201810206473 A CN 201810206473A CN 108509695 A CN108509695 A CN 108509695A
- Authority
- CN
- China
- Prior art keywords
- storm
- region
- flood
- design
- effective precipitation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F1/00—Methods, systems, or installations for draining-off sewage or storm water
- E03F1/001—Methods, systems, or installations for draining-off sewage or storm water into a body of water
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2111/00—Details relating to CAD techniques
- G06F2111/10—Numerical modelling
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/40—Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Health & Medical Sciences (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Geometry (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Life Sciences & Earth Sciences (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
本发明公开了一种中小流域暴雨洪水过程线形状推求方法,包括以下步骤,选取任一中小地域作为待检验地域,通过暴雨径流查算图表或水文手册查算统计该地域历时的设计暴雨,通过暴雨公式将该地域历时的设计暴雨转化为任一历时的设计暴雨,通过查阅该地域的水文手册确定损失参数,当设计暴雨和损失参数确定后,即可通过第一计算公式求出任一历时的净雨量以及平均净雨量,当净雨量和平均净雨量确定后,即可通过推理公式计算出洪峰流量值。本发明整个推求过程设计合理,过程严谨,采用线性的计算方法能够得到较为准确的洪水过程值,推求出来的数值与实际数值相差较小,便于对洪水灾害进行准确的预定,减少洪水对人们造成的财产损失。
Description
技术领域
本发明涉及暴雨洪水过程线形状推求技术领域,尤其涉及一种中小流域暴雨洪水过程线形状推求方法。
背景技术
中小流域通常是指集水面积不超过数百平方公里的小河小溪,但并无明确限制,一般认为流域面积在300~500km2以下可认为是中小流域,从水文角度看中小流域具有流域汇流以坡面汇流为主、水文资料缺乏、集水面积小等特性,中小流域设计洪水计算,与大流域相比,有许多特点,并且广泛应用于铁路、公路的小桥涵、中小型水利工程、农田、城市及厂矿排水等工程的规划设计中,因此水文学上常常作为一个专门的问题进行研究,中小流域设计洪水计算的主要特点是:绝大多数中小流域都没有水文站,即缺乏实测径流资料,甚至降雨资料也没有,因此中小流域设计洪水计算一般为无资料情况下的计算,中小流域面积小,自然地理条件趋于单一,拟定计算方法时,允许作适当的简化,即允许作出一些概化的假定,例如假定短历时的设计暴雨时空分布均匀。
中小流域设计洪水过程的推求方法有很多,但是大多数的推求方法计算过程比较简单,推求过程不够严谨,导致推求出来的数值与实际数值相差较大,显然已经无法满足人们的使用需求。
发明内容
基于背景技术存在的技术问题,本发明提出了一种中小流域暴雨洪水过程线形状推求方法。
本发明提出的一种中小流域暴雨洪水过程线形状推求方法,包括以下步骤:
S1:选取任一中小地域作为待检验地域,通过暴雨径流查算图表或水文手册查算统计该地域历时的设计暴雨;
S2:通过暴雨公式将该地域历时的设计暴雨转化为任一历时的设计暴雨;
S3:通过查阅该地域的水文手册确定损失参数,当设计暴雨和损失参数确定后,即可通过第一计算公式求出任一历时的净雨量以及平均净雨量;
S4:当净雨量和平均净雨量确定后,即可通过推理公式计算出洪峰流量值;
S5:将得到的洪峰流量值通过概化洪水过程线进行线性绘图;
S6:通过洪水过程线即可得到洪水过程计算公式,从而推求出洪水过程。
优选地,所述暴雨公式为Qy=Ψ·q·F,其中Qy为设计雨水流量,q为暴雨强度,F为汇水面积。
优选地,所述第一计算公式为或,其中t为暴雨历时,i为历时为t、频率为P的最大平均暴雨强度,SP为净雨量,n为暴雨衰减指数,d为损失参数,平均净雨量的计算公式为S=Sp/12,其中S为平均净雨量。
优选地,所述推理公式为,其中F、L、J为流域特征参数,SP、n为暴雨特征参数,产汇流参数。
优选地,所述S5中该地域洪峰流量值线性绘制时,应注意观察各洪峰流量值建立合理的坐标,坐标值之间的间隔应该适当,各洪峰流量值线条不能相交。
优选地,所述洪水过程计算公式为Qgm=RgF/1.8Tg,其中Rg为地下径流总量,Tg为地下径流历时。
本发明的有益效果为:本发明能够选取不同中小地域历时暴雨将该地域历时暴雨转换为任一历时的设计暴雨,然后通过设计暴雨依次计算出设计净雨和设计洪峰流量进而推求出洪水过程,整个推求过程设计合理,过程严谨,采用线性的计算方法能够得到较为准确的洪水过程值,推求出来的数值与实际数值相差较小,便于对洪水灾害进行准确的预定,减少洪水对人们造成的财产损失。
附图说明
图1为本发明提出的一种中小流域暴雨洪水过程线形状推求方法的流程结构示意图。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。
参照图1,一种中小流域暴雨洪水过程线形状推求方法,包括以下步骤:
S1:选取任一中小地域作为待检验地域,通过暴雨径流查算图表或水文手册查算统计该地域历时的设计暴雨;
S2:通过暴雨公式将该地域历时的设计暴雨转化为任一历时的设计暴雨;
S3:通过查阅该地域的水文手册确定损失参数,当设计暴雨和损失参数确定后,即可通过第一计算公式求出任一历时的净雨量以及平均净雨量;
S4:当净雨量和平均净雨量确定后,即可通过推理公式计算出洪峰流量值;
S5:将得到的洪峰流量值通过概化洪水过程线进行线性绘图;
S6:通过洪水过程线即可得到洪水过程计算公式,从而推求出洪水过程。
本发明中,暴雨公式为Qy=Ψ·q·F,其中Qy为设计雨水流量,q为暴雨强度,F为汇水面积。
本发明中,第一计算公式为或,其中t为暴雨历时,i为历时为t、频率为P的最大平均暴雨强度,SP为净雨量,n为暴雨衰减指数,d为损失参数,平均净雨量的计算公式为S=Sp/12,其中S为平均净雨量。
本发明中,推理公式为,其中F、L、J为流域特征参数,SP、n为暴雨特征参数,产汇流参数。
本发明中,S5中该地域洪峰流量值线性绘制时,应注意观察各洪峰流量值建立合理的坐标,坐标值之间的间隔应该适当,各洪峰流量值线条不能相交。
本发明中,洪水过程计算公式为Qgm=RgF/1.8Tg,其中Rg为地下径流总量,Tg为地下径流历时。
以上所述,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,根据本发明的技术方案及其发明构思加以等同替换或改变,都应涵盖在本发明的保护范围之内。
Claims (6)
1.一种中小流域暴雨洪水过程线形状推求方法,其特征在于,包括以下步骤:
S1:选取任一中小地域作为待检验地域,通过暴雨径流查算图表或水文手册查算统计该地域历时的设计暴雨;
S2:通过暴雨公式将该地域历时的设计暴雨转化为任一历时的设计暴雨;
S3:通过查阅该地域的水文手册确定损失参数,当设计暴雨和损失参数确定后,即可通过第一计算公式求出任一历时的净雨量以及平均净雨量;
S4:当净雨量和平均净雨量确定后,即可通过推理公式计算出洪峰流量值;
S5:将得到的洪峰流量值通过概化洪水过程线进行线性绘图;
S6:通过洪水过程线即可得到洪水过程计算公式,从而推求出洪水过程。
2.根据权利要求1所述的一种中小流域暴雨洪水过程线形状推求方法,其特征在于,所述暴雨公式为Qy=Ψ·q·F,其中Qy为设计雨水流量,q为暴雨强度,F为汇水面积。
3.根据权利要求1所述的一种中小流域暴雨洪水过程线形状推求方法,其特征在于,所述第一计算公式为或,其中t为暴雨历时,i为历时为t、频率为P的最大平均暴雨强度,SP为净雨量,n为暴雨衰减指数,d为损失参数,平均净雨量的计算公式为S=Sp/12,其中S为平均净雨量。
4.根据权利要求1所述的一种中小流域暴雨洪水过程线形状推求方法,其特征在于,所述推理公式为,其中F、L、J为流域特征参数,SP、n为暴雨特征参数,产汇流参数。
5.根据权利要求1所述的一种中小流域暴雨洪水过程线形状推求方法,其特征在于,所述S5中该地域洪峰流量值线性绘制时,应注意观察各洪峰流量值建立合理的坐标,坐标值之间的间隔应该适当,各洪峰流量值线条不能相交。
6.根据权利要求1所述的一种中小流域暴雨洪水过程线形状推求方法,其特征在于,所述洪水过程计算公式为Qgm=RgF/1.8Tg,其中Rg为地下径流总量,Tg为地下径流历时。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810206473.5A CN108509695A (zh) | 2018-03-13 | 2018-03-13 | 一种中小流域暴雨洪水过程线形状推求方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810206473.5A CN108509695A (zh) | 2018-03-13 | 2018-03-13 | 一种中小流域暴雨洪水过程线形状推求方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108509695A true CN108509695A (zh) | 2018-09-07 |
Family
ID=63377046
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810206473.5A Pending CN108509695A (zh) | 2018-03-13 | 2018-03-13 | 一种中小流域暴雨洪水过程线形状推求方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108509695A (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111339711A (zh) * | 2020-02-24 | 2020-06-26 | 三峡大学 | 一种小流域设计洪水推求方法 |
CN112052635A (zh) * | 2020-09-18 | 2020-12-08 | 福建省水土保持工作站 | 一种应用于小流域设计洪水过程线的求解方法 |
CN112231907A (zh) * | 2020-10-15 | 2021-01-15 | 浪潮云信息技术股份公司 | 一种流域设计洪水时空分布推算方法 |
CN112651099A (zh) * | 2019-11-11 | 2021-04-13 | 四川大学 | 一种基于gis的中小流域设计洪水模型 |
CN113111295A (zh) * | 2021-04-19 | 2021-07-13 | 黄河勘测规划设计研究院有限公司 | 一种淤地坝设计洪峰时暴雨递减指数的计算方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106951674A (zh) * | 2017-02-09 | 2017-07-14 | 陕西省水文水资源勘测局 | 一种无历史资料小流域洪水重现期推求方法 |
CN107729695A (zh) * | 2017-11-21 | 2018-02-23 | 中国水利水电科学研究院 | 一种用于小流域次洪模拟的水文模型率定方法 |
-
2018
- 2018-03-13 CN CN201810206473.5A patent/CN108509695A/zh active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106951674A (zh) * | 2017-02-09 | 2017-07-14 | 陕西省水文水资源勘测局 | 一种无历史资料小流域洪水重现期推求方法 |
CN107729695A (zh) * | 2017-11-21 | 2018-02-23 | 中国水利水电科学研究院 | 一种用于小流域次洪模拟的水文模型率定方法 |
Non-Patent Citations (3)
Title |
---|
张新田等: ""小流域设计洪水计算方法及应用"", 《水资源研究》 * |
百度文库: ""小流域设计洪水计算"", 《HTTPS://WENKU.BAIDU.COM/VIEW/F4A4B43825C52CC58AD6BE2F.HTML》 * |
闫大鹏等: "《城市生态水系统规划理论与实践》", 30 November 2016 * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112651099A (zh) * | 2019-11-11 | 2021-04-13 | 四川大学 | 一种基于gis的中小流域设计洪水模型 |
CN112651099B (zh) * | 2019-11-11 | 2023-03-14 | 四川大学 | 一种基于gis的中小流域设计洪水模型 |
CN111339711A (zh) * | 2020-02-24 | 2020-06-26 | 三峡大学 | 一种小流域设计洪水推求方法 |
CN111339711B (zh) * | 2020-02-24 | 2021-12-07 | 三峡大学 | 一种小流域设计洪水推求方法 |
CN112052635A (zh) * | 2020-09-18 | 2020-12-08 | 福建省水土保持工作站 | 一种应用于小流域设计洪水过程线的求解方法 |
CN112052635B (zh) * | 2020-09-18 | 2022-06-07 | 福建省水土保持工作站 | 一种应用于小流域设计洪水过程线的求解方法 |
CN112231907A (zh) * | 2020-10-15 | 2021-01-15 | 浪潮云信息技术股份公司 | 一种流域设计洪水时空分布推算方法 |
CN113111295A (zh) * | 2021-04-19 | 2021-07-13 | 黄河勘测规划设计研究院有限公司 | 一种淤地坝设计洪峰时暴雨递减指数的计算方法 |
CN113111295B (zh) * | 2021-04-19 | 2022-06-17 | 黄河勘测规划设计研究院有限公司 | 一种淤地坝设计洪峰时暴雨递减指数的计算方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108509695A (zh) | 一种中小流域暴雨洪水过程线形状推求方法 | |
Paquier et al. | From hydraulic modelling to urban flood risk | |
CN108022047A (zh) | 一种海绵城市水文计算方法 | |
CN108681848A (zh) | 一种“三位一体”小型水库或淤地坝汛期预警方法 | |
Burkard et al. | Initiation and evolution of gullies along the shoreline of Lake Huron | |
CN103886151B (zh) | 不同暴雨情景下城市下凹式立交桥区简化水力模型构建方法 | |
CN111090925B (zh) | 基于免管护淤地坝防溃决的洪水计算方法 | |
CN110222427A (zh) | 一种基于数学模型城市内涝的分析方法 | |
Bhandari et al. | Flood damage reduction in urban areas with use of low impact development designs | |
CN211228538U (zh) | 一种道路边坡的加固结构 | |
Rezaei‐Sadr | Flood hydrograph prediction in a semiarid mountain catchment: The role of catchment subdivision | |
CN108280792A (zh) | 一种变化环境下设计暴雨洪水同频率假定检验方法 | |
Ghasemizade et al. | Estimation of design flood hydrograph for an ungauged watershed | |
CN110596345A (zh) | 一种旱涝急转标准的计算方法 | |
Narayan et al. | GIS supported geomorphologic instantaneous unit hydrograph (GIUH) of Varuna river basin using geomorphological characteristics | |
Hrushikesh et al. | Flood Frequency Analysis and Assessment of Submergence Level for the Mathikere Catchment-A Flood Resilient Region in Bengaluru | |
Prodanovic et al. | Generation of synthetic design storms for the Upper Thames River basin | |
CN105740812B (zh) | 一种基于数字表面模型的城市汇水区提取方法 | |
CN111733833B (zh) | 基于凹槽土体特征的低频泥石流沟判识方法 | |
Aziz et al. | Flood Disaster in Erbil City: Problems and Solutions | |
Meierdiercks et al. | The effectiveness of centralized versus decentralized green infrastructure in improving Water Quality and reducing flooding at the Catchment Scale | |
Afrin et al. | Assessment of future flow of Hatirjheel-Begunbari drainage system due to climate change | |
CN107967383A (zh) | 一种基于分布式tin单元的tric径流指数预警方法 | |
Odiero et al. | Rainfall-Runoff Nexus in Mid-block of Yala Catchment | |
CN204418357U (zh) | 一种马路雨水井防堵塞井盖 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20201228 Address after: 514000 meizigang, eastern suburb of Meizhou City, Guangdong Province Applicant after: JIAYING University Address before: 510075 one of the compound No. 100, Xianlie Middle Road, Guangzhou City, Guangdong Province Applicant before: GUANGZHOU INSTITUTE OF GEOGRAPHY |
|
TA01 | Transfer of patent application right | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180907 |
|
RJ01 | Rejection of invention patent application after publication |