CN108508542B - Manufacturing method of optical fiber movable connector - Google Patents

Manufacturing method of optical fiber movable connector Download PDF

Info

Publication number
CN108508542B
CN108508542B CN201810285882.9A CN201810285882A CN108508542B CN 108508542 B CN108508542 B CN 108508542B CN 201810285882 A CN201810285882 A CN 201810285882A CN 108508542 B CN108508542 B CN 108508542B
Authority
CN
China
Prior art keywords
optical fiber
glue
grinding
core
clamping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810285882.9A
Other languages
Chinese (zh)
Other versions
CN108508542A (en
Inventor
邵继保
槐恩伟
冯青凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yibo Communication Equipment Group Co ltd
Original Assignee
Yibo Communication Equipment Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yibo Communication Equipment Group Co ltd filed Critical Yibo Communication Equipment Group Co ltd
Priority to CN201810285882.9A priority Critical patent/CN108508542B/en
Publication of CN108508542A publication Critical patent/CN108508542A/en
Application granted granted Critical
Publication of CN108508542B publication Critical patent/CN108508542B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G02OPTICS
    • G02BOPTICAL ELEMENTS, SYSTEMS OR APPARATUS
    • G02B6/00Light guides; Structural details of arrangements comprising light guides and other optical elements, e.g. couplings
    • G02B6/24Coupling light guides
    • G02B6/36Mechanical coupling means
    • G02B6/38Mechanical coupling means having fibre to fibre mating means
    • G02B6/3807Dismountable connectors, i.e. comprising plugs
    • G02B6/3898Tools, e.g. handheld; Tuning wrenches; Jigs used with connectors, e.g. for extracting, removing or inserting in a panel, for engaging or coupling connectors, for assembling or disassembling components within the connector, for applying clips to hold two connectors together or for crimping

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Mechanical Coupling Of Light Guides (AREA)

Abstract

The invention discloses a manufacturing method of an optical fiber movable connector, which is used for assembling the optical fiber movable connector and an optical fiber, wherein the optical fiber movable connector comprises a dustproof cap, a frame sleeve, a screw cap, a ferrule, a spring, a stop ring, a ferrule, a snap ring and a tail sheath, and the manufacturing method of the optical fiber movable connector comprises the following steps: the method comprises the steps of material preparation, optical fiber blanking, part penetrating and fiber core stripping, glue mixing, bubble clearing in glue, core inserting and glue dispensing, core inserting, core baking, fiber cutting, assembling, grinding and testing. The whole assembly process of the invention is simpler, not only improves the working efficiency, but also reduces the error probability, and is provided with a plurality of detection procedures, thereby facilitating the quality control.

Description

Manufacturing method of optical fiber movable connector
Technical Field
The invention relates to the technical field of optical fiber communication, in particular to a manufacturing method of an optical fiber movable connector.
Background
In the optical fiber communication field, optic fibre passes through optic fibre connector interconnect, and optic fibre connector is important, indispensable part, and current optic fibre connector is at the in-process of preparation, because the problem of technology self for whole assembling process is comparatively loaded down with trivial details, influences work efficiency, and finished goods defective percentage is higher moreover, is unfavorable for the control of quality.
Disclosure of Invention
The invention aims to avoid the defects in the prior art and provides a manufacturing method of an optical fiber movable connector, thereby effectively solving the defects in the prior art.
In order to achieve the purpose, the invention adopts the technical scheme that: the manufacturing method of the optical fiber movable connector is used for assembling the optical fiber movable connector and an optical fiber, the optical fiber movable connector comprises a dustproof cap, a frame sleeve, a screw cap, a ferrule, a spring, a stop ring, a clamping sleeve, a clamping ring and a tail protective sleeve, and the manufacturing method of the optical fiber movable connector comprises the following steps:
material preparation: preparing each component of the optical fiber movable connector, wherein each component comprises the dustproof cap, a frame sleeve, a screw cap, a ferrule, a spring, a stop ring, a clamping sleeve, a clamping ring and a tail sheath;
optical fiber blanking: the optical fiber roller is arranged on a cable cutting machine, and then the optical fiber is fed into a material cutting mechanism to be cut into required length;
a step of penetrating parts and stripping fiber cores: penetrating the cut optical fibers in the optical fiber blanking step from the small-opening end of the tail sheath, moving the tail sheath to a position 40cm away from the head of the optical fibers, bundling 12 optical fibers by using adhesive tape paper, sequentially penetrating the optical fibers into the snap ring, the snap sleeve, the stop ring and the spring, and moving the sleeved snap ring, the snap sleeve, the stop ring and the spring to a position 30cm away from the head of the optical fibers; stripping a part of the outer sheath of the head of the optical fiber by using a wire stripping pliers to expose 2.5cm of the stripped buffer layer, and then shearing off part of the buffer layer to leave 2cm of the exposed buffer layer; pulling out the buffer layer by 1.3cm by using wire stripping pliers to expose the fiber core; cleaning the stripped optical fiber by using non-scrap wiping paper soaked with alcohol; binding the optical fibers with the parts and orderly hanging the optical fibers on a hook of a suspension line;
glue mixing step: mixing 353ND glue and a curing agent according to a ratio of 10: 1, and uniformly stirring to obtain glue;
removing bubbles in the glue: putting the glue prepared in the glue mixing step into a measuring cup, then putting the measuring cup into a vacuum machine, starting the vacuum machine and running for 21 minutes to obtain glue without air bubbles; taking out the glue from the vacuum machine, pouring the glue into an injection glue barrel with a screwed needle head in advance, correctly placing a glue valve into the injection glue barrel by using tweezers, taking the position as the standard for contacting the injected glue surface, and screwing a glue barrel adapter;
and a step of core insert glue dispensing: injecting glue to the inserting core through an injecting glue barrel;
inserting a fiber core: placing the core insert with the point glue in the core insert glue dispensing step into an oven, hanging the optical fiber completed in the step of penetrating and peeling the fiber core on an oven bracket, inserting the fiber core of the optical fiber into the core insert, enabling the fiber core to be exposed by 2-4mm, and slowly rotating and moving the fiber core for 2 times in the front-back direction to enable the glue to be uniformly and respectively in the inner hole of the core insert;
modifying the shape of the glue drop at the tail part of the inserting core by using a tool;
and (3) baking the fiber core: starting the oven, setting the temperature of the oven to be 120 ℃, and baking for 15 minutes;
fiber cutting: cutting off the fiber core exposed out of the end face of the ferrule by using a ruby tool;
assembling: inserting the spring and the stop ring to the tail of the insertion core; pulling out the buffer layer and the outer sheath of the optical fiber from the tail part of the stop ring, uniformly wrapping the buffer layer on the knurled part at the tail part of the stop ring, clamping the clamping sleeve in the clamping way, firstly clamping the optical fiber for the first time by using a clamping machine, and then rotating the optical fiber for 90 degrees and then clamping the optical fiber for the second time; the outer sheath is pulled out from the tail part of the clamping sleeve, the outer sheath is divided into an upper piece and a lower piece which are wrapped outside the tail end of the clamping ring, and the clamping ring is clamped by a hexagonal clamping seat of a clamping machine; pushing the tail sheath into a clamping groove of the stop ring; threading the nut on the stop ring; dripping a little of thread glue on the thread of the stop ring, screwing the stop ring and the frame sleeve through the thread, and limiting a screw cap between the stop ring and the frame sleeve by left and right movement to obtain the assembled optical fiber movable connector;
grinding: the inserting core of the optical fiber movable connector assembled in the assembling step is arranged in a special grinding clamp for removing glue and grinding;
the testing steps are as follows: and after the test is qualified, packaging to obtain a finished product.
Further, the metal parts of the parts in the preparation step are required to pass a salt spray test for 48 hours.
Further, the glue obtained in the glue mixing step is used up within 2 hours.
Further, after the assembled optical fiber actuator is obtained in the assembling step, whether the inserting core has elasticity or not is pressed on the chipless paper, and the optical fiber actuator is disassembled inelastically and is installed again.
Further, the test in the test step comprises end face detection, insertion return loss test and end face reinspection in sequence.
Further, the end face detection includes the steps of:
turning on the power supply of the end face inspection tester and the monitor;
checking whether residual glue exists on the surface of the ferrule column body, if so, removing the residual glue, and cleaning the ferrule column body with alcohol;
inserting the ferrule into an adapter hole of a corresponding type of the detector, adjusting the longitudinal distance of a lens of the end detector until the end face of the ferrule magnified 400 times is clearly seen in a monitor screen, checking whether the end face of the ferrule has scratches, pits, bubbles, color spots and the like, and reworking if defects exist;
and respectively storing the good inserting core and the defective inserting core.
Further, the insertion return loss test is completed by using an insertion return loss detector.
Further, the operation method of the end face rechecking and the end face detection is the same, and whether the confirmed end face of the ferrule is damaged in the insertion return loss test is detected again.
The technical scheme of the invention has the following beneficial effects: the whole assembly process of the invention is simpler, not only improves the working efficiency, but also reduces the error probability, and is provided with a plurality of detection procedures, thereby facilitating the quality control.
Drawings
FIG. 1 is an exploded view of an optical fiber pigtail connector of an embodiment of the present invention;
FIG. 2 is an assembled view of an optical fiber mobility connector according to an embodiment of the present invention;
fig. 3 is a partially enlarged view of a portion a in fig. 2.
Detailed Description
The embodiments of the present invention will be described in further detail with reference to the drawings and examples. The following examples are intended to illustrate the invention but are not intended to limit the scope of the invention.
In the description of the present invention, "a plurality" means two or more unless otherwise specified; the terms "upper", "lower", "left", "right", "inner", "outer", "front", "rear", "head", "tail", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, are only for convenience in describing and simplifying the description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed in a particular orientation, and be operated, and thus, should not be construed as limiting the invention. In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "connected" and "connected" are to be interpreted broadly, e.g., as being fixed or detachable or integrally connected; can be mechanically or electrically connected; may be directly connected or indirectly connected through an intermediate. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
A manufacturing method of an optical fiber connector is used for assembling the optical fiber connector and an optical fiber 10, the optical fiber connector comprises a dustproof cap 1, a frame sleeve 2, a screw cap 3, a ferrule 4, a spring 5, a stop ring 6, a ferrule 7, a snap ring 8 and a tail sheath 9, and the manufacturing method of the optical fiber connector comprises the following steps:
material preparation: preparing each component part of the optical fiber movable connector, wherein the component part comprises a dustproof cap 1, a frame sleeve 2, a screw cap 3, a ferrule 4, a spring 5, a stop ring 6, a clamping sleeve 7, a clamping ring 8 and a tail sheath 9, the metal part of the component part in the step is required to be subjected to a 48h salt spray test, and the frame sleeve 2, the screw cap 3, the spring 5, the stop ring 6, the clamping sleeve 7 and the clamping ring 8 are metal parts;
optical fiber blanking: the optical fiber roller is arranged on a cable cutting machine, then the optical fiber is fed into a material cutting mechanism, and the optical fiber 10 is cut into required length;
a step of penetrating parts and stripping fiber cores: penetrating the cut optical fibers 10 in the optical fiber blanking step from the small-opening end of a tail sheath 9, moving the tail sheath 9 to a position 40cm away from the head of the optical fiber, bundling 12 optical fibers by using adhesive tape paper, sequentially penetrating the optical fibers into a clamping ring 8, a clamping sleeve 7, a stop ring 6 and a spring 5, and moving the sleeved clamping ring 8, clamping sleeve 7, stop ring 6 and spring 5 to a position 30cm away from the head of the optical fiber; stripping a part of the outer sheath 10a at the head of the optical fiber 10 by using a wire stripper to expose 2.5cm of the buffer layer 10b after stripping, wherein the buffer layer 10b is an aramid fiber layer, and then cutting off part of the buffer layer 10b to leave 2cm of the exposed buffer layer 10 b; pulling out the buffer layer 10b by 1.3cm by using wire stripping pliers to expose the fiber core 10 c; cleaning the stripped optical fiber by using non-scrap wiping paper soaked with alcohol; binding the optical fibers 10 with the parts, orderly hanging the optical fibers on a hook of a suspension line, and flowing into the next process;
it should be noted that the optical fiber 10 includes, in order from outside to inside, an outer sheath 10a, a buffer layer 10b, and a fiber core 10 c;
glue mixing step: the 353ND glue and a curing agent are mixed according to the proportion of 10: 1, the glue is obtained after uniform stirring, the glue is used up within 2 hours, and the glue is slowly stirred clockwise by a toothpick during stirring, wherein the 353ND glue is special glue for optical fiber bonding;
removing bubbles in the glue: putting the glue prepared in the glue mixing step into a measuring cup, then putting the measuring cup into a vacuum machine, starting the vacuum machine and running for 21 minutes to obtain glue without air bubbles; taking out the glue from the vacuum machine, pouring the glue into an injection glue barrel with a screwed needle head in advance, correctly placing a glue valve into the injection glue barrel by using tweezers, taking the position as the standard for contacting the injected glue surface, and screwing a glue barrel adapter;
the injection glue barrel is a special device for injecting glue;
and a step of core insert glue dispensing: injecting glue into the insertion core 4 through the glue injection barrel, and coating the glue into an inner hole 4a of the insertion core 4 through the glue injection barrel;
inserting a fiber core: placing the core insert 4 subjected to glue dispensing in the core insert glue dispensing step into an oven, hanging the optical fiber finished in the step of penetrating parts and peeling the fiber core on an oven support, inserting the fiber core 10c of the optical fiber into the inner hole 4a of the core insert 4, enabling the fiber core 10c to be exposed for 2-4mm at the other side, namely protruding out of the left end face of the core insert 4 for 2-4mm, and slowly rotating and moving the fiber core for 2 times in a front-back mode to enable glue to be uniformly and respectively in the inner hole of the core insert 4;
modifying the shape of the glue drop at the tail part of the inserting core 4 by using a tool, wherein the tool can be a toothpick;
and (3) baking the fiber core: starting the oven, setting the temperature of the oven to be 120 ℃, and baking for 15 minutes;
fiber cutting: cutting off the fiber core exposed out of the end face of the ferrule 4 by using a ruby tool;
assembling: inserting the spring 5 and the stop ring 6 to the tail part of the ferrule 4; pulling out the buffer layer 10b and the outer sheath 10a of the optical fiber from the tail part of the stop ring 6, uniformly wrapping the buffer layer on the knurled part 6a at the tail part of the stop ring 6, clamping the clamping sleeve 7 in, firstly clamping by using a clamping machine, and then rotating by 90 degrees and then clamping again; the outer sheath is pulled out from the tail part of the clamping sleeve 7, the outer sheath is divided into an upper piece and a lower piece which are wrapped outside the tail end of the clamping ring 8, and the clamping ring 8 is sleeved on the clamping ring and clamped by a hexagonal clamping seat of a clamping machine; the tail sheath 9 is pushed into a clamping groove of the stop ring 6; the screw cap 3 is threaded on the stop ring 6; dripping a little of thread glue on the thread of the stop ring 6, screwing the stop ring 6 and the frame sleeve 2 through the thread, limiting the screw cap 3 between the stop ring 6 and the frame sleeve 2 in a left-right movable manner, and penetrating the dustproof cap 1 on the inserting core 4 to obtain the assembled optical fiber movable connector;
after the assembled optical fiber actuator is obtained in the assembling step, pressing whether the inserting core 4 has elasticity or not on the chipless paper, and disassembling and re-installing inelastically;
grinding: the inserting core 4 of the optical fiber movable connector assembled in the assembling step is arranged in a special grinding clamp for removing glue and grinding;
the specific photoresist removing step is as follows: checking whether glue exists at the periphery of the ferrule 4 and the tail handle, mounting the qualified ferrule 4 into a special grinding fixture, and paying attention to the fact that 12 ferrules 4 are required to be assembled, if the ferrules 4 are less than 12, considering uniform distribution or supplementing positions by using the waste ferrules 4; bundling the optical fibers by using a bundling wire at a position 15cm away from the grinding clamp; flatly placing the 800# abrasive paper on a grinding rubber pad, installing a clamp to remove the rubber, and removing the rubber until the rubber is completely removed;
the specific grinding steps are as follows: cleaning the ground paper by using purified water and chipless paper, and blowing the ground paper clean by using an air gun; uniformly dripping a circle of purified water on the grinding paper, hanging the optical fiber on a wire hanging frame, installing a grinding clamp on a grinding machine for coarse grinding, taking down the grinding clamp after coarse grinding for cleaning, and then performing middle grinding and polishing according to the steps, wherein the specific grinding time and grinding pressure are shown in the following table:
grinding step Abrasive paper Sand grinding fluid Grinding time (seconds)
Resist stripping 30μ 35-40
Coarse grinding Purified water 35-40
Middle mill Purified water 35-40
Polishing and grinding machine 0.02μ Purified water 25-35
Figure BSA0000161713320000071
The testing steps are as follows: and after the test is qualified, packaging to obtain a finished product.
The test in the test step comprises end face detection, insertion return loss test and end face reinspection in sequence.
The end face detection comprises the following steps:
turning on the power supply of the end face inspection tester and the monitor; checking whether residual glue exists on the surface of the cylinder body of the ferrule 4, if so, removing the residual glue, and cleaning the residual glue with alcohol; inserting the ferrule 4 into an adapter hole of a corresponding model of the detector, adjusting the longitudinal distance of a lens of the end detector until the end face of the ferrule 4 amplified by 400 times is clearly seen in a monitor screen, checking whether the end face of the ferrule 4 has scratches, pits, bubbles, color spots and the like, and reworking if the end face has defects; and storing the good ferrule 4 and the defective ferrule 4 respectively.
The insertion return loss test is completed by using an insertion return loss detector.
The end face rechecking is the same as the operation method of the end face detection, and the end face of the ferrule 4 is detected again to determine whether the end face is damaged in the insertion return loss test.
The embodiments of the present invention have been presented for purposes of illustration and description, and are not intended to be exhaustive or limited to the invention in the form disclosed. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiment was chosen and described in order to best explain the principles of the invention and the practical application, and to enable others of ordinary skill in the art to understand the invention for various embodiments with various modifications as are suited to the particular use contemplated.

Claims (1)

1. The manufacturing method of the optical fiber movable connector is used for assembling the optical fiber movable connector and an optical fiber, and the optical fiber movable connector comprises a dustproof cap, a frame sleeve, a screw cap, a ferrule, a spring, a stop ring, a clamping sleeve, a clamping ring and a tail sheath, and is characterized by comprising the following steps:
material preparation: preparing each component of the optical fiber movable connector, wherein each component comprises the dustproof cap, a frame sleeve, a screw cap, a ferrule, a spring, a stop ring, a clamping sleeve, a clamping ring and a tail sheath;
optical fiber blanking: the optical fiber roller is arranged on a cable cutting machine, and then the optical fiber is fed into a material cutting mechanism to be cut into required length;
a step of penetrating parts and stripping fiber cores: penetrating the cut optical fiber in the optical fiber blanking step from the small-opening end of the tail sheath, moving the tail sheath to a position 40cm away from the head of the optical fiber, sequentially penetrating the optical fiber into the snap ring, the snap sleeve, the stop ring and the spring, and moving the sleeved snap ring, the snap sleeve, the stop ring and the spring to a position 30cm away from the head of the optical fiber; stripping a part of the outer sheath of the head of the optical fiber by using a wire stripping pliers to expose 2.5cm of the stripped buffer layer, and then shearing off part of the buffer layer to leave 2cm of the exposed buffer layer; pulling out the buffer layer by 1.3cm by using wire stripping pliers to expose the fiber core; cleaning the stripped optical fiber by using non-scrap wiping paper soaked with alcohol; binding the optical fibers with the parts and orderly hanging the optical fibers on a hook of a suspension line;
glue mixing step: mixing 353ND glue and a curing agent according to a ratio of 10: 1, and uniformly stirring to obtain glue;
removing bubbles in the glue: putting the glue prepared in the glue mixing step into a measuring cup, then putting the measuring cup into a vacuum machine, starting the vacuum machine and running for 21 minutes to obtain glue without air bubbles; taking out the glue from the vacuum machine, and pouring the glue into an injection glue barrel with a screwed needle head in advance;
and a step of core insert glue dispensing: injecting glue to the inserting core through an injecting glue barrel;
inserting a fiber core: placing the core insert with the point glue in the core insert glue dispensing step into an oven, hanging the optical fiber completed in the step of penetrating and peeling the fiber core on an oven bracket, inserting the fiber core of the optical fiber into the core insert, enabling the fiber core to be exposed by 2-4mm, and slowly rotating and moving the fiber core for 2 times in the front-back direction to enable the glue to be uniformly and respectively in the inner hole of the core insert;
modifying the shape of the glue drop at the tail part of the inserting core by using a tool;
and (3) baking the fiber core: starting the oven, setting the temperature of the oven to be 120 ℃, and baking for 15 minutes;
fiber cutting: cutting off the fiber core exposed out of the end face of the ferrule by using a ruby tool;
assembling: inserting the spring and the stop ring to the tail of the insertion core; pulling out the buffer layer and the outer sheath of the optical fiber from the tail part of the stop ring, uniformly wrapping the buffer layer on the knurled part at the tail part of the stop ring, clamping the clamping sleeve in the clamping way, firstly clamping the optical fiber for the first time by using a clamping machine, and then rotating the optical fiber for 90 degrees and then clamping the optical fiber for the second time; the outer sheath is pulled out from the tail part of the clamping sleeve, the outer sheath is divided into an upper piece and a lower piece which are wrapped outside the tail end of the clamping ring, and the clamping ring is clamped by a hexagonal clamping seat of a clamping machine; pushing the tail sheath into a clamping groove of the stop ring; threading the nut on the stop ring; dropping a little of thread glue on the thread of the stop ring, screwing the stop ring and the inside of the frame sleeve through the thread, limiting a screw cap between the stop ring and the frame sleeve by the left-right movable limit, and penetrating a dustproof cap on the insertion core to obtain the assembled optical fiber movable connector;
grinding: the inserting core of the optical fiber movable connector assembled in the assembling step is arranged in a special grinding clamp for removing glue and grinding;
wherein, the step of removing photoresist is as follows: checking whether glue exists around the ferrule and at the tail handle, mounting the qualified ferrules into a special grinding fixture, and mounting the qualified ferrules in place, wherein 12 ferrules are mounted in a group and uniformly distributed each time, and if the ferrules are insufficient, the position is supplemented by the waste ferrules; bundling the optical fibers by using a bundling wire at a position 15cm away from the grinding clamp; flatly placing the 800# abrasive paper on a grinding rubber pad, installing a clamp to remove the rubber until the rubber is completely removed;
wherein, the grinding step is as follows: cleaning the ground paper by using purified water and chipless paper, and blowing the ground paper clean by using an air gun; uniformly dripping a circle of purified water on the grinding paper, hanging the optical fiber on a wire hanging frame, installing a grinding clamp on a grinding machine for coarse grinding, and taking down the grinding clamp for cleaning after coarse grinding;
in the grinding step, 30 mu of grinding paper is adopted for removing glue, 9 mu of grinding paper is adopted for coarse grinding, 1 mu of grinding paper is adopted for middle grinding, 0.02 mu of grinding paper is adopted for polishing, purified water is adopted for grinding liquid of the coarse grinding, the middle grinding and the polishing, and when the grinding machine is started, the grinding machine is firstly operated for a plurality of circles and then pressure is applied;
the testing steps are as follows: after the test is qualified, packaging to obtain a finished product;
the metal parts of the parts in the material preparation step are required to pass a salt spray test for 48 hours;
the glue obtained in the glue mixing step is used up within 2 hours;
after the assembled optical fiber actuator is obtained in the assembling step, whether the inserting core has elasticity or not is pressed on the chipless paper, and the optical fiber actuator is disassembled inelastically and is installed again;
the test in the test step comprises end face detection, insertion return loss test and end face reinspection in sequence;
the end face detection comprises the following steps:
turning on the power supply of the end face inspection tester and the monitor;
checking whether residual glue exists on the surface of the ferrule column body, if so, removing the residual glue, and cleaning the ferrule column body with alcohol;
inserting the ferrule into an adapter hole of a corresponding type of the detector, adjusting the longitudinal distance of a lens of the end detector until the end face of the ferrule magnified 400 times is clearly seen in a monitor screen, checking whether the end face of the ferrule has scratches, pits, bubbles, color spots and the like, and reworking if defects exist;
respectively storing the good inserting core and the defective inserting core;
the insertion return loss test is completed by using an insertion return loss detector;
and the end face rechecking and the end face detection have the same operation method, and whether the confirmed end face of the ferrule end face is damaged in the insertion return loss test is detected again.
CN201810285882.9A 2018-04-03 2018-04-03 Manufacturing method of optical fiber movable connector Active CN108508542B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810285882.9A CN108508542B (en) 2018-04-03 2018-04-03 Manufacturing method of optical fiber movable connector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810285882.9A CN108508542B (en) 2018-04-03 2018-04-03 Manufacturing method of optical fiber movable connector

Publications (2)

Publication Number Publication Date
CN108508542A CN108508542A (en) 2018-09-07
CN108508542B true CN108508542B (en) 2020-09-08

Family

ID=63379758

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810285882.9A Active CN108508542B (en) 2018-04-03 2018-04-03 Manufacturing method of optical fiber movable connector

Country Status (1)

Country Link
CN (1) CN108508542B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112105978B (en) * 2019-01-08 2022-11-08 住友电气工业株式会社 Method for manufacturing optical connector
CN110333578A (en) * 2019-07-04 2019-10-15 中天宽带技术有限公司 A kind of production method and fiber active linker of high-performance optical fiber flexible jumper
CN110576348A (en) * 2019-09-24 2019-12-17 宁波阳光和谱光电科技有限公司 Low insertion loss As2S3Method for processing end face of optical fiber connector
CN113495329B (en) * 2021-07-07 2022-06-28 上海晶鹰光电科技有限公司 Method for manufacturing multimode large-wire-diameter suspended SMA (shape memory alloy) optical fiber connector
CN114400498A (en) * 2022-02-18 2022-04-26 山东华光光电子股份有限公司 Semiconductor laser capable of improving uniformity of output light spots and preparation method thereof
CN114706170A (en) * 2022-03-31 2022-07-05 江苏威晟轨道交通科技有限公司 Vehicle-mounted jumper production process

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003311597A (en) * 2002-04-30 2003-11-05 Totoku Electric Co Ltd Method and apparatus for slantly grinding end face of optical fiber
CN102841411B (en) * 2012-09-05 2014-07-23 武汉隽龙科技有限公司 SC type optical fiber connector with light filtering function and manufacturing technology thereof
JP2015077648A (en) * 2013-10-16 2015-04-23 並木精密宝石株式会社 Optical fiber end face grinder
CN106291824B (en) * 2015-04-29 2018-09-14 高安天孚光电技术有限公司 A kind of through-type fiber connector assembly technology
CN205720780U (en) * 2016-03-31 2016-11-23 河北东合通信设备有限公司 FC type fiber active linker loose mail

Also Published As

Publication number Publication date
CN108508542A (en) 2018-09-07

Similar Documents

Publication Publication Date Title
CN108508542B (en) Manufacturing method of optical fiber movable connector
CN108241191B (en) Process flow for automatically producing optical fiber connector
JPH02264907A (en) Cleaning implement for optical connector
JPS61117511A (en) Connector for optical fiber and connection therefor
CN113740973B (en) Flexible optical fiber circuit and manufacturing method thereof
CN107608032B (en) Optical fiber alignment device, ferrule device and method for manufacturing ferrule device
WO2002004998A1 (en) Optical fiber wire holder, fused connection device, cutting device, and method of connecting optical fiber
US11150413B2 (en) Molded ferrules for optical fibers
US6962446B2 (en) Method for fabricating an optical plug connector, device for carrying out the method, and plug connector for use in such a method
CN106019492A (en) Production technology for formed end rubber-insulated jumper wire
US5283849A (en) Optical connector preassembly
US5323475A (en) Optical connector
CN114217386B (en) Manufacturing method of optical fiber jumper
CN109283131B (en) Optical fiber coloring and curing degree detection device and detection method
EP3338118B1 (en) Automatic fiber cleaning system and method
JP2001208931A (en) Fusion splicing method, fusion splicing machine and coat removing device for optical fiber
CN104678523A (en) Portable coiling and storing device of tail fibers
JP4045677B2 (en) Optical fiber mounting method
CN106461876A (en) Optical fiber connector and assembly method thereof
CN110908038A (en) Large-core-number loose fiber optical cable splicing process
CN114706170A (en) Vehicle-mounted jumper production process
CN112859360B (en) Debugging method based on collimator coupling system
CN113495329B (en) Method for manufacturing multimode large-wire-diameter suspended SMA (shape memory alloy) optical fiber connector
CN205004607U (en) End needle instrument suit moves back
CN112797892B (en) Optical fiber clamping mechanism and calibration method of optical fiber parameter testing equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A Fabrication Method of Optical Fiber Movable Connector

Effective date of registration: 20221221

Granted publication date: 20200908

Pledgee: Bank of China Limited by Share Ltd. Cangzhou branch

Pledgor: YIBO COMMUNICATION EQUIPMENT GROUP Co.,Ltd.

Registration number: Y2022980027194

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20200908

Pledgee: Bank of China Limited by Share Ltd. Cangzhou branch

Pledgor: YIBO COMMUNICATION EQUIPMENT GROUP Co.,Ltd.

Registration number: Y2022980027194

PC01 Cancellation of the registration of the contract for pledge of patent right